CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3 BESI BETON POLOS



No



Diameter



Berat Besi



mm



Kg / m1



1



4.0



0.13



2



5.0



0.12



3



5.5



4



No



BESI BETON SPIRAL



Diameter



Berat Besi



mm



Kg / m1



No.



Diameter



Berat Besi



mm



Kg / m1



11



12



0.89



1



10.00



0.62



12



13



1.04



2



13.00



1.04



0.19



13



14



1.21



3



16.00



1.58



5.7



0.20



14



16



1.58



4



19.00



2.23



5



6.0



0.22



15



19



2.23



5



22.00



2.98



6



6.5



0.31



16



22



2.98



6



25.00



3.85



7



8.0



0.40



17



23



3.26



7



29.00



5.19



8



9.0



0.53



18



25



3.85



8



32.00



6.31



9



10.0



0.62



19



28



4.83



9



36.00



7.99



10



11.0



0.75



20



31



5.93



21



32



6.31



MENGHITUNG BERAT BESI BETON DALAM 1 M3 1.



Kolom Praktis 12 X 12 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm Panjang 1 m3 ukuran 12 x 12 cm = ( 1 : 0.12 : 0.12 )



=



Besi 4 batang dia. 12



=



247.22 kg ( A)



=



66.67 kg ( B )



=



4 x



69,44 x 0,89 kg



Besi beugel dia. 8 jarak 20 mm = ( 69,44 : 0,20 ) x ( 4 x 0,12 ) x 0, 40 kg BERAT BESI BETON UNTUK UKURAN 12 x 12 CM1 DALAM 1 M3 = 2.



313.89 kg/m3 ( A + B )



Kolom praktis 15 X 15 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 20 cm Panjang 1 m3 ukuran 15 x 15 cm = ( 1 : 0.15 : 0.15 )



=



Besi 4 batang dia. 12



=



158.22 kg ( A)



=



71.11 kg ( B )



=



4 x



44,44 x 0,89 kg



Besi beugel dia. 8 jarak 20 mm = ( 44,44 : 0,20 ) x ( 4 x 0,15 ) x 0, 40 kg BERAT BESI BETON UNTUK UKURAN 15 x 15 CM1 DALAM 1 M3 = 3.



4.



5



KOTA BANJAR



69.44 m1



44.44 m1



229.33 kg/m3 ( A + B )



Sloof praktis 15 X 20 cm' pakai tulangan 4 batang dia. 12 beugel dia. 8 jarak 15 cm Panjang 1 m3 ukuran 15 x 20 c= ( 1 : 0.15 : 0.20 )



=



Besi 4 batang dia. 12



=



118.67 kg ( A)



Besi beugel dia. 8 jarak 15 mm = ( 33,33 : 0,15 ) x ( 2 x 0,15 ) + ( 2 x 0,2 ) x



=



41.48 kg ( B )



BERAT BESI BETON UNTUK 15 x 20 CM1 DALAM 1 M3



=



=



4 x



33,33 x 0,89 kg



22.22 m1



160.15 kg/m3 ( A + B )



Kolom Beton 20 X 30 cm' pakai tulangan 4 batang dia. 12 + 2 batang dia. 10 beugel dia. 8 jarak 15 cm Panjang 1 m3 ukuran 20 x 30 cm = ( 1 : 0.20 : 0.30 )



=



16.67 m1



Besi 4 batang dia. 12



=



=



89.00 kg ( A)



Besi 2 batang dia. 10



= 2 x 16.67 x 0.62 kg



4 x



16,67 x 0,89 kg



=



kg ( B)



Besi beugel dia. 8 jarak 15 mm = ( 16,67 : 0.15 ) x (( 2 x 0.2 ) + ( 2 X 0,3 )) X



=



44.44 kg ( C )



BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3



=



133.44 kg/m3 ( A + B + C )



Plat lantai tebal 15 cm pakai tulangan dia. 10 jarak 15 cm Panjang 1 m3 ukuran tebal 15 cm = ( 1 : 0.15 ) Besi 10 = 4 x 7,67 x 7.67 x 6.67 x 0,62kg



= =



6.67 m1 152.11 kg ( A)



BERAT BESI BETON UNTUK UKURAN 20 x 30 CM DALAM 1 M3



=



152.11 kg/m3 ( A + B + C )



Halaman : 1+114



Lampiran 1



DAFTAR BERAT BESI KANAL " C "



NO.



UKURAN BESI KANAL " C "



BERAT 6 M1



BERAT PER 1 M1 6.00



1



60



x



30



x



10



x



1.6



x



6



mm



9.80



kg



1.63



kg



2



60



x



30



x



10



x



2.3



x



6



mm



13.90



kg



2.32



kg



3



75



x



35



x



15



x



1.6



x



6



mm



12.50



kg



2.08



kg



4



75



x



35



x



15



x



2.3



x



6



mm



17.40



kg



2.90



kg



5



75



x



45



x



15



x



1.6



x



6



mm



14.00



kg



2.33



kg



6



75



x



45



x



15



x



2.3



x



6



mm



19.00



kg



3.17



kg



7



100



x



50



x



20



x



2



x



6



mm



21.40



kg



3.57



kg



8



100



x



50



x



20



x



2.3



x



6



mm



24.40



kg



4.07



kg



9



100



x



50



x



20



x



3.2



x



6



mm



33.00



kg



5.50



kg



10



125



x



50



x



20



x



2



x



6



mm



23.70



kg



3.95



kg



11



125



x



50



x



20



x



2.3



x



6



mm



27.10



kg



4.52



kg



12



125



x



50



x



20



x



3.2



x



6



mm



37.00



kg



6.17



kg



13



150



x



50



x



20



x



2



x



6



mm



26.10



kg



4.35



kg



14



150



x



50



x



20



x



2.3



x



6



mm



29.76



kg



4.96



kg



15



150



x



50



x



20



x



3.2



x



6



mm



40.56



kg



6.76



kg



16



150



x



65



x



20



x



2



x



6



mm



28.92



kg



4.82



kg



17



150



x



65



x



20



x



2.3



x



6



mm



33.00



kg



5.50



kg



18



150



x



65



x



20



x



3.2



x



6



mm



45.10



kg



7.52



kg



19



200



x



75



x



20



x



2



x



6



mm



35.52



kg



5.92



kg



20



200



x



75



x



20



x



2.3



x



6



mm



40.62



kg



6.77



kg



21



200



x



75



x



20



x



3.2



x



6



mm



55.62



kg



9.27



kg



KOTA BANJAR



Halaman :2+115



Lampiran 2



DAFTAR BERAT BESI IWF NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23



UKURAN IWF 100 125 148 150 175 198 200 248 250 298 300 346 350 396 400 446 450 500 588 600 700 800 900



x x x x x x x x x x x x x x x x x x x x x x x



50 60 100 75 90 99 100 124 125 149 150 174 175 199 200 199 200 200 300 200 300 300 300



x x x x x x x x x x x x x x x x x x x x x x x



5 6 6 5 5 4.5 5.5 5 6 6 6.5 6 7 7 8 8 9 10 12 11 13 14 16



BERAT 12 M1 x x x x x x x x x x x x x x x x x x x x x x x



7 8 9 7 8 7 8 8 9 8 9 9 11 11 13 12 14 16 20 17 24 26 28



mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm



112.00 158.40 253.20 168.00 217.40 218.40 256.00 308.40 355.20 384.00 440.40 497.00 595.20 679.20 792.00 794.40 912.00 1,075.00 1,812.00 1,272.00 2,220.00 2,520.00 2,916.00



kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg



BERAT PER 1 M1 9.33 13.20 21.10 14.00 18.12 18.20 21.33 25.70 29.60 32.00 36.70 41.42 49.60 56.60 66.00 66.20 76.00 89.58 151.00 106.00 185.00 210.00 243.00



kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg



DAFTAR BERAT BESI SIKU " L " NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21



KOTA BANJAR



UKURAN BESI KANAL " L " 25 30 40 40 50 50 60 60 65 70 75 75 80 90 100 100 120 120 125 130 130



x x x x x x x x x x x x x x x x x x x x x



25 30 40 40 50 50 60 60 65 70 75 75 80 90 100 100 120 120 125 130 130



x x x x x x x x x x x x x x x x x x x x x



3 3 3 4 4 5 5 6 6 7 6 8 8 9 8 10 10 12 12 9 12



x x x x x x x x x x x x x x x x x x x x x



6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 12 12 12 12 12



BERAT / BATANG mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm



6.72 8.16 11.00 14.50 18.50 22.60 27.30 32.52 35.46 44.28 41.22 54.18 57.96 73.20 73.20 90.60 218.40 260.00 280.00 214.20 280.00



kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg



BERAT PER 1 M1 1.12 1.36 1.83 2.42 3.08 3.77 4.55 5.42 5.91 7.38 6.87 9.03 9.66 12.20 12.20 15.10 36.40 43.33 46.67 35.70 46.67



kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg kg



Halaman : 3+116



PROGRAM PEKERJAAN



: :



LOKASI



:



INSTANSI



:



PAGU



:



Pembangunan Sanitasi Berbasis Masyarakat (SANIMAS) Pembangunan Ipal Komunal Desa Taeng Kecamatan Pallangga Dinas Pekerjaan Umum dan Pentaan Ruang Kabupaten Gowa Rp 410,000,000.00



TAHUN ANGGARAN KAPASITAS



: 2019 : 51 SR



JUMLAH PENGGUNA PELAKSANA



: 51 SR : KSM ABBULOSIBATANG



Overhead & Profit



:



0



PAGU ANGGARAN



APBN KONTR.



400000000



TOTAL



400000000



KSM " ABBULOSIBATANG " ASRUL SULAIMAN SYAPARUDDIN MANDASINGI



SANIMAS)



N0.



PEKERJAAN



1.00 Pembangunan Ipal Komunal Ipal Komunal



abupaten Gowa



Jaringan Perpanjangan (SR) 2.00 Pembangunan Ipal Komunal Ipal Komunal Jaringan Perpanjangan (SR) 3.00 Pembangunan Ipal Komunal Ipal Komunal Jaringan Perpanjangan (SR) 4.00 Pembangunan Ipal Komunal Ipal Komunal Jaringan Perpanjangan (SR) 5.00 Pembangunan Ipal Komunal Ipal Komunal Jaringan Perpanjangan (SR) 6.00 Pembangunan Ipal Komunal Ipal Komunal Jaringan Perpanjangan (SR) 7.00 Pembangunan Ipal Komunal Ipal Komunal Jaringan Perpanjangan (SR)



50 60 135 104 349



LOKASI Desa Taeng Kecamatan Pallangga



NAMA KSM Abbulosibatang



Desa Rappolemba Kecamatan Tompobulu



Berkarya



Kelurahan Bonto-Bontoa Kecamatan Somba Opu



Sepakat



Desa Lempangan Kecamatan Bajeng



Desa Tamanyeleng Kecamatan Barombong



Boto Lempangan



Tamanyeleng



Desa Tinggimae Kecamatan Barombong



Assamaturu



Desa Jenetallasa Kecamatan Pallangga



Jenetaesa



JENIS DAK



PAGU DAK



Reguler



Rp 410,000,000.00



Penugasan



Rp 430,000,000.00



Penugasan



Rp 410,000,000.00



Reguler



Rp 420,000,000.00



Reguler



Rp 410,000,000.00



Penugasan



Rp 415,000,000.00



Penugasan



Rp 410,000,000.00



RENCANA ANGGARAN BIAYA PROGRAM PEKERJAAN



: :



Pembangunan Sanitasi Berbasis Masyarakat (SANIMAS) Pembangunan Ipal Komunal



LOKASI INSTANSI



: :



Desa Taeng Kecamatan Pallangga Dinas Pekerjaan Umum dan Pentaan Ruang Kabupaten Gowa



NO.



URAIAN PEKERJAAN



I. PEKERJAAN PERSIAPAN 1 Pengukuran dan Pemasangan bouplank 2 Membersihkan lapangan dan perataan 3 Sewa Gudang Material 4 Listrik Dan Air Kerja 5 Sewa Pompa II. PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) A PEKERJAAN TANAH DAN PASIR 1 Galian Tanah Bawah Atas Inlet Outlet 2 Urugan Pasir Bawah Pondasi dan Lantai IPAL Inlet Outlet Pondasi 3 Urugan Pasir Pengaman IPAL Bawah IPAL Samping IPAL Antar IPAL B 1 2 3



4



5 6



7



PERKERJAAN BETON DAN PONDASI Pasangan Pondasi Batu kosong Pasangan Pondasi Batu Kali 1 pc : 5 ps Lantai kerja Beton K 150 IPAL Inlet Outlet Plat Lantai IPAL Beton Bertulang (150 kg besi) IPAL Inlet Outlet Kolom Beton Bertulang 15 x 15 cm (150 kg besi + bekisting) Dinding Beton Bertulang (150 kg besi + bekisting) Inlet Outlet Balok Beton Bertulang 15 x 30 cm (200 kg besi + bekisting) Inlet Pengurang Outlet



Lebar Atas (m) a



Dimensi Lebar Bawah (m) b



Tinggi (m) h



Panjang/Jumlah (m/bh)



Luas Penampang (m2)



Volume (m3)



L/n



A



V



32.00 12.00 1.00 3.00 14.00



4.00



4.00



48.00



2.25 3.25 1.00 1.00



1.85 3.25 1.00 1.00



1.18 1.50 1.50 1.50



8.18 9.38 0.90 0.90



2.42 4.88 1.50 1.50



1.85 1.00 1.00 0.50



1.85 1.00 1.00 0.50



0.10 0.10 0.10 0.10



7.98 0.90 0.90 23.26



0.19 0.10 0.10 0.05



1.85 0.50 0.52



1.85 0.35 0.79



0.05 1.75 1.75



7.98 21.26 1.42



0.09 0.74 1.15



0.50 0.30



0.50 0.50



0.20 0.90



23.26 23.26



0.10 0.36



1.85 1.00 1.00



1.85 1.00 1.00



0.05 0.10 0.10



7.98 0.90 0.90



0.09 0.10 0.10



1.85 1.00 1.00



1.85 1.00 1.00



0.15 0.15 0.15



7.98 0.90 0.90



0.28 0.15 0.15



0.15 0.15



0.15 0.15



0.85 0.85



3.20 3.20



0.13 0.13



0.15 0.15 0.15



0.15 0.15 0.15



0.30 (0.05) 0.30



3.20 3.20 3.20



0.05 (0.01) 0.05



32.00 48.00 1.00 3.00 14.00



68.21 19.79 45.73 1.35 1.35 2.82 1.48 0.09 0.09 1.16 18.17 0.74 15.81 1.62



2.33 8.37 0.92 0.74 0.09 0.09 2.48 2.21 0.14 0.14 0.82 0.41 0.41 0.24 0.14 (0.02) 0.14



10



Pengurang Balok Beton Bertulang 20 x 30 cm (200 kg besi + bekisting) Memanjang Pengurang Melintang Pengurang Plat Penutup IPAL Beton Bertulang (150 kg besi + bekisting) IPAL Inlet Outlet Pengurang Tutup Manhole 1 Pengurang Tutup Manhole 1 Tutup Mainhole IPAL



C 1



PENGADAAN DAN PEMASANGAN PAKET IPAL Pengadaan dan Pemasangan Paket IPAL Kapasitas 50 SR



III. A 1 2 3 4



PEKERJAAN PEMIPAAN DAN BANGUNAN PENUNJANG PEKERJAAN BONGKARAN & RESTORASI Bongkaran Jalan Aspal Bongkaran Jalan Rabat Beton Setapak Restorasi Jalan Aspal Restorasi Jalan Rabat Beton Setapak



8



9



B 1 2 3 4 5



PEKERJAAN TANAH DAN PASIR Galian Tanah Kedalaman < 1 M Galian Tanah Kedalaman 1 - 2 M Galian Tanah Kedalaman 2 - 3 M Urugan Pasir Bawah Pipa Urugan Tanah Kembali dan Pemadatan Pengurang pasir urug Pengurang pipa



C 1 2 3



PEKERJAAN JARINGAN PERPIPAAN Pemas. Pipa PVC air limbah standar SNI 06-0162 ISO 4435 Ø 4" Pemas. Pipa PVC air limbah standar SNI 06-0162 ISO 4435 Ø 6" Pemas. Pipa PVC air limbah standar SNI 06-0162 ISO 4435 Ø 8"



D 1 2 3



PEKERJAAN BAK MANHOLE Pembuatan Bak Manhole H < 1 M Ø 60 Cm Pembuatan Bak Manhole H 1 - 2 M Ø 60 Cm Pembuatan Bak Manhole H 2 - 3 M Ø 60 Cm



IV. PEKERJAAN SAMBUNGAN RUMAH ( SR ) A PEKERJAAN BONGKARAN & RESTORASI 1 Bongkaran Lantai Beton Rabat 2 Bongkaran Pondasi Batu Kali 3 Bongkaran Lantai Tegel 4 Restorasi Lantai Beton Rabat 5 Restorasi Pondasi Batu Kali 6 Restorasi Lantai Tegel



0.15 Panjang



0.15 Lebar



(0.05) Tinggi



9.28 9.28 2.75 2.75



0.20 0.20 0.20 0.20



0.30 (0.05) 0.30 (0.05)



9.28 0.95 0.95 0.90 0.40



3.15 1.00 1.00 0.50 0.50



0.15 0.15 0.15 (0.15) (0.15)



3.20 jumlah 2.00 2.00 5.00 5.00



(0.01)



1.00 1.00 1.00 5.00 2.00 12.00



4.38 0.14 0.14 (0.07) (0.03)



0.56 (0.09) 0.17 (0.03)



(0.02) 1.62 1.11 (0.19) 0.83 (0.14) 4.27 4.38 0.14 0.14 (0.34) (0.06) 12.00



1.00



0.30



0.30



0.60



350.00



0.18



63.00



0.30 0.30 0.30



0.30 0.30 0.30



0.10 0.60 (0.10)



426.00 350.00 426.00 426.00



0.03 0.18 (0.03) (0.01)



12.78 46.88 (12.78) (3.34)



426.00



19.00



B 1 2 3



PEKERJAAN TANAH DAN PASIR Galian Tanah Kedalaman < 1 M Urugan Pasir Urugan Tanah Kembali Pengurang pasir urug Pengurang pipa



C 1 2 3 4 5 6



PEKERJAAN PEMASANGAN PIPA & ACCESORIESS Pemasangan pipa PVC tipe D diameter 4" Pemasangan Elbow 90° Type D Ø 4" Pemasangan Tee 90° Type D Ø 4" Pemasangan Tee Y Standar SNI 06-0178 ISO 4435 Ø 4" x 4" Pemasangan Tee Y Standar SNI 06-0178 ISO 4435 Ø 6" x 4" Pemasangan Bend 45° Standar SNI 06-0178 ISO 4435 Ø 4"



D 1 2 3



PEKERJAAN BAK KONTROL DAN KLOSET Pembuatan Bak Perangkap Lemak Ø 40 cm Pembuatan Bak Kontrol SR Ø 40 cm Pemasangan kloset jongkok keramik standard



V. PEKERJAAN FINISHING DAN ACCESORIESS 1 Tes Kebocoran dan Pembersihan IPAL 2 Tes Aliran dan Pembersihan Jaringan Perpipaan



0.30 0.30 0.30 0.30



0.30 0.30 0.30 0.30



0.50 0.10 0.50 (0.10)



450.00 450.00 450.00 450.00 300.00



0.15 0.03 0.15 (0.03) (0.01)



67.50 13.50 51.65 (13.50) (2.36)



300.00 50.00 50.00 50.00 50.00



50.00 50.00 11.00



1.00 1.00



REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN KONSTRUKSI PENGOLAHAN AIR LIMBAH NO



KODE ANALISA



1 2



PA PA



A.1 A.2



1 2 3 4 5 6 7 8 9 2 3 3 4 5 6



PT PT PT PT PT PT PT PT PT PT PT PT PT PT PT



B.1 B.2 B.3 B.4 B.5 B.6 B.7 B.8 B.9 B.10 B.11 B.12 B.13 B.14 B.15



1 2 3 4



PP PP PP PP



C.1 C.2 C.3 C.4



5 6 7 8 9 10



PD PD PD PD PD PD



D.1 D.2 D.3 D.4 D.5 D.6



URAIAN PEKERJAAN A. 1 M' 1 M² B. 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m² 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m³ 1 m2 C. 1 M³ 1 M³ 1 M³ 1 M³ D. 1 M² 1 M² 1 M² 1 M² 1 M² 1 M²



HARGA BAHAN



Pekerjaan Persiapan Pengukuran dan Pemasangan bouplank Membersihkan lapangan dan perataan Pekerjaan Tanah Galian tanah biasa sedalam 1 meter Galian tanah biasa sedalam 2 meter Galian tanah biasa sedalam 3 meter Galian tanah keras sedalam 1 meter Galian tanah cadas sedalam 1 meter Galian tanah lumpur sedalam 1 meter Pekerjaan stripping setinggi 1 meter Mengangkut tanah sejauh 15 meter Mengangkut tanah sejauh 150 meter Urug kembali bekas galian Pemadatan tanah ( per 20 cm ) Urugan pasir Urugan sirtu padat untuk peninggian lantai bangunan Urugan tanah mendatangkan Pemasangan lapisan ijuk tebal 10 cm untuk Resapan Pekerjaan Pondasi Pasang pondasi batu kali, 1 Pc : 3 Ps Pasang pondasi batu kali, 1 Pc : 4 Ps. Pasang pondasi batu kali, 1 Pc : 5 Ps Pasang pondasi batu kosong Pekerjaan Dinding Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps



Rekap Analisa



Rp



HARGA UPAH



39,600.00 Rp Rp



HARGA SATUAN



21,600.00 Rp 9,500.00 Rp



61,200.00 9,500.00



Rp Rp Rp Rp



110,400.00 138,000.00 115,200.00 456,000.00



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



71,250.00 85,500.00 99,750.00 95,000.00 142,500.00 114,000.00 4,750.00 31,350.00 49,020.00 47,500.00 47,500.00 28,500.00 23,750.00 28,500.00 14,250.00



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



71,250.00 85,500.00 99,750.00 95,000.00 142,500.00 114,000.00 4,750.00 31,350.00 49,020.00 47,500.00 47,500.00 138,900.00 161,750.00 143,700.00 470,250.00



Rp Rp Rp Rp



477,140.00 438,655.00 411,976.00 211,344.00



Rp Rp Rp Rp



233,250.00 233,250.00 233,250.00 121,290.00



Rp Rp Rp Rp



710,390.00 671,905.00 645,226.00 332,634.00



Rp Rp Rp Rp Rp Rp



135,082.75 128,190.75 124,683.00 64,326.25 61,559.50 59,820.00



Rp Rp Rp Rp Rp Rp



81,200.00 81,200.00 81,200.00 40,600.00 40,600.00 40,600.00



Rp Rp Rp Rp Rp Rp



216,282.75 209,390.75 205,883.00 104,926.25 102,159.50 100,420.00



Page 11 of 81



NO



KODE ANALISA



11 12 13 14 15 16 17 18 19 20 21 22 23 24 25



PPL PPL PPL PPL PPL PPL PPL PPL PPL PPL PPL PPL PPL PPL PPL



E.1 E.2 E.3 E.4 E.5 E.6 E.7 E.8 E.9 E.10 E.11 E.12 E.13 E.14 E.15



1 2 3 4 5 6 2 3 4 5 6 7 3 4 5 6 7 8 9 10 11 12



PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB



F.1 F.2 F.3 F.4 F.5 F.6 F.7 F.8 F.9 F.10 F.11 F.12 F.13 F.14 F.15 F.16 F.17 F.18 F.19 F.20 F.21 F.22



URAIAN PEKERJAAN E. 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² F. 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 M³ 1 Kg 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M3 1 M3



HARGA BAHAN



Pekerjaan Plesteran Plesteran bata merah 1 Pc : 3 Pp, tebal 15 mm Plesteran bata merah 1 Pc : 4 Pp, tebal 15 mm Plesteran bata merah 1 Pc : 5 Pp, tebal 15 mm Plesteran bata merah 1 Pc : 3 Pp, tebal 20 mm Plesteran bata merah 1 Pc : 4 Pp, tebal 20 mm Plesteran bata merah 1 Pc : 5 Pp, tebal 20 mm Plesteran Beton 1 Pc : 2 Pp, tebal 15 mm Plesteran Beton 1 Pc : 3 Pp, tebal 15 mm Plesteran Ciprat, 1 Pc : 2 Pp, tebal 10 mm Finishing Siar Pasangan Dinding Batu Bata (=20 m') Finishing Siar Pasangan Batu Kali, 1 Pc : 2 Pp Plesteran Batu Kali 1 Pc : 3 Pp, tebal 10 mm Plesteran Batu Kali 1 Pc : 4 Pp, tebal 10 mm Acian Plesteran waterproof bata cote 3 lapis Pekerjaan Beton Membuat beton 1 : 3 : 5 Membuat beton mutu f'c=9,8 MPa (K 125) Membuat beton mutu f'c=12,2 MPa (K 150) Membuat lantai kerja beton mutu f'c=7,4 MPa (K 100) Membuat beton mutu f'c=14,5 MPa (K 175) Membuat beton mutu f'c=16,9 MPa (K 200) Membuat beton 1 : 2 : 3 Membuat beton mutu f'c=21,7 MPa (K 250) Membuat beton mutu f'c=24,0 MPa (K 275) Membuat beton mutu f'c=26,4 MPa (K 300) Membuat beton mutu f'c=28,8 MPa (K 325) Membuat beton mutu f'c=31,2 MPa (K 350) Pembesian dengan besi polos atau besi ulir Pemasangan Bekisting untuk Pondasi Pemasangan Bekisting untuk Sloof Pemasangan Bekisting untuk Kolom Pemasangan Bekisting untuk Balok Pemasangan Bekisting untuk Lantai Pemasangan Bekisting untuk Dinding Pemasangan Bekisting untuk Tangga Membuat beton bertulang (150 kg besi + bekisting) Membuat sloof beton bertulang (200 kg besi + bekisting)



