KEGIATAN PEMBANGUNAN SARANA PRASARANA DESA TA
SALURAN DRAINASE RT 02-04 RW 01 PANJANG (M): 314.0
2017
0.40
PLASTERAN 1:4
SULING- SULING
PROPINSI JAWA TENGAH KABUPATEN KENDAL KECAMATAN PATEBON DESA LANJI LOKASI RT 02-04 RW 01
0.60
JENIS SARANA 1.00
PAS. BATU BELAH 1:5
0.40
Saluran Drainase GAMBAR
PASIR URUG
POTONGAN
0.05
DIBUAT OLEH 0.6
DETAIL SALURAN DRAINASE
(......................................) DIPERIKSA OLEH (......................................) DIKETAHUI OLEH (......................................)
Kabupaten Kecamatan Desa
KENDAL PATEBON LANJI
Jenis Prasaran Saluran Drainase Lokasi RT 02-04 RW 01 Volume 314 M
Take Off Sheet
a
b
c
d
Volume galian tanah Talud no. 1 P= 314m Panjang = 314.00 m Lebar = 0.60 m Tebal = 0.40 m Volume galian = 314 X 0.6 X 0.4 Talud no. 2 P= 314m Panjang = 314.00 m Lebar = 0.60 m Tebal = 0.40 m Volume galian = 314 X 0.6 X 0.4 Volume galian total Volume urugan pasir Talud no. 1 P= 314m Panjang = 314.00 m Lebar = 0.60 m Tebal = 0.05 m Volume urugan = 314 X 0.6 X 0.05 Talud no. 2 P= 314m Panjang = 314.00 m Lebar = 0.60 m Tebal = 0.05 m Volume urugan = 314 X 0.6 X 0.05 Volume urugan total Volume batu belah Talud no. 1 P= 314m Panjang = 314.00 Lebar atas = 0.40 Lebar bawah = 0.60 Tinggi talud = 0.60 Tinggi pondasi = 0.40 Volume batu belah {(0.4 + 0.6)/2} x 0.6 x 314 0.6 x 0.4 x 314 Talud no. 2 P= 314m Panjang = 314.00 Lebar atas = 0.40 Lebar bawah = 0.60 Tinggi talud = 0.60 Tinggi pondasi = 0.40 Volume batu belah {(0.4 + 0.6)/2} x 0.6 x 314 0.6 x 0.4 x 314 Volume total Volume plesteran Talud no. 1 P= 314m Panjang = 314.00
m
=
75.4
m³
= =
75.4 150.7
m³ m³
=
9.4
m³
= =
9.4 18.8
m³ m³
= =
94.2 75.4
m³ m³
= = =
94.2 75.4 339.1
m³ m³ m³
m m m m m
m m m m m
Lebar = 0.40 Volume plesteran (0,1 + 0.4) x 314 Talud no. 2 P= 314m Panjang = 314.00 Lebar = 0.40 Volume plesteran (0,1 + 0.4) x 314 Volume plesteran total f
Tanggal Survei :
m =
157.0
m²
= =
157.0 314.0
m² m²
=
309.3
HOK
m m
Langsiran material Pekerja langsiran (1 m³ = 0,5 HOK) Bahan = 618.7 m³ Pekerja
Dibuat oleh : TPK
PERHITUNGAN VOLUME PEKERJAAN, ANALISA HARGA SATUAN & BIAYA Uraian Pekerjaan
Volume
Satuan
Pekerjaan galian tanah (Analisa P.02.a) 0.563 Pekerja 0.025 Mandor Total biaya
150.7
m³
84.9 3.8
HOK HOK
Pekerjaan urugan pasir (Analisa T.14.c) 1.2 Pasir urug 0.4 Pekerja 0.04 Mandor Total biaya
18.8
m³
22.6 7.5 0.75
m³ HOK HOK
III Pasangan batu belah 1 : 5 (Analisa P.01.C.a.1) 1.17 Batu belah 2.352 Semen 50 Kg 0.5654 Pasir muntilan 1.18 Pekerja 0.59 Tukang 0.1 Kepala tukang 0.1 Mandor Total biaya
339.1
m³
396.8 797.6 191.7 400.2 200.1 33.9 33.9
m³ Zak m³ HOK HOK HOK HOK
IV Plesteran 1 PC : 4 PS, 15 mm (SNI 03 - 2837 - 2008) 0.125 Semen 50 Kg 0.024 Pasir muntilan 0.3 Pekerja 0.15 Tukang 0.015 Kepala tukang 0.015 Mandor Total biaya
314.0
m²
39.3 7.5 94.2 47.1 4.7 4.7
Zak m³ HOK HOK HOK HOK
I
II
Harga Satuan
55,000 60,000
55,000 60,000
Total Biaya
4,667,045 226,080 4,893,125
414,480 45,216 459,696
290,000 63,000 360,000 55,000 75,000 80,000 60,000
115,063,416 50,249,445 69,025,841 22,008,888 15,006,060 2,712,960 2,034,720 276,101,330
63,000 360,000 55,000 75,000 80,000 60,000
2,472,750 2,712,960 5,181,000 3,532,500 376,800 282,600 14,558,610
REKAP KEBUTUHAN BAHAN, ALAT DAN UPAH No 1 2 3 4 5 6 7 8 9
Uraian Pasir urug Batu belah Semen 50 Kg Pasir muntilan Pekerja Tukang Kepala tukang Mandor Pekerja langsiran
Volume 22.6 396.8 836.9 199.3 586.8 247.2 38.6 43.1 309.3
= = = = = = = = =
Satuan 23.0 397.0 837.0 200.0 587.0 248.0 39.0 44.0 310.0
m³ m³ Zak m³ HOK HOK HOK HOK HOK
RENCANA ANGGARAN BIAYA DESA LANJI KECAMATAN PATEBON TAHUN ANGGARAN 2017 Bidang Kegiatan Waktu Pelaksanaan Sumber dana Output
: : : : :
Pelaksanaan Pembangunan Desa Saluran Drainase
Rincian Pendanaan
No
Kode Rekening
Uraian
Volume
Satuan
Harga Satuan Rp
Saluran Drainase RT 02-04 RW 01 Vol= 314 m Belanja Barang dan Jasa Upah Tenaga Kerja Pekerja Tukang Kepala tukang Mandor Pekerja langsiran Belanja Modal Matrial Pasir urug Batu belah Semen 50 Kg Pasir muntilan
587.0 248.0 39.0 44.0 310.0
23.0 397.0 837.0 200.0
Jumlah Rp 318,002,000
HOK HOK HOK HOK HOK
m³ m³ Zak m³
55,000 75,000 80,000 60,000 55,000
73,695,000 73,695,000 32,285,000 18,600,000 3,120,000 2,640,000 17,050,000
170,000 290,000 63,000 360,000
244,307,000 243,771,000 3,910,000 115,130,000 52,731,000 72,000,000
Alat Cetok Ember plastik (5 liter) Sekop Cangkul
1.0 2.0 1.0 1.0
Set Buah Buah Buah
14,000 10,000 91,000 91,000
216,000 14,000 20,000 91,000 91,000
Sewa molen Prasasti Papan Proyek
1.0 1.0
Hari Ls Ls
250,000 300,000 20,000
300,000 20,000
JUMLAH
318,002,000 Lanji,
Disetujui/ Mengesahkan Kepala Desa
Telah Verifikasi Sekretaris Desa
Pelaksana Kegiatan
(......................................)
(......................................)
(......................................)