7 0 24 MB
06/08/2019
RENCANA PENAMBANGAN DI IUP OPERASI PRODUKSI (YANG DIAJUKAN)
PT BERKAH CIHERANG ABADI
BANDUNG, 9 Agustus 2019
LOKASI IUP OPERASI PRODUKSI (YANG DIAJUKAN) Untuk mencapai lokasi daerah penyelidikan dari
Kota
Bandung
dapat
ditempuh
menggunakan kendaraan roda empat selama kurang lebih 2 Jam melalui jalan Setiabudi – Jalan
Raya
Lembang
–
Jalan
Subang
Lembang – lokasi dengan jarak tempuh
No
Bujur Timur
Lintang Selatan
No
Bujur Timur
Lintang Selatan
o
'
"
o
'
"
o
'
"
o
'
"
1
107
44
6.943
6
37
5.282
14
107
43
51.473
6
37
50.761
2
107
44
10.647
6
37
5.282
15
107
43
51.473
6
37
40.454
3
107
44
10.647
6
37
16.467
16
107
43
58.735
4
107
44
12.332
6
37
16.467
17
107
43
58.735
6
37
32.995
5
107
44
12.332
6
37
24.157
18
107
44
3.199
6
37
32.995
6
107
44
9.592
6
37
24.157
19
107
44
3.199
6
37
27.447
7
107
44
9.592
6
37
27.235
20
107
44
6.050
6
37
27.447
8
107
44
7.429
6
37
27.235
21
107
44
6.050
6
37
16.908
9
107
44
7.429
6
37
32.847
22
107
44
6.943
6
37
16.908
10
107
44
4.707
6
37
32.847
23
107
44
6.943
6
37
16.667
11
107
44
4.707
6
37
36.713
24
107
44
7.652
6
37
16.667
12
107
44
1.406
6
37
36.713
25
107
44
7.652
6
37
13.629
13
107
44
1.406
6
37
50.761
26
107
44
6.943
6
37
13.629
6
37
40.454
kurang lebih 54 Km dari kota Bandung.
Daerah kegiatan memiliki luas sekitar 24 Ha, yang terletak di Desa Gunung Tua dan Desa Cijambe Kecamatan Cijambe, Kabupaten Subang, Provinsi Jawa Barat. Secara geografis terletak pada koordinat 107 ̊ 44’ 1,406” ‐ 107 ̊ 44’ 58,7349” BT dan 06 ̊ 37’ 5,282” ‐ 06 ̊ 37’ 50,761” LS.
1
06/08/2019
STATUS DAN KEGUNAAN LAHAN Lokasi IUP eksplorasi PT Berkah Ciherang Abadi yang berlokasi di Desa gunungtua Kecamatan Cijambe Kabupaten Subang Provinsi Jawa Barat termasuk kedalam kawasan Pertanian Lahan Basah. Sebagaimana tercantum dalam pasal 42 Perda no. 3 Tahun 2014 tentang RTRW ayat (2) Kawasan peruntukan pertambangan mineral dan batubara sebagaimana dimaksud pada ayat (1) huruf a tersebar di seluruh kecamatan kecuali kecamatan subang dan ayat (3) kawasan peruntukan pertambangan mineral dan batubara sebagaimana dimaksud pada ayat (2) tidak meliputi : a. Kawasan Lindung b. Kawasan Peruntukan Perkotaan.
