BILL OF QUANTITY TENAGA KHUSUS PT TENAGA LISTRIK GORONTALO
1.1 REKAPITULASI ANGGARAN BIAYA NO
URAIAN PEKERJAAN
TOTAL
I
PEKERJAAN PERSIAPAN
504,000,000
2
PEKERJAAN KONSTRUKSI JETTY DAN TRESTLE
5,302,710,305
3
PEKERJAAN BREASTING DAN DOLPHIN
3,519,544,850
4
PEKERJAAN MOORING DOLPHIN
1,741,626,690
5
PEKERJAAN KONSTRUKSI CATWALK
6
PEKERJAAN TALUD
838,646,109 796,133,465
7
PEKERJAAN PERKERASAN JALAN
237,883,750 12,940,545,169
Biaya Langsung Biaya Tak Langsung 1 Overhead
5.00
805,455,275
2 Resiko
1.00
161,091,055
2 Jamsostek
0.20
32,218,211
2 Biaya tagihan
0.80
128,872,844
2 PPh Jumlah biaya tak langsung Total Target laba Total
2.00 9.00
322,182,110 1,449,819,495 14,390,364,664 1,718,740,840 16,109,105,504
10.67
KETERANGAN
BILL OF QUANTITY TENAGA KHUSUS PT TENAGA LISTRIK GORONTALO 1.2
RENCANA ANGGARAN BIAYA
NO
URAIAN PEKERJAAN
I
SATUAN VOLUME
HARGA SATUAN
TOTAL
PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi Dermaga
hari
20
200,000
4,000,000
2 Pengukuran areal dermaga
ls
1
15,000,000
15000000
3 Mobilisasi Alat
ls
1
485,000,000
485,000,000
JUMLAH
504,000,000
BILL OF QUANTITY TENAGA KHUSUS PT TENAGA LISTRIK GORONTALO
NO
URAIAN PEKERJAAN
II
PEKERJAAN JETTY DAN TRESTLE
A
PEKERJAAN TIANG PANCANG
SATUAN VOLUME
HARGA SATUAN
1 Pengadaan tiang pancang 800 mm t= 19 mm
m'
846.00
3,610,400
2 Pengangkatan tiang ketitik pancang
titik
22.00
3,090,000
3 Pemancangan tiang tegak
m'
682.00
600,000
4 Pemancangan tiang miring
m'
164.00
800,000
5 Penyambungan tiang
titik
66.00
1,000,000
6 Pemotongan tiang
titik
22.00
500,000
7 Pengisian tiang beton 2 m
m3
22.11
4,085,000
8 Perlindungan tiang
titik
22.00
1,875,000
9 Pile load trial
titik
2.00
20,000,000 JUMLAH
B
PEKERJAAN POER 1 Poer tunggal ( 1.600 x 1.600 x 800 )
m3
36.86
5,006,500
2 Pemasangan perancah
m2
46.08
104,000
3 Pemasangan bekisting
m2
138.24
225,500
4 Poer Ganda ( 3.200 x 1.600 x 800 )
m3
8.19
5,006,500
5 Pemasangan perancah
m2
10.24
104,000
6 Pemasangan bekisting
m2
25.6
225,500 JUMLAH
C
PEKERJAAN BALOK 1 Balok memanjang 900 x 600
m3
28.13
5,006,500
2 Pemasangan perancah
m2
44.04
104,000
3 pemasangan bekisting
m2
95.95
225,500
4 Balok melintang 900 x 600
m3
34.38
5,006,500
5 Pemasangan perancah
m2
43.8
104,000
6 pemasangan bekisting
m2
145.08
225,500 JUMLAH
D
PEKERJAAN SLAB 1 Slab ( t = 30 cm )
m3
85.55
5,006,500
2 Pemasangan perancah
m2
285.17
104,000
3 pemasangan bekisting
m2
307.97
225,500 JUMLAH
E
PEKERJAAN FENDER 1 Plank Fender
m3
16.00
5,006,500
2 Pemasangan perancah
m2
5.60
104,000
3 pemasangan bekisting
m2
70.40
225,500
buah
4.00
8,250,000
4 Pengadaan Fender ANP 800
JUMLAH F
PEKERJAAN KERB 1 Pengadaan Kerb Precast
buah
160
350,000
2 Pemasangan Kerb Precast
buah
160
210,000 JUMLAH
TOTAL
