RENCANA ANGGARAN BIAYA vs. REALISASI PEKERJAAN KEGIATAN PAKET PEKERJAAN LOKASI LUAS BANGUNAN
: : : :
PEMBANGUNAN MASJID AL IKHLASH PEKERJAAN STRUKTUR PERUMAHAN DEPOK MAHARAJA RW. 012 496,5 M2 RENCANA ANGGARAN BIAYA
NO
URAIAN PEKERJAAN
1
2
VOLUME SATUAN 3
4
I
PEKERJAAN PERSIAPAN
1
Pengukuran dan bouwplank
2
Papan nama proyek
1.00
3
Listrik dan air kerja
4
Gudang Bahan
5
Dokumen Rekaman Akhir
136.00
m'
REALISASI PEKERJA HARGA SATUAN
JUMLAH BIAYA
VOLUME
5
6
3
46,484.60
6,321,905.60
136.00
buah
1,000,000.00
1,000,000.00
0.00
1.00
ls
1,500,000.00
1,500,000.00
0.00
24.00
m2
925,882.30
22,221,175.20
0.00
1.00
ls
7,500,000.00
7,500,000.00
0.00
Sub Total I II
PEKERJAAN TANAH
1
Penyiapan dan Perataan lahan
2
38,543,080.80
1,125.80
m3
17,750.00
19,982,950.00
1,125.80
Galian pondasi batu kali
4.32
m3
39,050.00
168,696.00
4.32
3
Galian pondasi sumuran
135.33
m3
48,015.00
6,497,700.17
135.33
4
Galian pondasi tangga teras
17.54
m3
39,050.00
684,976.05
17.54
5
Galian Sloof
42.48
m3
39,050.00
1,658,844.00
42.48
6
Galian Saluran
103.60
m3
39,050.00
4,045,580.00
103.60
7
Back fill
136.74
m3
10,967.00
1,499,662.95
136.74
8
Urugan pasir dibawah lantai
13.50
m3
135,000.00
1,822,500.00
13.50
9
Urugan pasir dibawah pondasi batu kali
0.72
m3
135,000.00
97,200.00
0.72
Sub Total II
36,458,109.17
Sub Total II
III
PEKERJAAN STRUKTURAL
A
PEKERJAAN PONDASI
1
Beton foot plate 100 x 100 x 25 - beton K 250
4.00
m3
3,359,304.30
13,437,217.20
4.00
2
Beton foot plate 80 x 80 x 25 - beton K 250
2.72
m3
3,647,815.30
9,922,057.62
2.72
3
Lantai kerja beton footplate 1 : 3 : 5 tebal 10 cm
1.28
m3
674,132.80
865,761.79
1.28
4
Pondasi sumuran type P.1
16.00
unit
1,350,000.00
21,600,000.00
16.00
5
Pondasi sumuran type P.2
17.00
unit
850,000.00
14,450,000.00
17.00
6
Pondasi batu kali 1PC : 5PS
2.52
m3
498,735.60
1,256,813.71
2.52
7
Pondasi batu kali saluran 1PC : 5PS
42.66
m3
477,688.20
20,376,888.85
42.66
Sub Total A
81,908,739.17
Sub Total A
B
PEKERJAAN BETON
1
Kolom K1 (30x30 cm) - beton K 250
9.69
m3
4,380,000.00
42,435,630.00
4.84
2
Kolom K2 (40x40 cm) - beton K 250
21.33
m3
4,380,000.00
93,430,656.00
10.67
3
Kolom praktis 11 x 11 cm
70.38
m'
55,700.00
3,920,166.00
0.00
4
Balok lantai induk BL.1 30 x 60 cm - beton K 250
4.25
m3
4,690,700.00
19,937,351.28
4.25
5
Balok lantai anak BL.2 30 x 40 cm - beton K 250
9.42
m3
4,690,700.00
44,208,909.36
9.42
6
Balok lantai anak BL.3 15 x 50 cm - beton K 250
0.99
m3
4,690,700.00
4,643,793.00
0.99
7
Balok lantai anak BL.4 15 x 60 cm - beton K 250
1.78
m3
2,234,250.00
3,981,433.50
1.78
8
Balok lantai anak BL.5 10 x 60 cm - beton K 250
12.67
m3
2,234,250.00
28,312,416.00
12.67
9
Balok praktis 12x20 cm - beton K 225
1.79
m3
2,234,250.00
3,994,839.00
0.00
10
Plat lantai, tebal 13 cm
18.09
m3
4,620,000.00
83,585,502.00
18.09
11
Balok atap BA.1.1, 30 x 40 cm - beton K 250
0.72
m3
4,690,700.00
3,377,304.00
0.72