PT berkah Ciherang Abadi mempunyai lokasi IUP Eksplorasi seluas 24 Ha yang terletak di Kp. Ciherang Desa Gunungtua Kecamatan Cijambe Kabupaten Subang. Saat ini kepemilikan seluruh lahan di dalam IUP Eksplorasi dimiliki oleh perusahaan dengan status lahan AJB dan lahan bersertifikat Hak Milik
2
06/08/2019
PERIZINAN YANG DIMILIKI 1. Surat Keputusan Kepala Dinas Penanaman Modal Dan Pelayanan Terpadu Satu Pintu Pemerintah Daerah Provinsi Jawa Bawat, Nomor 540/49/29.1.05.0/DPMPTSP/2018, tentang Wilayah Izin Usaha Pertambangan PT. Berkah Ciherang Abadi. 2. Surat Keputusan Kepala Dinas Penanaman Modal Dan Pelayanan Terpadu Satu Pintu Pemerintah Daerah Provinsi Jawa Bawat, Nomor 540/58/29.1.06.0/DPMPTSP/2018, tentang Izin Usaha Pertambangan Eksplorasi PT. Berkah Ciherang Abadi. 3. Surat
Keterangan
Peruntukan
Lahan
Dinas
Pekerjaan
Umum
dan
Penataan
Ruang
No.591/103/ket/Bid.TR 4. Keputusan Kepala Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu No 503/0051 – IL – DPMPTSP / IV / 2019 Tentang Izin Lingkungan Penambangan Batu Andesit Kepada PT Berkah Ciherang Abadi
SUMBERDAYA DAN CADANGAN No 1
Nama Blok IUP EKSPLORASI BCA
Sumber Daya Terukur
Luas (Ha)
Volume (m3)
Tonase (ton)
3.895.708
10.401.540,36
No
Nama Blok
24
Cadangan 2018 Luas (Ha)
Terbukti Volume (m3)
Tonase (ton)
1
Pit 1
238,232.46
636,080.67
2.60
2
Pit 2
71,324.05
190,435.20
0.94
3
Pit 3
196,754.08
525,333.40
1.88
4
Pit 4
730,434.58
1,950,260.34
4.28
3
06/08/2019
KONDISI SEBELUM PENAMBANGAN GEOMORFOLOGI Kondisi geomorfologi di daerah IUP Operasi Produksi yang dimohonkan dan sekitarnya dapat diketahui dengan melakukan interpretasi peta rupa bumi, analisis morfologi serta pengamatan dilapangan. Dari hasil kajian diketahui bahwa di sebelah Selatan IUP eksplorasi PT berkah Ciherang Abadi didominasi oleh satuan perbukitan, sedangkan daerah Utara IUP didominasi oleh satuan Dataran.
Daerah selatan IUP dibentuk oleh batuan hasil gunungapi muda tak teruraikan serta batuan aliran lava terutama dari gunung tangkubanparahu. Di sebelah Utara IUP Operasi Produksi yang dimohonkan dibentuk oleh anggota batulempung formasi Subang.
Satuan Perbukitan di Selatan IUP
4
06/08/2019
RENCANA PENAMBANGAN SISTEM/METODA DAN TATA CARA PENAMBANGAN Side hill type merupakan bentuk penambangan untuk batuan atau bahan galian industri yang terletak dilereng-lereng bukit atau endapannya berbentuk bukit dikarenakan bentuk endapan yang dapat digali hanya sebagian lereng bukit, maka front kerja dibuat memanjang dengan jalan masuk dari salah satu sisinya atau dari depan.
5
06/08/2019
RENCANA PENAMBANGAN Geometri Tinggi (m) 5
FK (Faktor Keamanan)
Slope (o)
Model 1
Model 2
60
4.84
4.11
3.9
70
4.80
3.94
3.47
80
4.35
3.74
3.33
Model 3
Simulasi lereng yang dilakukan untuk lereng tunggal menggunakan geometri yang berbeda-beda. Hal ini bertujuan untuk mendapatkan geometri yang paling ekonomis (terjal) namun tetap aman serta menjadi acuan dalam merencanakan geometri lereng keseluruhan. Adapun geometri lereng tunggul yang akan disimulasikan sebagai berikut : -
Tinggi lereng tunggal
: 5 meter
-
Sudut lereng tunggal
: 60 o, 70 o, dan 80o
FK (Faktor Keamanan)
Geometri Lereng
Tinggi (m)
Slope (o)
Statis
Dinamis
Inter ramp
Model
Model
Model
Model
Model
(m)
1
2
3
1
2
Model 3
2.49
2.03
1.49
PIT A
20
58
‐
3.24
2.62
2.05
PIT B
17.47
54
‐
3.59
2.81
2.27
2.81
2.12
1.7
PIT C
17
54
‐
3.87
2.87
2.4
3.05
2.26
1.76
PIT D