Rekap Analisa



HARGA UPAH



HARGA SATUAN



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



12,290.00 10,716.00 9,836.00 16,438.00 14,288.00 13,166.00 13,234.50 11,187.75 5,784.00 3,496.50 8,980.50 12,167.60 10,543.48 3,656.25 114,586.50



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



46,650.00 46,650.00 46,650.00 62,200.00 62,200.00 62,200.00 48,900.00 48,900.00 40,600.00 23,380.00 46,650.00 62,200.00 62,200.00 31,100.00 52,700.00



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



58,940.00 57,366.00 56,486.00 78,638.00 76,488.00 75,366.00 62,134.50 60,087.75 46,384.00 26,876.50 55,630.50 74,367.60 72,743.48 34,756.25 167,286.50



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



554,765.00 585,239.26 608,831.67 543,361.48 637,094.44 663,517.41 684,166.11 696,679.26 718,190.00 724,827.59 750,145.37 758,851.48 9,847.50 94,970.00 105,470.00 250,940.00 259,940.00 374,940.00 275,940.00 227,455.00 2,606,615.00 3,265,930.00



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



190,025.00 190,025.00 190,025.00 138,200.00 190,025.00 190,025.00 190,025.00 190,025.00 190,025.00 190,025.00 241,850.00 241,850.00 1,512.00 80,860.00 80,860.00 102,630.00 102,630.00 102,630.00 102,630.00 102,630.00 821,070.00 928,130.00



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



744,790.00 775,264.26 798,856.67 681,561.48 827,119.44 853,542.41 874,191.11 886,704.26 908,215.00 914,852.59 991,995.37 1,000,701.48 11,359.50 175,830.00 186,330.00 353,570.00 362,570.00 477,570.00 378,570.00 330,085.00 3,427,685.00 4,194,060.00



Page 12 of 81



NO



KODE ANALISA



13 14 15 16 17 18 19 20 21



PB PB PB PB PB PB PB PB PB



F.23 F.24 F.25 F.26 F.27 F.28 F.29 F.30 F.31



22 23 1 2 2 3 4 5 6 7 8 9 8 9 10 11 12 13 14 15 16 17 18 19 20 19 20 21 22 20 21



PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS



G.1 G.2 G.3 G.4 G.5 G.6 G.7 G.8 G.9 G.10 G.11 G.12 G.13 G.14 G.15 G.16 G.17 G.18 G.19 G.20 G.21 G.22 G.23 G.24 G.25 G.26 G.27 G.28 G.29 G.30 G.31



URAIAN PEKERJAAN 1 M3 1 M3 1 M3 1 M3 1 M3 1 M' 1 M' 1 M3 1 M3 G. 1 buah 1 buah 1 buah 1 buah 1 m' 1 m' 1 m' 1 m' 1 m' 1 m' 1 m' 1 m' 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 buah 1 unit 1 Unit



HARGA BAHAN



Membuat kolom beton bertulang (300 kg besi + bekisting) Membuat balok beton bertulang (200 kg besi + bekisting) Membuat kolom beton bertulang (150 kg besi + bekisting) Membuat dinding beton bertulang (150 kg besi + bekisting) Membuat dinding beton bertulang (200 kg besi + bekisting) Membuat kolom praktis beton bertulang (11 x 11 cm) Membuat ring balok beton bertulang (10 x 15 cm) Membuat plat lantai IPAL beton bertulang (150 kg besi) Membuat plat penutup IPAL beton bertulang (150 kg besi + bekisting) Pekerjaan Sanitasi Memasang kloset duduk keramik + tabung Memasang kloset duduk duduk tanpa tabung Memasang kloset jongkok standard Memasang kloset jongkok keramik ex. Toto Memasang pipa PVC tipe AW diameter 1/2" Memasang pipa PVC tipe diameter 3/4" Memasang Pipa PVC air limbah standar ISO 4435 Ø 2" Memasang Pipa PVC air limbah standar ISO 4435 Ø 3" Memasang Pipa PVC air limbah standar ISO 4435 Ø 4" Memasang Pipa PVC air limbah standar ISO 4435 Ø 4" Memasang Pipa PVC air limbah standar SNI 06-0162 ISO 4435 Ø 6" Memasang Pipa PVC air limbah standar SNI 06-0162 ISO 4435 Ø 8" Memasang Elbow PVC Ø 1/2" Memasang Elbow PVC Ø 3/4" Memasang Elbow 90° Ø 2" Memasang Elbow 90° Ø 3" Memasang Elbow 90° Ø 4" Memasang Tee Ø 1/2" Memasang Tee PVC Ø 3/4" Memasang Tee 90° Ø 2" Memasang Tee 90° Ø 3" Memasang Tee 90° Ø 4" Tee Y Standar ISO 4435 Ø 4" x 4" Tee Y Standar SNI 06-0178 ISO 4435 Ø 6" x 4" Tee Y Standar SNI 06-0178 ISO 4435 Ø 8" x 4" Bend 45° Standar ISO 4435 Ø 4" Memasang kran diameter ½" Memasang Floor drain Memasang Shock Drat Dalam PVC Tipe Ø 1/2" Memasang check valve Ø 4" Membuat Bak Perangkap Lemak Ø 40 Cm Rekap Analisa



Rp Rp Rp Rp Rp Rp Rp Rp Rp #N/A #N/A Rp #N/A #N/A Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



6,123,260.00 4,696,630.00 4,640,255.00 4,344,255.00 4,322,750.00 50,954.00 51,673.50 2,161,291.11 4,661,016.09



212,490.00



15,810.00 34,487.50 27,812.50 86,000.00 72,240.00 206,460.00 316,045.00 3,500.00 5,000.00 7,500.00 32,000.00 55,000.00 3,500.00 5,000.00 16,000.00 20,000.00 30,000.00 126,400.00 89,500.00 34,062.50 27,500.00 3,500.00 2,000,000.00 148,799.13



HARGA UPAH



HARGA SATUAN



Rp Rp Rp Rp Rp Rp Rp Rp Rp



1,156,830.00 1,005,630.00 821,400.00 928,130.00 821,070.00 24,360.00 40,205.00 416,825.00 1,101,059.21



Rp Rp Rp Rp Rp Rp Rp Rp Rp



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



495,000.00 286,000.00 286,000.00 286,000.00 10,680.00 10,680.00 16,020.00 24,030.00 24,030.00 24,030.00 36,045.00 54,067.50 8,010.00 8,010.00 5,340.00 8,010.00 10,680.00 8,010.00 8,010.00 5,340.00 8,010.00 10,680.00 10,680.00 16,020.00 21,360.00 10,680.00 13,050.00 13,050.00 8,010.00 300,000.00 132,247.90



#N/A #N/A Rp #N/A #N/A Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



7,280,090.00 5,702,260.00 5,461,655.00 5,272,385.00 5,143,820.00 75,314.00 91,878.50 2,578,116.11 5,762,075.30



498,490.00



26,490.00 50,507.50 51,842.50 110,030.00 96,270.00 242,505.00 370,112.50 11,510.00 13,010.00 12,840.00 40,010.00 65,680.00 11,510.00 13,010.00 21,340.00 28,010.00 40,680.00 137,080.00 16,020.00 21,360.00 100,180.00 47,112.50 40,550.00 11,510.00 2,300,000.00 281,047.03 Page 13 of 81



NO 22



KODE ANALISA PS



G.32



URAIAN PEKERJAAN



HARGA BAHAN



1 Unit Membuat Bak Kontrol SR Ø 40 Cm



Rp



Rekap Analisa



147,732.98 Rp



HARGA UPAH 94,287.30



HARGA SATUAN Rp



242,020.28



Page 14 of 81



NO



KODE ANALISA



23 24 25 26 27 28 29 30



PS PS PS PS PS PS PS PS



G.33 G.34 G.35 G.36 G.37 G.38 G.39 G.40



29 30 31 32 33 34



PPL PPL PPL PPL PPL PPL



H.1 H.2 H.3 H.4 H.5 H.6



1 2 3



PPL PPL PPL



I.1 I.2 I.3



4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15



PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB PTB



J.1 J.2 J.3 J.4 J.5 J.6 J.7 J.8 J.9 J.10 J.11 J.12 J.13 J.14 J.15 J.16 J.17 J.18



1 2



PKY PKY



K.1 K.2



URAIAN PEKERJAAN 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 unit 1 unit H. 1 M² 1 M² 1 M² 1 M² 1 M² 1 M² I. 1 M² 1 M² 1 M² J. 1 M³ 1 M³ 1 M2 1 M2 1 M³ 1 M³ 1 M³ 1 M2 1 M2 1 M2 1 M³ 1 M³ 1 M³ 1 Unit 1 M2 1 Bh 1 Bh 1 Set K. 1 M3 1 M3



HARGA BAHAN



Membuat Bak Manhole H < 1 M Ø 60 Cm Membuat Bak Manhole H 1 - 2 M Ø 60 Cm Membuat Bak Manhole H 2 - 3 M Ø 60 Cm Pengadaan dan Pemasangan Paket IPAL Kapasitas 50 SR Pemasangan Tandon Air 1,1 m3 Pemasangan Pompa Air Otomatis Membuat Bak Inlet Membuat Bak Outlet Pekerjaan Penutup Lantai dan Dinding Pasang lantai keramik 20 x 20 cm Pasang lantai keramik 20 x 25 cm Pasang lantai keramik 30 x 30 cm Pasang lantai keramik 40 x 40 cm Pasang Dinding keramik 20 x 20 cm Pasang Dinding keramik 20 x 25 cm Pekerjaan Pengecatan Pengecatan Bidang Kayu Baru Pengecatan Tembok Baru Pengecatan Waterproof Plat Atap Pekerjaan Tambahan Membongkar Cetakan/Bekisting Membongkar beton bertulang dan membersihkan Membongkar Aspal Dengan Jack Hammer Membongkar Paving Block Untuk Digunakan Kembali Membongkar Lantai beton rabat Membongkar Pasangan Batu Kali Membongkar Pasangan Batu Merah dan Membersihkan Membongkar Lantai Tegel Untuk Dipergunakan Lagi Mengupas Plesteran Lama Memasang Restorasi Paving Block Langsiran Batu Kali Langsiran Kerikil Langsiran Pasir Membuat Tutup Mainhole IPAL Restorasi Jalan Aspal Pemasangan Loster Pemasangan Glass block Pemasangan Pintu Aluminium Pekerjaan Kayu Pasang Kusen Pintu/Jendela Kayu Kls I Pasang Pintu/Jendela Panel Kayu Kls I Rekap Analisa



Rp Rp Rp Err:509 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



Rp



Rp Rp Rp Rp Rp Rp Rp



HARGA UPAH



368,308.90 Rp 545,906.21 Rp 1,196,949.22 Rp Rp 1,100,000.00 Rp 683,000.00 Rp 2,537,600.00 Rp 1,372,200.00 Rp 91,770.50 99,770.50 101,270.50 109,270.50 85,734.50 93,734.50



Rp Rp Rp Rp Rp Rp



24,290.00 Rp 16,633.33 Rp 7,713.00 Rp



-



96,299.23 247,435.64 35,000.00 26,000.00 350,000.00



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



9,940,000.00 Rp 457,500.00 Rp



263,718.32 219,765.20 399,808.32 18,375,000.00 165,000.00 102,450.00 938,100.00 938,100.00 101,250.00 101,250.00 101,250.00 101,250.00 72,950.00 111,450.00



HARGA SATUAN Rp Rp Rp Err:509 Rp Rp Rp Rp



632,027.23 765,671.41 1,596,757.54 1,265,000.00 785,450.00 3,475,700.00 2,310,300.00



Rp Rp Rp Rp Rp Rp



193,020.50 201,020.50 202,520.50 210,520.50 158,684.50 205,184.50



8,300.00 Rp 9,523.00 Rp 14,371.00 Rp



32,590.00 26,156.33 22,084.00



380,000.00 782,000.00 29,987.00 9,500.00 296,000.00 212,000.00 159,000.00 19,000.00 11,875.00 9,500.00 19,000.00 11,400.00 4,750.00 20,896.05 190,735.00 5,250.00 3,900.00 52,500.00



Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp



380,000.00 782,000.00 29,987.00 9,500.00 296,000.00 212,000.00 159,000.00 19,000.00 11,875.00 9,500.00 19,000.00 11,400.00 4,750.00 117,195.28 438,170.64 40,250.00 29,900.00 402,500.00



3,206,000.00 Rp 350,000.00 Rp



13,146,000.00 807,500.00 Page 15 of 81



NO



KODE ANALISA



3 4



PKY PKY



K.3 K.4



1 2 3



PET PET PET



L.1 L.2 L.3



URAIAN PEKERJAAN 1 Bh 1 Bh L. 1 Bh 1 Bh 1 Bh



HARGA BAHAN



Pasang Kunci Tanam Pasang Engsel Pintu Pekerjaan Eletrikal Pasang Lampu SL Pasang Stop Kontak Pasang Saklar Ganda



Rekap Analisa



HARGA UPAH



HARGA SATUAN



Rp Rp



21,000.00 Rp 5,000.00 Rp



56,025.00 19,575.00



Rp Rp



77,025.00 24,575.00



Rp Rp Rp



46,000.00 Rp 56,200.00 Rp 66,200.00 Rp



27,500.00 27,500.00 27,500.00



Rp Rp Rp



73,500.00 83,700.00 93,700.00



Page 16 of 81



RENCANA ANGGARAN BIAYA (RAB) Program Pekerjaan Sub. Pekerjaan Lokasi Instansi Pagu



: : : : : :



Pembangunan Sanitasi Berbasis Masyarakat (SANIMAS) Pembangunan Ipal Komunal Pembanguan MCK Desa Taeng Kecamatan Pallangga Dinas Pekerjaan Umum dan Pentaan Ruang Kabupaten Gowa Rp 410,000,000.00



No.



Uraian Pekerjaan



Satuan



Kuantitas



No. Anal.



1



2



3



4



5



I. 1 2 3 4



PEKERJAAN PERSIAPAN Papan Nama Proyek Pengukuran dan Pemasangan Bouwplank Pembersihan Lapangan dan Perataan Sewa Pompa



II. A. 1 2 3 4 5



PEKERJAAN MCK PEKERJAAN PONDASI.



B 1



2



3



C 1 2 3 D 1 E 1 2 3 4 F 1



Bh M1 M1 Ls Jumlah I Dibulatkan



1.00 8.00 9.00 1.00



Harga Satuan Material ( Rp ) 6



150,000.00 39,600.00



Harga Satuan Upah ( Rp ) 7



Harga Satuan Material+Upah ( Rp ) 8 (6+7)



21,600.00 9,500.00



150,000.00 61,200.00 9,500.00 300,000.00



300,000.00



Jumlah Harga Material ( Rp ) 9 (4x6)



Jumlah Harga Upah ( Rp ) 10 (4x7)



Jumlah Harga Materia+Upah ( Rp ) 11 (4x8)



150,000.00 316,800.00 300,000.00 766,800.00 767,000.00



172,800.00 85,500.00 258,300.00 258,000.00



150,000.00 489,600.00 85,500.00 300,000.00 1,025,100.00 1,025,000.00



Galian Tanah Pondasi Urugan Pasir Bawah Pondasi Pas. Pondasi Batu Kosong Pas. Pondasi Batu Gunung ad 1:4 Urugan Tnh. Kembali bks. Galian



M3 M3 M3 M3 M3



4.32 1.44 2.16 4.95 1.44



B.1 B.12 C.4 C.3 B.10



110,400.00 211,344.00 411,976.00 -



71,250.00 28,500.00 121,290.00 233,250.00 47,500.00



71,250.00 138,900.00 332,634.00 645,226.00 47,500.00



2,654,760.24 158,976.00 456,503.04 2,039,281.20 -



1,833,813.90 307,800.00 41,040.00 261,986.40 1,154,587.50 68,400.00



4,488,574.14 307,800.00 200,016.00 718,489.44 3,193,868.70 68,400.00



PEK. BETON BERTULANG Camp. 1:2:3 Sloof Beton 15/20 Besi Bekisting Kolom Beton 15/15 Besi Bekisting Ringbalk Beton 15/20 Besi Bekisting



M3 Kg M3 M3 Kg M3 M3 Kg M3



0.60 95.54 2.00 0.47 29.49 2.11 0.54 95.54 2.00



F.1 F.13 F.15 F.1 F.13 F.16 F.1 F.13 F.17



554,765.00 9,847.50 105,470.00 554,765.00 9,847.50 250,940.00 554,765.00 9,847.50 259,940.00



190,025.00 1,512.00 80,860.00 190,025.00 1,512.00 102,630.00 190,025.00 1,512.00 102,630.00



744,790.00 11,359.50 186,330.00 744,790.00 11,359.50 353,570.00 744,790.00 11,359.50 362,570.00



2,866,733.25 332,859.00 940,869.54 210,940.00 263,125.04 290,385.05 528,981.52 299,573.10 940,869.54 519,880.00



873,870.08 114,015.00 144,462.53 161,720.00 90,128.86 44,586.16 216,344.04 102,613.50 144,462.53 205,260.00



5,551,075.40 446,874.00 1,085,332.07 372,660.00 353,253.90 334,971.21 745,325.56 402,186.60 1,085,332.07 725,140.00



PEKERJAAN DINDING DAN PLESTERAN Pas. Dinding Bata camp. 1 : 4 Plesteran Dinding Bata camp. 1 : 4 Pek. Acian



M2 M2 M2



18.27 36.54 36.54



D.5 E.2 E.14



61,559.50 10,716.00 3,656.25



40,600.00 46,650.00 31,100.00



102,159.50 57,366.00 34,756.25



1,649,854.08 1,124,692.07 391,562.64 133,599.38



3,582,747.00 741,762.00 1,704,591.00 1,136,394.00



5,232,601.08 1,866,454.07 2,096,153.64 1,269,993.38



M3



1.41



F.31



4,661,016.09



1,101,059.21



5,762,075.30



6,567,837.77 6,567,837.77



1,551,502.53 1,551,502.53



8,119,340.31 8,119,340.31



M3 M3 M2 M2



0.35 0.70 6.25 10.00



B.12 F.1 H.1 H.6



110,400.00 554,765.00 91,770.50 93,734.50



28,500.00 190,025.00 101,250.00 111,450.00



138,900.00 744,790.00 193,020.50 205,184.50



1,940,021.00 38,833.20 390,277.18 573,565.63 937,345.00



1,891,019.96 10,024.88 133,682.59 632,812.50 1,114,500.00



3,831,040.97 48,858.08 523,959.77 1,206,378.13 2,051,845.00



Bh



2.00



G.3



212,490.00



286,000.00



498,490.00



674,585.00 424,980.00



709,640.00 572,000.00



1,384,225.00 996,980.00



PEKERJAAN ATAP Atap Beton (tebal=12 cm) Tulangan 2 arah PEKERJAAN LANTAI. Urugan Pasir Bawah Lantai Pekerjaan Rabat Beton Bawah Lantai Pasangan Lantai Tegel 20/20, Motif Pasangan Dinding Tegel 20/25 Dalam dan Luar (Tinggi 1,5 m) PEKERJAAN SANITAIR Pekerjaan Closet Jongkok



2 3 4 5 6



Pekerjaan Urinoir Pekerjaan Westafel Pemasangan Pipa AW 3/4" Pemasangan Floor Drain Pemasangan Kran Air



Bh Bh m' Btg Bh



8.00 2.00 2.00



G 1 2 3 4 5



PEKERJAAN KUSEN DAN PINTU Kusen Kayu Klas 1 (Bayam) Daun Pintu Kayu Klas 1 (Bayam) Memasang Kunci Tanam Memasang Engsel Pintu Roster Beton 15x30



M3 M3 Bh Bh Bh



0.04 2.16 2.00 4.00 14.00



H 1 2



PEKERJAAN PENGECATAN Pengecatan Dinding Pengecatan Waterproof Plat Atap



M2 M2



I 1 2 3



PEKERJAAN ELETRIKAL Pemasangan Lampu SL Pemasangan Stop Kontak Pemasangan Saklar Ganda



Ttk Ttk Ttk



J 1 2 3



PEMASANGAN TANGKI AIR Sumur Bor Tangki Air Fiber 1m3 Excel Mesin Air



Ls Bh Bh Jumlah II Dibulatkan Jumlah Total I + II



15,810.00 27,500.00 34,062.50



10,680.00 13,050.00 13,050.00



26,490.00 40,550.00 47,112.50



K.1 K.2 K.3 K.4



9,940,000.00 457,500.00 21,000.00 5,000.00 28,000.00



3,206,000.00 350,000.00 56,025.00 19,575.00 -



13,146,000.00 807,500.00 77,025.00 24,575.00 28,000.00



1,835,824.00 393,624.00 988,200.00 42,000.00 20,000.00 392,000.00



1,073,307.60 126,957.60 756,000.00 112,050.00 78,300.00 -



2,909,131.60 520,581.60 1,744,200.00 154,050.00 98,300.00 392,000.00



36.54 29.26



I.2 I.3



16,633.33 7,713.00



9,523.00 14,371.00



26,156.33 22,084.00



833,441.24 607,782.00 225,659.24



768,422.77 347,970.42 420,452.35



1,601,864.01 955,752.42 646,111.59



4.00 2.00 2.00



L.1 L.2 L.3



46,000.00 56,200.00 66,200.00



46,000.00 56,200.00 66,200.00



92,000.00 112,400.00 132,400.00



428,800.00 184,000.00 112,400.00 132,400.00



428,800.00 184,000.00 112,400.00 132,400.00



857,600.00 368,000.00 224,800.00 264,800.00



165,000.00 102,450.00



1,265,000.00 785,450.00



1,783,000.00 1,100,000.00 683,000.00 21,234,856.59 21,235,000.00 22,002,000.00



267,450.00 165,000.00 102,450.00 12,980,573.85 12,981,000.00 13,239,000.00



2,050,450.00 1,265,000.00 785,450.00 36,025,902.50 36,026,000.00 37,051,000.00



1.00 1.00



G.6 G.28 G.27



G.37 G.38



1,100,000.00 683,000.00



126,480.00 55,000.00 68,125.00



85,440.00 26,100.00 26,100.00



211,920.00 81,100.00 94,225.00



PERHITUNGAN KEBUTUHAN MATERIAL DAN HOK



KODE ANALISA



NO



URAIAN PEKERJAAN



KUANTITAS



N



1 2



PA PA



A.1 A.2



1 M' 1 M²



Pekerjaan Persiapan Pengukuran dan Pemasangan bouplank Membersihkan lapangan dan perataan



3 4



PT PT



B.1 B.2



1 m³ 1 m³



Galian tanah biasa sedalam 1 meter Galian tanah biasa sedalam 2 meter



5 6 7



PT PT PT



B.3 B.4 B.5



1 m³ 1 m³ 1 m³



Galian tanah biasa sedalam 3 meter Galian tanah keras sedalam 1 meter Galian tanah cadas sedalam 1 meter



8 9



PT PT



B.6 B.7



1 m³ 1 m²



Galian tanah lumpur sedalam 1 meter Pekerjaan stripping setinggi 1 meter



10 11 12



PT PT PT



B.8 B.9 B.10



1 m³ 1 m³ 1 m³



Mengangkut tanah sejauh 15 meter Mengangkut tanah sejauh 150 meter Urug kembali bekas galian



Err:509



13 14



PT PT



B.11 B.12



1 m³ 1 m³



Pemadatan tanah ( per 20 cm ) Urugan pasir



Err:509



15 16 17



PT PT PT



B.13 B.14 B.15



1 m³ 1 m³ 1 m2



Urugan sirtu padat untuk peninggian lantai bangunan Urugan tanah mendatangkan Pemasangan lapisan ijuk tebal 10 cm untuk Resapan



18 19



PPL PPL



C.1 C.2



1 M³ 1 M³



Pasang pondasi batu kali, 1 Pc : 3 Ps Pasang pondasi batu kali, 1 Pc : 4 Ps.



