KEJURUTERAAN ASASTERA BERHAD



Form No. : HIRADC No. :



KA-S-01 001



HIRADC



Revision No.:



01



ACTIVITY: LIFTING OPERATION (MOBILE CRANE) No.



Hazard Group & Potential Hazard



Sequence of Job/ Activity 



1.



Mobile crane arrival at site











2.



Unloading / Loading of mobile plant (Mobile Crane)







Lifting of Equipment (Load)



Uncontrolled vehicle movement







Property damage







 



Body injury Property damage







  



Body injury Death case Property damage



Overturning



 



Body injury Property damage



 



Body injury Property damage & equipment



 



Crane topples Property damage



  



Body injury Property damage Crane topple



Collision with structure







Incompetent person to operate mobile crane



Unsafe decks / ramps



Current Control Measure 



Unstable mobile crane in stationary











3.



Unsafe loading point near power lines & road closure.



Potential Harm/ Consequences



Project / Safety team to ensure briefing must be conducted and monitor the operation closely. Conduct mobile crane inspection prior of operating mobile crane.



Risk Evaluation S



2



P



1



Risk Level



Score



2



(L/M/H)



L



FMA 1967 (Electric Passenger and Goods Lift) Regulation 28 FMA 1967 (Electric Passenger and Goods Lift) Regulation 29



3



2



6



M







Appoint safety flag man if vehicle may need to move or reverse. Moving vehicles will be proximity to people.



 



Ensure brake is applied. Chock delivery vehicle wheels if necessary.



4



2



8



M







Crane is set up as close to the lift area as possible to avoid over reaching. Crane operator should maintain a steady speed during the operation.







4



2



8



FMA 1967 (Electric Passenger and Goods Lift) Regulation 25



M



FMA 1967 (Electric Passenger and Goods Lift) Regulation 20







Exclusion zone should be erected to segregate the work area from other plant.



3



2



6



M



FMA 1967 (Electric Passenger and Goods Lift) Regulation 20







Project / Safety team to ensure monitor the operation closely. Only a competent person may load or unload plant and equipment from delivery vehicle.



3



2



6



M



FMA 1967 (Electric Passenger and Goods Lift) Regulation 28



 



Ensure the safety of deck free from any debris. Ensure that there will be enough friction for a controlled move.



3



3



9



M











Person hit by mobile crane



 



Body injury Fatality







Appoint a spotter to assist and direct the operator as necessary.



4



2



8



M







Struck by moving mobile plant (crane)



  







Ensure equipment are properly secured and restrained against uncontrolled movement. (lifting gear use of web sling belt)



4



2



8



M







Manual Handling



Body injury Fatality Property damage Hand injury MSD



1



3



3



L



 



Legal Requirements







To know the load length, weight and balance point before lifting.



FMA 1967 (Electric Passenger and Goods Lift) Regulation 20 FMA 1967 (Electric Passenger and Goods Lift) Regulation 28 FMA 1967 (Electric Passenger and Goods Lift) Regulation 8 FMA 1967 (Electric Passenger and Goods Lift)



Page 1 of 2



KEJURUTERAAN ASASTERA BERHAD



Form No. : HIRADC No. :



KA-S-01 001



HIRADC



Revision No.:



01



ACTIVITY: LIFTING OPERATION (MOBILE CRANE) No.



Hazard Group & Potential Hazard



Sequence of Job/ Activity











Person struck by swing load



Unsecured load



Potential Harm/ Consequences



 



Fatality Property damage



 



Fatality Property damage



Current Control Measure 



To wear PPE.







Project / Safety team to ensure briefing must be done and monitor the processes closely. Do not hoist lift overhead, don’t stand below load being lifted. Barricade area and display safety signage. Use of communication equipment of walkie talkie between crane operator and upper level person in charge.



  







Risk Evaluation S



P



Risk Level



Score



(L/M/H)



Legal Requirements Regulation 7



Ensure release tide down sling belt in sequence when unloading.



FMA 1967 (Electric Passenger and Goods Lift) Regulation 25 4



4



2



3



8



12



M



H



FMA 1967 (Electric Passenger and Goods Lift) Regulation 7



Abbreviations: S = Severity, P = Probability, L = Low, M = Medium, H = High Approvals & Signatures Prepared by (KAB):



Verify & Approved by (KAB):



Signature & Stamp :



Signature & Stamp :



Name : Asvini Segeran Date : 24/6/2020 Position : Site Safety Supervisor



Name : Date : Position :



7105



Page 2 of 2