43
48
10
2.99
2.46
1.5
2.5
1.87
1.12
6
06/08/2019
7
06/08/2019
RENCANA PENAMBANGAN RENCANA PRODUKSI Berdasarkan hasil estimasi yang telah dilakukan pit potensial yang berada di wilayah IUP Operasi Produksi yang dimohonkan PT Berkah Ciherang Abadi diperoleh total cadangan tertambang sebesar 1.236.745,17 m3 atau 3.302.110 ton dengan total tanah penutup 65.091,85 m3. Adapun rencana produksi andesit PT Berkah Ciherang Abadi secara detail dengan losses penambangan dan pengolahan sebesar 5%. Sehubungan dengan hasil perhitungan cadangan andesit pada wilayah IUP PT Berkah Ciherang Abadi ini, maka umur tambang yang berada di wilayah IUP PT Berkah Ciherang Abadi selama 11 tahun. Tahun
1
2
3
4
5
6
7
8
9
10
11
Rencana Produksi (ton)
275.000
300.000
300.000
300.000
300.000
300.000
300.000
300.000
300.000
300.000
300.000
Mineable
250.025
280.697
308.700
308.264
308.254
308.254
335.891
307.762
308.637
308.064
277.562
Jarak Angkut (m )
1.200
1.200
1.200
1.200
1.200
1.200
1.000
1.000
600
400
400
Tanah Penutup (bcm )
15.496
8.025
5.225
4.125
4.015
1.558
8.109
2.246
12.512
3.781
0
Jarak Angkut (m )
150
150
150
150
150
150
150
150
150
150
0
Produksi Crusher
237.524
266.662
293.265
292.851
292.841
292.841
319.097
292.374
293.205
292.661
263.684
8
06/08/2019
9
06/08/2019
10
06/08/2019
11
06/08/2019
RENCANA PENAMBANGAN PERALATAN PENAMBANGAN Pemilihan jenis peralatan utama yang akan digunakan dalam operasi penambangan batu andesit PT BCA adalah Breaker, excavator, dump truck dan bulldozer.
A. PERALATAN UTAMA PENAMBANGAN
Model
Tahun
Satuan
(Andesit)
1
2
3
4
5
6
7
8
9
10
11
Breaking
PC 200
(unit)
2
2
2
2
2
2
2
2
2
2
2
Excavator
PC 200
(unit)
1
1
1
1
1
1
1
1
1
1
1
Hauling Truck
Hino 2836 TIP
(unit)
2
2
2
2
2
2
2
2
2
1
1
Breaking
D85
(unit)
1
1
1
1
1
1
1
1
1
1
1
Excavator
PC 200
(unit)
1
1
1
1
1
1
1
1
1
1
1
Hauling Truck
Hino 2836 TIP
(unit)
1
1
1
1
1
1
1
1
1
1
1
(Tanah Penutup)
B. PERALATAN PENUNJANG Water Truck
(unit)
1
1
1
1
1
1
1
1
1
1
1
Fuel/lube truck
(unit)
1
1
1
1
1
1
1
1
1
1
1
Welding
(unit)
1
1
1
1
1
1
1
1
1
1
1
Passenger Bus
(unit)
1
1
1
1
1
1
1
1
1
1
1
General Manager Vehicle
(unit)
1
1
1
1
1
1
1
1
1
1
1
Mine Manager Vehicle
(unit)
1
1
1
1
1
1
1
1
1
1
1
Safety Vehicle
(unit)
1
1
1
1
1
1
1
1
1
1
1
Computer
(unit)
2
2
2
2
2
2
2
2
2
2
2
Telephone Communication Equipment
(unit)
2
2
2
2
2
2
2
2
2
2
2
Mine Radio
(unit)
5
5
5
5
5
5
5
5
5
5
5
Engineering & Survey Equipment
(unit)
2
2
2
2
2
2
2
2
2
2
2
1
C. PERALATAN PENGOLAHAN/STOCKPILE Wheel Loader
(unit)
1
1
1
1
1
1
1
1
1
1
Hopper
Cat C-970F
(unit)
1
1
1
1
1
1
1
1
1
1
1
Vibrating grizly
(unit)
2
2
2
2
2
2
2
2
2
2
2
Jaw Crusher
(unit)
1
1
1
1
1
1
1
1
1
1
1
Cone Crusher
(unit)
1
1
1
1
1
1
1
1
1
1
1
Belt Conveyor
(unit)
3
3
3
3
3
3
3
3
3
3
3
12
06/08/2019
RENCANA PENGOLAHAN
RENCANA REKLAMASI DAN PASCATAMBANG PROGRAM REKLAMASI Lahan yang umumnya akan dilakukan kegiatan direklamasi meliputi lahan bekas tambang, jalan tambang dan non tambang. Tujuan dari kegiatan reklamasi ini yaitu untuk mengambalikan fungsi lahan yang terganggu akibat kegiatan penambangan yang telah dilakukan
13
06/08/2019
RENCANA REKLAMASI DAN PASCATAMBANG PROGRAM REKLAMASI
Rencana Luasan Reklamasi Pertahun
14
06/08/2019
Berdasarkan rencana penambangan, rencana reklamasi dan pascatambang yang akan dilaksanakan oleh PT Berkah Ciherang Abadi, lubang bekas penambanganakan dimanfaatkan sebagai
kolam
penampungan
air.