20 21



PPL PPL



C.3 C.4



1 M³ 1 M³



Pasang pondasi batu kali, 1 Pc : 5 Ps Pasang pondasi batu kosong



22 23 24



PD PD PD



D.1 D.2 D.3



1 M² 1 M² 1 M²



Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps



25 26 27



PD PD PD



D.4 D.5 D.6



1 M² 1 M² 1 M²



Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps



28 29



PPL PPL



E.1 E.2



1 M² 1 M²



Plesteran bata merah 1 Pc : 3 Pp, tebal 15 mm Plesteran bata merah 1 Pc : 4 Pp, tebal 15 mm



30 31 32



PPL PPL PPL



E.3 E.4 E.5



1 M² 1 M² 1 M²



Plesteran bata merah 1 Pc : 5 Pp, tebal 15 mm Plesteran bata merah 1 Pc : 3 Pp, tebal 20 mm Plesteran bata merah 1 Pc : 4 Pp, tebal 20 mm



33 34



PPL PPL



E.6 E.7



1 M² 1 M²



Plesteran bata merah 1 Pc : 5 Pp, tebal 20 mm Plesteran Beton 1 Pc : 2 Pp, tebal 15 mm



35 36 37



PPL PPL PPL



E.8 E.9 E.10



1 M² 1 M² 1 M²



38 39



PPL PPL



E.11 E.12



1 M² 1 M²



Finishing Siar Pasangan Batu Kali, 1 Pc : 2 Pp Plesteran Batu Kali 1 Pc : 3 Pp, tebal 10 mm



40 41 42



PPL PPL PPL



E.13 E.14 E.15



1 M² 1 M² 1 M²



Plesteran Batu Kali 1 Pc : 4 Pp, tebal 10 mm Acian Plesteran waterproof bata cote 3 lapis



43 44 45 46 47



PB PB PB PB PB



F.1 F.2 F.3 F.4 F.5



1 1 1 1 1



M³ M³ M³ M³ M³



Membuat Membuat Membuat Membuat Membuat



beton 1 : 3 : 5 beton mutu f'c=9,8 MPa (K 125) beton mutu f'c=12,2 MPa (K 150) lantai kerja beton mutu f'c=7,4 MPa (K 100) beton mutu f'c=14,5 MPa (K 175)



48 49 50 51 52



PB PB PB PB PB



F.6 F.7 F.8 F.9 F.10



1 1 1 1 1



M³ M³ M³ M³ M³



Membuat Membuat Membuat Membuat Membuat



beton beton beton beton beton



53 54 55 56 57



PB PB PB PB PB



F.11 F.12 F.13 F.14 F.15



1 1 1 1 1



M³ M³ Kg M2 M2



Membuat beton mutu f'c=28,8 MPa (K 325) Membuat beton mutu f'c=31,2 MPa (K 350) Pembesian dengan besi polos atau besi ulir Pemasangan Bekisting untuk Pondasi Pemasangan Bekisting untuk Sloof



58 59 60 61 62



PB PB PB PB PB



F.16 F.17 F.18 F.19 F.20



1 1 1 1 1



M2 M2 M2 M2 M2



Pemasangan Pemasangan Pemasangan Pemasangan Pemasangan



63 64 65 66 67



PB PB PB PB PB



F.21 F.22 F.23 F.24 F.25



1 1 1 1 1



M3 M3 M3 M3 M3



Membuat Membuat Membuat Membuat Membuat



beton bertulang (150 kg besi + bekisting) sloof beton bertulang (200 kg besi + bekisting) kolom beton bertulang (300 kg besi + bekisting) balok beton bertulang (200 kg besi + bekisting) kolom beton bertulang (150 kg besi + bekisting)



68 69 70 71 72



PB PB PB PB PB



F.26 F.27 F.28 F.29 F.30



1 1 1 1 1



M3 M3 M' M' M3



Membuat Membuat Membuat Membuat Membuat



dinding beton bertulang (150 kg besi + bekisting) dinding beton bertulang (200 kg besi + bekisting) kolom praktis beton bertulang (11 x 11 cm) ring balok beton bertulang (10 x 15 cm) plat lantai IPAL beton bertulang (150 kg besi)



73



PB



F.31



74 75 76 77



PS PS PS PS



G.1



78 79 80 81 82



PS PS PS PS PS



83 84 85 86 87



PS PS PS PS PS



88 89 90 91 92



PS PS PS PS PS



93 94 95 96 97



PS PS PS PS PS



98 99 100 101 102



PS PS PS PS PS



103 104 105 106 107



PS PS PS PS PS



108 109 110 111



PS PS PS PS



112 113 114 115



PPL PPL PPL PPL



H.1 H.2 H.3 H.4



1 M² 1 M² 1 M² 1 M²



Pasang lantai Pasang lantai Pasang lantai Pasang lantai



116 117



PPL PPL



H.5 H.6



1 M² 1 M²



Pasang Dinding keramik 20 x 20 cm Pasang Dinding keramik 20 x 25 cm



### ###



118 119



PPL PPL



I.1 I.2



1 M² 1 M²



Pengecatan Bidang Kayu Baru Pengecatan Tembok Baru



### ### ###



G.2 G.3 G.4 G.5 G.6 G.7 G.8 G.9 G.10 G.11 G.12 G.13 G.14 G.15 G.16 G.17 G.18 G.19 G.20 G.21 G.22 G.23 G.24 G.25 G.26 G.27 G.28 G.29 G.30 G.31 G.32 G.33 G.34 G.35 G.36 G.37 G.38



1 M3



Bekisting Bekisting Bekisting Bekisting Bekisting



untuk untuk untuk untuk untuk



Memasang Pipa PVC air limbah Memasang Pipa PVC air limbah Memasang Pipa PVC air limbah Memasang Pipa PVC air limbah Memasang Elbow PVC Ø 1/2"



1 buah 1 buah 1 buah 1 buah 1 buah



Memasang Elbow PVC Ø 3/4" Memasang Elbow 90° Ø 2" Memasang Elbow 90° Ø 3" Memasang Elbow 90° Ø 4" Memasang Tee Ø 1/2"



1 buah 1 buah 1 buah 1 buah 1 buah



Memasang Tee PVC Ø 3/4" Memasang Tee 90° Ø 2" Memasang Tee 90° Ø 3" Memasang Tee 90° Ø 4" Tee Y Standar ISO 4435 Ø 4" x 4"



1 buah 1 buah 1 buah 1 buah 1 buah



Tee Y Standar SNI 06-0178 ISO 4435 Ø 6" x 4" Tee Y Standar SNI 06-0178 ISO 4435 Ø 8" x 4" Bend 45° Standar ISO 4435 Ø 4" Memasang kran diameter ½" Memasang Floor drain



1 buah 1 unit 1 Unit 1 Unit 1 Unit



Memasang Shock Drat Dalam PVC Tipe Ø 1/2" Memasang check valve Ø 4" Membuat Bak Perangkap Lemak Ø 40 Cm Membuat Bak Kontrol SR Ø 40 Cm Membuat Bak Manhole H < 1 M Ø 60 Cm



1 Unit 1 Unit 1 Unit 1 Unit 1 Unit



Membuat Bak Manhole H 1 - 2 M Ø 60 Cm Membuat Bak Manhole H 2 - 3 M Ø 60 Cm Pengadaan dan Pemasangan Paket IPAL Kapasitas 50 SR Pemasangan Tandon Air 1,1 m3 Pemasangan Pompa Air Otomatis keramik keramik keramik keramik



PPL



I.3



1 M²



Pengecatan Waterproof Plat Atap



PTB PTB PTB



J.1



1 M³ 1 M³ 1 M2



Membongkar Cetakan/Bekisting Membongkar beton bertulang dan membersihkan Membongkar Aspal Dengan Jack Hammer



124 125 126 127 128



PTB PTB PTB PTB PTB



J.4 J.5 J.6



1 M2 1 M³ 1 M³ 1 M³ 1 M2



Membongkar Paving Block Untuk Digunakan Kembali Membongkar Lantai beton rabat Membongkar Pasangan Batu Kali Membongkar Pasangan Batu Merah dan Membersihkan Membongkar Lantai Tegel Untuk Dipergunakan Lagi



129 130 131 132 133



PTB PTB PTB PTB PTB



J.9 J.10 J.11



1 M2 1 M2 1 M³ 1 M³ 1 M³



Mengupas Plesteran Lama Memasang Restorasi Paving Block Langsiran Batu Kali Langsiran Kerikil Langsiran Pasir



134 135 136 137



PTB PTB PTB PTB



J.14 J.15 J.16



138



PTB



J.12 J.13



m³ m³ m³



Err:509



### ### ### ### ###



### ### ### ###



Err:509 Err:508



### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###



J.17



1 Unit 1 M2 1 Bh 1 Bh



Membuat Tutup Mainhole IPAL Restorasi Jalan Aspal Pemasangan Loster Pemasangan Glass block



J.18



1 Set



Pemasangan Pintu Aluminium



### ### ###



Err:509 Err:508



### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###



Err:509



### ### ###



Err:508 Err:508



### ### ### ### ###



Err:508 Err:508



### ###



Err:508



### ### ### ### ### ### ### ###



Err:508 Err:508 Err:508 Err:508



### ### ### ### ### ### ### ### ### ###



Err:508



### ### ### ### ###



Err:508 Err:508 Err:508



### ### ### ### ###



Err:508



### ### ### ### ###



Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508



20 x 20 cm 20 x 25 cm 30 x 30 cm 40 x 40 cm



121 122 123



J.7 J.8



### ###



### ###



standar ISO 4435 Ø 4" standar ISO 4435 Ø 4" standar SNI 06-0162 ISO 4435 Ø 6" standar SNI 06-0162 ISO 4435 Ø 8"



120



J.2 J.3



Err:508 Err:509



Err:509 Err:508



Kolom Balok Lantai Dinding Tangga



1 m' 1 m' 1 m' 1 m' 1 buah



### ### ### ### ### ### ### ### ###



Err:508



### ### ###



Err:508



### ### ### ### ###



Err:509 Err:508 Err:508



### ### ### ### ### Err:508 Err:508



### ### ### ### ###



Jumlah



Err:508



Err:508 Err:508



m³ m³



MPa (K 250) MPa (K 275) MPa (K 300)



Memasang kloset jongkok keramik ex. Toto Memasang pipa PVC tipe AW diameter 1/2" Memasang pipa PVC tipe diameter 3/4" Memasang Pipa PVC air limbah standar ISO 4435 Ø 2" Memasang Pipa PVC air limbah standar ISO 4435 Ø 3"



Err:508



M' M²



###



MPa (K 200)



1 buah 1 m' 1 m' 1 m' 1 m'



Kepala Tukang



### ###



### ###



Membuat plat penutup IPAL beton bertulang (150 kg besi + bekisting)



Tukang



Err:509



### ### ###



1 buah Memasang kloset duduk keramik + tabung 1 buah Memasang kloset duduk duduk tanpa tabung 1 buah Memasang kloset jongkok standard



Pekerja



Err:508 Err:508



Plesteran Beton 1 Pc : 3 Pp, tebal 15 mm Plesteran Ciprat, 1 Pc : 2 Pp, tebal 10 mm Finishing Siar Pasangan Dinding Batu Bata (=20 m')



mutu f'c=16,9 1:2:3 mutu f'c=21,7 mutu f'c=24,0 mutu f'c=26,4



STN



Err:508



Mandor



Sewa Gerobak



Solar



Aspal



Err:508 Err:508



Kayu Kaso Paku Biasa 5 - 7 /400 2" - 5" cm Err:508



Err:508



Balok Kayu Pasir Urug Kls III



Sirtu



Tanah Urug



Batu Kali/belah 15 - 20 cm



Ijuk



Portland Cement (PC)



PC warna



Batu Batu Merah ( Batu Pecah Kali/belah 5,5 x 11 x 22 Waterproof Pasir beton 2 - 3 cm 10 - 15 cm cm )



Pasir pasang



Besi Beton Polos



Air Kerja



Kawat Beton



Papan Minyak kayu kls III Bekisting



Balok Kayu kls II



Plywood 120x240 tbl. 9 mm



Kayu Kloset duduk Kloset duduk Dolken / keramik + keramik Kayu Laut Ø 8 tabung tanpa tabung cm/ 400 cm



-



Err:509 -



-



-



m³ m³ m³



Err:509



Err:509



m³ m³



Err:509



-



Err:509



m³ m³ m2



-



-



M³ M³



Err:509 Err:508



Err:509 Err:508



Err:509 Err:508



-



-



-



-



-



Err:509 Err:508



Err:509



-



-



-



Err:509



Err:509



Err:508



Err:508



-



-



-



-



-



-



-



-



-



-



-



M² M² M²



-



-



-



-



-



-



-



-



-



-



-



-



-



M² M²



-



-



-



-



-



-



-



-



M² M² M²



-



-



-



-



-



-



-



-



-



-



M² M²



-



-



-



-



-



-



-



-



M² M² M²



-



-



-



-



-



-



-



-



M² M²



-



-



-



-



-



-



-



-



M² M² M²



-



-



-



-



-



-



M³ M³ M³ M³ M³



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



M³ M³ Kg M2 M2



-



-



-



-



-



-



-



-



-



-



-



-



M2 M2 M2 M2 M2



-



-



-



-



M3 M3 M3 M3 M3



-



Err:509 Err:508



Err:509 Err:508



Err:509 Err:508



Err:508 Err:508



Err:508 Err:508



Err:508 Err:508 -



Err:509 Err:508



Err:509 Err:508 -



-



M³ M³ M³ M³ M³



Err:509 Err:508



Err:509 Err:508 -



-



Err:509 Err:508 -



-



-



-



-



-



-



-



-



Err:509



Err:509



Err:509



Err:509



Err:508



Err:508



Err:508



Err:508



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



Err:509



Err:509



Err:509



Err:509



Err:509



Err:509



Err:509



Err:509



Err:509



Err:509



Err:509



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508 Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508 -



Err:508 -



Err:508



Err:508



Err:508



Err:508 Err:508 Err:508 -



Err:508 Err:508 Err:508 -



Err:508 Err:508 Err:508 -



Err:508 -



Err:508 -



Err:508 -



-



Err:508 Err:508 Err:508



Err:508 Err:508 Err:508



Err:508 Err:508 Err:508



-



Err:508 -



Err:508 -



Err:508 -



Err:508 Err:508 Err:508 Err:508



Err:508 Err:508 Err:508 Err:508



Err:508 Err:508 Err:508 Err:508



Err:508 Err:508 Err:508 Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



-



Err:508 -



Err:508 -



Err:508 -







-



-



-



-



M² M² M²



-



-



-



-



Err:508



-



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



M3



Err:508



m' m' m' m' m' m' m' m' buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah buah unit Unit Unit Unit Unit Unit Unit Unit Unit M² M² M² M² M²



M³ M³ M2 M2 M³ M³ M³ M2 M2



Err:508



Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 -



Err:508 Err:508 Err:508 Err:508 -



Err:508



Err:508



M2 Bh Bh



Err:508 -



Err:509 Err:508 -



Err:509 Err:508 -



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



-



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



-



Err:508



-



Err:508



-



Err:508



-



Err:508 -



Err:508



Err:508



-



Err:508



-



Err:508



-



-



-



-



Err:508



Err:508



Err:508



Err:508



-



-



-



-



-



-



-



-



-



Err:508



Err:509



Err:508



Err:508 -



-



M2 M³ M³ M³ Unit



Pipa PVC Pipa PVC Pipa PVC Ø air limbah air limbah 3/4" standar ISO standar ISO 4435 Ø 2" 4435 Ø 2"



-



-



buah buah buah buah



Pipa PVC Tipe AW Ø 1/2"



Err:509



-



Err:508



Kloset jongkok keramik ex. toto



Err:508



M² M² M²



M3 M3 M' M' M3



Kloset jongkok standard



Err:509 Err:508



m³ m²



M³ M³



Sewa mesin Jack Hammer



-



-



-



-



-



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Set Err:508



-



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



-



-



Perhitungan Material



-



Err:509



Err:508



Err:508



Err:508



Err:508



Err:508



-



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



-



-



Err:508



-



-



-



-



-



Page 19 of 81



Pipa PVC Pipa PVC Pipa PVC Pipa PVC Elbow PVC Elbow PVC Elbow 90° Elbow 90° Elbow 90° air limbah air limbah air limbah air limbah ISO 4435 Ø ISO 4435 Ø ISO 4435 Ø ISO 4435 Ø ISO 4435 Ø standar ISO standar ISO standar ISO standar ISO 1/2" 3/4" 2" 3" 4" 4435 Ø 4" 4435 Ø 4" 4435 Ø 6" 4435 Ø 8"



Tee PVC Ø 1/2"



Tee Y Tee Y Standar Tee 90° Tee 90° Tee 90° Tee PVC Ø Standar SNI 06ISO 4435 Ø ISO 4435 Ø ISO 4435 Ø 3/4" ISO 4435 Ø 0178 ISO 2" 3" 4" 4" x 4" 4435 Ø 6" x 4"



Tee Y Standar Bend 45° SNI 06Standar 0178 ISO ISO 4435 Ø 4435 Ø 8" 4" x 4"



Kran air Ø 1/2"



Seal tape



Floor drain Shock Drat Check Ø 4" Dalam PVC Valve Ø 4" steinless Tipe Ø 1/2"



Buis Beton Buis Beton Ø 40 cm, Ø 60 cm, tebal 8 cm tebal 8 cm



Besi strip UK 5mm x 50 mm



Baut Ø 16 mm



IPAL Fiber IPAL Fiber Large Small Vessel + Vessel + Biaya Biaya Instalasi Instalasi (Standard) (Standard) 30 M³ 7,5 M³



Err:509



Tandon Air 1,1 m3



Pompa Air Keramik 20 Keramik 20 Keramik 30 Keramik 40 Cat Meni Otomatis x 20 cm x 25 cm x 30 cm x 40 cm Kayu/ Besi (Shimizu)



Dempul



Cat kayu



Kertas Gosok ( Amplas)



Kuas 3 "



-



-



-



-



-



-



Plamur



Cat tembok (metrolite)



Roll cat



Cat waterproof



Paving Block



Besi Siku 50 x 50 x 50 mm



Loster Beton



Glass Block



Pintu Aluminium



Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 -



Err:508 Err:508 Err:508 Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508



Err:508 Err:508



Err:508



Err:508 Err:508 -



-



-



-



-



-



-



Err:508 Err:508



Err:508



Err:508



Err:508



-



-



-



-



Err:508



-



-



-



-



Err:508



Err:508



Err:508



-



Err:508



-



-



-



-



Err:508



Err:508



Err:508



Err:508



Perhitungan Material



Err:508



Err:508



Err:508



Err:508



-



-



-



-



Err:508



-



-



-



-



-



-



-



-



-



-



-



Err:508



-



-



-



-



Page 20 of 81



DAFTAR HARGA SATUAN UPAH DAN BAHAN NO.



URAIAN



HARGA



SATUAN



A



TENAGA KERJA



1



Pekerja



@Rp.



95,000.00 /



OH



2



Mandor



@Rp.



0.00 /



OH



2



Tukang Batu



@Rp.



110,000.00 /



3



Tukang Kayu



@Rp.



4



Tukang Besi



@Rp.



5



Tukang Keramik



6 7



HARGA TOKO 1



HARGA TOKO 2



HARGA TOKO 3



HARGA KAB. GOWA



Rp



95,000.00 Rp



100,000.00 Rp



100,000.00 Rp



100,000.00



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



@Rp.



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



Tukang Gali



@Rp.



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



Tukang Pasang Pipa



@Rp.



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



8



Tukang Cat



@Rp.



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



9



Tukang Las



@Rp.



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



10



Kepala Tukang



@Rp.



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



13



Tukang Listrik



@Rp.



110,000.00 /



OH



Rp



110,000.00 Rp



120,000.00 Rp



120,000.00 Rp



120,000.00



14



Sewa Mesin Jack Hammer



@Rp.



0.00 /



OH



15



Sewa Gerobak



@Rp.



0.00 /



OH



B



BAHAN TIMBUNAN



1



Tanah Urug



@Rp.



96,000.00 /



M3



Rp



100,000.00 Rp



100,000.00 Rp



100,000.00 Rp



96,000.00



2



Pasir Urug



@Rp.



92,000.00 /



M3



Rp



125,000.00 Rp



125,000.00 Rp



125,000.00 Rp



92,000.00



3



Pasir Pasang



@Rp.



154,000.00 /



M



3



Rp



200,000.00 Rp



200,000.00 Rp



200,000.00 Rp



154,000.00



4



Pasir beton



@Rp.



154,000.00 /



M



3



Rp



175,000.00 Rp



175,000.00 Rp



175,000.00 Rp



154,000.00



5



Sirtu



@Rp.



115,000.00 /



M3



Rp



125,000.00 Rp



150,000.00 Rp



200,000.00 Rp



115,000.00



C



BAHAN PEREKAT



1



Portland Cement (PC)



@Rp.



1,125.00 /



Kg



Rp



1,250.00 Rp



1,125.00 Rp



1,250.00 Rp



1,237.50



2



PC warna



@Rp.



15,000.00 /



Kg



Rp



25,000.00 Rp



20,000.00 Rp



20,000.00 Rp



15,000.00



3



Waterproof



@Rp.



39,000.00 /



Kg



Rp



39,000.00



@Rp.



17,000.00 /



Kg



Rp



17,000.00



Rp



146,000.00



4



Aspal



D



BAHAN BATU



1



Batu Kali/belah 15 - 20 cm



@Rp.



146,000.00 /



M3



2



Batu Kali/belah 10 - 15 cm



@Rp.



143,000.00 /



M3



Rp



143,000.00



3



Batu Pecah 2 - 3 cm



@Rp.



245,000.00 /



M3



Rp



375,000.00 Rp



350,000.00 Rp



350,000.00 Rp



245,000.00



4



Batu Merah ( 5,5 x 11 x 22 cm )



@Rp.



600.00 /



Bh



Rp



700.00 Rp



700.00 Rp



700.00 Rp



600.00



5



Paving Block



@Rp.



95,000.00 /



M2



Rp



95,000.00



NO.



URAIAN



HARGA



SATUAN



HARGA TOKO 1



HARGA TOKO 2



HARGA TOKO 3



HARGA KAB. GOWA



E



BAHAN KAYU



1



Papan Kayu Kls III



@Rp.



2,100,000.00 /



M3



Rp



2,100,000.00



2



Balok Kayu Kls III



@Rp.



2,000,000.00 /



M3



Rp



2,000,000.00



3



Balok Kayu Kls II



@Rp.



3,000,000.00 /



M3



Rp



3,000,000.00



4



Kayu Kaso 5 - 7 /400 cm



@Rp.



2,100,000.00 /



M3



Rp



2,100,000.00



5



Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



@Rp.



31,000.00 /



Btg



Rp



31,000.00



6



Ijuk



@Rp.



76,000.00 /



Roll



Rp



76,000.00



7



Plywood 120x240 tbl. 9 mm



@Rp.



120,000.00 /



Lbr



Rp



120,000.00



F



BAHAN BESI / ALUMINIUM



1



Besi Beton polos



@Rp.



9,000.00 /



Kg



Rp



9,000.00



2



Besi Beton polos Ø 6 mm



@Rp.



29,000.00 /



Btg



Rp



29,000.00



3



Besi Beton polos Ø 8 mm



@Rp.



46,000.00 /



Btg



Rp



46,000.00



4



Besi Beton polos Ø 10 mm



@Rp.



68,000.00 /



Btg



Rp



68,000.00



5



Besi Beton polos Ø 12 mm



@Rp.



100,000.00 /



Btg



Rp



100,000.00



6



Besi Beton polos Ø 14 mm



@Rp.



115,000.00 /



Btg



Rp



115,000.00



7



Besi strip UK 5mm x 50 mm



@Rp.



65,000.00 /



Btg



Rp



65,000.00



8



Besi Siku 50 x 50 x 50 mm



@Rp.



65,000.00 /



Btg



Rp



65,000.00



9



Kawat Beton



@Rp.



26,500.00 /



Kg



Rp



26,500.00



10



Paku Biasa 2" - 5"



@Rp.



20,000.00 /



Kg



Rp



20,000.00



11



Baut Ø 16 mm



@Rp.



17,000.00 /



Bh



Rp



17,000.00



Rp



49,700.00



I



BAHAN CAT / MINYAK DAN BAHAN BAKAR



1



Minyak Bekisting



@Rp.



49,700.00 /



Ltr



Rp



55,000.00



1



Cat tembok (metrolite)



@Rp.



45,000.00 /



kg



Rp



45,000.00 Rp



45,000.00 Rp



45,000.00 Rp



64,000.00



2



Cat kayu



@Rp.



56,000.00 /



kg



Rp



60,000.00 Rp



60,000.00 Rp



60,000.00 Rp



56,000.00



3



Cat waterproof



@Rp.



39,000.00 /



kg



Rp



42,500.00



Rp



39,000.00



4



Kertas Gosok ( Amplas)



@Rp.



2,500.00 /



lbr



Rp



4,000.00 Rp



2,500.00 Rp



3,000.00 Rp



5,000.00



5



Dempul



@Rp.



25,000.00 /



kg



Rp



25,000.00



6



Cat Meni Kayu/ Besi



@Rp.



33,000.00 /



ltr



Rp



35,000.00 Rp



33,000.00 Rp



350,000.00 Rp



35,000.00



7



Roll cat



@Rp.



23,000.00 /



bh



Rp



23,000.00



8



Plamur



@Rp.



26,900.00 /



kg



Rp



55,000.00 Rp



55,000.00 Rp



26,900.00



9



Kuas 3 "



@Rp.



12,000.00 /



bh



Rp



20,000.00 Rp



15,000.00 Rp



15,000.00 Rp



12,000.00



J



BAHAN SANITASI / PIPA



1



IPAL Fiber Large Vessel + Biaya Instalasi (Standard) 30 M³



@Rp.



210,000,000.00 /



Unit



Rp



214,500,000.00 Rp



210,000,000.00



2



IPAL Fiber Large Vessel + Biaya Instalasi (UV) 25 M³



@Rp.



175,000,000.00 /



Unit



Rp



178,750,000.00 Rp



175,000,000.00



NO.