12
Balok atap BA.1.1a, 30 x 50 cm - beton K 250
0.90
m3
4,690,700.00
4,221,630.00
0.90
13
Balok atap BA.1.2, 30 x 40 cm - beton K 250
1.80
m3
4,690,700.00
8,443,260.00
1.80
14
Balok atap BA.1.3, 25 x 25 cm - beton K 250
0.94
m3
4,380,000.00
4,106,250.00
0.94
15
Balok atap BA.2.1, 30 x 40 cm - beton K 250
5.76
m3
4,690,700.00
27,018,432.00
0.00
16
Balok atap BA.2.2, 30 x 40 cm - beton K 250
5.76
m3
4,690,700.00
27,018,432.00
0.00
17
Balok atap K.1, 30 x 40 cm - beton K 250
3.31
m3
4,620,000.00
15,301,440.00
0.00
18
Plat Atap Lt. 1.1, tebal 10 cm
1.99
m3
4,620,000.00
9,170,700.00
1.99
19
Plat Atap Lt. 1.2, tebal 10 cm
4.07
m3
4,620,000.00
18,794,160.00
4.07
20
Plat Atap Lt. 1.3, tebal 12 cm
3.55
m3
4,620,000.00
16,407,468.00
3.55
21
Plat Atap Lt. 2, tebal 12 cm
21.44
m3
4,620,000.00
99,043,560.00
0.00
22
Listplank Lantai 1, 8 x 60 cm
2.88
m3
2,234,250.00
6,434,640.00
2.88
23
Listplank Lantai 2, 8 x 60 cm
2.88
m3
2,234,250.00
6,434,640.00
0.00
24
Balok praktis 12x20 cm - beton K 225
1.79
m3
2,234,250.00
3,994,839.00
0.00
25
Sloof (SL1) 25 x 30 cm - beton K 250
14.40
m3
4,380,000.00
63,072,000.00
14.40
26
Sloof (SL2) 12 x 20 cm - beton K 225
0.14
m3
2,234,250.00
321,732.00
0.14
27
Ringbalk R2, 20 x 30 cm - beton K 250
1.58
m3
4,380,000.00
6,937,920.00
0.00
28
Talang beton t=10 cm, K 250
2.24
m3
4,620,000.00
10,367,280.00
0.00
29
Tangga, beton K 250
8.28
m3
4,690,700.00
38,861,775.21
0.00
30
Cover saluran, beton K 250
5.29
m3
4,620,000.00
24,449,040.00
5.29
31
Lantai kerja tebal 10 cm dgn tulangan susut, beton 1
12.60
m3
825,000.00
10,395,000.00
12.60
Sub Total B
732,622,198.40
Sub Total B
C
PEKERJAAN ATAP
1
Kuda-kuda Pipa Baja ø 6"
78.20
m'
383,333.33
29,976,666.41
0.00
2
Plat Stiffener, tebal 10 mm
150.72
kg
33,725.00
5,083,032.00
0.00
3
Aluminium foil
263.12
m2
26,919.00
7,082,808.84
0.00
4
64.13 64.13
m2 m2
90,606.00
5
Glasswool, density 24 kg/m3 Wiremesh Type 4410, ø3.25mm2, (100x100)mm2
46,149.00
5,810,109.75 2,959,304.63
0.00 0.00
6
Kaso dan reng baja ringan
64.13
m2
72,500.00
4,649,062.50
0.00
7
Atap genteng
64.13
m2
81,790.00
5,244,783.75
0.00
8
Genteng nok
30.00
m2
26,919.00
807,570.00
0.00
Sub Total C D 1
PEKERJAAN WATER PROFFING Plesteran overstack lt.1, 1PC : 2 PS, 15 mm
2
61,613,337.87
Sub Total C
71.90
m2
41,748.59
3,001,723.62
0.00
Plesteran atap beton 1PC : 2 PS, 15 mm
278.90
m2
39,071.71
10,897,099.92
0.00
3
Acian
m2
22,472.45
7,883,335.46
4
Water proffing membrane sheet
350.80 350.80
165,155.00
57,936,374.00
0.00 0.00
m2
Sub Total D
79,718,533.00
Sub Total D
REALISASI PEKERJAAN TAHAP I dan TAHAP II SATUAN
HARGA SATUAN
JUMLAH BIAYA
4
5
6
RENCANA PEKERJAAN TAHAP III VOLUME SATUAN 4.00
3
46,484.60
6,321,905.60
0.00
m'
buah
1,000,000.00
-
0.00
ls
1,500,000.00
-
m2
925,882.30
-
m'
ls
7,500,000.00
Sub Total I
-
HARGA SATUAN
JUMLAH BIAYA
5
6
46,484.60
-
buah
1,000,000.00
-
0.00
ls
1,500,000.00