Selanjutmya
kolam
penampunganair ini akan digunakan sebagai objek pariwisata dan budidaya ikan air tawar yang diharapkan akan bermanfaat bagi warga sekitar area bekas penambangan
15
06/08/2019
RENCANA REKLAMASI DAN PASCATAMBANG
RONA LINGKUNGAN AKHIR LAHAN PASCATAMBANG KEADAAN CADANGAN TERSISA Rencana penambangan di daerah PT BCA dibuat sampai pada kedalaman 270m dpl. Hal ini dikarenakan topografi terendah dan rencana design secara ekonomis hanya sampai kedalaman tersebut. Aktivitas penambangan sampai akhir berjalan dengan baik. Jumlah cadangan di lokasi IUP PT BCA , yaitu sebesar 3.302.109,60 Ton. Berdasarkan perundang – undangan yang berlaku umur ijin tambang bahan galian batuan maksimal 5 tahun dan dapat diperpanjang 2x5 tahun. Berdasarkan cadangan yang terdapat di lokasi IUP PT Berkah Ciherang Abadi, maka umur ijin tambang yang dimintakan adalah 5 tahun dengan opsi perpanjangan 5 tahun dan 1 tahun .
Tahun Sisa Cadangan (Ton) 0 1 2 3 4 5 6 7 8 9 10 11
3.302.109,61 3.052.084,61 2.771.387,65 2.462.687,38 2.154.423,38 1.846.169,38 1.537.915,38 1.202.024,27 894.262,27 585.625,67 277.561,67 0,00
16
06/08/2019
ANALISIS KELAYAKAN
No Jenis Ukuran Batuan Andesit
PEMASARAN
2
1
3 4 5
6 7
8 9
Kegunaan
Boulder Elephant Stone (Batu Penimbunan daerah rawa atau bibir pantai Gajah) sebagai pembuatan dermaga dan pondasi Base Course (lapisan Kedua) Untuk lapisan kedua/ketiga dari suatu areal yang akan ditimbun, dimana tanah dasar sudah cukup stabil Batu Belah (20 cm x 30 cm) Untuk pondasi bangunan Sirtu Untuk lapisan kedua, dimana tanah awalnya masih kurang stabil Split Stone (3 cm x 5 cm) Digunakan untuk dasar badan jalan sebelum menggunakan material yang lain, penyangga bantalan kereta api, penutup/pemberat pipa dasar laut, juga digunakan untuk campuran beton. Split Stone (2 cm x 3cm) Untuk pengecoran lantai kerja, pengecoran atau pembetonan horizontal dan AMP Split Stone (1 cm x 2 cm) Untuk pengecoran segala macam kontruksi mulai dari yang ringan sampai konstruksi berat seperti jalan tol, gedung bertingkat, lapang pesawat udara, bantaran kereta api pelabuhan, dan dermaga, tiang pancang dan jembatan. Screening Untuk campuran dan pengaspalan jalan mulai dari jalan ringan sampai dengan jalan ke I (asphalt mixed plant) Abu Batu (0 – 5) Untuk campuran dalam proses pengaspalan dan dapat berfungsi sebagai pengganti pasir, untuk pembuatan gorong-gorong.
Modal kerja pada tahun ke-1 yang dibutuhkan
INVESTASI
untuk proyek penambangan batu andesit ini adalah
MODAL KERJA
sebesar
Rp.
17.948.427.374
(tujuh
belas
milyar
sembilan ratus emapt puluh delapan juta emapt ratus dua puluh tujuh juta tiga ratus tujuh puluh empat rupiah) Jenis sumber pendanaan untuk investasi rencana penambangan batu andesit PT Berkah Ciherang Abadi merupakan Modal sendiri (20 %) dan pinjaman Modal sebesar 80%.
