Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 1 of12
SAFETY PLAN
(RENCANA PENGENDALIAN SAFETY, HEALTH & ENVIRONMENT UNTUK PEKERJAAN DENGAN RESIKO TINGGI)
JUDUL PEKERJAAN : CONSTRUCTION NEW SLIDE GATE 230 COPPER STORAGE BUILDING PROJECT (CIVIL & MECHANICAL WORK) W/O NUMBER PIC
:
PT SMELTING :
YAHYA RIDWAN
KONTRAKTOR
: PT. OTE ENGINEERING INDONESIA
PIC KONTRAKTOR
: ALEF AULIA
HARAP MENGISI FORM INI DENGAN BENAR, DAN JANGAN MENGABAIKAN POTENSI RESIKO YANG ADA DI LAPANGAN. HAL INI DIPERLUKAN MENGINGAT KEBIJAKAN KESELAMATAN DAN KESEHATAN KERJA ANDA MERUPAKAN BAGIAN DARI KOMITMENT MANAJEMEN SAFETY DI LINGKUNGAN KERJA KITA.
Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 2 of12
SEMUA PEKERJAAN DENGAN TINGKAT RESIKO KECELAKAAN YANG TINGGI HARUS MELENGKAPI FORM RENCANA PENGENDALIAN SAFETY, HEALTH, DAN ENVIRONMENT. SETIAP PEKERJAAN YANG TIDAK RUTIN DENGAN MELIBATKAN BEBERAPA ORANG DENGAN KATAGORI PEKERJAAN PROJECT (PROJECT MODIFIKASI, PERBAIKAN, INSPEKSI) ADALAH TERGOLONG PEKERJAAN DENGAN RESIKO KECELAKAAN YANG TINGGI DENGAN KETENTUAN SEBAGAI BERIKUT : a). b). c). d). e). f). g). h). i). j). k). l)
PEKERJAAN DI KETINGGIAN, Misalnya Pekerjaan Roofing, Scaffolding, Overhead tank, overhead pipe Rack, Overhead cable tray, High stack, dll. PEKERJAAN DI PERAIRAN, Misalnya Pekerjaan dengan potensi terjatuh dan tenggelam di laut, di Water Reservoire, di Tickenerr, dsb PEKERJAAN PENGGALIAN, Misalnya penggalian di area kabel bawah tanah, saluran air bawah tanah, Pemasangan tiang pancang, dsb. CONFINED SPACE, Misalnya masuk di daerah tertutup atau ruangan terbatas,dengan intensitas O2 yang terbatas, akses keluar masuk sempit dengan potensi gas berbahaya, terjatuh di kedalaman, dsb PEKERJAAN BERHUBUNGAN DENGAN PAPARAN CAIRAN KIMIA BERBAHAYA, Misalnya H2SO4, HCl, Electrolyte, H2O2, dsb. PEKERJAAN BERHUBUNGAN DENGAN PAPARAN GAS KONSENTRASI TINGGI, Misalnya SO2, SO3, CL2, NaHS, dsb PEKERJAAN BERHUBUNGAN DENGAN PAPARAN LOGAM BERAT YANG BERACUN KONSENTRASI TINGGI, Misalnya Pb, Cu, Te, dsb PEKERJAAN BERHUBUNGAN DENGAN PAPARAN PANAS YANG TINGGI, Misalnya pekerjaan di sekitar area Furnace, casting, Acid Converter, dsb. PEKERJAAN PADA LISTRIK TEGANGAN TINGGI, Misalnya pekerjaan di area sub station, Switch gear, Trafo, Cable Feeder, dsb. PEKERJAAN PENGANGKATAN ATAU PENGANGKUTAN DENGAN MELIBATKAN KENDARAAN ATAU ALAT BERAT, Misalnya mengangkat barang di ketinggian dengan menggunakan alat berat misalnya unit mobil crane, dsb. PEKERJAAN DENGAN BAHAN YANG MUDAH MELEDAK, Misalnya peledakan accretion di boiler. HAL – HAL YANG DIKATEGORIKAN BERBAHAYA OLEH DEPARTEMEN OSH.
