RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN
: PENGUATAN DATA BASE JALAN DAN SURVEI KONDISI JALAN
LOKASI
: WILAYAH 1
KABUPATEN LUWU TAHUN ANGGARAN
: 2020
WAKTU PELAKSANAAN
: 3 (Tiga) Bulan
NO
TOTAL BIAYA ( Rp.)
URAIAN
I
BIAYA LANGSUNG PERSONIL
II
BIAYA LANGSUNG NON PERSONIL
124,500,000
58,615,000
JUMLAH PPN 10 % JUMLAH DIBULATKAN
183,115,000 18,311,500 201,426,500 201,425,000
Terbilang : Dua Ratus Satu Juta Empat Ratus Dua Puluh Lima Ribu Rupiah
RENCANA ANGGARAN BIAYA (RAB) PEKERJAAN
: PENGUATAN DATA BASE JALAN DAN SURVEI KONDISI JALAN
LOKASI
: WILAYAH 1
KABUPATEN LUWU
I NO.
TAHUN ANGGARAN
: 2020
WAKTU PELAKSANAAN
: 3 (Tiga) Bulan
RINCIAN BIAYA LANGSUNG PERSONIL URAIAN
A. BIAYA TENAGA AHLI
VOLUME SATUAN
HARGA JUMLAH HARGA SATUAN Rp. Rp.
1 2
Team Leader / Ahli Sipil Ahli GIS
1 1
3 3
Org / Bln Org / Bln
8,500,000 8,000,000
25,500,000 24,000,000
Sub Jumlah a
49,500,000
B. BIAYA TENAGA PENDUKUNG 1
Drafter GIS
3
3
Org / Bln
5,000,000
45,000,000
2
Surveyor
3
2
Org / Bln
5,000,000
30,000,000
Sub Jumlah b
75,000,000
Jumlah a + b
124,500,000
TOTAL BIAYA LANGSUNG PERSONIL
II
REINCIAN BIAYA LANGSUNG NON PERSONIL
NO.
URAIAN
A. BIAYA SEWA PERALATAN 1 Sewa Kendaraan Roda 4 2 Sewa Kendaraan Roda 2 3 4
Sewa GPS + Kamera Sewa Measuring Whell
B. BIAYA OPERASIONAL 1 Konsumsi Surveyor 2 Akomodasi 3
HARGA SATUAN Rp.
JUMLAH HARGA Rp.
Unit/Bln Unit/Bln
5,000,000 1,000,000
15,000,000 4,000,000
Unit/Bln Unit/Bln
500,000 500,000
2,000,000 2,000,000
Sub Jumlah a
23,000,000
2,250,000 2,700,000
13,500,000 16,200,000
3,700,000 Sub Jumlah b
3,700,000 33,400,000
100,000 110,000 200,000 165,000
500,000 550,000 1,000,000 165,000
Sub Jumlah c Jumlah a + b + c
2,215,000 58,615,000
VOLUME SATUAN
1 2 2 2
3 3
3 2 2 2
2 2
ATK
Org / Bln Org / Bln LS
C. BIAYA PELAPORAN 1 Laporan Pendahuluan 2 Laporan Akhir 4 Album Peta A3 5 FDD Backup Data
5 5 5 1
Exp. Exp. Exp. Buah
TOTAL BIAYA LANGSUNG NON PERSONIL
,