5 0 9 KB
*Any data highlighted in red below is data that has been added or updated in the last release of the project Capital PEC Report
Project ID: 300294125
Project Name TANGERANG ACRYLIC RESINS PLANT EXPANSION Industry Code 07 Chemical Processing (CPI) Project Type Plant Expansion TIV (USD) 3,000,000 SIC Code 2821 Plastics Materials, Nonvulcanizable Elastomers & Synthetic Resins SIC Product 2821*0003 Acrylic resins-mfg Status Active Environmental Air (A) Water (W) Project Capacity
PEC Activity Diagram
TIV (IDR) 42,660,000,000 Sector Plastics/Rubbers
Last Update 06-Oct-2021 Initial Release 29-Jul-2016 Construction Labor Preference Non-Union Operations Labor Preference Non-Union
Planned 9,000 Metric T/yr of Acrylic Resins
Plant Owner Plant Name Plant ID Location
PT Diachem Resins Indonesia Tangerang Acrylic Resins 3203767 Jalan Raya Serang Km 26,Balaraja City/State Tangerang, Banten 15610 Indonesia
Plant Parent Mitsubishi Chemical Holdings Corporation Unit Name Acrylic Resins Phone +62 215 953 549 Zone/County IY*01, Banten
Project Responsibility Project Company Project Manager PT Diachem Resins Indonesia Kawasan Industri Manis, Jalan Raya Manis 2-B, Gandasari, Jatiuwung Tangerang, Banten 15137 Indonesia Specification and Reliability PT Diachem Resins Indonesia Kawasan Industri Manis, Jalan Raya Manis2-B, Gandasari, Jatiuwung Tangerang, Banten 15137 Indonesia Planning & Scheduling PT Diachem Resins Indonesia Kawasan Industri Manis, Jalan Raya Manis 2-B, Gandaria, Jatiuwung Tangerang, Banten 15137 Indonesia
Project Contact Jonifdel Manir Engineering Manager & Production Manager [Tel.] +62 215 953 549 [E-Mail] [email protected] Ferry Distianto Plant Manager [Tel.] +62 215 953 549 [E-Mail] [email protected] Parwoto Maintenance Supervisor & Process Engineer [Tel.] +62 215 918 859 [E-Mail] [email protected]
PEC® Timing C1 PEC® Activity Construction - Merit Shop Project Probability High (81-99%) Scope PT Diachem Resins Indonesia continues Construction - Merit Shop for Acrylic Resins Plant Extension. DETAILS: At the existing 5,000 Metric T/yr Acrylic Resins Plant, install new plus Upgrade/Modify existing process Equipment to increase capacity to 9,000 Metric T/yr Acrylic Resins. REQUIRES MODIFICATION/INSTALLATION OF: Reactor Vessels, Heat Exchangers, Absorption and Purification Columns, Level Indicators, Cooling Tower, Digital Transmitters/Controllers, Compressors (Gas & Air), Electric Utilities, Chiller, Pumps, Motors, Pipings (SS and CS), Pipe Racks, Controls (DCS), Control Valves, Flowmeters, Tanks. ENVIRONMENTAL: (A) Scrubbers, Emission Monitors; (W) Wastewater Treatment Tie-ins. Schedule PT Diachem Resins Indonesia continues Construction - Merit Shop. PT Diachem Resins Indonesia selects Basic Engineering Contractors 3Q21 (Jul) releases remaining Equipment RFQs plus Subcontractor Bid Documents 3Q21 (Aug-Sep). Project Kick-Off 4Q21 (Oct). Project Completion 2Q22 (Apr). Project Milestones
AFE 202106
Sub Bid Doc 202109
Equip RFQ 202108
Kick-Off 202110
Completion 29-Apr-2022 Precision MONTH Kickoff Slippage 48 Months
Duration 7 Months
Engineering Contracting
Electrical
Project Key Needs
Structural
Environmental Control Room
Instrumentation Electrical Mechanical HVAC Piping/Fittings Insulation/Coatings Environmental Utilities Continuous Process Matter Phase
Liquid
Solid
Energy Buy Sell Plant Standard Contacts Functional/Actual Title Contact Name/E-mail Telephone/On-site QC Date/LinkedIn ID Plant Manager Ferry Distianto [Phn.] +62 215 918 859 Feb-2021 [email protected] No Maintenance Manager Mr. Parwoto Maintenance [email protected] Supervisor & Process
[Phn.] +62 215 918 859 Feb-2021 No
Instrumentation Mechanical Structural General [G/C] Process Equip Heat Transfer Storage NDE Valves Pumps
Engineer Purchasing Manager Ketty Taslim [email protected]
[Phn.] +62 213 864 790 Feb-2021 No
Engineering Manager Jonifdel Manir [Phn.] +62 215 918 859 Feb-2021 Engineering Manager & Production [email protected] No Manager Historical Reports Project Name
Report Date
TIV Phase
TANGERANG ACRYLIC RESINS PLANT EXPANSION 29-Jul-2016
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 05-Jun-2017
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 09-May-2018
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 15-Apr-2019
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 11-Mar-2020
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 09-Jun-2020
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 29-Jun-2020
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 07-Jun-2021
3,000,000 USD Project Scope (P1 - 03)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 30-Jun-2021
3,000,000 USD Preliminary Engineering (E2 - 22)
TANGERANG ACRYLIC RESINS PLANT EXPANSION 06-Oct-2021
3,000,000 USD Construction - Merit Shop (C1 - 36)
© 2021 ALL RIGHTS RESERVED. Industrial Info Resources, Inc. - Sugar Land, TX - 800-762-3361