5 0 98 KB
TAHUN PEKERJAAN LOKASI
: :
:
2019 MUSHOLA MANOKOWARI
RINCIAN RENCANA ANGGARAN BIAYA No
Uraian Pekerjaan
I 1 2 3 II 1 2
PEKERJAAN PENDAHULUAN Pembersihan lokasi sebelum dan sesudah Bowplank Sewa air, gudang, alat dan listrik PEKERJAAN TANAH DAN PASIR Galian Tanah Pondasi Batu Kali dan Footplat Urug pasir bawah lantai dan bawah pondasi
Volume
Satuan
132.00
m²
46.00 1.00
m' Ls
117.65 9.70
m³ m³
3 4
Urugan Tanah biasa dalam mushola Urugan Tanah Kembali
28.80 22.50
m³ m³
1
PEKERJAAN PASANGAN BATU Pasangan batu belah camp 1pc:3psr
20.30
m³
1 2
PEKERJAAN STRUKTUR BETON BERTULANG Pondasi Footplat 1 x 1 m Beton sloof SL 15x20cm
2.40 2.18
m³ m³
1.06 2.59 1.35 5.52
m³ m³ m³ m³
3.56 11.01
m³ m³
143.21 286.42 286.42
m² m² m²
9.00 37.29 66.24
m² m² m²
121.00 32.00
m² m'
78.40 48.00 78.40
m² m m²
286.42
m²
1.00
Ls
3.000 6.000 1.000
Unit Unit Ls
III
IV
3 4 6 7
Beton kolom praktis 15x15cm Beton kolom K1 25x25 total Beton kolom teras 15x25 total Beton balok B2 20x30
8 9
Ring Balok RB 15x20 Dak Beton Atap Teras dan talang
V 1 2 3 5 6 7 VI 1 2 3 4 5 VII 1 2 VIII 1 2 3
PEKERJAAN PASANGAN, PLESTERAN DAN BESI Pasang dinding Plesteran dinding Acian dinding Roster teralis besi holow vertikal PEKERJAAN LANTAI, DINDING, PLAFOND DAN ATAP Keramik lantai 60x60 setara platinum List plank 3x30 GRC Rangka Atap Kaso Reng Meranti Gording Meranti 6/12 Genteng + accessories PEKERJAAN CAT, FINISHING Cat dinding dulux List Jendela fasad acesories PEKERJAAN PINTU JENDELA Pintu P1 alumunium Jendela Lengkung Perlengkapan Pintu Handel, engsel dll
IX 1 2 3 4 5 6 7 X 1
PEKERJAAN ELEKTRIKAL Instalasi Lampu MCB + MCB Box Memasang Stop Kontak Memasang Lampu dan Fitting Lampu Outdoor Memasang Saklar Tunggal Memasang Saklar Ganda PEKERJAAN SANITASI Memasang Pipa PVC 3' buagan air hujan
24.000 1.000 7.000
unit unit unit
19.000 5.000 2.000 4.000
unit Unit unit unit
46.000
m'
RAN BIAYA Harga satuan ( Rp )
Jumlah Harga ( Rp )
12,000.00
1,584,000.00
20,065.40 5,000,000.00
923,008.40 5,000,000.00
Sub Jumlah
7,507,008.40
36,400.00 57,986.00
4,282,460.00 562,464.20
27,405. 00 17,450. 00 Sub Jumlah
789,264.00 392,625.00
1,433,718.98 Sub Jumlah
6,026,813.20 29,104,495.19 29,104,495.19
3,300,037.93 3,743,338.61
7,920,091.02 8,160,478.18
5,972,594.54 5,766,244.32 6,081,323.43 6,295,927.16
6,330,950.21 14,934,572.78 8,209,786.63 34,753,517.94
3,743,338.61 5,248,054.01
13,326,285.46 57,781,074.65
Sub Jumlah
151,416,756.87
200,503.32 46,634.10 51,394.14
28,714,079.81 13,356,938.06 14,720,309.58
438,119.64 300,000.00 300,000.00
3,943,076.78 11,187,000.00 19,872,000.00
Sub Jumlah
91,793,404.23
152,708.27 32,428.94
18,477,701.22 1,037,725.97
52,890.20 62,639.61 43,050.00
4,146,591.33 3,006,701.21 5,375,120.00
Sub Jumlah 38,516.00 4,000,000.00 Sub Jumlah 4,000,000.00 3,000,000.00 2,000,000.00
32,043,839.73 11,031,752.72 4,000,000.00 15,031,752.72 12,000,000.00 18,000,000.00 2,000,000.00
Sub Jumlah
32,000,000.00
213,720.00 385,300.00 50,300.00
5,129,280.00 385,300.00 352,100.00
70,300.00 300,000.00 65,600.00 75,600.00
1,335,700.00 1,500,000.00 131,200.00 302,400.00
Sub Jumlah 74,683.50 Sub Jumlah
9,135,980.00 3,435,441.00 3,435,441.00
REKAPITULASI RENCANA ANGGARAN BIAYA
NO
Uraian Pekerjaan
Jumlah Harga
I
PEKERJAAN PENDAHULUAN
Rp
II
PEKERJAAN TANAH DAN PASIR
Rp
III
PEKERJAAN PASANGAN BATU
Rp
IV
PEKERJAAN STRUKTUR BETON BERTULANG
Rp
V
PEKERJAAN PASANGAN, PLESTERAN DAN BESI
Rp
VI
PEKERJAAN LANTAI, DINDING, PLAFOND DAN ATAP
Rp
VII
PEKERJAAN CAT, FINISHING
Rp
VIII
PEKERJAAN PINTU JENDELA
Rp
IX
PEKERJAAN ELEKTRIKAL
Rp
X
PEKERJAAN SANITASI
Rp
Jumlah Total Dibulatkan
Rp Rp TIGA RATUS TUJUH PULUH TUJUH RIBU EMPAT RATUS SEMBILAN PULUH LIMA JUTA RUPIAH
Jumlah Harga 7,507,008.40 6,026,813.20 29,104,495.19 151,416,756.87 91,793,404.23 32,043,839.73 15,031,752.72 32,000,000.00 9,135,980.00 3,435,441.00
377,495,491.34 377,495,000.00 LUH LIMA JUTA RUPIAH