Document No Revision Issued date Page
1.
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 3 of12
PENJELASAN SINGKAT PEKERJAAN dan RUANG LINGKUP PEKERJAAN Construction New Slide Gate 230 Copper Storage Building (Civil and Mechanical Work) merupakan suatu bagian dari pekerjaan sipil (chipping, pengecoran), fabrikasi dan pemasangan (install). Sebagai gambaran, Pekerjaan Construction New Slide Gate 230 Copper Storage Building (Civil and Mechanical Work) ini akan meliputi pekerjaan sbb : A. FOUNDATION WORK Measurement and Marking Cutting floor for Railing Way Cutting floor for foundation support Chipping for concrete slab Excavation work Base Coarse & Compaction Re-bar Work Fabrication (Cutting Wheel) & Installation Formwork installation and remove Concrete work Disposal soil & Debris B. REMOVAL EXISTING Scaffolding work Removal existing rolling door Reposition Canopy Gate C. EMERGENCY MAN DOOR Scaffolding Work Dismantle existing wall Modification siding wall Entrance flooring slab work Installation door Wall work D. HANDRAILING WORK Fabrication handrail Installation handrail
Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 4 of12
General Cleaning Untuk pekerjaan Pekerjaan Construction New Slide Gate 230 Copper Storage Building (Civil and Mechanical Work) ini akan dimulai bulan 28 Maret 2016 – Mei 2016. 2.
RENCANA WAKTU PELAKSANAAN (Tanggal Mulai dan Selesai), Jam Mulai Pekerjaan dan Selesai Pekerjaan Setiap Hari pada jam kerja RENCANA WAKTU PELAKSANAAN: 28 Maret 2016 – Mei 2016 Jam 08:00 ~ 17:00 (Lembur dilakukan apabila diperlukan)
3.
URUTAN PELAKSANAAN PEKERJAAN dan CARA KERJA (Bisa dilampirkan Schedule dan Gambar yang Diperlukan sebagai Penjelasan) Construction New Slide Gate 230 Copper Storage Building (Civil and Mechanical Work) ini akan meliputi pekerjaan sbb : A. FOUNDATION WORK Measurement and Marking Cutting floor for Railing Way Cutting floor for foundation support Chipping for concrete slab Excavation work Base Coarse & Compaction Re-bar Work Fabrication (Cutting Wheel) & Installation Formwork installation and remove Concrete work Disposal soil & Debris B. REMOVAL EXISTING Scaffolding work Removal existing rolling door Reposition Canopy Gate C. EMERGENCY MAN DOOR Scaffolding Work Dismantle existing wall Modification siding wall Entrance flooring slab work Installation door Wall work
Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 5 of12
D. HANDRAILING WORK Fabrication handrail Installation handrail General Cleaning 4.
PEKERJA YANG TERLIBAT DAN PEMBAGIAN PEKERJAAN TERMASUK PENEMPATAN ALAT BANTU (Dilampirkan gambar pemetaan kawasan) GAMBAR TERLAMPIR
5.
TATA CARA PEKERJA DAN CARA MEMBAWA PERALATAN / MATERIAL KE TITIK LOKASI KERJA Tata cara pekerja peralatan/material ke titik lokasi : untuk peralatan berukuran besar diangkut dengan menggunakan mobil pick up, sedangkan untuk membawa peralatan yg berukuran kecil dengan cara manual. Untuk material dengan volume besar akan menggunakan Unic Truck.
6.
NAMA SEMUA PENGAWAS DAN JELASKAN TUGAS-TUGASNYA.
