Doosan Heavy Industries Vietnam Dung Quat Economic Zone,
Binh Thuan, Binh Son, Quang Ngai, Vietnam T +84 55 5618 900 F +84 553 618 950
A
21/05/12
DANNY
J.Y.JEONG
K.J.LIM
Rev.
Date
Drawn
Checked
Approved
For Information Details of Revision
Owner :
AES-VCM MONG DUONG POWER COMPANY LIMITED Owner's Engineer :
Contractor :
Project :
PC MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT
Title :
T10206-QE01-POZEN__-040204 INSPECTION AND TEST PLAN FOR LIGHTING & SMALL POWER INSTALLATION
:
T10206
UAS :
QE01
Unit :
PO
KKS :
ZEN
Reg. No. 040204 Revision :
Drawing No. :
T10206-QE01-P0ZEN-040204
Page-No :
A 1 of 5
ITP for Lighting & Small Power Installation
AES-VCM
This note is only applicable for AES-VCM Mong Duong
Detailed Legend
S
:
Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong except for the first or last operation on the basis of each process. AES-VCM Mong Duong could check the operation, if he is present at the site during the inspection by Doosan.
R
:
Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document attesting to the satisfactory performance of the related test or inspection for review by AES-VCM Mong Duong.
W
:
Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to decide whether they will attend such inspection or not.
H
:
Hold Point / Downstream construction and other activities shall not proceed without attendance or any written approval of AES-VCM Mong Duong.
NOTE : The Site ITP and all of the abovementioned reports will be kept available by DOOSAN at anytime for control and or review by AES-VCM Mong Duong.
Page 2
Inspection & Test Plan for Lighting & Small Power Ínstallation
Item Name
Oper. No.
A1 A. Material Receipt
A2 A3 B1
B.Installatio n& Inspection of Conduits & Boxes
B2
T10206-QE01-POZEN-040204
Rev. A
Contractor
DOOSAN
Page 3 of 5
Inspection & Test Activities Specific Applicable drawing number, Standard Code number, Subcontractor DOOSAN AES-VCM Specification A Sign A Sign A Sign
Inspection Process Check the physical condition and intactness of the packing case. Check intactness of instruments / accessesories installed on the panels / fittings. Check type and size of the cables/ cable gland/ lugs/ lighting/ wires Check for dimensions / sizes and routings according to Approved Drawing Check support positions, based on the specifications and Drawings.
Verification Document
Remarks (Allowable tolerance)
Packing List
R
R
R
Packing List
N/A
Packing List
R
R
R
Packing List
N/A
Material Technical Specification
R
R
W
Packing List
N/A
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
H
W
W
Refer to attached Checklist
N/A
H
W
W
Refer to attached Checklist
N/A
B3
Verifyy Proper p fixing g of fittings g and accessories
B4
Where Check Expansion joints provision required
AFC Drawing T10206-YQ01POZEN-141313 AFC Drawing T10206-YQ01POZEN-141313
B5
Check Electrical continuity /bonding complete
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
B6
Check Alignment and Leveling is proper
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
C1
Verify Dimensions/sizes and routings according to latest Approved Drawing
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
IEC-61557
H
W
W
Refer to attached Checklist
100 mega-ohms above
IEC-61557
H
W
W
Refer to attached Checklist
N/A
C2 C. LAYING & INSPECTI ON OF WIRES & CABLES
Doc. No.
AES-VCM
C3
Check Insulation resistance for Power cables and wires Check Insulation resistance for Control cables and wires
C4
Check Proper fixing of cable ties and accessories
Approved for Construction Drawing/Specification
H
W
W
Refer to attached Checklist
N/A
C5
Check Proper fixing of cable glands and lugs
Approved for Construction Drawing/Specification
H
W
W
Refer to attached Checklist
N/A
Check Electrical continuity /bonding complete
Approved for Construction Drawing/Specification
H
W
W
Refer to attached Checklist
N/A
Verify Cable/wiring dressing & ferruling is proper
Approved for Construction Drawing/Specification
H
W
W
Refer to attached Checklist
N/A
C6 C7 Abbreviation :
S: Surveillance
R: Report Review
W: Witness Inspection
H: Hold Inspection
Note :
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
Inspection & Test Plan for Lighting & Small Power Ínstallation
Item Name
D. Installation & Inspection of Lighting Panel
E. Installation & Inspection of Lighting Fitting & Receptacle
F. Final Documenta tion
Oper. No.
Doc. No.
T10206-QE01-POZEN-040204
Rev. A
Contractor
DOOSAN
Page 4 of 5
AES-VCM
Inspection & Test Activities Specific Applicable drawing number, Standard Code number, Subcontractor DOOSAN AES-VCM Specification A Sign A Sign A Sign
Inspection Process
Verification Document
Remarks (Allowable tolerance)
D1
Check Dimensions/sizes according to latest Approved Drawing
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
D2
Verify Proper fixing of panels on foundation/walls
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
D3
Check Insulation Resistance Test
IEC-61557
H
W
W
Refer to attached Checklist
100 mega-ohms above
D4
Check Alignment and Leveling is proper
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
E1
Check type of fittings and fixtures
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
E2
Verify locations
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
E3
Check quantity
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
E4
Verify associated components
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
E5
Check wiring termination
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
E5
Verify telecom receptacles
AFC Drawing T10206-YQ01POZEN-141313
H
W
W
Refer to attached Checklist
N/A
F1
Ensure that the conduits and associated accessories are available on site.
Material Technical Specification
H
W
W
Material Technical Specification
N/A
F2
Ensure that conduit layout drawing are available at site.
Approved for Construction Drawing/Specification
H
W
W
Refer to attached Checklist
N/A
F3
Ensure that proper and valid work permit, if applicable, is available at site for carrying out the job.
Approved PTW
H
W
R
Approved PTW
N/A
Abbreviation :
S: Surveillance
R: Report Review
W: Witness Inspection
H: Hold Inspection
Note :
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
AES-VCM
Inspection Check List Project
:
Drawing No.
:
Specific Location
:
Lighting & Small Power Installation Work
Ref. No. Date :
CHECK ITEM Verification & Approval Observed Result / Remarks Yes No N/A
No
Inspection elements
1
Check the physical condition and intacness of the packing case.
2
Check intactness of instruments / accessesories installed on the panels / fittings
3
Check type and size of the cables/ cable gland/ lugs/ lighting/ wires
4
Check for dimensions / sizes and routings Approved Drawing
5
Check support positions, based on the specifications and Drawings.
6
Verify Proper fixing of fittings and accessories
7
Check Expansion joints provision where required
8
Check Electrical continuity /bonding complete
9
Check Alignment and Leveling is proper
10
Verify Dimensions/sizes and routings according to latest Approved Drawing
11
Check Insulation resistance for Power cables and wires
12
Check Proper fixing of cable ties and accessories
according to
Checked by : (Subcontractor) DOOSAN Electrical Dept.
DOOSAN QA/QC Dept.
AES-VCM
Name & Signature
Name & Signature
Name & Signature
Name & Signature
Position
Position
Position
Position
Date
Date
Date
Date
page 5