To Open New Project



Te Prepare Main DataBase



Design Mode



To Import Data Reserve



From Data Hirarci



Data SR yg masih Additive di rubah ke Weight Average



To Import Polygon



To Prepare Polygon Graphic



Menghitung secara keseluruhan



To Set Up Calender by Fleet



To Scheduling Set Up



To Scheduling Running Video



Set Up by Legend



To Scheduling report



Shedule Report by ALL Volume



M (Kode Mine DataBase) dan didalamnya code dari data base



Shedule Report by Seam



Shedule Report by Seam



Memunculkan Code



Shedule Report by Resource



Membuat Gantt Chart (Sequence)



Save As to Excel



To Prepare DataBase Report & Bus Graphic (Graphic Reserve LOM)



Excample Graphic LOM



To Prepare Range



To Prepare Preshedule Path / Mine Out Quantities



To Prepare Out Put Path



To Mine Status Plot



To Periode Plot Progress



Periode Status untuk Sequence Stripping



To Prepare Disposal



Kemudian ke Mincom untuk membuat Batter Block Disposal dan seterusnya hingga sama dengan mengeluarkan Reserve Disposal dan Polygon Graphical Output



Import Data Reserv. Disposal



Harus Di Nol kan



Setiap Unit Diganti seperti contoh di bawah



Dimulai dari Elevasi terendah (Dumping kearah Elevasi yang terendah, contrengan pertama di artikan awal dari Dumpingan Activity)



Continue to Run Scenario



Note : Vol. Pit Harus Lebih Kecil Dari Disposal



Edit Legend -- > Shading (input seperti contoh di bawah)



To Run Video



Note : Program Run Disposal Harus di Plot Type “Mine Status Plot”



1. Xpac Calender, Schedule Set Up, Running Scenario, Gantt Chart, Schedule Report