URAIAN



HARGA



SATUAN



HARGA TOKO 1



HARGA TOKO 2



HARGA TOKO 3



3



IPAL Fiber Large Vessel + Biaya Instalasi (UV+) 20 M³



@Rp.



140,000,000.00 /



Unit



Rp



143,000,000.00 Rp



140,000,000.00



4



IPAL Fiber Medium Vessel + Biaya Instalasi (Standard) 15 M³



@Rp.



105,000,000.00 /



Unit



Rp



107,250,000.00 Rp



105,000,000.00



5



IPAL Fiber Medium Vessel + Biaya Instalasi (UV) 10 M³



@Rp.



70,000,000.00 /



Unit



Rp



71,500,000.00 Rp



70,000,000.00



6



IPAL Fiber Medium Vessel + Biaya Instalasi (UV+) 8 M³



@Rp.



56,000,000.00 /



Unit



Rp



56,000,000.00



7



IPAL Fiber Small Vessel + Biaya Instalasi (Standard) 7,5 M³



@Rp.



52,500,000.00 /



Unit



Rp



52,500,000.00



8



IPAL Fiber Small Vessel + Biaya Instalasi (UV) 5M³



@Rp.



35,000,000.00 /



Unit



Rp



35,750,000.00 Rp



35,000,000.00



9



Kloset jongkok standar



@Rp.



200,000.00 /



Bh



Rp



350,000.00 Rp



10



Buis Beton Ø 40 cm, tebal 8 cm



@Rp.



250,000.00 /



M'



11



Buis Beton Ø 60 cm, tebal 8 cm



@Rp.



300,000.00 /



M'



12



Pipa PVC air limbah standar ISO 4435 Ø 4"



@Rp.



68,800.00 /



M'



Rp



79,266.67 Rp



68,800.00 Rp



77,816.67



13



Pipa PVC air limbah standar ISO 4435 Ø 6"



@Rp.



133,200.00 /



M'



Rp



163,283.33 Rp



133,200.00 Rp



141,908.33



14



Pipa PVC air limbah standar ISO 4435 Ø 8"



@Rp.



203,900.00 /



M'



Rp



247,500.00 Rp



203,900.00 Rp



217,966.67



15



Pipa PVC air limbah standar ISO 4435 Ø 2"



@Rp.



22,250.00 /



M'



Rp



32,908.33



16



Pipa PVC air limbah standar ISO 4435 Ø 3"



@Rp.



34,900.00 /



M'



Rp



55,691.67 Rp



17



Pipa PVC Ø 1/2"



@Rp.



8,700.00 /



M'



18



Pipa PVC Ø 3/4"



@Rp.



10,200.00 /



M'



19



Elbow PVC ISO 4435 Ø 1/2"



@Rp.



3,500.00 /



Bh



20



Elbow PVC ISO 4435 Ø 3/4"



@Rp.



5,000.00 /



Bh



21



Elbow 90° ISO 4435 Ø 2"



@Rp.



7,500.00 /



Bh



22



Elbow 90° ISO 4435 Ø 3"



@Rp.



32,000.00 /



Bh



Rp



32,000.00



23



Elbow 90° ISO 4435 Ø 4"



@Rp.



55,000.00 /



Bh



Rp



55,000.00



24



Tee PVC Ø 1/2"



@Rp.



3,500.00 /



Bh



25



Tee PVC Ø 3/4"



@Rp.



5,000.00 /



Bh



26



Tee 90° ISO 4435 Ø 2"



@Rp.



16,000.00 /



Bh



Rp



16,000.00



27



Tee 90° ISO 4435 Ø 3"



@Rp.



20,000.00 /



Bh



Rp



20,000.00



28



Tee 90° ISO 4435 Ø 4"



@Rp.



30,000.00 /



Bh



Rp



30,000.00



29



Tee Y Standar ISO 4435 Ø 4" x 4"



@Rp.



126,400.00 /



Bh



Rp



126,400.00



30



Tee Y Standar SNI 06-0178 ISO 4435 Ø 6" x 4"



@Rp.



0.00 /



Bh



31



Tee Y Standar SNI 06-0178 ISO 4435 Ø 8" x 4"



@Rp.



0.00 /



Bh



32



Bend 45° Standar ISO 4435 Ø 4"



@Rp.



89,500.00 /



Bh



Rp



89,500.00



33



Shock Drat Dalam PVC Tipe Ø 1/2"



@Rp.



3,500.00 /



Bh



34



Kran air Ø 1/2"



@Rp.



34,000.00 /



Bh



35



Seal tape



@Rp.



2,500.00 /



Bh



36



Floor drain Ø 4" steinless



@Rp.



27,500.00 /



Bh



37



Check Valve Ø 4"



@Rp.



2,000,000.00 /



Unit



HARGA KAB. GOWA



350,000.00 Rp



350,000.00 Rp



200,000.00



Rp



266,900.00 Rp



250,000.00



Rp



447,700.00 Rp



300,000.00



Rp



43,241.67 Rp



22,250.00



34,900.00 Rp



63,100.00 Rp



44,375.00



NO.



URAIAN



HARGA



SATUAN



38



Air Kerja



@Rp.



/



Liter



39



Lem Pipa



@Rp.



36,000.00 /



Klg



40



Lubricant @ 800 gr



@Rp.



85,000.00 /



Btl



HARGA TOKO 1



HARGA TOKO 2



HARGA TOKO 3



Rp



94,400.00



HARGA KAB. GOWA



NO.



URAIAN



HARGA



SATUAN



K



BAHAN PENUTUP LANTAI DAN DINDING



1



Keramik 20 x 20 cm



@Rp.



50,000.00 /



M2



2



Keramik 20 x 25 cm



@Rp.



58,000.00 /



3



Keramik 30 x 30 cm



@Rp.



59,500.00 /



4



Keramik 40 x 40 cm



@Rp.



67,500.00 /



L



BAHAN ELEKTRIKAL



1



Biaya penyambungan listrik baru



@Rp.



2



Biaya Instalasi



3 4



HARGA TOKO 1 Rp



50,000.00 Rp



HARGA TOKO 2 53,000.00 Rp



HARGA TOKO 3



HARGA KAB. GOWA



55,000.00 Rp



59,000.00



M2



Rp



58,000.00



M2



Rp



59,500.00



M2



Rp



67,500.00



2,500,000.00 /



Paket



Rp



2,500,000.00



@Rp.



58,000.00 /



Titik



Rp



58,000.00



MCB 30 A



@Rp.



110,000.00 /



bh



Rp



110,000.00



Sakelar Tunggal



@Rp.



10,500.00 /



bh



Rp



10,500.00



5



Sakelar Seri



@Rp.



24,000.00 /



bh



Rp



24,000.00



6



Stop Kontak



@Rp.



18,000.00 /



bh



Rp



18,000.00



7



Downlight



@Rp.



85,000.00 /



bh



Rp



85,000.00



8



Fitting



@Rp.



9,500.00 /



bh



Rp



9,500.00



9



Lampu Hemat Energi 11 Watt



@Rp.



40,000.00 /



bh



Rp



40,000.00



10



Lampu Hemat Energi 18 Watt



@Rp.



49,500.00 /



bh



Rp



49,500.00



11



Lampu Taman Mercury



@Rp.



269,000.00 /



bh



Rp



269,000.00



12



Kabel NYK 3 x 2.5 mm



@Rp.



17,800.00 /



m'



Rp



17,800.00



13



Kabel NYK 2 x 2.5 mm



@Rp.



14,000.00 /



m'



Rp



14,000.00



14



Kabel NYK 2 x 1.5 mm



@Rp.



8,300.00 /



m'



Rp



8,300.00



M



BAHAN PERLENGKAPAN



1



Tandon Air 1,1 m3



@Rp.



1,100,000.00 /



unit



Rp



1,100,000.00



2



Ember air besar



@Rp.



40,000.00 /



bh



Rp



40,000.00



3



Gayung



@Rp.



10,000.00 /



bh



Rp



10,000.00



4



Tempat Sabun



@Rp.



10,000.00 /



bh



Rp



10,000.00



5



Gantungan Baju



@Rp.



20,000.00 /



bh



Rp



20,000.00



6



Sapu Plastik



@Rp.



35,000.00 /



bh



Rp



35,000.00



7



Alat Pel



@Rp.



55,000.00 /



bh



Rp



55,000.00



8



Sikat Kloset



@Rp.



10,000.00 /



bh



Rp



10,000.00



9



Tempat Sampah



@Rp.



60,000.00 /



bh



Rp



60,000.00



10



Kesed Lantai



@Rp.



20,000.00 /



bh



Rp



20,000.00



11



Box Uang



@Rp.



75,000.00 /



bh



Rp



75,000.00



12



Pompa Air Otomatis (Shimizu)



@Rp.



683,000.00 /



unit



Rp



683,000.00



13



Loster Beton



@Rp.



35,000.00 /



bh



Rp



35,000.00



14



Glass Block



@Rp.



26,000.00 /



bh



Rp



26,000.00



NO. 15



URAIAN Pintu Aluminium



HARGA @Rp.



350,000.00 /



SATUAN set



HARGA TOKO 1



HARGA TOKO 2



HARGA TOKO 3



HARGA KAB. GOWA Rp



350,000.00



NO.



URAIAN



HARGA



SATUAN



HARGA TOKO 1



HARGA TOKO 2



HARGA TOKO 3



HARGA KAB. GOWA



N



BAHAN KAYU



1



Balok Kayu Kls I



@Rp.



9,000,000.00 /



M3



Rp



9,000,000.00



2



Papan Kayu Kls I



@Rp.



15,000,000.00 /



M3



Rp



15,000,000.00



3



Balok Kayu Kls II



@Rp.



3,000,000.00 /



M3



Rp



3,000,000.00



4



Papan Kayu Kls II



@Rp.



3,700,000.00 /



M3



Rp



3,700,000.00



P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12



-



P0 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13



25.04 24.94 15.68 24.90 24.95 24.95 24.81 24.98 25.01 25.05 12.57 14.23 24.36



P14 P15



-



P14 P15 P3



24.82 M 23.91 M



P16 P17 P18 P19 P20



-



P16 P17 P18 P19 P20 P13



28.25 14.16 35.62 24.99 24.28



M M M M M



P13 P21 P22 P23 P24 P25 P26



-



P13 P21 P22 P23 P24 P25 P26 P27



24.36 25.01 24.69 37.78 24.96 25.09 25.40



M M M M M M M



TOTAL



M M M M M M M M M M M M M M



654.79 M



PAVING BLOCK PAVING BLOCK



PAVING BLOCK



109.13



214.62 M



461.83 87.32



35.77 RESTORASI PAVING



RESTORASI PAVING



REKAPITULASI RENCANA ANGGARAN BIAYA Program



: Pembangunan Sanitasi Berbasis Masyarakat (SANIMAS)



Pekerjaan



: Pembangunan Ipal Komunal



Lokasi



: Desa Taeng Kecamatan Pallangga



Instansi



: Dinas Pekerjaan Umum dan Pentaan Ruang Kabupaten Gowa



Pagu



: Rp



410,000,000.00



NO



I.



URAIAN



PEKERJAAN PERSIAPAN



JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA MATERIAL UPAH (Rp) (Rp) (Rp) 2,022,000.00



817,000.00



2,839,000.00



195,409,000.00



26,603,000.00



222,012,000.00



III. PEKERJAAN PEMIPAAN DAN MENHOLE



39,448,000.00



25,389,000.00



64,837,000.00



IV. PEKERJAAN SAMBUNGAN RUMAH ( SR )



36,447,000.00



23,695,000.00



60,142,000.00



933,000.00



1,465,000.00



2,398,000.00



20,500,000.00



20,500,000.00



98,469,000.00



372,728,000.00 37,272,800.00 410,000,800.00 410,000,000.00



II. PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL)



V.



PEKERJAAN BANGUNAN PENUNJANG



VI. BIAYA OPERASIONAL KSM JUMLAH DANA KONSTRUKSI PPN 10% TOTAL DANA DIBULATKAN



TERBILANG :



274,259,000.00



TIGA RATUS DUA PULUH TUJUH JUTA RUPIAH



DISETUJUI OLEH KSM " ABBULOSIBATANG "



DIBUAT OLEH KSM " ABBULOSIBATANG "



ASRUL SULAIMAN KETUA



SYAPARUDDIN MANDASINGI TIM PERENCANA



RENCANA ANGGARAN BIAYA (RAB) Program



:



Pembangunan Sanitasi Berbasis Masyarakat (SANIMAS)



Pekerjaan



:



Pembangunan Ipal Komunal



Sub. Pekerjaan



:



Pembangunan Ipal Komunal 18 Kubik



Lokasi



:



Desa Taeng Kecamatan Pallangga



Instansi



:



Dinas Pekerjaan Umum dan Pentaan Ruang Kabupaten Gowa



Pagu



:



Rp



410,000,000.00



No.



Uraian Pekerjaan



1



2



I. 1 2 3



II. A 1 2 3



PEKERJAAN PERSIAPAN Pengukuran dan Pemasangan Bouwplank Pembersihan Lapangan dan Perataan Pengadaan P3K dan Rambu - Rambu K3



PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) PEKERJAAN TANAH DAN PASIR Galian Tanah Urugan Pasir Bawah Pondasi dan Lantai Urugan Pasir Pengaman IPAL



Satuan Kuantitas 3



M1 M2 Ls Jumlah I Dibulatkan



M3 M3 M3



B 1 2 3 4 5 6 7 8 9 10



PERKERJAAN PONDASI DAN BETON Pasangan Batu Kali 1 Pc : 5 Ps ( Dinding IPAL ) Lantai Kerja Bawah IPAL ( 1 PC : 3 PS : 5 Krl ) Balok 20/25 ( 1 Pc : 2 Ps : 3 Krl ) Lantai IPAL Beton ( 1 Pc : 2 Ps : 3 Krl ) Penutup IPAL Beton ( 1 Pc : 2 Ps : 3 Krl ) Tutup Menhole Besi Curah Membuat Bak Inlet Membuat Bak Outlet Memasang Check Valve Ø 4 "" Penutup Manhole



M3 M3 M3 M3 M3 Unit Unit Unit Buah Unit



C 1



PENGADAAN DAN PEMASANGAN PAKET IPAL IPAL kapasitas 50 KK



Unit Jumlah II Dibulatkan



No. Anal.



4



5



25.80 27.39 1.00



Ls Ls Ls



109.63 3.42 17.83



32.5 1.86 1.78 3.42 4.42 4.00 1.00 1.00 1.00 4.00



1.00



Harga Satuan Material ( Rp ) 6



Harga Satuan Upah ( Rp ) 7



Harga Satuan Material+Upah ( Rp ) 8 (6+7)



Jumlah Harga Material ( Rp ) 9 (4x6)



Jumlah Harga Upah ( Rp ) 10 (4x7)



Jumlah Harga Materia+Upah ( Rp ) 11 (4x8)



39,600.00 1,000,000.00



21,600.00 9,500.00



61,200.00 9,500.00 1,000,000.00



1,021,680.00 1,000,000.00 2,021,680.00 2,022,000.00



557,280.00 260,205.00 817,485.00 817,000.00



1,578,960.00 260,205.00 1,000,000.00 2,839,165.00 2,839,000.00



B.1 B.12 B.12



110,400.00 110,400.00



71,250.00 28,500.00 28,500.00



71,250.00 138,900.00 138,900.00



378,059.28 1,968,741.12 2,346,800.40



7,811,162.08 97,596.83 508,234.80 8,416,993.71



7,811,162.08 475,656.11 2,476,975.92 10,763,794.11



C.3 F.1 F.24 F.30 F.31 Ls G.39 G.40 G.30 G.34



411,976.00 554,765.00 4,696,630.00 2,161,291.11 4,661,016.09 1,300,000.00 2,537,600.00 1,372,200.00 2,000,000.00 1,300,000.00



233,250.00 190,025.00 1,005,630.00 416,825.00 1,101,059.21 938,100.00 938,100.00 300,000.00 -



645,226.00 744,790.00 5,702,260.00 2,578,116.11 5,762,075.30 1,300,000.00 3,475,700.00 2,310,300.00 2,300,000.00 1,300,000.00



13,384,935.45 1,029,089.08 8,341,214.88 7,395,938.18 20,601,691.12 5,200,000.00 2,537,600.00 1,372,200.00 2,000,000.00 5,200,000.00 67,062,668.71



7,578,199.20 352,496.38 1,785,998.88 1,426,375.15 4,866,681.71 938,100.00 938,100.00 300,000.00 18,185,951.31



20,963,134.65 1,381,585.45 10,127,213.76 8,822,313.33 25,468,372.83 5,200,000.00 3,475,700.00 2,310,300.00 2,300,000.00 19,500,000.00 99,548,620.02



126,000,000.00



126,000,000.00 126,000,000.00 195,409,469.11 195,409,000.00



26,602,945.02 26,603,000.00



126,000,000.00 126,000,000.00 236,312,414.13 236,312,000.00



Ls



126,000,000.00



-



No.



Uraian Pekerjaan



1



2



III. A 1 2



Satuan Kuantitas 3



4



No. Anal. 5



PEKERJAAN PEMIPAAN DAN MENHOLE PEKERJAAN BONGKARAN & RESTORASI Membongkar Paving Block Untuk Digunakan Kembali Memasang Restorasi Paving Block



M2 M2



B 1 2 3



PEKERJAAN TANAH DAN PASIR Galian Tanah < 1 m Urugan Tanah Kembali dan Pemadatan Urugan Pasir di bawah pipa



M3 M3 M3



C 1 2



PEKERJAAN JARINGAN PERPIPAAN Pemasangan Pipa Air Limbah Standar ISO 4435 Ø 4 ' Pemasangan Pipa Air Limbah Standar ISO 4435 Ø 4 ' ( Outlet )



M' M'



350.00



G.9 G.9



D 1 2



PEKERJAAN BAK MENHOLE DAN BAK PENGGELONTORAN Pembuatan Bak Menhole Kedalaman 1 - 2 M Ø 60 cm Penutup Manhole



Unit Unit



15.00 15.00



G.33 G.34



72.50 72.50



Harga Satuan Material ( Rp ) 6



J.4 J.10



99.75 B.1 89.24 B.10 10.50 B.12



Harga Satuan Upah ( Rp ) 7



-



Harga Satuan Material+Upah ( Rp ) 8 (6+7)



Jumlah Harga Material ( Rp ) 9 (4x6)



Jumlah Harga Upah ( Rp ) 10 (4x7)



Jumlah Harga Materia+Upah ( Rp ) 11 (4x8)



9,500.00 9,500.00



9,500.00 9,500.00



-



688,750.00 688,750.00 1,377,500.00



688,750.00 688,750.00 1,377,500.00



110,400.00



71,250.00 47,500.00 28,500.00



71,250.00 47,500.00 138,900.00



1,159,200.00 1,159,200.00



7,107,187.50 4,239,004.50 299,250.00 11,645,442.00



7,107,187.50 4,239,004.50 1,458,450.00 12,804,642.00



86,000.00 86,000.00



24,030.00 24,030.00



110,030.00 110,030.00



30,100,000.00 30,100,000.00



8,410,500.00 8,410,500.00



38,510,500.00 38,510,500.00



545,906.21 1,300,000.00



263,718.32 -



809,624.53 1,300,000.00



8,188,593.09 19,500,000.00 8,188,593.09 39,447,793.09 39,448,000.00



3,955,774.86 3,955,774.86 25,389,216.86 25,389,000.00



12,144,367.95 19,500,000.00 31,644,367.95 84,337,009.95 84,337,000.00



110,400.00



71,250.00 47,500.00 28,500.00



71,250.00 47,500.00 138,900.00



1,490,400.00 1,490,400.00



2,565,000.00 1,068,379.50 384,750.00 4,018,129.50



2,565,000.00 1,068,379.50 1,875,150.00 5,508,529.50



-



Jumlah III Dibulatkan IV. A. 1 2 3



PEKERJAAN SAMBUNGAN RUMAH ( SR ) PEKERJAAN TANAH DAN PASIR Galian Tanah Kedalaman < 1 m Urugan Tanah Kembali dan Pemadatan Urugan Pasir Bawah Pipa



M3 M3 M3



B. 1 2 3 4 5



PEKERJAAN PEMASANGAN PIPA DAN ACCESORIESS Pemasangan Pipa Air Limbah Standar ISO 4435 Ø 4 ' Pemasangan Pipa Air Limbah Standar ISO 4435 Ø 3 ' Pemasangan Elbow 90° Ø 3" Pemasangan Tee 90° Ø 3" Pemasangan Tee Y Standar ISO 4435 Ø 4' x 4'



M' M' Bh Bh Bh



100.00 350.00 35.00 35.00 35.00



G.9 G.8 G.16 G.21 G.23



86,000.00 27,812.50 32,000.00 20,000.00 126,400.00



24,030.00 24,030.00 8,010.00 8,010.00 10,680.00



110,030.00 51,842.50 40,010.00 28,010.00 137,080.00



8,600,000.00 9,734,375.00 1,120,000.00 700,000.00 4,424,000.00 24,578,375.00



2,403,000.00 8,410,500.00 280,350.00 280,350.00 373,800.00 11,748,000.00



11,003,000.00 18,144,875.00 1,400,350.00 980,350.00 4,797,800.00 36,326,375.00



C 1 2



PEKERJAAN BAK KONTROL Pembuatan Bak Perangkap Lemak Ø 40 cm Pembuatan Bak Kontrol SR Ø 40 cm



Unit Unit



35.00 35.00



G.31 G.32



148,799.13 147,732.98



132,247.90 94,287.30



281,047.03 242,020.28



5,207,969.67 5,170,654.42 10,378,624.08 36,447,399.08 36,447,000.00



4,628,676.50 3,300,055.50 7,928,732.00 23,694,861.50 23,695,000.00



9,836,646.17 8,470,709.92 18,307,356.08 60,142,260.58 60,142,000.00



16,633.33 -



8,300.00 1,000,000.00 -



24,933.33 1,000,000.00 -



932,797.33 -



465,464.00 1,000,000.00 -



1,398,261.33 1,000,000.00 -



932,797.33 933,000.00 274,259,000.00



1,465,464.00 1,465,000.00 77,969,000.00



2,398,261.33 2,398,000.00 386,028,000.00



36.00 B.1 22.49 B.10 13.50 B.12



-



Jumlah IV Dibulatkan V. 1 2 4 5



PEKERJAAN BANGUNAN PENUNJANG Pengecetan Tembok Baru Pasangan Batu 1 : 5 ( untuk Pengaman Pipa ) Sewa Pompa Pompa Submersible



M2 M3 Unit Unit



56.08 0.00 1.00 0.00



Jumlah V Dibulatkan Jumlah Total I + II +III + IV + V



I.2 C.3 Ls Ls



RENCANA ANGGARAN BIAYA PROGRAM



:



DAK SANITASI BERBASIS MASYARAKAT ( SANIMAS )



TAHUN ANGGARAN



PEKERJAAN LOKASI



: :



Pembangunan Instalasi Pengolahan Air Limbah ( IPAL ) dan Perpipaan RT.003/RW.002, Kelurahan Sumpang Minangae, Kec. Bacukiki Barat, Kota Parepare, Prov. SulSel



KAPASITAS IPAL JUMLAH CALON PENGGU



INSTANSI



:



Dinas Pekerjaan Umum dan Penataan Ruang Kota Parepare 436,363,636



PELAKSANA



NO.