KONTRAKTOR : PT. OTE ENGINEERING INDONESIA SUPERVISOR
: ALEF AULIA
: SuperVisor
(08123154783)
: TRIO HENDRATNO : SITE Engineer I
(08123042615)
: MISBACHUDIN
(081219124697)
SAFETY OFFICER
: SITE Engineer II
: Mr. ADITYA M T
: SAFETY I
(085233794690)
: Mr. SURYO ATMOJO : SAFETY II
(082233745486)
SUB-KONTRAKTOR : PT. HIKARI TEKNOLOGI INDONESIA SUPERVISOR
: Mr. ENDIT S
JUMLAH PEKERJA
: 34 ORANG
FOREMAN
: Mr. AINUR ROFIQ (082330306169) AGUS SARAGRUSKAI : Mr. RIAN WAHYU (082244568940)
SAFETY
Mr. ALFIAN NDARU
7.
(082330306169)
(085853360316)
APAKAH BENAR PENGAWAS AKAN SELALU BERADA DI LOKASI AREA PEKERJAAN. Pengawas dari SubContractor akan berada di lokasi area pekerjaan.
Document No Revision Issued date Page
8.
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 6 of12
TATA CARA PENGAWAS DALAM MELAKUKAN PENGAWASAN TERHADAP TINDAKAN TIDAK AMAN (UNSAFE ACTION) MAUPUN KONDISI TIDAK AMAN (UNSAFE CONDITION) DARI PERILAKU PEKERJA. (Misalnya dengan melakukan tool box meeting, morning meeting, review di setiap akhir pekerjaan, melakukan koreksi langsung jika ada yang tidak benar, menyetop pekerjaan bila beresiko kecelakaan, dsb) Melakukan koreksi secara langsung jika ada suatu tindakan yang tidak benar / tidak aman (unsafe action) maupun kondisi yang tidak aman (unasafe condition), menyetop pekerjaan apabila beresiko terjadi kecelakaan. Pengarahan tentang Safety dan Progress Pekerjaan, Pemberitahuan Schedule yang dilakukan di awal pekerjaan. Safety dan Progress Meeting akan dilakukan setiap waktu untuk merefresh dan mengingatkan kembali para pekerja akan safety dan progress pekerjaan
9.
PEKERJA PELAKSANA PT. (TERLAMPIR) RIWAYAT PEKERJA DAN TRAINING KEAHLIAN PENGALAMAN USIA TERAKHIR IKUT BEKERJA DI PEKERJA TRAINING AREA INI (tahun) KEAHLIAN (tahun) (tahun)
NAMA
TUGAS / BAGIAN
ENDIT SUTARYO
SUPERVISOR
3
41
-
SAFETY
1
29
2014
ALFIAN NDARU P
SAFETY
1
23
2014
AINUR ROFIQ
FOREMAN
2
43
-
IMAM SUBEKHI
FITTER
3
49
-
ABD MUJIB RIDWAN
FITTER
3
32
-
ABDULLAH WASIAN
FITTER
2
29
-
SALIM RAWE
FITTER
4
41
-
PONAJI
FITTER
2
39
-
M. FATIH
FITTER
2
37
-
ABDUL MUIZ
FITTER
1
35
-
RIAN WAHYU DIAN
Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 7 of12
ANDI INDRA NURYADI
FITTER
1
22
-
M. ANSHOR
FITTER
1
35
-
SUTRISNO
ELECTRICAL
1
30
-
CHOLID MAWARDI
OPERATOR
7
46
2015
M. SYAFIQ
OPERATOR
6
31
2016
BAMBANG SUMANTRI
SCAFFOLDER SPV
8
42
2012
FATHURROZI
SCAFFOLDER
3
27
2015
ANTOK MARZUKHI
HELPER SCAFFOLDER
2
25
-
M. IMAM GOZALI
HELPER SCAFFOLDER
1
28
-
AHMAD FAISAL
HELPER SCAFFOLDER
1
25
-
ALIMAN
HELPER SCAFFOLDER
1
33
-
M. ROMLI
HELPER SCAFFOLDER
1
38
-
KASLIM
HELPER SCAFFOLDER
1
37
-
MA’RUF
WELDER
4
43
-
RIAU LINGGA
WELDER
3
24
-
A. N. BASHORI
CIVIL SPV
1
55
-
ERSAN
CIVIL
1
45
-
MOCH. SYAFI’I
CIVIL
1
48
-
MISNAN
CIVIL
1
55
-
Document No Revision Issued date Page
a). b). 10.
