GTA HUB DEVELOPMENT PROJECT
PT Prospera Brillar Indonesia – Final Dossier Index
Client Purchase Order No. Description Project Title
: PT Prospera Brillar Indonesia : TBA : Fabrication of Hot Dip Galvanized Handrails & Ladders : GTA HUB DEVELOPMENT PROJECT
Final Dossier Index VOL
SECT.
01
A
GENERAL QUALITY DOCUMENT/PROCEDURES
A-1
QA/QC personnel organization chart
A-2
Project Quality Plan
A-3
Internal Audit Report
A-4
Non-Conformant Reports (If any)
A-5
Inspection Test Plan (ITP)
A-6
Project Quality Control Plan (PQCP)
A-7
List of monitoring and measuring devices and calibration certificates
A-8
WPS/PQR
A-9
Welder Qualification Certificates (WQT)
A-10
Blasting Painting / Galvanizing Procedure
A-11
NDT Procedure
A-12
NDT Operator register List
A-13
Welding Map
A-14
Material Control Storage & Preservation Procedure
A-15
Material Receiving and Traceability Procedure
A-16
Dimensional Control Procedure
A-17
Instrument Measurement Equipment
A-18
Project QAQC Organization Chart
A-19
Kick of Meeting (Minute of Meeting)
A-20
Pre-Inspection Meeting and Minute of meeting
A-21
Inspection Release Note (IRN)
02
B
ENGINEERING DOCUMENT/PROCEDURES
B-1
Data Sheets
B-2
Technical Query (TQ) and Technical Deviations (TD)
B-3
Design Analysis and Calculations
B-4
Project Specifications and Standard Drawings
B-5
Shop Drawings
B-6
Redline mark up
03
C
SUPPLY CHAIN DOCUMENT/PROCEDURES
C-1
Material PO for Permanent Part (Purchase by SUBCONTRACTOR)
C-2
Material PO for Additional Services (Purchase by
REMARKS
GTA HUB DEVELOPMENT PROJECT
PT Prospera Brillar Indonesia – Final Dossier Index
SUBCONTRACTOR)
D-1
MISCELLANEOUS CERTIFICATES, TEST RECORDS and REPORTS Material Verification report
D-2
Material Certificates
D-3
Material Traceability Report
D-4
Welding Traceability Report Incl. Fit-Up, Visual
D-5
Dimensional Report
D-6
NDT Report
D-7
Painting / Galvanizing Inspection report
D-8
Calibration Equipment Test Report
04
PBI-XX
D
Page 2 of 4
Rev:0