17
06/08/2019
ANALISIS KELAYAKAN Analisis Kepekaan dan Break Event Point
RENCANA KERJA TAHUN KE 1 Perbaikan Sarana Prasarana Tambang yang ada
18
06/08/2019
Bukaan Lahan Rencana dan Realisasi
Rencana Tahun Ke 1
Deskripsi
Lokasi/Blok/Pit Tambang Aktif (Ha)
Tambang Selesai (Ha)
Blok BCA
Pit 1
0,00
0,00
Blok BCA
Pit 2
0,00
0,00
Blok BCA
Pit 3
0,00
0,00
Blok BCA
Pit 4
1,97
0,16
Total
Total
1,97
0,16
Elevasi Deskripsi Rencana dan Realisasi
RENCANA TAHUN (2019)
Lokasi/Blok/P it
Elevasi Tambang
Elevasi Tambang Sesuai FS
(m)
(m)
Blok BCA
Pit 1
286
286
Blok BCA
Pit 2
302
302
Blok BCA
Pit 3
312
312
Blok BCA
Pit 4
338
325
309,5
306,25
Rata‐rata
Rencana Biaya Kegiatan Penambangan Tahun Ke 1 No
1
Rencana & Realisasi
Rencana Tahun
Deskripsi
Lokasi
Deskripsi
Blok/Pit
Lokasi/Pit I
Ke 1
Land Clearing (Ha)
DESKRIPSI
1 1 Batuan yang diolah (ton) 2 Produksi (ton) 3 Spesifikasi produk Base coarse (0%-15%) Split 3-5 (20%) Split 2-3 (20%) Split 1-2 (35%) Abu (10%) 4 Recovery pengolahan (%)
(Ton)
Jumlah (Rp) Reconturing (Ha)
Kuantitas
0,69
80.526,00
0,19
Satuan Biaya
1.678.804.124,51
23.116,52
75.921.102,93
1.158.374.845,91
1.861.480.884,11
14.425.009,56
Total Biaya
NO
Mineral Getting
3.034.280.739,57
RENCANA TAHUN (2019) 2 250.025,00 237.523,75 35.628,56 47.504,75 47.504,75 83.133,31 23.752,38 95,00%
19
06/08/2019
Rencana dan Realisasi Tahun (2019) (IDR)
Uraian Biaya Pengelolaan dan Pemantauan Lingkungan 1 1 Biaya Pengelolaan Lingkungan 1) Pembongkaran fasilitas tambang (jika ada) 2) Penataan lahan 3) Penghijauan 4) Pekerjaan sipil seperti pembuatan dan perawatan dam/kolam pengendap 5) Pengelolaan Kualitas Air 2 Biaya Pemantauan Lingkungan Kualitas Air Total Biaya Pengelolaan Dan Pemantauan Lingkungan
N
Tri. I Rencana 2
Tri. II Realisasi 3
Rencana 4 -
Rencana 6
Tri. IV Realisasi 7
-
Rencana 8
TOTAL Realisasi 9
-
Rencana 10=(2+4+6+8) -
Realisasi 11=(3+5+7+9)
Rp
-
Rp
-
Rp
Rp
-
Rp
Rp
-
Rp
Rp
-
Rp
Rp
-
Rp Rp
-
Rp Rp
-
Rp 1.540.231,05 Rp Rp 820.099,12 Rp
-
Rp 1.540.231,05 Rp Rp 820.099,12 Rp
-
Rp 1.540.231,05 Rp Rp 820.099,12 Rp
-
Rp 4.620.693,14 Rp Rp 2.460.297,36 Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
Rp
-
-
-
-
-
Rp
-
Rp
Rp
-
Rp
Rp
-
Rp
Rp
-
Rp
Rp
-
Rp 3.000.000,00 Rp
-
Rp 3.000.000,00 Rp
-
Rp 3.000.000,00 Rp
-
Rp 3.000.000,00 Rp
-
Rp 12.000.000,00 Rp
-
Rp 3.000.000,00 Rp
-
Rp 5.360.330,17 Rp
-
Rp 5.360.330,17 Rp
-
Rp 5.360.330,17 Rp
-
Rp 19.080.990,50 Rp
-
TAHUN Ke 1
URAIAN
O
PENERIMAAN NEGARA a
Tri. III Realisasi 5
RENCANA
REALISASI
PRAKIRAAN REALISASI
1
2
3
PAJAK Pajak‐pajak daerah
Rp 732.529.793
Rp ‐
Rp 700.000.000
Jumlah Pajak
Rp 732.529.793
Rp ‐
Rp 700.000.000
JUMLAH PENERIMAAN NEGARA
Rp 732.529.793
Rp ‐
Rp 700.000.000
20
06/08/2019
TERIMA KASIH
21