3,054,398,400.00 67,980,000 409,200,000 131,200,000 66,000,000 11,000,000 90,319,350 41,250,000 40,000,000 3,911,347,750.00 184,539,590 4,792,320 31,173,120 41,003,235 1,064,960 5,772,800 268,346,025 140,832,845 4,580,160 21,636,725 172,123,470 4,555,200 32,715,540 376,443,940 428,306,075 29,657,680 69,447,235 527,410,990
80,104,000 582,400 15,875,200 33,000,000 129,561,600 56,000,000 33,600,000 89,600,000 5,302,710,305
BILL OF QUANTITY TENAGA KHUSUS PT TENAGA LISTRIK GORONTALO
NO
URAIAN PEKERJAAN
III
PEKERJAAN KONSTRUKSI BREASTING DOLPHIN
A
Pekerjaan Tiang Pancang
B
HARGA SATUAN
1 Pengadaan tiang pancang 800 mm t= 19 mm
m'
624.00
3,610,400
2 Pengangkatan tiang ketitik pancang
titik
16.00
3,090,000
3 Pemancangan tiang miring
m'
640.00
800,000
4 Penyambungan tiang
m'
1,000,000
5 6 7 8
Pemotongan tiang Pengisian tiang beton 2 m Perlindungan tiang Pile load trial
titik titik m3 titik
48.00 16.00 16.08 16.00 2.00
Pekerjaan Poer 1 Poer ( 4,80 x 4,80 x 1,200 ) 2 Pemasangan perancah 3 pemasangan bekisting
m3 m2 m2
55.3 46.08 92.16
5,006,500 104,000 225,500 JUMLAH
Pekerjaan Fender Plank Fender Pemasangan perancah pemasangan bekisting Pengadaan Fender ANP 800
m3 m2 m2 buah
25.92 15.36 45.36 2.00
5,006,500 104,000 225,500 8,250,000 JUMLAH
Pekerjaan Bollard 1 Pengadaan tee bollard 60 tons
buah
C 1 2 3 4 D
SATUAN VOLUME
2.00
500,000 4,085,000 1,875,000 20,000,000 JUMLAH
26,500,000 JUMLAH
TOTAL
2,252,889,600.00 49,440,000 512,000,000 48,000,000 8,000,000 65,686,800 30,000,000 40,000,000 3,006,016,400 276,859,450 4,792,320 20,782,080 302,433,850 129,768,480 1,597,440 10,228,680 16,500,000 158,094,600 53,000,000 53,000,000 3,519,544,850
BILL OF QUANTITY TENAGA KHUSUS PT TENAGA LISTRIK GORONTALO
NO
URAIAN PEKERJAAN
SATUAN VOLUME
IV
PEKERJAAN KONSTRUKSI MOORING DOLPHIN
A
Pekerjaan Tiang Pancang
B
HARGA SATUAN
1 Pengadaan tiang pancang 800 mm t= 19 mm
m'
320.00
3,610,400
1,155,328,000.00
2 Pengangkatan tiang ketitik pancang
titik
8.00
3,090,000
24,720,000
3 Pemancangan tiang miring
m'
320.00
800,000
256,000,000
4 Penyambungan tiang
titik
24.00
5 Pemotongan tiang
titik
8.00
1,000,000 500,000
24,000,000 4,000,000
6 Pengisian tiang beton 2 m
m3
8.04
32,843,400
7 Perlindungan tiang
titik
8.00
4,085,000 1,875,000
8 Pile load trial
titik
2.00
20,000,000 JUMLAH
40,000,000 1,551,891,400
1 Poer ( 3.200 x 3.200 x 1,200 )
m3
24.58
5,006,500
123,059,770
2 Pemasangan perancah
m2
20.48
104,000
2,129,920
3 Pemasangan bekisting
m2
51.2
225,500
11,545,600
15,000,000
Pekerjaan Poer
JUMLAH c
TOTAL
136,735,290
Pekerjaan Bollard 1 Pengadaan tee bollard 60 tons
buah
2.00
26,500,000 JUMLAH
53,000,000 53,000,000 1,741,626,690
BILL OF QUANTITY TENAGA KHUSUS PT TENAGA LISTRIK GORONTALO
NO
URAIAN PEKERJAAN
V
PEKERJAAN KONSTRUKSI CAT WALK
A
Pekerjaan Tiang Pancang
SATUAN VOLUME
HARGA SATUAN
1 Pengadaan tiang pancang 800 mm t= 19 mm
m'
80.00
3,610,400
288,832,000.00