-
0.00
m2
925,882.30
-
0.00
ls
7,500,000.00
-
Sub Total I
6,321,905.60
-
m3
17,750.00
19,982,950.00
0.00
m3
17,750.00
-
m3
39,050.00
168,696.00
0.00
m3
39,050.00
-
0.00
m3
48,015.00
-
39,050.00
-
m3
48,015.00
6,497,700.17
m3
39,050.00
684,976.05
0.00
m3
m3
39,050.00
1,658,844.00
0.00
m3
39,050.00
-
m3
39,050.00
4,045,580.00
0.00
m3
39,050.00
-
m3
10,967.00
1,499,662.95
0.00
m3
10,967.00
-
m3
135,000.00
1,822,500.00
0.00
m3
135,000.00
-
m3
135,000.00
97,200.00
0.00
m3
135,000.00
-
Sub Total II
Sub Total II
36,458,109.17
-
m3
3,359,304.30
13,437,217.20
0.00
m3
3,359,304.30
-
m3
3,647,815.30
9,922,057.62
0.00
m3
3,647,815.30
-
m3
674,132.80
865,761.79
0.00
m3
674,132.80
-
unit unit
1,350,000.00 850,000.00
21,600,000.00 14,450,000.00
0.00
unit
1,350,000.00
-
0.00
unit
850,000.00
-
498,735.60
-
477,688.20
-
m3
498,735.60
1,256,813.71
0.00
m3
m3
477,688.20
20,376,888.85
0.00
m3
Sub Total A
Sub Total A
81,908,739.17
-
m3
4,380,000.00
21,217,815.00
4.84
m3
4,380,000.00
21,217,815.00
m3
4,380,000.00
46,715,328.00
10.67
m3
4,380,000.00
46,715,328.00
70.38
m'
55,700.00
3,920,166.00
4,690,700.00
-
m'
55,700.00
-
m3
4,690,700.00
19,937,351.28
0.00
m3
m3
4,690,700.00
44,208,909.36
0.00
m3
4,690,700.00
-
m3
4,690,700.00
4,643,793.00
0.00
m3
4,690,700.00
-
m3
2,234,250.00
3,981,433.50
0.00
m3
2,234,250.00
-
m3
2,234,250.00
28,312,416.00
0.00
m3
2,234,250.00
-
m3
2,234,250.00
-
1.79
m3
2,234,250.00
3,994,839.00
m3
4,620,000.00
83,585,502.00
0.00
m3
4,620,000.00
-
0.00
m3
4,690,700.00
-
4,690,700.00
-
m3
4,690,700.00
3,377,304.00
m3
4,690,700.00
4,221,630.00
0.00
m3
m3
4,690,700.00
8,443,260.00
0.00
m3
4,690,700.00
-
m3
4,380,000.00
4,106,250.00
0.00
m3
4,380,000.00
-
m3
4,690,700.00
-
5.76
m3
4,690,700.00
27,018,432.00
m3
4,690,700.00
-
5.76
m3
4,690,700.00
27,018,432.00
m3
4,620,000.00
-
3.31
m3
4,620,000.00
15,301,440.00
m3
4,620,000.00
9,170,700.00
0.00
m3
4,620,000.00
-
0.00
m3
4,620,000.00
-
4,620,000.00
-
m3
4,620,000.00
18,794,160.00
m3
4,620,000.00
16,407,468.00
0.00
m3
m3
4,620,000.00
-
21.44
m3
4,620,000.00
99,043,560.00
m3
2,234,250.00
6,434,640.00
0.00
m3
2,234,250.00
-
m3
2,234,250.00
-
2.88
m3
2,234,250.00
6,434,640.00
m3
2,234,250.00
-
1.79
m3
2,234,250.00
3,994,839.00
m3
4,380,000.00
63,072,000.00
0.00
m3
4,380,000.00
-
m3
2,234,250.00
321,732.00
0.00
m3
2,234,250.00
-
1.58
m3
4,380,000.00
6,937,920.00
4,620,000.00
10,367,280.00
m3
4,380,000.00
-
m3
4,620,000.00
-
2.24
m3
m3
4,690,700.00
-
8.28
m3
4,690,700.00
38,861,775.21
m3
4,620,000.00
24,449,040.00
0.00
m3
4,620,000.00
-
m3
825,000.00
10,395,000.00
0.00
m3
825,000.00
-
Sub Total B
Sub Total B
421,795,732.10
###
m'
383,333.33
-
78.20
m'
383,333.33
29,976,666.41
kg
33,725.00
-
150.72
kg
33,725.00
5,083,032.00
m2
26,919.00
-
263.12
m2
26,919.00
7,082,808.84
m2 m2
90,606.00 46,149.00
-
64.13
m2
64.13
m2
90,606.00 46,149.00
5,810,109.75 2,959,304.63
m2
