Profile Educations • 2003 – 2005 SMA Negeri 1 Sidoarjo • 2005 – 2009 Institut Teknologi Sepuluh Nopember (B. Eng) • 2018 – 2019 University of Manchester (M.Sc with Distinction) Professional Experiences • 2009 – 2011 McDermott International, E&I Engineer • 2011 – 2017 PT. PLN UIP3BS UPT Tanjung Karang, Har Proteksi • 2017 – 2018 PT. PLN UIP3BS UPT Tanjung Karang, Renev • 2018 – 2020 PT. PLN Div TLN, Pegawai Tugas Belajar • 2019 – 2019 UK National Grid Power Systems Research Centre, Internship • 2020 – 2020 PT. PLN Div RKO, Internship • 2020 – Now PT. PLN UIT JBT, Har Proteksi
Eko Prasetyo, S.T, M.Sc PT. PLN (Persero) UIT JBT eko. [email protected]
Notable Activities • 2014 Delegate of PLN Group, APPTC by Omicron, Singapore • 2017 Delegate of PLN Group, APPS Course by GE Grid, Stafford, UK • 2017 Awardee of LPDP Scholarship PK-122, Kemenkeu Indonesia • 2019 MSc Best Projects Prize, University of Manchester, UK • 2020 Conference Reviewer, ICT-PEP 2020
www.pln.co.id
|
1. Modern Grid (Smart Grid) ▪ Bi-Directional power flow ▪ Extensive communication ▪ More inverters in the grid ▪ More green energy ▪ Dynamic pricing ▪ Demand response ▪ Use of Non-Conventional Instrument Transformers ▪ etc
Source: CLP, “Smart Grid,” Hongkong. website: https://www.clp.com.hk/
www.pln.co.id
|
2. Smart Transmission Grid
Source: GE Grid Solutions, “Session 86 - IEC 61850 Process Bus,” APPS, Stafford 2018
www.pln.co.id
|
3. Philosophy of Substation Control System ▪ Conventional Control Full of copper hardwire Less communication
▪ Digital Control Substation Automation System (SAS) 61850-1
Digital Substation (DSS) 61850-2 Extensive use of IEC-61850 based communication Source: GE Grid Solutions, “Session 70 – Digital Control System,” APPS, Stafford 2018
www.pln.co.id
|
4. Digital Substation: Evolution or Revolution? ▪ Substation = critical link Transmission, and Distribution.
between
Generation,
▪ Substations can be made smarter by adding sensors, monitoring, automation, and analysis systems. ▪ DSS completely changes how substation monitored and controlled. Source: https://www.tdworld.com/smart-utility/article/20958258/digital-substation-evolution-or-revolution
www.pln.co.id
|
5. Standard Protocol in DSS
Source: Schneider Electric, “Digital Substation,” 2020
www.pln.co.id
|
6. Technical Comparison Conventional: more hardwire and civil works uses static or 1st generation digital relays only capable for network management/switching
Digital: more fibre optics and programming uses IEC 61850-2 IEDs capable of asset performance management
Source: ABB Powergrids, “We are bridging the gap, Enabling Digital Substations,” Switzerland, 2018.
www.pln.co.id
|
7. Why Digital Substation? Advantages of DSS: ▪
Interoperability according to IEC 61850s
▪
Lower instrument transformer requirement
▪
Improved asset management, safety, and reliability
▪
Opportunity of controllable cyber security
▪
Software based testing
▪
Fewer human operators
Considerations of DSS:
Source: ABB Powergrids, “We are bridging the gap, Enabling Digital Substations,” Switzerland, 2018.
▪
11 years experience (1st world DSS in 2009 by ABB)
▪
Would require regulation updates
▪
Needs of competency upgrade on O&M engineer www.pln.co.id
|
8. Future Potential of DSS
Source: Digital Substation Market with Covid-19 Impact Analysis by Module, 2020. website: www.marketsandmarkets.com/
Source: Effectiveness and Comparison of Digital Substations Over Conventional Substations, DOI :10.25046/aj040452
www.pln.co.id
|
9. Existing and Potential Use of IEC-61850 in Indonesia ▪ Basic substation measurement and control (SOGI)
▪ Use of MMS in IEDs for automated disturbance reporting ▪ Redundant inter-substation trip using GOOSE
▪ CB Failure and non-cascaded protection on transformer using GOOSE
www.pln.co.id
|
10. Milestone of DSS in Indonesia
2020 2014
2008 1st batch SAS (MMS).
SS retrofit includes 9-2LE (Kalibakal etc).
SS retrofit using SAS (MMS, GSSE, GOOSE).
Fully DSS (Sepatan, Teluk Naga, Bandung Utara).
1st DSS with 9-2LE (SKMDU & JKBRG).
Use of NCIT (Hybrid Pasar Kemis – Gajah Tunggal).
SS retrofit using SAS (MMS). www.pln.co.id
|
11. Key Supporting Factors • Update in regulation and standard for process bus and DSS. (SPLN S3.001-3: 2012 & S6.002:2014 follows IEC 61850)
Cyber Security
• Operation & maintenance readiness. (Updates on SKDIR 520 book 26 for SOGI)
• Cyber security handling.
O&M
Engineer
Readiness
Development
Regulation Update
• Intensive training for SAS & DSS engineer.
DSS PLN
R&D
• Strengthen collaboration and R & D with universities. www.pln.co.id
|
12. Experience learned from UK NGET Incorporation of local universities for: •
Preparing dedicated engineers
•
Problem solving
•
R & D related to SAS & DSS
MU
Relay Tester
GPS Time Sync Fibre Optics
IED
Switches
RTDS
Corporate investment in universities for DSS laboratory www.pln.co.id
|