2 Pengangkatan tiang ketitik pancang
titik
2.00
3,090,000
6,180,000
3 Pemancangan tiang miring
m'
80.00
800,000
64,000,000
4 Penyambungan tiang
m'
6.00
1,000,000
6,000,000
5 Pemotongan tiang
titik
2.00
500,000
1,000,000
6 Pengisian tiang beton 2 m
titik
2.01
4,085,000
8,210,850
7 Perlindungan tiang
m3
2.00
1,875,000
3,750,000
8 Pile load trial
titik
2.00
20,000,000
40,000,000
JUMLAH B
417,972,850
Pekerjaan Poer 1 Poer ( 3.200 x 3.200 x 1,200 )
m3
4.10
5,006,500
20,526,650
2 Pemasangan perancah
m2
5.12
104,000
532,480
3 Pemasangan bekisting
m2
15.36
225,500
3,463,680
JUMLAH C
TOTAL
24,522,810
Pekerjaan Cal walk Baja 1 Baja WF 250.125.6.9
m'
194.60
597,920
116,355,232
2 Baja WF 100.50.5.7
m'
76.00
187,860
14,277,360
3 Baja UNP 120.55.6
m'
41.80
252,500
10,554,500
4 Baja L
m'
22.80
246,440
5,618,832
5 Grating 1 - 3/4 x 3/16
m'
97.20
2,000,000
194,400,000
6 Pipa dia 2 inch
m'
194.40
150,692
29,294,525
buah
1026.00
25,000
25,650,000
90.90.9
7 Baut 10 mm
JUMLAH
396,150,449
JUMLAH TOTAL
838,646,109
BILL OF QUANTITY TENAGA KHUSUS PT TENAGA LISTRIK GORONTALO
NO VI
URAIAN PEKERJAAN
SATUAN VOLUME
HARGA SATUAN
PEKERJAAN TALUD 1 Batu Core Layer 140 - 160 kg
m3
290.15
340,000
98,651,000
2 Batu Primary layer 1,400 - 1,600 kg
m3
1397.28
340,000
475,075,200
3 Geotextile non woven
m2
456.44
65,000
29,668,600
4 Abutment
m3
11.48
5,006,500
57,474,620
5 Plat Injak
m3
2.43
5,006,500
12,165,795
6 Timbunan back fill
m3
746.05
165,000
123,098,250
JUMLAH
VII
TOTAL
796,133,465
PEKERJAAN PERKERASAN 1 Base course klas A
m3
71.65
435,000
31,167,750
2 Sand bedding t = 5 cm
m3
17.91
350,000
6,268,500
3 Pavling Blok K - 500 t = 10 cm
m3
35.83
3,250,000
116,447,500
buah
240.00
350,000
84,000,000
4 Kerb
JUMLAH
237,883,750
ANALISA HARGA SATUAN PEKERJAAN Nama Bahan / Upah / Peralatan
Sat
Koef
Harga Satuan
1 ls Upah
Pembersihan Pembersihan
hr
20.0000
200,000
1 ls Sub
Pengukuran areal dermaga Pengukuran
ls
1.0000
15,000,000
1 ls Sub
Mobilisasi alat Mob./demob. Alat pancang Excavator Vibro compactor Alat-2 ringan Direksi keet lengkap Pelaporan & administrasi Listrik Air
ls ls ls ls ls ls ls ls
1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000
300,000,000 10,000,000 10,000,000 25,000,000 50,000,000 50,000,000 25,000,000 15,000,000
1 m' Bahan
Pengad. TP dia. 800 t: 16 mm TP Baja Angk. Jakarta-lokasi Bongkar Sepatu tiang pancang
kg kg kg bh
309.00 309.00 309.00 0.026
11,000 500 100 1,000,000
1 ttk Upah
Pengangkatan TP ke titik pancang Angkat TP kg
12,360.00
250
1 m' Upah
Pancang tiang tegak Pancang tiang tegak
m'
1.00
600,000
1 m' Upah
Pancang tiang miring Pancang tiang miring
m'
1.00
800,000
1 ttk Upah
Penyambungan TP Penyambungan TP
ttk
1.00
1,000,000
1 ttk Upah
Pemotongan TP Pemotongan TP
ttk
1.00
500,000
1 m3
Pengisian tiang beton t: 2 meter