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 8 of12
M. THOHIR
CIVIL
1
39
-
KHOIRUL SYAHRI
CIVIL
1
22
-
M. ASLIKH
CIVIL
1
41
-
MUSLICH
CIVIL
1
31
-
ISILAH TABEL INI DENGAN BENAR, DAN BILA JUMLAH PEKERJA MELEBIHI DARI TABEL INI BISA DILAMPIRKAN PADA LEMBARAN TERSENDIRI. LAMPIRKAN PHOTO PEKERJA UKURAN 3x4, KHUSUS YANG TIDAK MEMILIKI ID DARI PT. SMELTING BAHAYA ATAU RESIKO DARI PEKERJAAN INI & TATA CARA PENGONTROLAN ( RISK ASSESMENT)
BAHAYA
KONSEKWENSI -
FABRICATION WORK
-
-
LIFTING WORK
ELECTRICAL TOOLS
SCAFFOLDING
GANGGUAN PERNAFASAN AKIBAT PAPARAN GAS SO2 LUKA BAKAR AKIBAT PERCIKAN MATERIAL LAS KEBAKARAN AKIBAT PERCIKAN MATERIAL LAS DAN KESALAHAN PADA PERALATAN GANGGUAN PENGLIHATAN AKIBAT PAPARAN SINAR HASIL PENGELASAN
TERTIMPA / TERJEPIT MATERIAL
- TERSENGAT ALIRAN LISTRIK / TERSETRUM
TERJATUH, TERPELESET, SCAFFOLDING ROBOH, TERJEPIT
AKIBAT JIKA TIDAK DIKONTROL
LUKA BERAT, FATAL
LUKA BERAT, FATAL
LUKA BERAT, FATAL
LUKA BERAT, FATAL
CARA PENGENDALIAN GUNAKAN RESPIRATOR GAS SO2, APRON BESERTA APD STANDART SECARA BENAR, PASANG FIRE BLANKET DAN LAKUKAN INSPEKSI TERHADAP PERALATAN SEBELUM DIGUNAKAN DAN LAKUKAN PEKERJAAN SESUAI DENGAN PROSEDUR, GUNAKAN WELDING SHIELD
PASANG SAFETY LINE DISEKITAR AREA KERJA DAN LAKUKAN PEKERJAAN SESUAI DENGAN PROSEDUR, PASTIKAN OPERATOR BERSERTIFIKAT DAN PERALATAN SUDAH MENDAPATKAN SURAT IJIN KELAYAKAN OPERASIONAL DARI DISNAKER SETEMPAT, GUNAKAN APD STANDART DENGAN BENAR PENGETESAN ALAT / TOOLS (INSPEKSI OLEH ELECTRIC PTS) SEBELUM BEKERJA, GUNAKAN SARUNG TANGAN, PASANG GROUNDING. IKUTI PROSEDUR PENDIRIAN SCAFFOLDING (SSC-OP-21-22), SCAFFOLDING WORK DILAKUKAN OLEH PERSONEL YANG
Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 9 of12
KOMPETENSI DIBIDANGNYA, MEMILIKI SERTIFIKAT, MEMAKAI BODY HARNESS
- TERJEPIT - TERGORES - TERPOTONG - MATA KEMASUKAN GRAM
MANUAL TOOLS
LUKA BERAT, FATAL
PENGETESAN ALAT (INSPEKSI OLEH PTS) SEBELUM MELAKUKAN PEKERJAAN, SAFETY GLOVES, SAFETY GLASSES (GOOGLES), MENGGUNAKAN APD SESUAI STANDART, MEMEGANG ALAT DENGAN CARA YANG BENAR
KETERANGAN CONTOH : Pengetesan alat sebelum bekerja (inspeksi oleh electric PTS), sarung tangan, pasang grounding
Hand tool ( Power tool) electrical
Tersengat listrik
Luka berat. Fatal
Hand tool ( Power tool) mechanical
Tergores atau terpotong
Luka serius
Sarung tangan, periksa / inspeksi kelengkapan alat sebelum digunakan (inspeksi dilakukan oleh electric PTS)
Angkat Barang Berat
Kaki terjepit, atau kejatuhan
Luka serius
Pakai safety shoes, periksa peralatan dengan cermat
Kejatuhan barang dari ketinggian
Anggota badan kejatuhan
Luka serius
Pakai helm, pasang barricade, ikat peralatan kerja dengan aman, safety belt di kaitkan
10.