URAIAN PEKERJAAN



I. PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) A PEKERJAAN PERSIAPAN



NO. ANALISA



KUANTITAS



Pembersihan Lapangan dan Peralatan Listrik dan Air



-



1.00 -



3 4



Sewa Pompa Air Gerobak Dorong



-



-



5



Pemasangan bowplank



B 1 2



PEKERJAAN TANAH DAN PASIR Galian Tanah Urugan Pasir Bawah Pondasi dan Lantai



2



Urugan Pasir Bawah Pondasi dan Lantai



C 1



PEKERJAAN BETON DAN PONDASI Lantai kerja Beton ( K-175 )



2 3



Cor Lantai Inlet dan Outlet (K-250) Plat Beton Lantai IPAL (K-250)



4



Slof 30/20 cm Melintang Ipal, Bak Inlet dan Outlet (K-250) Bekisting Slof



6



8



9



HARGA BAHAN



HARGA UPAH



HARGA SATUAN



JUMLAH HARGA BAHAN



JUMLAH HARGA UPAH



( Rp )



( Rp )



( Rp )



( Rp )



( Rp )



-



1 2



5



SATUAN



A.1



Ls Ls



1,000,000.00



1,500,000.00 -



1,500,000.00 1,000,000.00



-



1,500,000.00 -



Ls Unit



2,000,000.00 500,000.00



-



2,000,000.00 500,000.00



-



-



25.80



M2



34,700.00



20,750.00



55,450.00



895,260.00 895,260.00



535,350.00 2,035,350.00



B.3 B.12



109.63 3.42



M3 M3



135,000.00



89,250.00 25,500.00



89,250.00 160,500.00



462,300.75



9,784,508.29 87,323.48



B.12



17.83



M3



135,000.00



25,500.00



160,500.00



2,407,428.00 462,300.75



454,736.40 9,871,831.77



F.5



1.86



M3



604,715.87



173,937.50



778,653.37



1,121,747.94



322,654.06



F.8 F.8



0.22 3.42



M3 M3



670,333.07 670,333.07



173,937.50 173,937.50



844,270.57 844,270.57



144,791.94 2,293,879.76



37,570.50 595,214.13



F.8 F.15



1.41 14.11



M3 M2



670,333.07 44,250.00



173,937.50 38,025.00



844,270.57 82,275.00



945,974.03 624,456.00



245,460.60 536,608.80



Pembesian Slof Kolom 20/20 cm (K-250)



F.13 F.8



279.95 0.90



Kg M3



10,350.00 670,333.07



1,452.50 173,937.50



11,802.50 844,270.57



2,897,463.99 600,618.43



406,624.78 155,848.00



Bekisting Kolom Pembesian Kolom



F.16 F.13



17.92 146.57



M2 Kg



104,000.00 10,350.00



48,262.50 1,452.50



152,262.50 11,802.50



1,863,680.00 1,516,956.94



864,864.00 212,886.95



Balok 30/20 cm Plat (K-250) Bekisting Balok



F.8 F.17



1.78 11.84



M3 M2



670,333.07 107,750.00



173,937.50 48,262.50



844,270.57 156,012.50



1,190,511.53 1,275,760.00



308,913.00 571,428.00



Pembesian Balok Plat Penutup Manhole, Bak Inlet dan Outlet Bekisting Plat Penutup



F.13 F.8 F.18



280.78 0.43 2.04



Kg M3 M2



10,350.00 670,333.07 154,000.00



1,452.50 173,937.50 48,262.50



11,802.50 844,270.57 202,262.50



2,906,094.20 290,589.39 314,160.00



407,835.92 75,401.91 98,455.50



Pembesian Plat Penutup Plat IPAL t = 20 cm



F.13 F.8



75.59 4.42



Kg M3



10,350.00 670,333.07



1,452.50 173,937.50



11,802.50 844,270.57



782,356.50 2,962,872.16



109,794.48 768,803.75



Bekisting Plat IPAL Pembesian Plat IPAL



F.18 F.13



23.14 513.22



M2 Kg



154,000.00 10,350.00



48,262.50 1,452.50



202,262.50 11,802.50



3,563,560.00 5,311,867.57



1,116,794.25 745,457.74



30,607,340.38



7,580,616.37



D



PEKERJAAN PASANGAN



1 2



Pasangan 1 Batu Bata Campuran 1Pc : 3Ps Inlet Pasangan 1 Batu Bata Campuran 1Pc : 3Ps Outlet



D.1 D.1



3.00 4.50



M2 M2



133,777.50 133,777.50



75,500.00 75,500.00



209,277.50 209,277.50



401,332.50 601,998.75



226,500.00 339,750.00



3 4



Plesteran Dalam 1Pc : 3Ps Pas Batu Kali 1Pc : 4Ps



E.1 C.2



32.49



M2 M3



11,918.70 398,100.00



43,875.00 219,375.00



55,793.70 617,475.00



12,934,109.76



7,127,406.00



13,937,441.01



7,693,656.00



122,400,000.00



-



122,400,000.00 168,302,342.14



27,181,454.13



E 1



PENGADAAN DAN PEMASANGAN PAKET IPAL IPAL PABRIKASI Kapasitas 50 KK



1.00



Unit



122,400,000.00



Jumlah I



122,400,000.00



NO.



URAIAN PEKERJAAN



NO. ANALISA



KUANTITAS



SATUAN



HARGA BAHAN



HARGA UPAH



HARGA SATUAN



JUMLAH HARGA BAHAN



JUMLAH HARGA UPAH



( Rp )



( Rp )



( Rp )



( Rp )



( Rp )



II. PEKERJAAN PEMIPAAN DAN MANHOLE A PEKERJAAN TANAH DAN PASIR 1



Galian Tanah Kedalaman < 1 M



132.80



M3



-



63,750.00



63,750.00



-



2



Urugan Pasir Bawah Pipa



B.12



B.1



12.00



M3



135,000.00



25,500.00



160,500.00



1,620,000.00



306,000.00



3



Urugan Tanah Kembali dan Pemadatan



B.10



33.20



M3



-



42,500.00



42,500.00



1,620,000.00



1,411,000.00 10,183,000.00



B 1



PEKERJAAN JARINGAN PERPIPAAN Pemas. Pipa PVC air limbah standar SNI 06-0162 ISO 4435 Ø 4"



G.10



300.00



M1



98,166.66



23,422.50



121,589.16



29,449,998.45 29,449,998.45



7,026,750.00 7,026,750.00



C 1



PEKERJAAN BAK MANHOLE Pembuatan Bak Manhole kedalaman < 1 M Ø 60 Cm



G.33



10.00



558,595.32



252,589.41



811,184.73



5,585,953.24 5,585,953.24



2,525,894.11 2,525,894.11



36,655,951.69



19,735,644.11



Unit



Jumlah II



8,466,000.00



III. PEKERJAAN SAMBUNGAN RUMAH ( SR ) A PEKERJAAN TANAH DAN PASIR 1 2 3



Galian Tanah Kedalaman < 1 M Urugan Pasir Urugan Tanah Kembali



4 5



Pasangan 1/2 Batu Bata Campuran 1Pc : 3Ps Plesteran Dinding 1Pc : 3Ps



6 7 8 9



B.1 B.12 B.10



61.65 12.33 15.41



M3 M3 M3



135,000.00 -



63,750.00 25,500.00 42,500.00



63,750.00 160,500.00 42,500.00



1,664,550.00 -



3,930,187.50 314,415.00 655,031.25



D.4 E.1



75.60 151.20



M2 M2



63,744.00 11,918.70



37,750.00 43,875.00



101,494.00 55,793.70



4,819,046.40 1,802,107.44



2,853,900.00 6,633,900.00



Acian Dinding Lantai Cor ( K-250 )



E.14 F.8



75.60 1.30



M3 M4



3,900.00 670,333.07



29,250.00 173,937.50



33,150.00 844,270.57



294,840.00 868,751.66



2,211,300.00 225,423.00



Acian Lantai Plat Penutup (K-250)



E.14 F.8



8.64 0.77



M5 M6



3,900.00 670,333.07



29,250.00 173,937.50



33,150.00 844,270.57



33,696.00 513,106.45



252,720.00 133,140.46



Bekisting Plat Penutup Pembesian Plat Penutup



F.18 F.13



6.80 209.99



M7 M8



308,000.00 10,350.00



96,525.00 1,452.50



404,525.00 11,802.50



2,095,632.00 2,173,396.50



656,756.10 305,010.48



14,265,126.44



18,171,783.78



B



PEKERJAAN PEMASANGAN PIPA & ACCESORIESS



1 2



Pemasangan pipa PVC tipe D diameter 3" Pemasangan Elbow 90° Type D Ø 3"



G.8 G.16



411.00 27.00



M' Bh



58,125.00 25,000.00



23,422.50 7,807.50



81,547.50 32,807.50



23,889,375.00 675,000.00



9,626,647.50 210,802.50



4 5 6



Pemasangan Tee 90° Type D Ø 3" Pemasangan Tee Y Standar SNI 06-0178 ISO 4435 Ø 4" x 4" Pemasangan Bend 45° Standar SNI 06-0178 ISO 4435 Ø 4"



G.16 G.23 G.26



27.00 27.00 2.00



Bh Bh Bh



25,000.00 125,000.00 90,500.00



7,807.50 10,410.00 10,410.00



32,807.50 135,410.00 100,910.00



675,000.00 3,375,000.00 181,000.00 28,795,375.00



210,802.50 281,070.00 20,820.00 10,350,142.50



C 1



PEKERJAAN KLOSET Pemasangan kloset jongkok keramik standard



G.3



27.00



Unit



212,525.00



277,250.00



489,775.00



Jumlah III



5,738,175.00



7,485,750.00



5,738,175.00 48,798,676.44



7,485,750.00 36,007,676.28



V. PEKERJAAN BANGUNAN PENUNJANG 1



Galian Tanah Kedalaman < 1 M



B.1



3.50



M3



-



63,750.00



63,750.00



-



223,125.00



2



Pasangan Pondasi Batu kosong



C.4



1.58



M3



48,600.00



114,075.00



162,675.00



76,545.00



179,668.13



3 4



Pasangan Pondasi Batu Kali 1pc : 4ps Urugan Tanah Kembali



C.2 B.10



3.50 1.75



M3 M3



398,100.00 -



219,375.00 42,500.00



617,475.00 42,500.00



1,393,350.00 -



767,812.50 74,375.00



5 6



Urugan Pasir Beton Slof 15/15 cm Melintang (K-250) (1 pc : 2 ps : 3 krl)



B.12 F.8



1.40 0.63



M3 M3



135,000.00 670,333.07



25,500.00 173,937.50



160,500.00 844,270.57



189,000.00 422,309.83



35,700.00 109,580.63



7 8 9



Pembesian Slof 15/15 cm Melintang Bekisting Slof 15/15 cm Melintang Beton Kolom 15/15 cm (K-250) (1 pc : 2 ps : 3 krl)



F.13 F.18 F.8



141.98 8.72 0.47



Kg M2 M3



10,350.00 308,000.00 670,333.07



1,452.50 96,525.00 173,937.50



11,802.50 404,525.00 844,270.57



1,469,493.00 2,685,760.00 316,732.38



206,225.95 841,698.00 82,185.47



10 11



Pembesian Kolom 15/15 cm Bekisting Kolom 15/15 cm



F.13 F.18



93.55 6.57



Kg M2



10,350.00 308,000.00



1,452.50 96,525.00



11,802.50 404,525.00



968,242.50 2,023,560.00



135,881.38 634,169.25



12 13



Beton Ring balk 15/15 cm (K-250) (1 pc : 2 ps : 3 krl) Pembesian Ring Balk 15/15 cm



F.8 F.13



0.63 141.98



M3 Kg



670,333.07 10,350.00



173,937.50 1,452.50



844,270.57 11,802.50



422,309.83 1,469,493.00



109,580.63 206,225.95



14 15



Bekisting Ring Balk 15/15 cm Beton Ring balk Atap 15/15 cm (K-250) (1 pc : 2 ps : 3 krl)



F.18 F.8



8.72 0.34



M2 M3



308,000.00 670,333.07



96,525.00 173,937.50



404,525.00 844,270.57



2,685,760.00 227,913.24



841,698.00 59,138.75



16 17



Pembesian Ring Balk Atap Kuda-Kuda 15/15 cm Bekisting Ring BalkAtap 15/15 cm



F.13 F.18



66.93 4.77



Kg M2



10,350.00 308,000.00



1,452.50 96,525.00



11,802.50 404,525.00



692,725.50 1,469,160.00



97,215.83 460,424.25



18 19



Beton Cor (K-250) (1 pc : 2 ps : 3 krl) Lantai Beton ( 1 pc : 3 ps : 5 krl )



F.8 F.3



0.31 2.66



M3 M3



670,333.07 573,672.02



173,937.50 173,937.50



844,270.57 747,609.52



208,138.42 1,525,967.58



54,007.59 462,673.75



20



Pasangan batu merah 1/2 Batu 1:4



D.5



32.68



60,637.50



37,750.00



98,387.50



1,981,330.31



1,233,481.25



M



2



NO.



URAIAN PEKERJAAN



21 22



Pekerjaan Atap Pekerjaaan Pengecetan



VI



BIAYA OPERASIONAL



NO. ANALISA J.19 I.2



KUANTITAS 45.00 120.76



SATUAN



HARGA BAHAN



HARGA UPAH



HARGA SATUAN



JUMLAH HARGA BAHAN



JUMLAH HARGA UPAH



( Rp )



( Rp )



( Rp )



( Rp )



( Rp )



M2 M3



31,900.00 28,065.00



16,950.00 9,417.50



48,850.00 37,482.50



Jumlah IV



Diverifikasi Oleh,



ASWIN SYAM S.T., M.T. NIP. 19821103 201101 1 007



Diperiksa oleh, Tenaga Fasilitator Lapangan



SUDARMIN, ST TFL TEKNIK



762,750.00 1,137,248.82



25,052,394.74



8,714,866.11



24,000,000.00



Jumlah V JUMLAH TOTAL



PPK PROGRAM SANIMAS 2019 DINAS PUPR KOTA PAREPARE



1,435,500.00 3,389,104.14



302,809,365.01



91,639,640.63



Diketahui Oleh,



Dibuat Oleh,



KSM "PEDULI"



Tim Perencana KSM "PEDULI"



AHMAD BAHRUN



AFTAN ARIF



KETUA



KOORDINATOR



: 2018 : 50 KK : 27 SR : KSM PEDULI JUMLAH HARGA TOTAL ( Rp )



1,500,000.00 1,430,610.00 2,930,610.00 9,784,508.29 549,624.23 2,862,164.40 10,334,132.52 1,444,402.01 182,362.44 2,889,093.89 1,191,434.63 1,161,064.80 3,304,088.76 756,466.43 2,728,544.00 1,729,843.89 1,499,424.53 1,847,188.00 3,313,930.12 365,991.29 412,615.50 892,150.98 3,731,675.91 4,680,354.25 6,057,325.32 38,187,956.75 627,832.50 941,748.75 20,061,515.76 21,631,097.01



122,400,000.00 122,400,000.00 195,483,796.27



JUMLAH HARGA TOTAL ( Rp )



8,466,000.00 1,926,000.00 1,411,000.00 11,803,000.00 36,476,748.45 36,476,748.45 8,111,847.34 8,111,847.34 56,391,595.79



3,930,187.50 1,978,965.00 655,031.25 7,672,946.40 8,436,007.44 2,506,140.00 1,094,174.66 286,416.00 646,246.91 2,752,388.10 2,478,406.98 32,436,910.23 33,516,022.50 885,802.50 885,802.50 3,656,070.00 201,820.00 39,145,517.50 13,223,925.00 13,223,925.00 84,806,352.73 223,125.00 256,213.13 2,161,162.50 74,375.00 224,700.00 531,890.46 1,675,718.95 3,527,458.00 398,917.84 1,104,123.88 2,657,729.25 531,890.46 1,675,718.95 3,527,458.00 287,051.99 789,941.33 1,929,584.25 262,146.01 1,988,641.33 3,214,811.56



JUMLAH HARGA TOTAL ( Rp ) 2,198,250.00 4,526,352.97 33,767,260.85



24,000,000.00 394,449,005.65



TIME SCHEDULE PELAKSANAAN KONSTRUKSI PROGRAM



:



Pembangunan Sanitasi Berbasis Masyarakat (SANIMAS)



PEKERJAAN



:



Pembangunan Ipal Komunal



LOKASI



:



Desa Taeng Kecamatan Pallangga



INSTANSI



:



Dinas Pekerjaan Umum dan Pentaan Ruang Kabupaten Gowa



NO



URAIAN PEKERJAAN



JUMLAH HARGA TOTAL



BOBOT %)



BULAN I



( M. 1



M. 2



BULAN II



M. 3



M. 4



M. 1



M. 2



BULAN III



M. 3



M. 4



M. 1



M. 2



BULAN IV



M. 3



M. 4



M. 1



M. 2



BULAN V



M. 3



M. 4



M. 1



M. 2



M. 3



M. 4



KET.



100% I



PEKERJAAN PERSIAPAN



2,839,000



0.76



222,012,000



59.56



III PEKERJAAN PEMIPAAN DAN MENHOLE



64,837,000



17.40



IV PEKERJAAN SAMBUNGAN RUMAH ( SR )



60,142,000



16.14



II PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH (IPAL)



V



PEKERJAAN BANGUNAN PENUNJANG



VI BIAYA OPERASIONAL KSM



0.38



0.38 3.72



3.72



3.72



3.72



3.72



3.72



3.72



3.72



3.72



3.72



3.72



3.72



3.72



3.72



1.45



1.45



1.45



1.45



1.45



1.45



1.45



1.45



1.45



1.45



1.45



1.45



1.34



1.34



1.34



1.34



1.34



1.34



1.34



1.34



1.34



3.72



3.72



1.34



1.34



1.34



50%



2,398,000



0.64



0.08



0.08



0.08



0.08



0.08



0.08



0.08



0.08



20,500,000



5.50



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



0.27



372,728,000.00



100.00



0.66



4.38



4.00



5.45



5.45



5.45



6.79



6.87



6.87



6.87



6.87



6.87



6.87



6.87



6.87



5.34



5.34



1.62



0.27



0.27



-



0.66



5.03



9.03



14.48



19.93



25.37



32.17



39.04



45.91



52.78



59.66



66.53



73.40



80.27



87.15



92.49



97.83



99.45



99.73



100.00



0% RENCANA FISIK RENCANA FISIK KOMULATIF REALISASI FISIK REALISASI FISIK KOMULATIF



-



DEVIASI FISIK KOMULATIF



DISETUJUI OLEH KSM " ABBULOSIBATANG "



DIBUAT OLEH KSM " ABBULOSIBATANG "



ASRUL SULAIMAN KETUA



SYAPARUDDIN MANDASINGI TIM PERENCANA



RINCIAN KEBUTUHAN MATERIAL DAN HOK NO.



URAIAN



KUANTITAS



SATUAN HOK



Mandor



Err:508 Err:508



Tukang



Err:508



HOK



Kepala Tukang



Err:508



HOK



5



Pasir Urug



Err:508



M3



6



Pasir Pasang



Err:508



M3



7



Pasir beton



Err:508



M3



8



Portland Cement (PC)



Err:508



Kg



9



Batu Kali/belah 15 - 20 cm



Err:509



M3



10



Batu Kali/belah 10 - 15 cm



Err:508



M3



11



Batu Pecah 2 - 3 cm



Err:508



M3



12



Batu Merah ( 5,5 x 11 x 22 cm )



Err:508



Bh



13



Papan Kayu Kls III



Err:508



M3



14



Balok Kayu Kls III



Err:508



M3



15



Balok Kayu Kls II



Err:508



M3



16



Kayu Kaso 5 - 7 /400 cm



Err:508



M3



17



Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



Err:508



Btg



18



Plywood 120x240 tbl. 9 mm



Err:508



Lbr



19



Besi Beton polos



Err:508



Kg



20



Besi strip UK 5mm x 50 mm



Err:508



Btg



21



Besi Siku 50 x 50 x 50 mm



Err:508



Btg



22



Kawat Beton



Err:508



Kg



23



Paku Biasa 2" - 5"



Err:508



Kg



24



Baut Ø 16 mm



Err:508



Bh



25



Minyak Bekisting



Err:508



Ltr



26



IPAL Fiber Large Vessel + Biaya Instalasi (Standard)



#N/A



Unit



27



IPAL Fiber Small Vessel + Biaya Instalasi (Standard)



#N/A



Unit



28



Material Filter Bioball + Pemasangan



#N/A



Chamber



29



Kloset jongkok keramik standard



#N/A



Bh



30



Buis Beton Ø 40 cm, tebal 10 cm



#N/A



M'



31



Buis Beton Ø 60 cm, tebal 10 cm



#N/A



M'



32



Pipa PVC air limbah standar SNI 06-0162 ISO 4435 Ø 4"



#N/A



M'



33



Pipa PVC Tipe D Ø 4"



#N/A



M'



34



Elbow 90° Type D Ø 4"



#N/A



Bh



35



Tee 90° Type D Ø 4"



#N/A



Bh



36



Tee Y Standar SNI 06-0178 ISO 4435 Ø 4" x 4"



#N/A



Bh



37



Bend 45° Standar SNI 06-0178 ISO 4435 Ø 4"



#N/A



Bh



38



Check Valve Ø 4"



Err:508



Unit



1



Pekerja



2 3 4



HOK



DISETUJUI OLEH, PPK AIR LIMBAH 2015 SATKER PENGEMBANGAN AIR MINUM DAN SANITASI PROVINSI SULAWESI SELATAN



MENGETAHUI : KEPALA DINAS PEKERJAAN UMUM DAERAH KABUPATEN TAKALAR



DILAKSANAKAN OLEH, KELOMPOK SWADAYA MASYARAKAT ( KSM ) " LESTARI "



M. RISAL, ST NIP. 19730325 200710 1 001



H. BASRI SULAIMAN, SE, MM Pangkat : Pembina Tk. I NIP. 19631225 199002 1 003



B. Dg. NABA KETUA KSM



M. RISAL, ST



NO. NIP. 19730325 200710 1 001



URAIAN



H. BASRI SULAIMAN, SE, MM Pangkat : Pembina Tk. I NIP. 19631225 199002 1 003



B. Dg. NABA



KUANTITASKETUA KSMSATUAN



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN BAK INLET DAN OUTLET Nomor Jenis Pekerjaan Kuantitas Pekerjaan Hasil Per Hari / Jam



: : :



No.



Bak Inlet 1 Unit



Uraian



Satuan



Bahan 1 Galian Tanah 2 Pas Urug 3 Lantai Kerja, Beton K. 175 4 Lantai, Pasangan 1 Bata 1:2 5 Dinding,Pasangan 1 Bata 1:2 6 Beton Bertulang : - Sloof - Kolom - Tutup 7 Plesteran 1 : 3 8 Grill Bak Inlet 9 Screen Bak Inlet 10 Besi L. 30.30.3 pada tutup II. Tenaga III. Alat



Harga Satuan Rp Bahan Upah



jumlah Harga Rp Bahan Upah



1.950



554,765.00 64,326.25 64,326.25



95,000.00 190,025.00 40,600.00 40,600.00



0.135 0.243 0.050 1.950 2.000 1.000 -



2,606,615.00 2,606,615.00 2,606,615.00 12,290.00 150,000.00 800,000.00 20,000.00



821,070.00 821,070.00 821,070.00 46,650.00



173,900.00 125,400.00 351,900.00 633,400.00 129,000.00 24,000.00 300,000.00 800,000.00 -



357,400.00 59,600.00 79,200.00 110,800.00 199,500.00 40,600.00 91,000.00 -



2,537,600.00



938,100.00



Kuantitas



I.



M3 M3 M3 M2 M2 M3 M3 M3 M3 M2 ls ls M



3.762 0.209 0.314



15,000.00



Jumlah



Nomor Jenis Pekerjaan Kuantitas Pekerjaan Hasil Per Hari / Jam No. I.



II. III.



: : :



Bak Outlet 1 Unit



Uraian



Satuan



Bahan 1 Galian Tanah 2 Pas Urug 3 Lantai Kerja, Beton K. 175 4 Lantai, Pasangan 1 Bata 1:2 5 Dinding,Pasangan 1 Bata 1:2 6 Beton Bertulang : - Sloof - Kolom - Tutup 7 Plesteran 1 : 3 Tenaga Alat



M3 M3 M3 M2 M2 M3 M3 M3 M3 M2



Jumlah



Harga Satuan Rp Bahan Upah



jumlah Harga Rp Bahan Upah



1.560



554,765.00 64,326.25 64,326.25



95,000.00 190,025.00 40,600.00 40,600.00



0.120 0.243 0.065 1.560



2,606,615.00 2,606,615.00 2,606,615.00 12,290.00



821,070.00 821,070.00 821,070.00 46,650.00



137,300.00 100,300.00 312,800.00 633,400.00 169,200.00 19,200.00



282,200.00 47,000.00 63,300.00 98,500.00 199,500.00 53,300.00 72,800.00



1,372,200.00



816,600.00



Kuantitas



2.970 0.165 0.248



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN PERSIAPAN PA



PA



A.1



1 M' Pengukuran dan Pemasangan bouplank



A.1.1. -



Bahan Kayu Kaso 5 - 7 /400 cm Paku Biasa 2" - 5" Balok Kayu Kls III



A.1.2. -



Tenaga Tukang kayu Pekerja Kepala tukang Mandor



A.2



1 M² Membersihkan lapangan dan perataan



A.2.1



Tenaga - Pekerja - Mandor



Harga Satuan 0.012 M3 0.020 Kg 0.007 M3 Jumlah (1)



Rp



61,200.00



x Rp 2,100,000.00 = Rp x Rp 20,000.00 = Rp x Rp 2,000,000.00 = Rp = Rp



25,200.00 400.00 14,000.00 39,600.00



0.100 OH x Rp 0.100 OH x Rp 0.010 OH x Rp 0.005 OH x Rp Jumlah (2) Jumlah (1 + 2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



110,000.00 95,000.00 110,000.00 0.00



= = = = = = 0% = =



Rp Rp Rp Rp Rp Rp Rp Rp



11,000.00 9,500.00 1,100.00 0.00 21,600.00 61,200.00 0.00 61,200.00



Rp



9,500.00



95,000.00 = Rp 0.00 = Rp = Rp 0% = Rp = Rp



9,500.00 0.00 9,500.00 0.00 9,500.00



Harga Satuan



0.100 OH x Rp 0.050 OH x Rp Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



Pek. Persiapan



Page 43 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN TANAH PT



B.1 B.1.1



PT



B.10



1 m³ Galian tanah biasa sedalam 1 meter Tenaga - Pekerja - Mandor



Harga Satuan



0.750 OH x Rp. 0.025 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



1 m³ Urug kembali bekas galian



= Rp.



71,250.00



95,000.00 = Rp. 0.00 = Rp. = Rp. 0% = Rp. = Rp.



71,250.00 0.00 71,250.00 0.00 71,250.00



Harga Satuan



= Rp.



47,500.00



95,000.00 = Rp. 0.00 = Rp.



47,500.00



= Rp. 0% = Rp.



47,500.00



= Rp.



47,500.00



= Rp.



47,500.00



95,000.00 = Rp. 0.00 = Rp.



47,500.00



= Rp.



47,500.00



B.10.1 Tenaga - Pekerja - Mandor



0.500 OH 0.050 OH



x Rp. x Rp.



Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



PT



B.11



1 m³ Pemadatan tanah ( per 20 cm )



Harga Satuan



0.00 0.00



B.11.1 Tenaga - Pekerja - Mandor



0.500 OH 0.050 OH



x Rp. x Rp.



Jumlah (1)



0% = Rp.



0.00



= Rp.



47,500.00



= Rp.



138,900.00



92,000.00 = Rp.



110,400.00



= Rp.



110,400.00



95,000.00 = Rp. 0.00 = Rp.



28,500.00



= Rp.



28,500.00



= Rp. 0% = Rp.



138,900.00



= Rp.



138,900.00



Overhead & Profit (2) Jumlah (1 + 2)



PT



B.12



1 m³ Urugan pasir



0.00



Harga Satuan



B.12.1 Bahan - Pasir urug



1.200 M3



x Rp.



Jumlah (1) B.12.2 Tenaga - Pekerja - Mandor



0.300 OH 0.010 OH



x Rp. x Rp.



Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Tanah



0.00



0.00



Page 44 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN PONDASI PP



PP



C.1



1 M³ Pasang pondasi batu kali, 1 Pc : 3 Ps



C.1.1. -



Bahan Batu Kali/belah 15 - 20 cm Portland Cement (PC) Pasir pasang



C.1.2. -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



C.2



1 M³ Pasang pondasi batu kali, 1 Pc : 4 Ps.



C.2.1. -



Bahan Batu Kali/belah 15 - 20 cm Portland Cement (PC) Pasir Pasang



C.2.2. -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



Harga Satuan



1.200 M3 202.000 Kg 0.485 M3 Jumlah (1)



x Rp. x Rp. x Rp.



1.500 OH x Rp. 0.750 OH x Rp. 0.075 OH x Rp. 0.075 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



= Rp.



710,390.00



146,000.00 = Rp. 1,125.00 = Rp. 154,000.00 = Rp. = Rp.



175,200.00 227,250.00 74,690.00 477,140.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



142,500.00 82,500.00 8,250.00 0.00 233,250.00 710,390.00 0.00 710,390.00



= Rp.



671,905.00



146,000.00 = Rp. 1,125.00 = Rp. 154,000.00 = Rp. = Rp.



175,200.00 183,375.00 80,080.00 438,655.00



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



1.200 M3 163.000 Kg 0.520 M3 Jumlah (1)



x Rp. x Rp. x Rp.



1.500 OH x Rp. 0.750 OH x Rp. 0.075 OH x Rp. 0.075 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Pondasi



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



142,500.00 82,500.00 8,250.00 0.00 233,250.00 671,905.00 0.00 671,905.00



Page 45 of 81



PP



PP



C.3



1 M³ Pasang pondasi batu kali, 1 Pc : 5 Ps



C.3.1. -



Bahan Batu Kali/belah 15 - 20 cm Portland Cement (PC) Pasir Pasang



C.3.2. -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



C.4



1 M³ Pasang pondasi batu kosong



C.4.1. Bahan - Batu Kali/belah 10 - 15 cm - Pasir urug



C.4.2. -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



Harga Satuan



1.200 M3 136.000 Kg 0.544 M3 Jumlah (1)



x Rp. x Rp. x Rp.



1.500 OH x Rp. 0.750 OH x Rp. 0.075 OH x Rp. 0.075 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



= Rp.



645,226.00



146,000.00 = Rp. 1,125.00 = Rp. 154,000.00 = Rp. = Rp.



175,200.00 153,000.00 83,776.00 411,976.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



142,500.00 82,500.00 8,250.00 0.00 233,250.00 645,226.00 0.00 645,226.00



= Rp.



332,634.00



143,000.00 = Rp. 92,000.00 = Rp. = Rp.



171,600.00 39,744.00 211,344.00



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



1.200 M3 0.432 M3 Jumlah (1)



x Rp. x Rp.



0.780 OH x Rp. 0.390 OH x Rp. 0.039 OH x Rp. 0.039 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Pondasi



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



74,100.00 42,900.00 4,290.00 0.00 121,290.00 332,634.00 0.00 332,634.00



Page 46 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN DINDING PD



D.1 D.1.1



1 M² Pasangan bata merah tebal 1 bata, 1Pc : 3 Ps Bahan - Batu Merah ( 5,5 x 11 x 22 cm ) - Portland Cement (PC) - Pasir pasang



D.1.2 -



PD



D.2 D.2.1



Bahan - Batu Merah ( 5,5 x 11 x 22 cm ) - Portland Cement (PC) - Pasir pasang



-



D.3 D.3.1



Tenaga Pekerja Tukang batu Kepala tukang Mandor



140.000 Bh 26.550 Kg 0.093 M3 Jumlah (1)



D.3.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



140.000 Bh 22.200 Kg 0.102 M3 Jumlah (1)



x Rp. x Rp. x Rp.



216,282.75



600.00 = Rp 1,125.00 = Rp 154,000.00 = Rp = Rp



84,000.00 37,068.75 14,014.00 135,082.75



= = = = = = 0% = =



Rp Rp Rp Rp Rp. Rp. Rp. Rp.



57,000.00 22,000.00 2,200.00 0.00 81,200.00 216,282.75 0.00 216,282.75



= Rp.



209,390.75



600.00 = Rp 1,125.00 = Rp 154,000.00 = Rp = Rp



84,000.00 29,868.75 14,322.00 128,190.75



95,000.00 110,000.00 110,000.00 0.00



= = = = = = 0% = =



Rp Rp Rp Rp Rp. Rp. Rp. Rp.



57,000.00 22,000.00 2,200.00 0.00 81,200.00 209,390.75 0.00 209,390.75



= Rp.



205,883.00



600.00 = Rp 1,125.00 = Rp 154,000.00 = Rp = Rp



84,000.00 24,975.00 15,708.00 124,683.00



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



x Rp. x Rp. x Rp.



0.600 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Dinding



= Rp.



Harga Satuan



0.600 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Pasangan bata merah tebal 1 bata, 1Pc : 5 Ps Bahan - Batu Merah ( 5,5 x 11 x 22 cm ) - Portland Cement (PC) - Pasir pasang



x Rp. x Rp. x Rp.



0.600 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Pasangan bata merah tebal 1 bata, 1Pc : 4 Ps



D.2.2



PD



Tenaga Pekerja Tukang batu Kepala tukang Mandor



140.000 Bh 32.950 Kg 0.091 M3 Jumlah (1)



Harga Satuan



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp Rp Rp Rp Rp. Rp. Rp. Rp.



57,000.00 22,000.00 2,200.00 0.00 81,200.00 205,883.00 0.00 205,883.00



Page 47 of 81



PD



D.4 D.4.1



1 M² Pasangan bata merah tebal 1/2 bata, 1Pc : 3 Ps Bahan - Batu Merah ( 5,5 x 11 x 22 cm ) - Portland Cement (PC) - Pasir pasang



D.4.2 -



PD



D.5 D.5.1



Bahan - Batu Merah ( 5,5 x 11 x 22 cm ) - Portland Cement (PC) - Pasir pasang



-



D.6 D.6.1



Tenaga Pekerja Tukang batu Kepala tukang Mandor



70.000 Bh 11.500 Kg 0.043 M3 Jumlah (1)



D.6.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



70.000 Bh 9.680 Kg 0.045 M3 Jumlah (1)



x Rp. x Rp. x Rp.



104,926.25



600.00 = Rp 1,125.00 = Rp 154,000.00 = Rp = Rp



42,000.00 16,166.25 6,160.00 64,326.25



= = = = = = 0% = =



Rp Rp Rp Rp Rp. Rp. Rp. Rp.



28,500.00 11,000.00 1,100.00 0.00 40,600.00 104,926.25 0.00 104,926.25



= Rp.



102,159.50



600.00 = Rp 1,125.00 = Rp 154,000.00 = Rp = Rp



42,000.00 12,937.50 6,622.00 61,559.50



95,000.00 110,000.00 110,000.00 0.00



= = = = = = 0% = =



Rp Rp Rp Rp Rp. Rp. Rp. Rp.



28,500.00 11,000.00 1,100.00 0.00 40,600.00 102,159.50 0.00 102,159.50



= Rp.



100,420.00



600.00 = Rp 1,125.00 = Rp 154,000.00 = Rp = Rp



42,000.00 10,890.00 6,930.00 59,820.00



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan x Rp. x Rp. x Rp.



0.300 OH x Rp. 0.100 OH x Rp. 0.010 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Dinding



= Rp.



Harga Satuan



0.300 OH x Rp. 0.100 OH x Rp. 0.010 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Pasangan bata merah tebal 1/2 bata, 1Pc : 5 Ps Bahan - Batu Merah ( 5,5 x 11 x 22 cm ) - Portland Cement (PC) - Pasir pasang



x Rp. x Rp. x Rp.



0.300 OH x Rp. 0.100 OH x Rp. 0.010 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps



D.5.2



PD



Tenaga Pekerja Tukang batu Kepala tukang Mandor



70.000 Bh 14.370 Kg 0.040 M3 Jumlah (1)



Harga Satuan



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp Rp Rp Rp Rp. Rp. Rp. Rp.



28,500.00 11,000.00 1,100.00 0.00 40,600.00 100,420.00 0.00 100,420.00



Page 48 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN PLESTERAN PPL E.1 E.1.1



1 M² Plesteran bata merah 1 Pc : 3 Pp, tebal 15 mm Bahan - Portland Cement (PC) - Pasir pasang



E.1.2 -



PPL E.2 E.2.1



Bahan - Portland Cement (PC) - Pasir pasang



PPL E.3



Tenaga Pekerja Tukang batu Kepala tukang Mandor



6.240 Kg 0.024 M3 Jumlah (1)



E.3.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



5.184 Kg 0.026 M3 Jumlah (1)



x Rp. x Rp.



58,940.00



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



8,748.00 3,542.00 12,290.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



28,500.00 16,500.00 1,650.00 0.00 46,650.00 58,940.00 0.00 58,940.00



= Rp.



57,366.00



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



7,020.00 3,696.00 10,716.00



95,000.00 110,000.00 110,000.00 0.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



28,500.00 16,500.00 1,650.00 0.00 46,650.00 57,366.00 0.00 57,366.00



= Rp.



56,486.00



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



5,832.00 4,004.00 9,836.00



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



x Rp. x Rp.



0.300 OH x Rp. 0.150 OH x Rp. 0.015 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Plesteran



= Rp.



Harga Satuan



0.300 OH x Rp. 0.150 OH x Rp. 0.015 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Plesteran bata merah 1 Pc : 5 Pp, tebal 15 mm Bahan - Portland Cement (PC) - Pasir pasang



x Rp. x Rp.



0.300 OH x Rp. 0.150 OH x Rp. 0.015 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Plesteran bata merah 1 Pc : 4 Pp, tebal 15 mm



E.2.2 -



E.3.1



Tenaga Pekerja Tukang batu Kepala tukang Mandor



7.776 Kg 0.023 M3 Jumlah (1)



Harga Satuan



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



28,500.00 16,500.00 1,650.00 0.00 46,650.00 56,486.00 0.00 56,486.00



Page 49 of 81



PPL E.4 E.4.1



1 M² Plesteran bata merah 1 Pc : 3 Pp, tebal 20 mm Bahan - Portland Cement (PC) - Pasir pasang



E.4.2 -



PPL E.5 E.5.1



Bahan - Portland Cement (PC) - Pasir pasang



-



PPL E.6



Tenaga Pekerja Tukang batu Kepala tukang Mandor



8.320 Kg 0.032 M3 Jumlah (1)



E.6.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



6.912 Kg 0.035 M3 Jumlah (1)



x Rp. x Rp.



78,638.00



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



11,664.00 4,774.00 16,438.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



38,000.00 22,000.00 2,200.00 0.00 62,200.00 78,638.00 0.00 78,638.00



= Rp.



76,488.00



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



9,360.00 4,928.00 14,288.00



95,000.00 110,000.00 110,000.00 0.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



38,000.00 22,000.00 2,200.00 0.00 62,200.00 76,488.00 0.00 76,488.00



= Rp.



75,366.00



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



7,776.00 5,390.00 13,166.00



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



x Rp. x Rp.



0.400 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.022 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Plesteran



= Rp.



Harga Satuan



0.400 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.022 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Plesteran bata merah 1 Pc : 5 Pp, tebal 20 mm Bahan - Portland Cement (PC) - Pasir pasang



x Rp. x Rp.



0.400 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.022 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Plesteran bata merah 1 Pc : 4 Pp, tebal 20 mm



E.5.2



E.6.1



Tenaga Pekerja Tukang batu Kepala tukang Mandor



10.368 Kg 0.031 M3 Jumlah (1)



Harga Satuan



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



38,000.00 22,000.00 2,200.00 0.00 62,200.00 75,366.00 0.00 75,366.00



Page 50 of 81



PPL E.7 E.7.1



1 M²



Bahan - Portland Cement (PC) - Pasir pasang



E.7.2 -



PPL E.8 E.8.1



Tenaga Pekerja Tukang batu Kepala tukang Mandor



1 M²



-



PPL E.9



Tenaga Pekerja Tukang batu Kepala tukang Mandor



1 M²



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



Harga Satuan



x Rp. x Rp.



0.260 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.013 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



7.070 Kg 0.021 M3 Jumlah (1)



4.320 Kg 0.006 M3 Jumlah (1)



x Rp. x Rp.



62,134.50



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



10,462.50 2,772.00 13,234.50



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



24,700.00 22,000.00 2,200.00 0.00 48,900.00 62,134.50 0.00 62,134.50



= Rp.



60,087.75



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



7,953.75 3,234.00 11,187.75



95,000.00 110,000.00 110,000.00 0.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



24,700.00 22,000.00 2,200.00 0.00 48,900.00 60,087.75 0.00 60,087.75



= Rp.



46,384.00



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



4,860.00 924.00 5,784.00



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



x Rp. x Rp.



0.300 OH x Rp. 0.100 OH x Rp. 0.010 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Plesteran



= Rp.



Harga Satuan



0.260 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.013 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Plesteran Ciprat, 1 Pc : 2 Pp, tebal 10 mm



Bahan - Portland Cement (PC) - Pasir pasang



E.9.2



9.300 Kg 0.018 M3 Jumlah (1)



Plesteran Beton 1 Pc : 3 Pp, tebal 15 mm



Bahan - Portland Cement (PC) - Pasir pasang



E.8.2



E.9.1



Plesteran Beton 1 Pc : 2 Pp, tebal 15 mm



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



28,500.00 11,000.00 1,100.00 0.00 40,600.00 46,384.00 0.00 46,384.00



Page 51 of 81



PPL E.10



1 M²



Finishing Siar Pasangan Dinding Batu Bata (=20 m')



E.10.1 Bahan - Portland Cement (PC)



E.10.2 -



PPL E.11



Tenaga Pekerja Tukang batu Kepala tukang Mandor



1 M²



PPL E.12



Tenaga Pekerja Tukang batu Kepala tukang Mandor



E.12.2 -



6.340 Kg 0.012 M3 Jumlah (1)



Tenaga Pekerja Tukang batu Kepala tukang Mandor



8.160 Kg 0.019 M3 Jumlah (1)



x Rp. x Rp.



26,876.50



1,125.00 = Rp. = Rp.



3,496.50 3,496.50



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



14,250.00 8,250.00 880.00 0.00 23,380.00 26,876.50 0.00 26,876.50



= Rp.



55,630.50



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



7,132.50 1,848.00 8,980.50



95,000.00 110,000.00 110,000.00 0.00



95,000.00 110,000.00 110,000.00 0.00



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



28,500.00 16,500.00 1,650.00 0.00 46,650.00 55,630.50 0.00 55,630.50



= Rp.



74,367.60



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



9,180.00 2,987.60 12,167.60



95,000.00 110,000.00 110,000.00 0.00



38,000.00 22,000.00 2,200.00 0.00 62,200.00 74,367.60 0.00 74,367.60



Harga Satuan



x Rp. x Rp.



0.400 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.020 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Plesteran



= Rp.



Harga Satuan



0.300 OH x Rp. 0.150 OH x Rp. 0.015 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1 M² Plesteran Batu Kali 1 Pc : 3 Pp, tebal 10 mm



E.12.1 Bahan - Portland Cement (PC) - Pasir pasang



x Rp.



0.150 OH x Rp. 0.075 OH x Rp. 0.008 OH x Rp. 0.008 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Finishing Siar Pasangan Batu Kali, 1 Pc : 2 Pp



E.11.1 Bahan - Portland Cement (PC) - Pasir pasang



E.11.2 -



3.108 Kg Jumlah (1)



Harga Satuan



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



Page 52 of 81



PPL E.13



1 M² Plesteran Batu Kali 1 Pc : 4 Pp, tebal 10 mm



E.13.1 Bahan - Portland Cement (PC) - Pasir pasang



E.13.2 -



PPL E.14



6.511 Kg 0.021 M3 Jumlah (1)



Tenaga Pekerja Tukang batu Kepala tukang Mandor



PPL E.15



1 M² Acian



3.250 Kg Jumlah (1)



Bahan Portland Cement (PC) Waterproof Pasir pasang



E.15.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



x Rp.



0.200 OH x Rp. 0.100 OH x Rp. 0.010 OH x Rp. 0.010 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Plesteran waterproof bata cote 3 lapis



E.15.1 -



= Rp.



72,743.48



1,125.00 = Rp. 154,000.00 = Rp. = Rp.



7,324.88 3,218.60 10,543.48



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



38,000.00 22,000.00 2,200.00 0.00 62,200.00 72,743.48 0.00 72,743.48



= Rp.



34,756.25



1,125.00 = Rp. = Rp.



3,656.25 3,656.25



= = = = = = 0% = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



19,000.00 11,000.00 1,100.00 0.00 31,100.00 34,756.25 0.00 34,756.25



= Rp.



167,286.50



1,125.00 = Rp. 39,000.00 = Rp. 154,000.00 = Rp. = Rp.



562.50 113,100.00 924.00 114,586.50



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



Tenaga Pekerja Tukang batu Kepala tukang Mandor



1 M²



x Rp. x Rp.



0.400 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.020 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



E.14.1 Bahan - Portland Cement (PC)



E.14.2 -



Harga Satuan



95,000.00 110,000.00 110,000.00 0.00



Harga Satuan



0.500 Kg 2.900 Kg 0.006 M3 Jumlah (1)



x Rp. x Rp. x Rp.



0.300 OH x Rp. 0.200 OH x Rp. 0.020 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Plesteran



= = = = = = 0% = =



95,000.00 110,000.00 110,000.00 0.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



28,500.00 22,000.00 2,200.00 0.00 52,700.00 167,286.50 0.00 167,286.50



Page 53 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN BETON



PB



PB



PB



F.1



1 M³ Membuat beton 1 : 3 : 5



F.1.1 -



Bahan Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm Air Kerja



F.1.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



F.7



Bahan Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm Air Kerja



F.7.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



1,125.00 154,000.00 245,000.00 0.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



277,875.00 95,590.00 181,300.00 0.00 554,765.00



1.650 OH x Rp. 0.275 OH x Rp. 0.028 OH x Rp. 0.083 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



156,750.00 30,250.00 3,025.00 0.00 190,025.00 744,790.00 0.00 744,790.00



Rp.



874,191.11



0%



371.000 0.499 0.776 215.000 Jumlah (1)



Rp. Rp. Rp. Rp.



1,125.00 154,000.00 245,000.00 0.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



417,375.00 76,780.00 190,011.11 0.00 684,166.11



1.650 OH x Rp. 0.275 OH x Rp. 0.028 OH x Rp. 0.083 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



156,750.00 30,250.00 3,025.00 0.00 190,025.00 874,191.11 0.00 874,191.11



Rp.



11,359.50



9,000.00 = Rp. 26,500.00 = Rp. = Rp.



9,450.00 397.50 9,847.50



Kg M3 M3 Liter



x x x x



0%



1 Kg Pembesian dengan besi polos atau besi ulir



F.13.1 Bahan - Besi Beton Polos - Kawat Beton



F.13.2 -



x x x x



Tenaga Pekerja Tukang batu Kepala tukang Mandor



744,790.00



Rp. Rp. Rp. Rp.



Kg M3 M3 Liter



1 M³ Membuat beton 1 : 2 : 3



F.7.1 -



F.13



247.000 0.621 0.740 215.000 Jumlah (1)



Rp.



1.050 Kg 0.015 Kg Jumlah (1)



x Rp. x Rp.



0.007 OH x Rp. 0.007 OH x Rp. 0.001 OH x Rp. 0.000 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3) Pek. Beton



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



665.00 770.00 77.00 0.00 1,512.00 11,359.50 0.00 11,359.50 Page 54 of 81



Pek. Beton



Page 55 of 81



PB



PB



PB



F.14



1 M2



F.14.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting



F.14.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



Pemasangan Bekisting untuk Pondasi



F.15



1 M2



F.15.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting



F.15.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



0.040 M3 0.300 Kg 0.100 Ltr Jumlah (1)



Rp.



175,830.00



x Rp. 2,100,000.00 = Rp. x Rp. 20,000.00 = Rp. x Rp. 49,700.00 = Rp. = Rp.



84,000.00 6,000.00 4,970.00 94,970.00



0.520 OH x Rp. 0.260 OH x Rp. 0.026 OH x Rp. 0.026 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



49,400.00 28,600.00 2,860.00 0.00 80,860.00 175,830.00 0.00 175,830.00



Rp.



186,330.00



x Rp. 2,100,000.00 = Rp. x Rp. 20,000.00 = Rp. x Rp. 49,700.00 = Rp. = Rp.



94,500.00 6,000.00 4,970.00 105,470.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Pemasangan Bekisting untuk Sloof



F.16



1 M2



F.16.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.16.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



0.045 M3 0.300 Kg 0.100 Ltr Jumlah (1)



0.520 OH x Rp. 0.260 OH x Rp. 0.026 OH x Rp. 0.026 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



49,400.00 28,600.00 2,860.00 0.00 80,860.00 186,330.00 0.00 186,330.00



Rp.



353,570.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



84,000.00 8,000.00 9,940.00 45,000.00 42,000.00 62,000.00 250,940.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Pemasangan Bekisting untuk Kolom



0.040 0.400 0.200 0.015 0.350 2.000 Jumlah (1)



M3 Kg Ltr M3 Lbr Btg



x x x x x x



0.660 OH x Rp. 0.330 OH x Rp. 0.033 OH x Rp. 0.033 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Beton



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



62,700.00 36,300.00 3,630.00 0.00 102,630.00 353,570.00 0.00 353,570.00



Page 56 of 81



PB



PB



PB



F.17



1 M2



F.17.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.17.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



Pemasangan Bekisting untuk Balok



F.18



1 M2



F.18.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.18.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



0.040 0.400 0.200 0.018 0.350 2.000 Jumlah (1)



M3 Kg Ltr M3 Lbr Btg



x x x x x x



Rp.



362,570.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



84,000.00 8,000.00 9,940.00 54,000.00 42,000.00 62,000.00 259,940.00



0.660 OH x Rp. 0.330 OH x Rp. 0.033 OH x Rp. 0.033 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



62,700.00 36,300.00 3,630.00 0.00 102,630.00 362,570.00 0.00 362,570.00



Rp.



477,570.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



84,000.00 8,000.00 9,940.00 45,000.00 42,000.00 186,000.00 374,940.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Pemasangan Bekisting untuk Lantai



F.19



1 M2



F.19.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



0.040 0.400 0.200 0.015 0.350 6.000 Jumlah (1)



M3 Kg Ltr M3 Lbr Btg



x x x x x x



0.660 OH x Rp. 0.330 OH x Rp. 0.033 OH x Rp. 0.033 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pemasangan Bekisting untuk Dinding



0.030 0.400 0.200 0.020 0.350 3.000 Jumlah (1)



Pek. Beton



M3 Kg Ltr M3 Lbr Btg



x x x x x x



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



62,700.00 36,300.00 3,630.00 0.00 102,630.00 477,570.00 0.00 477,570.00



Rp.



378,570.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



63,000.00 8,000.00 9,940.00 60,000.00 42,000.00 93,000.00 275,940.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Page 57 of 81



F.19.2 -



PB



PB



Tenaga Pekerja Tukang batu Kepala tukang Mandor



F.20



1 M2



F.20.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.20.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor



0.660 OH x Rp. 0.330 OH x Rp. 0.033 OH x Rp. 0.033 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



62,700.00 36,300.00 3,630.00 0.00 102,630.00 378,570.00 0.00 378,570.00



Rp.



330,085.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



63,000.00 8,000.00 7,455.00 45,000.00 42,000.00 62,000.00 227,455.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Pemasangan Bekisting untuk Tangga



F.21



1 M3



F.21.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm



F.21.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



0.030 0.400 0.150 0.015 0.350 2.000 Jumlah (1)



M3 Kg Ltr M3 Lbr Btg



x x x x x x



0.660 OH x Rp. 0.330 OH x Rp. 0.033 OH x Rp. 0.033 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



62,700.00 36,300.00 3,630.00 0.00 102,630.00 330,085.00 0.00 330,085.00



Rp.



3,427,685.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. = Rp.