72,500.00
-
64.13
m2
72,500.00
4,649,062.50
m2
81,790.00
-
64.13
m2
81,790.00
5,244,783.75
m2
26,919.00
-
30.00
m2
26,919.00
807,570.00
Sub Total C
Sub Total C
-
61,613,337.87
m2
41,748.59
-
71.90
m2
41,748.59
3,001,723.62
m2
39,071.71
-
278.90
m2
39,071.71
10,897,099.92
m2
22,472.45
-
350.80
m2
22,472.45
7,883,335.46
m2
165,155.00
-
350.80
m2
165,155.00
57,936,374.00
Sub Total D
-
Sub Total D
79,718,533.00
67,933,143.00
178,811,343.00
228,040,398.20
REKAPITULASI RENCANA vs. REALISASI PEKERJAAN dan RENCANA TAH KEGIATAN PAKET PEKERJAAN LOKASI LUAS BANGUNAN
NO
I II III
: : : :
PEMBANGUNAN MASJID AL IKHLASH PEKERJAAN STRUKTUR PERUMAHAN DEPOK MAHARAJA RW. 012 496,5 M2
RENCANA PEKERJAAN
PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN STRUKTURAL A PEKERJAAN PONDASI B PEKERJAAN BETON C PEKERJAAN ATAP D PEKERJAAN WATER PROFFING GRAND TOTAL
RENCANA BIAYA
38,543,080.80 36,458,109.17 81,908,739.17 732,622,198.40 61,613,337.87 79,718,533.00 1,030,863,998.41
CATATAN : 1 Kegiatan Tahap I dan II. Kegiatan Tahap I, terdiri dari: - Pekerjaan persiapan (bouwplank dan pengukuran) - Pekerjaan tanah (galian tanah, timbunan dan perataan tanah, galian pondasi, urugan pasir) - Pekerjaan saluran (galian saluran, pemasangan box culvert, turap saluran dan pembuatan tutup saluran) - Pekerjaan pondasi (pondasi sumuran, pile cap dan pondasi batu kali) Kegiatan Tahap II, terdiri dari: - Pekerjaan beton (pembuatan sloof utama, sloof praktis dan lantai kerja) - Pekerjaan beton (konstruksi kolom utama 40/40 dan 30/30 dengan konstruksi beton K-250) - Pekerjaan beton (konstruksi balok dan plat lantai 2 dengan beton K-250) Kegiatan Tahap I dan II, mengalami surplus biaya terhadap realisasi pengeluaran biaya konstruksi, hal ini disebabkan oleh beberapa faktor, antara lain: a. Adanya modifikasi detail kegiatan dan percepatan-percepatan kegiatan konstruksi minor. b. Adanya sumbangan-sumbangan berupa alat konstruksi (perancah besi, concrete pump, concrete vibrator)
c. Adanya sumbangan-sumbangan bahan atau potongan harga dari harga pasar (beton mixing, besi beton) 2 a. b. c. d.
Kegiatan Tahap III. Melihat lingkup konstruksinya, kegiatan Tahap III dapat dibagi menjadi 4 phase, yaitu: Phase 1: Konstruksi kolom utama lantai 2 Rp. 67,933,143.00 Phase 2: Konstruksi balok dan plat atap beton Rp. 228,040,398.20 Phase 3: Konstruksi rangka baja dan penutup atap Rp. 61,613,337.87 Phase 4: Konstruksi waterproofing atap beton Rp. 79,718,533.00
AAN dan RENCANA TAHAP III
REALISASI PEKERJAAN TAHAP I dan TAHAP II
mbuatan tutup saluran)
aya konstruksi, hal ini
mp, concrete vibrator)
6,321,905.60 36,458,109.17 81,908,739.17 421,795,732.10 -
RENCANA PEKERJAAN TAHAP III 310,826,466.20 61,613,337.87
-
79,718,533.00
546,484,486.04
452,158,337.07
n mixing, besi beton)
(pelaksanaan 3 minggu) (pelaksanaan 5 minggu) (pelaksanaan 6 minggu) (pelaksanaan 2 minggu)