ALAT PELINDUNG DIRI (APD) SEPERTI SARUNG TANGAN, SEPATU SAFETY, HELMET, SAFETY BELT, SAFETY HARNESS, KACAMATA, PELINDUNG BADAN, dll. SELALU DIPAKAI OLEH PEKERJA JENIS ALAT PELINDUNG DIRI
UMUM
1. Safety Helmet 2. Sepatu Safety 3. Kacamata Safety (Safety Googles / Safety Glasses) 4. Respirator atau masker (SO2 Gas Cartridge, Dust Cartridge) 5. Full Body Harness Double Hook & Safety Belt 6. Hand gloves (Sarung Tangan) 7. Welding Shield 8. Face Shield 9. Pakaian Kerja (Lengan Panjang dan Celana Panjang)
CATATAN :
Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 10 of12
ALAT PELINDUNG DIRI (APD) HARUS SESUAI DENGAN STANDARD MUTU SAFETY YANG TELAH MENDAPATKAN PERSETUJUAN DARI PT SMELTING 11.
PERALATAN KERJA LISTRIK YANG AKAN DIPAKAI, MERK, TAHUN PEMBUATAN, DAN KONDISI SAAT INI (BERDASARKAN HASIL PENGECEKAN OLEH DEPARTEMENT TERKAIT). Misalnya Mesin Las, Generator, Mesin Gerinda, kabel roll, dll.
JENIS PERALATAN
GRINDING MACHINE WELDING MACHINE WELDING MACHINE PLASMA CUTTING
MERK / BRAND
MAKITA WELD KING SAFFRO 450 WEICO
CHIPPING
HITACHI
SPEED CUTTER
MAKITA
HAND TOOLS
STANLEY
KABEL ROLL
ETERNA
TAHUN PEMBUATAN
KONDISI SAAT INI ( hasil cek) KONDISI FISIK
KONDISI FUNGSI
2011
OK
OK
2014
OK
OK
2010
OK
OK
2012
OK
OK
2013
OK
OK
2013
OK
OK
2013
OK
OK
2012
OK
OK
WIRE SLING
-
2010
OK
OK
CHAIN BLOCK 1T & 2T
-
2011
OK
OK
2012
OK
OK
2012
OK
OK
2014
OK
OK
2014
OK
OK
CUTTING TORCH
-
PALU STANLEY SEKOP CANGKUL
-
CATATAN : KONDISI FISIK DIPERIKSA OLEH AUTHORIZED INSPEKTOR PTS
Document No Revision Issued date Page
12.
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 11 of12
METODE KOMUNIKASI ANTAR PEKERJA KONTRAKTOR. (Misalnya meeting setiap pagi di lokasi, komunikasi tool box meeting sebelum pekerjaan dimulai, dll) Dilakukan meeting setiap Pagi (08.00)
13.
METODE KOMUNIKASI ANTARA KONTRAKTOR DENGAN PT SMELTING. (Misalnya : Laporan harian setiap pagi, dan sore, melalui email, dll.) PT OEI akan berkomunikasi dengan PT SMELTING mengenai progress pekerjaan, performa safety, masalah yang terjadi, dll, mengenai waktunya akan disesuaikan dengan situasi dan kondisi, baik bertemu secara langsung, maupun melalui e-mail atau mobile phone.
14.
