6 0 392 KB
GAMBAR As Built Drawing DESA PENGLATAN KEC. BULELENG KAB. BULELENG
BRONCAPTERING
SKEMA JARINGAN PIPANISASI DESA PENGLATAN
RESERVOAR (Existing) SI N
BA RA RA GA A M JA
PAMSIMAS III - 2020 KABUPATEN BULELENG PROVINSI BALI KEGIATAN :
RESERVOAR TOWER (Existing)
PIPA TRANSMISI (HDPE PN 10) L = 432 m d : 4"
BAK BAGI
PIPA TRANSMISI (HDPE PN 16) L = 400 m d : 2"
PEKERJAAN : SISTEM PENYEDIAAN AIR MINUM DESA PENGLATAN KECAMATAN BULELENG PIPA TRANSMISI (HDPE PN 16) L = 100 m d : 2"
PIPA TRANSMISI (Existing)
BRONCAPTERING PIPA TRANSMISI EXISTING (Existing)
PROGRAM PAMSIMAS III TAHUN 2020
PIPA TRANSMISI (HDPE PN 16) L = 700 m d : 2"
MENGETAHUI : DPMU KABUPATEN BULELENG
GEDE SUHARJONO, ST, MT 19820122 200604 1 008
POMPA PAMSIMAS
MENYETUJUI : SENIOR FASILITATOR KABUPATEN BULELENG
BRONCAPTERING (Existing)
PUTU SUNANTO, ST DIPERIKSA :
RESERVOAR (Existing)
TFM WSS
PIPA Distribusi L = 100 m d : 2"
I PUTU AGUS SATYA MAHARDIKA, S.T DIBUAT OLEH : KETUA SATLAK
(KOMANG MERTAYASA) JUDUL GAMBAR : PIPA DISTRIBUSI JARINGAN PIPA DESA PENGLATAN
SI N
BA RA RA GA A M JA
PAMSIMAS III - 2020 KABUPATEN BULELENG PROVINSI BALI KEGIATAN : PROGRAM PAMSIMAS III TAHUN 2020
Muka aspal Sirtu
PEKERJAAN : SISTEM PENYEDIAAN AIR MINUM DESA PENGLATAN KECAMATAN BULELENG
Batu pecah 5/7
MENGETAHUI : DPMU KABUPATEN BULELENG
Tanah Urug
0.60
0.40 0. Tanah Urug
GEDE SUHARJONO, ST, MT 19820122 200604 1 008 MENYETUJUI : SENIOR FASILITATOR KABUPATEN BULELENG
PUTU SUNANTO, ST
0.10
0.09 0.
0.10
0.10
0.05
0.10
DIPERIKSA : TFM WSS
GALIAN TANAH BIASA
GALIAN JALAN ASPAL I PUTU AGUS SATYA MAHARDIKA, S.T DIBUAT OLEH : KETUA SATLAK
POTONGAN GALIAN PIPA
(KOMANG MERTAYASA) JUDUL GAMBAR :
GALIAN PIPA
Kayu 8/12
+ 2.70
Atap seng gelombang SI N
+ 2.40
2,50
BA RA RA GA A M JA
PAMSIMAS III - 2020 KABUPATEN BULELENG PROVINSI BALI
+ 2.10
KEGIATAN :
Ring 15/15 PROGRAM PAMSIMAS III TAHUN 2020 PEKERJAAN :
+1
Dinding keramik 20 X 25
+ 0.75
SISTEM PENYEDIAAN AIR MINUM DESA PENGLATAN KECAMATAN BULELENG
Lantai keramik + 0.25 0.00 - 0.20
Rabat beton (tb 6 cm) Sloof 15/20
MENGETAHUI : DPMU KABUPATEN BULELENG
Pas. batu kali (camp 1 : 4) - 0.75 - 0.80
TAMPAK DEPAN
Pasir bawah pondasi (tb. 5 cm) 0,25 0,55
0,95
POTONGAN A - A
SKALA 1: 50
SKALA 1: 50
1,50
0,25 0,55
GEDE SUHARJONO, ST, MT 19820122 200604 1 008 MENYETUJUI : SENIOR FASILITATOR KABUPATEN BULELENG
PUTU SUNANTO, ST
0,60 DIPERIKSA :
TFM WSS
2,00
A
I PUTU AGUS SATYA MAHARDIKA, S.T
A
DIBUAT OLEH : KETUA SATLAK
(KOMANG MERTAYASA)
DENAH KM/WC BARU SKALA 1: 50
TAMPAK DEPAN
JUDUL GAMBAR :
SKALA 1: 50 GAMBAR KAMAR MANDI
SI N
BA RA RA GA A M JA
PAMSIMAS III - 2020 KABUPATEN BULELENG PROVINSI BALI
Kran 1/2 "
KEGIATAN : PROGRAM PAMSIMAS III TAHUN 2020 PEKERJAAN :
Wastafel Batu Alam
SISTEM PENYEDIAAN AIR MINUM DESA PENGLATAN KECAMATAN BULELENG MENGETAHUI : DPMU KABUPATEN BULELENG
GEDE SUHARJONO, ST, MT 19820122 200604 1 008 MENYETUJUI : SENIOR FASILITATOR KABUPATEN BULELENG
PUTU SUNANTO, ST DIPERIKSA : TFM WSS
Pipa PVC 1/2" (pipa air bersih)
Pipa PVC 1" (pipa air kotor)
I PUTU AGUS SATYA MAHARDIKA, S.T DIBUAT OLEH : KETUA SATLAK
(KOMANG MERTAYASA) JUDUL GAMBAR :
DETAIL SARANA CUCI TANGAN
DETAIL SARANA CTPS