420,000.00 30,000.00 19,880.00 1,417,500.00 59,625.00 378,000.00 83,160.00 198,450.00 2,606,615.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Membuat beton bertulang (150 kg besi + bekisting)



0.200 1.500 0.400 157.500 2.250 336.000 0.540 0.810 Jumlah (1)



M3 Kg Ltr Kg Kg Kg M3 M3



x x x x x x x x



5.300 OH x Rp. 0.275 OH x Rp. 1.300 OH x Rp. 1.050 OH x Rp. 0.262 OH x Rp. 0.265 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Beton



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



503,500.00 30,250.00 143,000.00 115,500.00 28,820.00 0.00 821,070.00 3,427,685.00 0.00 3,427,685.00



Page 58 of 81



PB



PB



F.22



1 M3



F.22.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm



F.22.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



Membuat sloof beton bertulang (200 kg besi + bekisting)



F.23



1 M3



F.23.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm Balok Kayu Kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.23.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



0.270 2.000 0.600 210.000 3.000 336.000 0.540 0.810 Jumlah (1)



M3 Kg Ltr Kg Kg Kg M3 M3



x x x x x x x x



Rp.



4,194,060.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. = Rp.



567,000.00 40,000.00 29,820.00 1,890,000.00 79,500.00 378,000.00 83,160.00 198,450.00 3,265,930.00



5.650 OH x Rp. 0.275 OH x Rp. 1.560 OH x Rp. 1.400 OH x Rp. 0.323 OH x Rp. 0.283 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



536,750.00 30,250.00 171,600.00 154,000.00 35,530.00 0.00 928,130.00 4,194,060.00 0.00 4,194,060.00



Rp.



7,280,090.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



840,000.00 80,000.00 99,400.00 2,835,000.00 119,250.00 378,000.00 83,160.00 198,450.00 450,000.00 420,000.00 620,000.00 6,123,260.00



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Membuat kolom beton bertulang (300 kg besi + bekisting)



0.400 4.000 2.000 315.000 4.500 336.000 0.540 0.810 0.150 3.500 20.000 Jumlah (1)



M3 Kg Ltr Kg Kg Kg M3 M3 M3 Lbr Btg



x x x x x x x x x x x



7.050 OH x Rp. 0.275 OH x Rp. 1.650 OH x Rp. 2.100 OH x Rp. 0.403 OH x Rp. 0.353 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Beton



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



669,750.00 30,250.00 181,500.00 231,000.00 44,330.00 0.00 1,156,830.00 7,280,090.00 0.00 7,280,090.00



Page 59 of 81



PB



PB



F.24



1 M3



F.24.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm Balok Kayu Kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.24.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



Membuat balok beton bertulang (200 kg besi + bekisting)



F.25



1 M3



F.25.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm Balok Kayu Kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.25.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



0.320 3.200 1.600 210.000 3.000 336.000 0.540 0.810 0.140 2.800 16.000 Jumlah (1)



M3 Kg Ltr Kg Kg Kg M3 M3 M3 Lbr Btg



x x x x x x x x x x x



Rp.



5,702,260.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



672,000.00 64,000.00 79,520.00 1,890,000.00 79,500.00 378,000.00 83,160.00 198,450.00 420,000.00 336,000.00 496,000.00 4,696,630.00



6.350 OH x Rp. 0.275 OH x Rp. 1.650 OH x Rp. 1.400 OH x Rp. 0.333 OH x Rp. 0.318 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



603,250.00 30,250.00 181,500.00 154,000.00 36,630.00 0.00 1,005,630.00 5,702,260.00 0.00 5,702,260.00



Rp.



5,461,655.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



672,000.00 64,000.00 79,520.00 1,417,500.00 59,625.00 378,000.00 83,160.00 198,450.00 360,000.00 336,000.00 992,000.00 4,640,255.00



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Membuat kolom beton bertulang (150 kg besi + bekisting)



0.320 3.200 1.600 157.500 2.250 336.000 0.540 0.810 0.120 2.800 32.000 Jumlah (1)



M3 Kg Ltr Kg Kg Kg M3 M3 M3 Lbr Btg



x x x x x x x x x x x



5.300 OH x Rp. 0.275 OH x Rp. 1.300 OH x Rp. 1.050 OH x Rp. 0.265 OH x Rp. 0.265 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Beton



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



503,500.00 30,250.00 143,000.00 115,500.00 29,150.00 0.00 821,400.00 5,461,655.00 0.00 5,461,655.00



Page 60 of 81



PB



PB



F.26



1 M3



F.26.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm Balok Kayu Kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.26.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



Membuat dinding beton bertulang (150 kg besi + bekisting)



F.27



1 M3



F.27.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Minyak Bekisting Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm Balok Kayu Kls II Plywood 120x240 tbl. 9 mm Kayu Dolken / Kayu Laut Ø 8 cm/ 400 cm



F.27.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



0.240 3.200 1.600 157.500 2.250 336.000 0.540 0.810 0.160 2.800 24.000 Jumlah (1)



M3 Kg Ltr Kg Kg Kg M3 M3 M3 Lbr Btg



x x x x x x x x x x x



Rp.



5,272,385.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



504,000.00 64,000.00 79,520.00 1,417,500.00 59,625.00 378,000.00 83,160.00 198,450.00 480,000.00 336,000.00 744,000.00 4,344,255.00



5.650 OH x Rp. 0.275 OH x Rp. 1.560 OH x Rp. 1.400 OH x Rp. 0.323 OH x Rp. 0.283 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



536,750.00 30,250.00 171,600.00 154,000.00 35,530.00 0.00 928,130.00 5,272,385.00 0.00 5,272,385.00



Rp.



5,143,820.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 49,700.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. Rp. 3,000,000.00 = Rp. Rp. 120,000.00 = Rp. Rp. 31,000.00 = Rp. = Rp.



525,000.00 60,000.00 59,640.00 1,890,000.00 79,500.00 378,000.00 83,160.00 198,450.00 315,000.00 300,000.00 434,000.00 4,322,750.00



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Membuat dinding beton bertulang (200 kg besi + bekisting)



0.250 3.000 1.200 210.000 3.000 336.000 0.540 0.810 0.105 2.500 14.000 Jumlah (1)



M3 Kg Ltr Kg Kg Kg M3 M3 M3 Lbr Btg



x x x x x x x x x x x



5.300 OH x Rp. 0.275 OH x Rp. 1.300 OH x Rp. 1.050 OH x Rp. 0.262 OH x Rp. 0.265 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Beton



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



503,500.00 30,250.00 143,000.00 115,500.00 28,820.00 0.00 821,070.00 5,143,820.00 0.00 5,143,820.00



Page 61 of 81



PB



PB



F.28



1 M'



F.28.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm



F.28.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



Membuat kolom praktis beton bertulang (11 x 11 cm)



F.29



1 M'



F.29.1 -



Bahan Papan kayu kls III Paku Biasa 2" - 5" Besi beton polos Kawat beton Portland Cement (PC) Pasir beton Batu Pecah 2 - 3 cm



F.29.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



0.002 0.010 3.000 0.450 4.000 0.006 0.009 Jumlah (1)



M3 Kg Kg Kg Kg M3 M3



x x x x x x x



Rp.



75,314.00



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. = Rp.



4,200.00 200.00 27,000.00 11,925.00 4,500.00 924.00 2,205.00 50,954.00



0.180 OH x Rp. 0.020 OH x Rp. 0.020 OH x Rp. 0.020 OH x Rp. 0.006 OH x Rp. 0.009 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



17,100.00 2,200.00 2,200.00 2,200.00 660.00 0.00 24,360.00 75,314.00 0.00 75,314.00



Rp.



91,878.50



Rp. 2,100,000.00 = Rp. Rp. 20,000.00 = Rp. Rp. 9,000.00 = Rp. Rp. 26,500.00 = Rp. Rp. 1,125.00 = Rp. Rp. 154,000.00 = Rp. Rp. 245,000.00 = Rp. = Rp.



6,300.00 400.00 32,400.00 1,325.00 6,187.50 1,386.00 3,675.00 51,673.50



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Membuat ring balok beton bertulang (10 x 15 cm)



0.003 0.020 3.600 0.050 5.500 0.009 0.015 Jumlah (1)



M3 Kg Kg Kg Kg M3 M3



x x x x x x x



0.297 OH x Rp. 0.033 OH x Rp. 0.033 OH x Rp. 0.033 OH x Rp. 0.010 OH x Rp. 0.015 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Beton



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



28,215.00 3,630.00 3,630.00 3,630.00 1,100.00 0.00 40,205.00 91,878.50 0.00 91,878.50



Page 62 of 81



PB



F.30



1 M3



Membuat plat lantai IPAL beton bertulang (150 kg besi)



F.30.1 Bahan - Membuat beton mutu f'c=19,3 MPa (K 225) - Pembesian dengan besi polos atau besi ulir



F.30.2 Tenaga - Membuat beton mutu f'c=19,3 MPa (K 225) - Pembesian dengan besi polos atau besi ulir



PB



F.31



1 M3



Rp.



2,578,116.11



x Rp. x Rp.



684,166.11 = Rp. 9,847.50 = Rp. = Rp.



684,166.11 1,477,125.00 2,161,291.11



1.000 M3 x Rp. 150.000 Kg x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



190,025.00 = Rp. 1,512.00 = Rp. = Rp. = Rp. 0% = Rp. = Rp.



190,025.00 226,800.00 416,825.00 2,578,116.11 0.00 2,578,116.11



1.000 M3 150.000 Kg Jumlah (1)



Membuat plat penutup IPAL beton bertulang (150 kg besi + bekisting)



F.31.1 Bahan - Membuat beton mutu f'c=19,3 MPa (K 225) Pemasangan Bekisting untuk Lantai - Pembesian dengan besi polos atau besi ulir



F.31.2 Tenaga - Membuat beton mutu f'c=19,3 MPa (K 225) Pemasangan Bekisting untuk Lantai - Pembesian dengan besi polos atau besi ulir



Rp.



5,762,075.30



x Rp. x Rp. x Rp.



684,166.11 = Rp. 374,940.00 = Rp. 9,847.50 = Rp. = Rp.



684,166.11 2,499,724.98 1,477,125.00 4,661,016.09



1.000 M3 x Rp. 6.667 M2 x Rp. 150.000 Kg x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



190,025.00 = Rp. 102,630.00 = Rp. 1,512.00 = Rp. = Rp. = Rp. 0% = Rp. = Rp.



190,025.00 684,234.21 226,800.00 1,101,059.21 5,762,075.30 0.00 5,762,075.30



1.000 M3 6.667 M2 150.000 Kg Jumlah (1)



Pek. Beton



Page 63 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN SANITASI PS



G.3



1 buah Memasang kloset jongkok standard



G.3.1 -



Bahan Kloset jongkok standard Batu Merah ( 5,5 x 11 x 22 cm ) Portland Cement (PC) Pasir pasang



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



G.3.2



PS



G.6 G.6.1



1 m'



-



PS



G.7 G.7.1



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1 m'



-



200,000.00 600.00 1,125.00 154,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



200,000.00 4,200.00 6,750.00 1,540.00 212,490.00



1.100 OH x Rp. 1.500 OH x Rp. 0.150 OH x Rp. 0.1100 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



104,500.00 165,000.00 16,500.00 0.00 286,000.00 498,490.00 0.00 498,490.00



Rp.



26,490.00



10,200.00 = Rp. 10,200.00 = Rp. = Rp.



12,240.00 3,570.00 15,810.00



0%



1.200 M' 35.000 % Jumlah (1)



x Rp. x Rp.



0.036 OH x Rp. 0.060 OH x Rp. 0.006 OH x Rp. 0.0018 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



3,420.00 6,600.00 660.00 0.00 10,680.00 26,490.00 0.00 26,490.00



Rp.



50,507.50



22,250.00 = Rp. 22,250.00 = Rp. = Rp.



26,700.00 7,787.50 34,487.50



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Memasang Pipa PVC air limbah standar ISO 4435 Ø 2"



Bahan - Pipa PVC air limbah standar ISO 4435 Ø 2" - Perlengkapan



G.7.2



x x x x



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



498,490.00



Rp. Rp. Rp. Rp.



bh Bh Kg M3



Memasang pipa PVC tipe diameter 3/4"



Bahan - Pipa PVC Ø 3/4" - Perlengkapan



G.6.2



1.000 7.000 6.000 0.010 Jumlah (1)



Rp.



1.200 M' 35.000 % Jumlah (1)



x Rp. x Rp.



0.054 OH x Rp. 0.090 OH x Rp. 0.009 OH x Rp. 0.0027 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Sanitasi



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



5,130.00 9,900.00 990.00 0.00 16,020.00 50,507.50 0.00 50,507.50



Page 64 of 81



PS



G.8 G.8.1



1 m'



Bahan - Pipa PVC air limbah standar ISO 4435 Ø 2" - Perlengkapan



G.8.2 -



PS



G.9 G.9.1



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1 m'



-



G.10



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1 m'



x Rp. x Rp.



0.081 OH x Rp. 0.135 OH x Rp. 0.0135 OH x Rp. 0.0041 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



51,842.50



22,250.00 = Rp. 22,250.00 = Rp. = Rp.



22,250.00 5,562.50 27,812.50



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



7,695.00 14,850.00 1,485.00 0.00 24,030.00 51,842.50 0.00 51,842.50



Rp.



110,030.00



68,800.00 = Rp. 68,800.00 = Rp. = Rp.



68,800.00 17,200.00 86,000.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1.000 M' 25.000 % Jumlah (1)



x Rp. x Rp.



0.081 OH x Rp. 0.135 OH x Rp. 0.0135 OH x Rp. 0.0041 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



7,695.00 14,850.00 1,485.00 0.00 24,030.00 110,030.00 0.00 110,030.00



Rp.



96,270.00



68,800.00 = Rp. 68,800.00 = Rp. = Rp.



68,800.00 3,440.00 72,240.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Memasang Pipa PVC air limbah standar ISO 4435 Ø 4"



G.10.1 Bahan - Pipa PVC air limbah standar ISO 4435 Ø 4" - Perlengkapan



G.10.2 -



1.000 M' 25.000 % Jumlah (1)



Rp.



Memasang Pipa PVC air limbah standar ISO 4435 Ø 4"



Bahan - Pipa PVC air limbah standar ISO 4435 Ø 4" - Perlengkapan



G.9.2



PS



Memasang Pipa PVC air limbah standar ISO 4435 Ø 3"



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1.000 M' 5.000 % Jumlah (1)



x Rp. x Rp.



0.081 OH x Rp. 0.135 OH x Rp. 0.0135 OH x Rp. 0.0041 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Sanitasi



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



7,695.00 14,850.00 1,485.00 0.00 24,030.00 96,270.00 0.00 96,270.00



Page 65 of 81



PS



G.13



1 buah Memasang Elbow PVC Ø 1/2"



G.13.1 Bahan - Elbow PVC ISO 4435 Ø 1/2"



G.13.2 -



PS



G.14



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



PS



G.15



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



0.027 OH x Rp. 0.045 OH x Rp. 0.005 OH x Rp. 0.0137 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



3,500.00 = Rp. = Rp.



3,500.00 3,500.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



2,565.00 4,950.00 495.00 0.00 8,010.00 11,510.00 0.00 11,510.00



Rp.



13,010.00



5,000.00 = Rp. = Rp.



5,000.00 5,000.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1.000 Bh Jumlah (1)



x Rp.



0.027 OH x Rp. 0.045 OH x Rp. 0.005 OH x Rp. 0.0137 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



2,565.00 4,950.00 495.00 0.00 8,010.00 13,010.00 0.00 13,010.00



Rp.



12,840.00



7,500.00 = Rp. = Rp.



7,500.00 7,500.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1 buah Memasang Elbow 90° Ø 2"



G.15.1 Bahan - Elbow 90° ISO 4435 Ø 2"



G.15.2 -



x Rp.



11,510.00



1 buah Memasang Elbow PVC Ø 3/4"



G.14.1 Bahan - Elbow PVC ISO 4435 Ø 3/4"



G.14.2 -



1.000 Bh Jumlah (1)



Rp.



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1.000 Bh Jumlah (1)



x Rp.



0.018 OH x Rp. 0.030 OH x Rp. 0.003 OH x Rp. 0.001 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Sanitasi



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



1,710.00 3,300.00 330.00 0.00 5,340.00 12,840.00 0.00 12,840.00



Page 66 of 81



PS



G.16



1 buah Memasang Elbow 90° Ø 3"



G.16.1 Bahan - Elbow 90° ISO 4435 Ø 3"



G.16.2 -



PS



G.17



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



PS



G.18



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



0.027 OH x Rp. 0.045 OH x Rp. 0.005 OH x Rp. 0.001 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



32,000.00 = Rp. = Rp.



32,000.00 32,000.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



2,565.00 4,950.00 495.00 0.00 8,010.00 40,010.00 0.00 40,010.00



Rp.



65,680.00



55,000.00 = Rp. = Rp.



55,000.00 55,000.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1.000 Bh Jumlah (1)



x Rp.



0.036 OH x Rp. 0.060 OH x Rp. 0.0060 OH x Rp. 0.0018 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



3,420.00 6,600.00 660.00 0.00 10,680.00 65,680.00 0.00 65,680.00



Rp.



11,510.00



3,500.00 = Rp. = Rp.



3,500.00 3,500.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1 buah Memasang Tee Ø 1/2"



G.18.1 Bahan - Tee PVC Ø 1/2"



G.18.2 -



x Rp.



40,010.00



1 buah Memasang Elbow 90° Ø 4"



G.17.1 Bahan - Elbow 90° ISO 4435 Ø 4"



G.17.2 -



1.000 Bh Jumlah (1)



Rp.



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1.000 Bh Jumlah (1)



x Rp.



0.027 OH x Rp. 0.045 OH x Rp. 0.005 OH x Rp. 0.0137 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Sanitasi



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



2,565.00 4,950.00 495.00 0.00 8,010.00 11,510.00 0.00 11,510.00



Page 67 of 81



PS



G.19



1 buah Memasang Tee PVC Ø 3/4"



G.19.1 Bahan - Tee PVC Ø 3/4"



G.19.2 -



PS



G.20



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



PS



G.21



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



0.027 OH x Rp. 0.045 OH x Rp. 0.005 OH x Rp. 0.0137 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



5,000.00 = Rp. = Rp.



5,000.00 5,000.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



2,565.00 4,950.00 495.00 0.00 8,010.00 13,010.00 0.00 13,010.00



Rp.



21,340.00



16,000.00 = Rp. = Rp.



16,000.00 16,000.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1.000 Bh Jumlah (1)



x Rp.



0.018 OH x Rp. 0.030 OH x Rp. 0.003 OH x Rp. 0.001 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



1,710.00 3,300.00 330.00 0.00 5,340.00 21,340.00 0.00 21,340.00



Rp.



28,010.00



20,000.00 = Rp. = Rp.



20,000.00 20,000.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1 buah Memasang Tee 90° Ø 3"



G.21.1 Bahan - Tee 90° ISO 4435 Ø 3"



G.21.2 -



x Rp.



13,010.00



1 buah Memasang Tee 90° Ø 2"



G.20.1 Bahan - Tee 90° ISO 4435 Ø 2"



G.20.2 -



1.000 Bh Jumlah (1)



Rp.



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1.000 Bh Jumlah (1)



x Rp.



0.027 OH x Rp. 0.045 OH x Rp. 0.005 OH x Rp. 0.001 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Sanitasi



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



2,565.00 4,950.00 495.00 0.00 8,010.00 28,010.00 0.00 28,010.00



Page 68 of 81



PS



G.22



1 buah Memasang Tee 90° Ø 4"



G.22.1 Bahan - Tee 90° ISO 4435 Ø 4"



G.22.2 -



PS



G.23



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



PS



G.26



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



0.036 OH x Rp. 0.060 OH x Rp. 0.0060 OH x Rp. 0.0018 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



30,000.00 = Rp. = Rp.



30,000.00 30,000.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



3,420.00 6,600.00 660.00 0.00 10,680.00 40,680.00 0.00 40,680.00



Rp.



137,080.00



126,400.00 = Rp. = Rp.



126,400.00 126,400.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1.000 Bh Jumlah (1)



x Rp.



0.036 OH x Rp. 0.060 OH x Rp. 0.0060 OH x Rp. 0.0018 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



3,420.00 6,600.00 660.00 0.00 10,680.00 137,080.00 0.00 137,080.00



Rp.



100,180.00



89,500.00 = Rp. = Rp.



89,500.00 89,500.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1 buah Bend 45° Standar ISO 4435 Ø 4"



G.26.1 Bahan - Bend 45° Standar ISO 4435 Ø 4"



G.26.2 -



x Rp.



40,680.00



1 buah Tee Y Standar ISO 4435 Ø 4" x 4"



G.23.1 Bahan - Tee Y Standar ISO 4435 Ø 4" x 4"



G.23.2 -



1.000 Bh Jumlah (1)



Rp.



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1.000 Bh Jumlah (1)



x Rp.



0.036 OH x Rp. 0.060 OH x Rp. 0.0060 OH x Rp. 0.0018 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Sanitasi



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



3,420.00 6,600.00 660.00 0.00 10,680.00 100,180.00 0.00 100,180.00



Page 69 of 81



PS



G.27



1 buah Memasang kran diameter ½"



G.27.1 Bahan - Kran air Ø 1/2" - Seal tape



G.27.2 -



PS



G.28



1.000 Bh 0.025 Bh Jumlah (1)



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



0.010 OH x Rp. 0.100 OH x Rp. 0.010 OH x Rp. 0.0050 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



PS



G.29



1.000 Bh Jumlah (1)



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



34,000.00 = Rp. 2,500.00 = Rp. = Rp.



34,000.00 62.50 34,062.50



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



950.00 11,000.00 1,100.00 0.00 13,050.00 47,112.50 0.00 47,112.50



Rp.



40,550.00



27,500.00 = Rp. = Rp.



27,500.00 27,500.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



x Rp.



0.010 OH x Rp. 0.100 OH x Rp. 0.010 OH x Rp. 0.0050 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



950.00 11,000.00 1,100.00 0.00 13,050.00 40,550.00 0.00 40,550.00



Rp.



11,510.00



3,500.00 = Rp. = Rp.



3,500.00 3,500.00



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



1 buah Memasang Shock Drat Dalam PVC Tipe Ø 1/2"



G.29.1 Bahan - Shock Drat Dalam PVC Tipe Ø 1/2"



G.29.2 -



47,112.50



1 buah Memasang Floor drain



G.28.1 Bahan - Floor drain Ø 4" steinless



G.28.2 -



x Rp. x Rp.



Rp.



Tenaga Pekerja Tukang Pasang Pipa Kepala tukang Mandor



1.000 Bh Jumlah (1)



x Rp.



0.027 OH x Rp. 0.045 OH x Rp. 0.005 OH x Rp. 0.0137 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Sanitasi



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



2,565.00 4,950.00 495.00 0.00 8,010.00 11,510.00 0.00 11,510.00



Page 70 of 81



PS



G.30



1 unit Memasang check valve Ø 4"



G.30.1 Bahan - Check Valve Ø 4"



Rp.



2,300,000.00



1.000 Unit x Rp. Jumlah (1)



2,000,000.00 = Rp. = Rp.



2,000,000.00 2,000,000.00



15.000 % x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



2,000,000.00 Rp. Rp. Rp. Rp.



300,000.00 300,000.00 2,300,000.00 0.00 2,300,000.00



Rp.



281,047.03



G.30.2 Tenaga - 15 % dari harga bahan



PS



PS



G.31



1 Unit Membuat Bak Perangkap Lemak Ø 40 Cm



G.31.1 -



Bahan Buis Beton Ø 40 cm, tebal 8 cm Beton lantai K 225 Pasir Urug Pas. Bata Merah 1/2 bata 1 : 3 Beton Cover K 225 + 150 kg besi + bekisting



G.31.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



G.32



1 Unit Membuat Bak Kontrol SR Ø 40 Cm



G.32.1 -



Bahan Buis Beton Ø 40 cm, tebal 8 cm Beton lantai K 225 Pasir Urug Pas. Bata Merah 1/2 bata 1 : 3 Beton Cover K 225 + 150 kg besi + bekisting



G.32.2 -



Tenaga Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor



0.400 0.030 0.020 0.000 0.010 Jumlah (1)



Rp. Rp. Rp. Rp. Rp.



250,000.00 684,166.11 110,400.00 64,326.25 2,606,615.00



= = = = = =



Rp. Rp. Rp. Rp. Rp. Rp.



100,000.00 20,524.98 2,208.00 0.00 26,066.15 148,799.13



1.200 OH x Rp. 0.067 OH x Rp. 0.026 OH x Rp. 0.021 OH x Rp. 0.052 OH x Rp. 0.096 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



= = = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



114,000.00 7,370.00 2,860.00 2,310.00 5,707.90 0.00 132,247.90 281,047.03 0.00 281,047.03



Rp.



242,020.28



0.500 0.030 0.020 0.000 0.000 Jumlah (1)



M' M3 M3 M2 M3



x x x x x



0%



= = = =



Rp. Rp. Rp. Rp. Rp.



250,000.00 684,166.11 110,400.00 64,326.25 2,606,615.00



= = = = = =



Rp. Rp. Rp. Rp. Rp. Rp.