SUDAHKAH PEKERJA MEMBACA DAN MEMAHAMI ATURAN KESELAMATAN KERJA DAN TATA TERTIB PT SMELTING YANG BERLAKU DI AREA TEMPAT ANDA AKAN BEKERJA INI? Sebagian pekerja sudah pernah bekerja di dalam PT Smelting, sehingga sudah mengetahui aturan yg berlaku di PT Smelting. Sedangkan yang belum pernah akan diberi Safety Induction terlebih dahulu.
15.
DIMANAKAH ANDA AKAN MENEMPATKAN ALAT KERJA ATAU MATERIAL SELAMA PROYEK BERLANGSUNG, APAKAH SUDAH MENDAPATKAN IJIN DARI AREA PLANT? Alat Kerja (Hand Tools) ditempatkan di dalam Tools Box yang berada di sekitar area kerja, Untuk Equipment besar akan ditempatkan sekitar area kerja Untuk penempatan semua itu terlebih dahulu meminta ijin ke Process dan Maintenance Area
16.
SEBUTKAN TANDA ISOLASI FISIK ATAU BLOK AREA YANG AKAN DIPASANG, DAN APAKAH ADA TANDA PAPAN INFORMASI ATAU PERINGATAN, .Misalnya : Pita kuning hitam (Tanda Peringatan) atau merah putih (Tanda Larangan) atau pemasangan sekat/dinding temporer Area sekitar pekerjaan akan dipasang Barricade / safety line atau papan petunjuk.
17.
LIMBAH DARI PEKERJAAN INI DAN CARA PENANGANANNYA. Limbah dari pekerjaan mechanical ini berupa kayu dari box palet, potongan besi dari hasil fabrikasi dan limba sarung tangan. Untuk limba kayu akan dibuang di daerah cooling tower, untuk limba logam akan dibuang sesuai klasifikasi yang telah ditemtukan oleh pihak PTS, dan untuk limba sarung tangan bekas akan dibuang di tempat sampah limba B3 yang nerwarna biru.
18.
APA DAMPAK KEPADA ORANG DAN AREA SEKITAR SELAMA PEKERJAAN INI DILAKUKAN? (Misalnya : Noise, Asap, Debu, Bau, Terhentinya aktifitas Produksi, dsb) AKAN ADA GANNGGUAN.
Document No Revision Issued date Page
: SSC-FM-21-27-01 : 00 : 7 April 2014 : 12 of12
Dampak yang terjadi selama pekerjaan adalah timbul Debu, Gas SO2 dan Noise (Bising) akibat dari pekerjaan tersebut. 19.
APAKAH SETIAP PEKERJA TELAH PENANGANAN KEADAAN DARURAT
MENGETAHUI
PROSEDUR
PENANGANAN
Setiap pekerja akan diberitahu mengenai Prosedur Penanganan Keadaan Darurat melalui Safety Meeting dan LEMBAR KOMUNIKASI KEADAAN DARURAT DENGAN INI KAMI (KONTRAKTOR) YANG BERTUGAS UNTUK PELAKSANAAN PEKERJAAN SEPERTI YANG DIMAKSUD, SUDAH MENGETAHUI DAN MELAKUKAN RISK ASSESMENT YANG BENAR DAN MENGETAHUI POTENSI BAHAYA YANG ADA YANG BERHUBUNGAN DENGAN PEKERJAAN TERSEBUT. KAMI AKAN MEMENUHI SEMUA ATURAN DAN STANDARD SAFETY YANG TELAH DITETAPKAN DALAM KONTRAK KERJA. DISIAPKAN OLEH : CONTRACTOR TANGGAL
(18 March 2016)
PT. OTE ENGINEERING INDONESIA
NAMA
(ALEF AULIA )
ASS. MANAGER
(PRIBADYO D.S)
MANAGER
(SEKINE )
DISETUJUI OLEH PT. SMELTING M & U DEPT.
PROCESS or DEPT. CONCERN
OSH DEPT.
(.........................)(...............................) (................................) (DEDY O E)(MAN RIDHO)(SUGENG WIBOWO)