15 0 234 KB
RENCANA ANGGARAN BIAYA PROYEK LANSEKAP MAKET MASTERPLAN MAN INSAN CENDEKIA GOWA
NO.
I
URAIAN PEKERJAAN
VOLUME SAT
HARGA SATUAN (Rp.)
TOTAL HARGA (Rp.)
1.00 2.52
1,000,000.00 500,000.00
1,000,000.00 1,260,000.00
Total I
2,260,000.00
PEKERJAAN PERSIAPAN 1 Pekerjaan lahan Maket 2 Pekerjaan penambahan dan pembetukan media
II
ls m2
PEKERJAAN MINIATUR MAKET 1:500
II.A Bahan Taman/Halaman Pohon 1 2 3 4 5 6 7 8
Palem Raja Palem Sadeng Palem Botol Pohon Cabang Pisang Kipas Onclang Ceper Pohon Bulat Cemara Udang
1 2 3 4
Perdu Sikas Halus (warna) Bonsai Rumbai (Polos Hijau) uk. Sedang Bonsai Tulang (Uk. Sedang) Cemara Busa
90.00 90.00 90.00 90.00 90.00 90.00 90.00 90.00
phn phn phn phn phn phn phn phn
45,000.00 80,000.00 35,000.00 40,000.00 35,000.00 35,000.00 40,000.00 40,000.00
4,050,000.00 7,200,000.00 3,150,000.00 3,600,000.00 3,150,000.00 3,150,000.00 3,600,000.00 3,600,000.00
5.00 5.00 5.00 5.00
duz duz duz duz
35,000.00 35,000.00 35,000.00 35,000.00
175,000.00 175,000.00 175,000.00 175,000.00
78.75 39.38
m2 m2
45,000.00 45,000.00
3,543,750.00 1,771,875.00
Subtotal II.A
37,515,625.00
125,000.00 125,000.00 20,000.00 125,000.00
125,000.00 875,000.00 300,000.00 62,500.00
Subtotal II.D Subtotal II
1,362,500.00 38,878,125.00
TOTAL ( I+II )
41,138,125.00
DIBULATKAN
41,138,125.00
Rumput
1 Media Rumput Halus 2 Media Rumput Sedang
III ELEMEN TAMAN 1 3 4 5
Koral Putih Mika/Fiber Falt 3mm Karton Maket Pasir Sencon/Silica
1.00 7.00 15.00 1/2
krg lmb lmb Krg
Surabaya, 21 November 2016 Dibuat Oleh, CV. MAKET BINTANG
BINTANG JAYA Terima Kasih Telah Menggunakan Jasa Kami
Page 1