125,000.00 20,524.98 2,208.00 0.00 0.00 147,732.98



0.853 OH x Rp. 0.045 OH x Rp. 0.026 OH x Rp. 0.021 OH x Rp. 0.029 OH x Rp. 0.047 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 110,000.00 110,000.00 0.00



= = = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



80,989.40 4,895.00 2,860.00 2,310.00 3,232.90 0.00 94,287.30 242,020.28 0.00 242,020.28



Pek. Sanitasi



M' M3 M3 M2 M3



x x x x x



0%



0%



Page 71 of 81



PS



PS



PS



G.33



1 Unit Membuat Bak Manhole H < 1 M Ø 60 Cm



G.33.1 -



Bahan Buis Beton Ø 60 cm, tebal 8 cm Beton lantai K 225 Pasir Urug Balok Reinforcement Beton Cover K 225 + 150 kg besi + bekisting Besi strip UK 5mm x 50 mm Baut Ø 16 mm



G.33.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor Tukang gali



0.850 0.096 0.045 0.000 0.017 0.000 0.000 Jumlah (1)



G.34



1 Unit Membuat Bak Manhole H 1 - 2 M Ø 60 Cm



G.34.1 -



Bahan Buis Beton Ø 60 cm, tebal 8 cm Beton lantai K 225 Pasir Urug Balok Reinforcement Beton Cover K 225 + 150 kg besi + bekisting Besi strip UK 5mm x 50 mm Baut Ø 16 mm



G.34.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor Tukang gali



300,000.00 684,166.11 92,000.00 2,606,615.00 2,606,615.00 65,000.00 17,000.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



255,000.00 65,892.04 4,173.12 0.00 43,243.74 0.00 0.00 368,308.90



1.239 OH x Rp. 0.893 OH x Rp. 0.084 OH x Rp. 0.044 OH x Rp. 0.350 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00 110,000.00



= = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



117,727.33 98,225.80 9,265.20 0.00 38,500.00 263,718.32 632,027.23 0.00 632,027.23



Rp.



765,671.41



0.850 0.090 0.023 0.054 0.033 0.000 0.000 Jumlah (1)



G.35



1 Unit Membuat Bak Manhole H 2 - 3 M Ø 60 Cm



G.35.1 -



Bahan Buis Beton Ø 60 cm, tebal 8 cm Beton lantai K 225 Pasir Urug Balok Reinforcement Beton Cover K 225 + 150 kg besi + bekisting Besi strip UK 5mm x 50 mm Baut Ø 16 mm



G.35.2 -



Tenaga Pekerja Tukang batu Kepala tukang Mandor Tukang gali



632,027.23



Rp. Rp. Rp. Rp. Rp. Rp. Rp.



M' M3 M3 M3 M3 Btg Bh



x x x x x x x



Rp.



Rp. Rp. Rp. Rp. Rp. Rp. Rp.



300,000.00 684,166.11 92,000.00 2,606,615.00 2,606,615.00 65,000.00 17,000.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



255,000.00 61,574.95 2,086.56 140,757.21 86,487.49 0.00 0.00 545,906.21



1.000 OH x Rp. 0.700 OH x Rp. 0.084 OH x Rp. 0.030 OH x Rp. 0.350 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00 110,000.00



= = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



95,000.00 77,000.00 9,265.20 0.00 38,500.00 219,765.20 765,671.41 0.00 765,671.41



Rp.



1,596,757.54



3.000 0.114 0.045 0.053 0.017 0.000 2.000 Jumlah (1)



M' M3 M3 M3 M3 Btg Bh



x x x x x x x



0%



Rp. Rp. Rp. Rp. Rp. Rp. Rp.



300,000.00 684,166.11 92,000.00 2,606,615.00 2,606,615.00 65,000.00 17,000.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



900,000.00 77,707.59 4,173.12 137,824.77 43,243.74 0.00 34,000.00 1,196,949.22



1.619 OH x Rp. 1.083 OH x Rp. 0.103 OH x Rp. 0.063 OH x Rp. 1.050 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00 110,000.00



= = = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



153,827.33 119,125.80 11,355.20 0.00 115,500.00 399,808.32 1,596,757.54 0.00 1,596,757.54



Pek. Sanitasi



M' M3 M3 M3 M3 Btg Bh



x x x x x x x



0%



0%



Page 72 of 81



PS



G.36



1 Unit Pengadaan dan Pemasangan Paket IPAL Kapasitas 50 SR



Rp.



Err:509



= = = = =



Rp. Rp. Rp. Rp. Rp.



210,000,000.00 105,000,000.00 52,500,000.00 Err:509 Err:509



17,500,000.00 = = = 5% = =



Rp. Rp. Rp. Rp. Rp.



17,500,000.00 17,500,000.00 Err:509 Err:509 Err:509



Rp.



1,265,000.00



1.000 unit x Rp. Jumlah (1)



1,100,000.00 = Rp. = Rp.



1,100,000.00 1,100,000.00



15.000 % x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



1,100,000.00 Rp. Rp. Rp. Rp.



165,000.00 165,000.00 1,265,000.00 0.00 1,265,000.00



Rp.



785,450.00



1.000 unit x Rp. Jumlah (1)



683,000.00 = Rp. = Rp.



683,000.00 683,000.00



15.000 % x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



683,000.00



102,450.00 102,450.00 785,450.00 0.00 785,450.00



G.36.1 Bahan - IPAL Fiber Large Vessel + Biaya Instalasi (Standard) 30 M³ 1.000 IPAL Fiber Medium Vessel + Biaya Instalasi (Standard) 15 M³ 1.000 - IPAL Fiber Small Vessel + Biaya Instalasi (Standard) 7,5 M³ 1.000 - Err:509 1.000 Jumlah (1) G.36.2 Tenaga - Biaya Pengiriman



PS



G.37



Unit Unit Unit ###



x x x x



Rp. Rp. Rp. Rp.



1.000 Pkt x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



210,000,000.00 105,000,000.00 52,500,000.00 Err:509



1 Unit Pemasangan Tandon Air 1,1 m3



G.37.1 Bahan - Tandon Air 1,1 m3



G.37.2 Tenaga - 15 % dari harga bahan



PS



G.38



0%



= = = =



1 Unit Pemasangan Pompa Air Otomatis



G.38.1 Bahan - Pompa Air Otomatis (Shimizu)



G.38.2 Tenaga - 15 % dari harga bahan



Pek. Sanitasi



0%



= = = =



Rp. Rp. Rp. Rp.



Page 73 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN PENUTUP LANTAI DAN DINDING PPLD H.1



1 M²



H.1.1 -



Bahan Keramik 20 x 20 cm Portland Cement (PC) Pasir pasang PC warna



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



H.1.2



PPLD H.2



1 M²



H.2.1



Bahan Keramik 20 x 25 cm Portland Cement (PC) Pasir pasang PC warna



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



PPLD H.3



1 M²



H.3.1



Rp. Rp. Rp. Rp.



50,000.00 1,125.00 154,000.00 15,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



50,000.00 12,802.50 6,468.00 22,500.00 91,770.50



0.620 OH x Rp. 0.350 OH x Rp. 0.035 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



58,900.00 38,500.00 3,850.00 0.00 101,250.00 193,020.50 0.00 193,020.50



Harga Satuan



= Rp.



201,020.50



Rp. Rp. Rp. Rp.



58,000.00 1,125.00 154,000.00 15,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



58,000.00 12,802.50 6,468.00 22,500.00 99,770.50



0.620 OH x Rp. 0.350 OH x Rp. 0.035 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



58,900.00 38,500.00 3,850.00 0.00 101,250.00 201,020.50 0.00 201,020.50



Harga Satuan



= Rp.



202,520.50



Rp. Rp. Rp. Rp.



59,500.00 1,125.00 154,000.00 15,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



59,500.00 12,802.50 6,468.00 22,500.00 101,270.50



0.620 OH x Rp. 0.350 OH x Rp. 0.035 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



58,900.00 38,500.00 3,850.00 0.00 101,250.00 202,520.50 0.00 202,520.50



1.000 11.380 0.042 1.500 Jumlah (1)



M2 Kg M3 Kg



x x x x



1.000 11.380 0.042 1.500 Jumlah (1)



M2 Kg M3 Kg



x x x x



Pasang lantai keramik 30 x 30 cm



-



Bahan Keramik 30 x 30 cm Portland Cement (PC) Pasir pasang PC warna



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



H.3.2



= Rp.



Pasang lantai keramik 20 x 25 cm



-



H.2.2



Harga Satuan



Pasang lantai keramik 20 x 20 cm



1.000 11.380 0.042 1.500 Jumlah (1)



M2 Kg M3 Kg



Pek. P. Lantai dan Dinding



x x x x



0%



0%



0%



193,020.50



Page 74 of 81



PPLD H.4



1 M²



H.4.1 -



Bahan Keramik 40 x 40 cm Portland Cement (PC) Pasir pasang PC warna



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



H.4.2



PPLD H.5



1 M²



H.5.1



Bahan Keramik 20 x 20 cm Portland Cement (PC) Pasir pasang PC warna



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



PPLD H.6



1 M²



H.6.1



210,520.50



Rp. Rp. Rp. Rp.



67,500.00 1,125.00 154,000.00 15,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



67,500.00 12,802.50 6,468.00 22,500.00 109,270.50



0.620 OH x Rp. 0.350 OH x Rp. 0.035 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



58,900.00 38,500.00 3,850.00 0.00 101,250.00 210,520.50 0.00 210,520.50



Harga Satuan



= Rp.



158,684.50



Rp. Rp. Rp. Rp.



50,000.00 1,125.00 154,000.00 15,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



50,000.00 10,462.50 2,772.00 22,500.00 85,734.50



0.600 OH x Rp. 0.100 OH x Rp. 0.045 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



57,000.00 11,000.00 4,950.00 0.00 72,950.00 158,684.50 0.00 158,684.50



Harga Satuan



= Rp.



205,184.50



Rp. Rp. Rp. Rp.



58,000.00 1,125.00 154,000.00 15,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



58,000.00 10,462.50 2,772.00 22,500.00 93,734.50



0.600 OH x Rp. 0.450 OH x Rp. 0.0450 OH x Rp. 0.030 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



57,000.00 49,500.00 4,950.00 0.00 111,450.00 205,184.50 0.00 205,184.50



1.000 11.380 0.042 1.500 Jumlah (1)



M2 Kg M3 Kg



x x x x



1.000 9.300 0.018 1.500 Jumlah (1)



M2 Kg M3 Kg



x x x x



Pasang Dinding keramik 20 x 25 cm



-



Bahan Keramik 20 x 25 cm Portland Cement (PC) Pasir pasang PC warna



-



Tenaga Pekerja Tukang batu Kepala tukang Mandor



H.6.2



= Rp.



Pasang Dinding keramik 20 x 20 cm



-



H.5.2



Harga Satuan



Pasang lantai keramik 40 x 40 cm



1.000 9.300 0.018 1.500 Jumlah (1)



M2 Kg M3 Kg



Pek. P. Lantai dan Dinding



x x x x



0%



0%



0%



Page 75 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN PENGECATAN PPC I.1 I.1.1 -



Bahan Cat Meni Kayu/ Besi Dempul Cat kayu Kertas Gosok ( Amplas) Kuas 3 "



-



Tenaga Pekerja Tukang cat Kepala tukang Mandor



I.1.2



PPC I.2



= Rp.



32,590.00



Rp. Rp. Rp. Rp. Rp.



33,000.00 25,000.00 56,000.00 2,500.00 12,000.00



= = = = = =



Rp. Rp. Rp. Rp. Rp. Rp.



6,600.00 3,750.00 9,520.00 4,300.00 120.00 24,290.00



0.070 OH x Rp. 0.009 OH x Rp. 0.006 OH x Rp. 0.003 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



6,650.00 990.00 660.00 0.00 8,300.00 32,590.00 0.00 32,590.00



Harga Satuan



= Rp.



26,156.33



Rp. Rp. Rp. Rp. Rp.



26,900.00 45,000.00 2,500.00 12,000.00 23,000.00



= = = = = =



Rp. Rp. Rp. Rp. Rp. Rp.



4,483.33 7,500.00 4,300.00 120.00 230.00 16,633.33



0.020 OH x Rp. 0.063 OH x Rp. 0.006 OH x Rp. 0.003 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



1,900.00 6,930.00 693.00 0.00 9,523.00 26,156.33 0.00 26,156.33



= Rp.



22,084.00



39,000.00 = Rp. 12,000.00 = Rp. = Rp.



6,513.00 1,200.00 7,713.00



0.200 0.150 0.170 1.720 0.010 Jumlah (1)



ltr kg kg lbr bh



x x x x x



1 M² Pengecatan Tembok Baru



I.2.1 -



Bahan Plamur Cat tembok (metrolite) Kertas Gosok ( Amplas) Kuas 3 " Roll cat



-



Tenaga Pekerja Tukang cat Kepala tukang Mandor



I.2.2



PPC I.3 I.3.1



Harga Satuan



1 M² Pengecatan Bidang Kayu Baru



0.167 0.167 1.720 0.010 0.010 Jumlah (1)



kg kg lbr bh bh



I.3.2 -



Tenaga Pekerja Tukang cat Kepala tukang Mandor



0%



Harga Satuan



1 M² Pengecatan Waterproof Plat Atap Bahan - Cat waterproof - Kuas 3 "



x x x x x



0%



0.167 kg 0.100 bh Jumlah (1)



x Rp. x Rp.



0.150 OH x Rp. 0.001 OH x Rp. 0.000 OH x Rp. 0.003 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Pengecatan



95,000.00 110,000.00 110,000.00 0.00



0%



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



14,250.00 110.00 11.00 0.00 14,371.00 22,084.00 0.00 22,084.00



Page 76 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN TAMBAHAN PTB J.1



1 M³



Membongkar Cetakan/Bekisting



Harga Satuan



Tenaga - Pekerja



PTB J.2



1 M³



4.000 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



Membongkar beton bertulang dan membersihkan



Tenaga - Pekerja - Tukang batu - Mandor



PTB J.3



1 M2



-



PTB J.4



Tenaga Sewa mesin Jack Hammer Solar Pekerja Tukang Jack Hammer/Masinis Mandor



1 M2



PTB J.10



1 M2



Memasang Restorasi Paving Block



Tenaga Pekerja Tukang batu Kepala tukang Mandor



380,000.00 380,000.00 0.00 380,000.00



= Rp.



782,000.00



95,000.00 = Rp. 110,000.00 = Rp. 0.00 = Rp. = Rp. 0% = Rp. = Rp.



760,000.00 22,000.00 0.00 782,000.00 0.00 782,000.00



= Rp.



= = = = = = 0% = =



0.00 6,237.00 23,750.00 0.00 0.00 29,987.00 0.00 29,987.00



= Rp.



9,500.00



95,000.00 = Rp. 0.00 = Rp. = Rp. 0% = Rp. = Rp.



9,500.00 0.00 9,500.00 0.00 9,500.00



Harga Satuan



1.000 M2 0.050 M3 Jumlah (1)



x Rp. x Rp.



0.100 OH x Rp. 0.250 OH x Rp. 0.025 OH x Rp. 0.003 OH x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Tambahan



29,987.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



0.00 4,725.00 95,000.00 0.00 0.00



Harga Satuan



0.100 OH x Rp. 0.010 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



J.10.1 Bahan - Paving Block - Pasir Urug



J.10.2 -



0.660 OH x Rp. 1.320 #N/A x Rp. 0.250 OH x Rp. 0.040 OH x Rp. 0.063 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



380,000.00



Rp. Rp. Rp. Rp.



Harga Satuan



Membongkar Paving Block Untuk Digunakan Kembali



Tenaga - Pekerja - Mandor



95,000.00 = = 0% = =



Harga Satuan



8.000 OH x Rp. 0.200 OH x Rp. 0.100 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



Membongkar Aspal Dengan Jack Hammer



= Rp.



= Rp.



9,500.00



0.00 = Rp. 0.00 = Rp. = Rp.



0.00 0.00 0.00



= = = = = = 0% = =



95,000.00 0.00 0.00 0.00



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



9,500.00 0.00 0.00 0.00 9,500.00 9,500.00 0.00 9,500.00



Page 77 of 81



PTB J.11



1 M³



Langsiran Batu Kali



Tenaga - Pekerja - Mandor - Sewa Gerobak



PTB J.12



1 M³



1 M³



J.14.2 Tenaga - Plat Beton bertulang K 225 - 15 % Harga Bahan besi siku



PTB J.15 J.15.1 -



0.120 OH x Rp. 0.012 OH x Rp. 1.000 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



1 M2



0.050 OH x Rp. 0.005 OH x Rp. 1.000 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



J.15.2 Tenaga - Pekerja - Mandor



95,000.00 = Rp. 0.00 = Rp. 0.00 = Rp. = Rp. 0% = Rp. = Rp.



19,000.00 0.00 0.00 19,000.00 0.00 19,000.00



= Rp.



11,400.00



95,000.00 = Rp. 0.00 = Rp. 0.00 = Rp. = Rp. 0% = Rp. = Rp.



11,400.00 0.00 0.00 11,400.00 0.00 11,400.00



= Rp.



4,750.00



95,000.00 = Rp. 0.00 = Rp. 0.00 = Rp. = Rp. 0% = Rp. = Rp.



4,750.00 0.00 0.00 4,750.00 0.00 4,750.00



Harga Satuan



= Rp.



117,195.28



x Rp. x Rp.



2,606,615.00 = Rp. 65,000.00 = Rp. = Rp.



39,099.23 57,200.00 96,299.23



0.015 M3 x Rp. 1.000 Ls x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



821,070.00 = Rp. 8,580.00 = Rp. = Rp. = Rp. 0% = Rp. = Rp.



12,316.05 8,580.00 20,896.05 117,195.28 0.00 117,195.28



0.015 M3 0.880 Btg Jumlah (1)



Restorasi Jalan Aspal



Bahan Beton K 250 Batu Pecah 2 - 3 cm Aspal



19,000.00



Harga Satuan



1 Unit Membuat Tutup Mainhole IPAL



J.14.1 Bahan - Plat Beton bertulang K 225 - Besi Siku 50 x 50 x 50 mm



= Rp.



Harga Satuan



Langsiran Pasir



Tenaga - Pekerja - Mandor - Sewa Gerobak



PTB J.14



0.200 OH x Rp. 0.020 OH x Rp. 1.000 OH x Rp. Jumlah (1) Overhead & Profit (2) Jumlah (1 + 2)



Langsiran Kerikil



Tenaga - Pekerja - Mandor - Sewa Gerobak



PTB J.13



Harga Satuan



Harga Satuan



0.150 M3 0.100 M3 5.290 Kg



x Rp. x Rp. x Rp.



2.000 M3 x Rp. 0.200 Ls x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Tambahan



= Rp.



438,170.64



= = = =



Rp. Rp. Rp. Rp.



133,005.64 24,500.00 89,930.00 247,435.64



95,000.00 = Rp. 3,675.00 = Rp. = Rp. = Rp. 0% = Rp. = Rp.



190,000.00 735.00 190,735.00 438,170.64 0.00 438,170.64



886,704.26 245,000.00 17,000.00 Jumlah (1)



Page 78 of 81



PTB J.16



1 Bh



Pemasangan Loster



J.16.1 Bahan - Loster Beton



J.16.2 Tenaga - 15 % Harga Bahan besi siku



PTB J.17



1 Bh



J.17.2 Tenaga - 15 % Harga Bahan besi siku



1 Set



1.000 bh Jumlah (1)



J.18.2 Tenaga - 15 % Harga Bahan besi siku



= Rp.



40,250.00



35,000.00 = Rp. = Rp.



35,000.00 35,000.00



5,250.00 = = = 0% = =



Rp. Rp. Rp. Rp. Rp.



5,250.00 5,250.00 40,250.00 0.00 40,250.00



= Rp.



29,900.00



26,000.00 = Rp. = Rp.



26,000.00 26,000.00



Harga Satuan



1.000 bh Jumlah (1)



x Rp.



1.000 Ls x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pemasangan Pintu Aluminium



J.18.1 Bahan - Pintu Aluminium



x Rp.



1.000 Ls x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pemasangan Glass block



J.17.1 Bahan - Glass Block



PTB J.18



Harga Satuan



3,900.00 = = = 0% = =



Rp. Rp. Rp. Rp. Rp.



3,900.00 3,900.00 29,900.00 0.00 29,900.00



= Rp.



402,500.00



350,000.00 = Rp. = Rp.



350,000.00 350,000.00



Harga Satuan



1.000 set Jumlah (1)



x Rp.



1.000 Ls x Rp. Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Pek. Tambahan



52,500.00 = = = 0% = =



Rp. Rp. Rp. Rp. Rp.



52,500.00 52,500.00 402,500.00 0.00 402,500.00



Page 79 of 81



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN KAYU PKY



K.1 K.1.1



1 M3



Bahan - Balok Kayu Kls I - Paku 10 cm - Lem Kayu



K.1.2 -



PKY



K.2 A.2.1



K.3



-



K.4 K.4.1



Tenaga Pekerja Tukang Kayu Kepala tukang Mandor



1 Bh



K.4.2 -



Tenaga Pekerja Tukang Kayu Kepala tukang Mandor



Rp.



13,146,000.00



x x x



Rp. Rp. Rp.



9,000,000.00 20,000.00 15,000.00



= = = =



Rp. Rp. Rp. Rp.



9,900,000.00 25,000.00 15,000.00 9,940,000.00



7.000 OH 21.000 OH 2.100 OH 0.350 OH Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



x x x x



Rp. Rp. Rp. Rp.



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



665,000.00 2,310,000.00 231,000.00 0.00 3,206,000.00 13,146,000.00 0.00 13,146,000.00



=



Rp.



807,500.00



0%



Harga Satuan



0.030 M3 0.500 m3 Jumlah (1)



x x



Rp. Rp.



15,000,000.00 15,000.00



= = =



Rp. Rp. Rp.



450,000.00 7,500.00 457,500.00



0.500 OH 2.500 OH 0.250 OH 0.050 OH Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



x x x x



Rp. Rp. Rp. Rp.



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



47,500.00 275,000.00 27,500.00 0.00 350,000.00 807,500.00 0.00 807,500.00



=



Rp.



77,025.00



0%



Harga Satuan



1.000 Bh Jumlah (1)



x



Rp.



21,000.00



= =



Rp. Rp.



21,000.00 21,000.00



0.005 OH 0.500 OH 0.005 OH 0.003 OH Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



x x x x



Rp. Rp. Rp. Rp.



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



475.00 55,000.00 550.00 0.00 56,025.00 77,025.00 0.00 77,025.00



=



Rp.



24,575.00



0%



Harga Satuan



Pasang Engsel Pintu



Bahan - Engsel Pintu



=



1.100 m3 1.250 kg 1.000 Kg Jumlah (1)



Pasang Kunci Tanam



Bahan - Kunci Tanam Kamar Mandi



K.3.2



PKY



Tenaga Pekerja Tukang Kayu Kepala tukang Mandor



1 Bh



Harga Satuan



Pasang Pintu/Jendela Panel Kayu Kls I



Bahan - Papan Kayu Kls I - Lem Kayu



-



K.3.1



Tenaga Pekerja Tukang Kayu Kepala tukang Mandor



1 M3



K.2.2



PKY



Pasang Kusen Pintu/Jendela Kayu Kls I



1.000 Bh Jumlah (1)



x



Rp.



5,000.00



= =



Rp. Rp.



5,000.00 5,000.00



0.015 OH 0.150 OH 0.015 OH 0.001 OH Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



x x x x



Rp. Rp. Rp. Rp.



95,000.00 110,000.00 110,000.00 0.00



= = = = = = = =



Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.



1,425.00 16,500.00 1,650.00 0.00 19,575.00 24,575.00 0.00 24,575.00



0%



ANALISA HARGA SATUAN PEKERJAAN PEKERJAAN ELETRIKAL PET



L.1 L.1.1



L.1.2



PET



1 Bh



Bahan - Balon Lampu - Fitting Lampu



Tenaga - Tukang Listrik



L.2



1 Bh



L.2.1 -



L.2.2



PET



L.3.1 -



L.3.2



Bahan Pipa Union Saklar Tunggal Dos-Inbow Kabel NYA 2,5 mm



1 Bh



1.000 Bh 1.000 Bh Jumlah (1)



Tenaga - Tukang Listrik



Rp.



73,500.00



Rp. Rp.



34,000.00 12,000.00



= = =



Rp. Rp. Rp.



34,000.00 12,000.00 46,000.00



0.250 Oh x Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp.



110,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



27,500.00 27,500.00 73,500.00 0.00 73,500.00



=



Rp.



83,700.00



0%



Harga Satuan



2.000 m' 1.000 Bh 1.000 Bh 5.000 m' Jumlah (1)



x x x x



Rp. Rp. Rp. Rp.



2,250.00 28,000.00 3,700.00 4,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



4,500.00 28,000.00 3,700.00 20,000.00 56,200.00



0.250 Oh x Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp.



110,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



27,500.00 27,500.00 83,700.00 0.00 83,700.00



=



Rp.



93,700.00



0%



Harga Satuan



Pasang Saklar Ganda



Bahan Pipa Union Saklar Ganda Dos-Inbow Kabel NYA 2,5 mm



=



x x



Pasang Stop Kontak



Tenaga - Tukang Listrik



L.3



Harga Satuan



Pasang Lampu SL



2.000 m' 1.000 Bh 1.000 Bh 7.500 m' Jumlah (1)



x x x x



Rp. Rp. Rp. Rp.



2,250.00 28,000.00 3,700.00 4,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



4,500.00 28,000.00 3,700.00 30,000.00 66,200.00



0.250 Oh x Jumlah (2) Jumlah (1) + (2) Overhead & Profit (3) Jumlah (1 + 2 + 3)



Rp.



110,000.00



= = = = =



Rp. Rp. Rp. Rp. Rp.



27,500.00 27,500.00 93,700.00 0.00 93,700.00