K-500 Pembesian Plat penahan
m3 kg bh
1.00 180.00 0.50
1,269,000 14,950 250,000
1 ttk Bahan
Pelindung TP 1 meter Splash Guard
m2
2.50
750,000
1 m3
Beton K-300 bertulang K-300 Pembesian
m3 kg
1.00 250.00
1,269,000 14,950
m3 Upah Bahan Alat
Beton K-300 tanpa tulang Cor beton Ready mix K-300 Vibartor
m3 m3 jam
1.00 1.02 1.00
200,000 950,000 100,000
kg Upah Bahan
Pembesian Pabrikasi / stel Besi Beton ulir Kawat Bendrat
kg kg kg
1.00 1.10 0.02
3,000 10,500 20,000
m2 Upah Bahan
Bekisting Pabrikasi/stel/bongkar Kayu Kelas III Multiplek 12 mm Paku Minyak kist
m2 m3 lbr kg ltr
1.00 0.03 0.35 0.80 0.20
75,000 2,500,000 200,000 20,000 10,000
m2 Upah Bahan
Perancah Pabrikasi/stel/bongkar Kayu Kelas III Paku
m2 m3 kg
1.00 0.02 0.20
50,000 2,500,000 20,000
bh Upah Bahan
Pengad. Fender ANP 800 Pasang fender Fender ANP 800 Alat kerja
bh bh ls
1.00 1.00 1.00
250,000 7,500,000 500,000
bh Upah Bahan
Pengad. Bollard 60 ton Pasang bollard Bollard 60 ton Alat kerja
bh bh ls
1.00 1.00 1.00
500,000 25,000,000 1,000,000
1
1
1
1
1
1
1 m'
Baja WF 250.125.6.9
Bahan
Baja WF Angk. Jakarta-lokasi Bongkar Pabrikasi/erection
kg kg kg kg
29.60 29.60 29.60 29.60
11,000 1,000 200 8,000
Baja WF 100.50.5.7 Baja WF Angk. Jakarta-lokasi Bongkar Pabrikasi/erection
kg kg kg kg
9.30 9.30 9.30 9.30
11,000 1,000 200 8,000
Baja UNP 120.55.6 Baja UNP Angk. Jakarta-lokasi Bongkar Pabrikasi/erection
kg kg kg kg
12.50 12.50 12.50 12.50
11,000 1,000 200 8,000
L 90.90.9 Besi L 90.90.9 Angk. Jakarta-lokasi Bongkar Pabrikasi/erection
kg kg kg kg
12.20 12.20 12.20 12.20
11,000 1,000 200 8,000
1 m' Bahan
Grating 1 - 3/4 x 3/16 Grating 1 - 3/4 x 3/16
m'
1.00
2,000,000
1 m' Bahan
Upah
Pipa dia. 2" Pipa dia. 2" Angk. Jakarta-lokasi Bongkar Pabrikasi/erection
kg kg kg kg
7.46 7.46 7.46 7.46
11,000 1,000 200 8,000
m3 Upah Bahan
Batu core layer Pas bolder (Alat Excav) Batu bolder
m3 m3
1.00 1.20
100,000 200,000
m2 Upah Bahan
Geotextil non woven Pas geotex Geotextil non woven
m2 m2
1.00 1.20
5,000 50,000
m3 Upah Bahan
Timbunan backfill Hampar/padat alat Timbunan
m3 m3
1.00 1.20
75,000 75,000
Upah
1 m' Bahan
Upah
1 m' Bahan
Upah
1 m' Bahan
Upah
1
1
1
1
1
1
m3 Upah Bahan
Base coarse klas A Hampar/padat alat Base coarse klas A
m3 m3
1.00 1.20
75,000 300,000
m3 Upah Bahan
Sand bidding Hampar/padat alat Sand bidding
m3 m3
1.00 1.20
50,000 250,000
m3 Upah Bahan
Paving blok Pasang/padat Paving blok
m3 m3
1.00 1.10
500,000 2,500,000
ATUAN PEKERJAAN Bahan
Upah
Sub
0
4,000,000 4,000,000
15,000,000
15,000,000
300,000,000 10,000,000 10,000,000 25,000,000 50,000,000 50,000,000 25,000,000 15,000,000 485,000,000
300,000,000 10,000,000 10,000,000 25,000,000 50,000,000 50,000,000 25,000,000 15,000,000 485,000,000
3,399,000
154,500 30,900 26,000 211,400
0
3,399,000 154,500 30,900 26,000 3,610,400
0
3,090,000 3,090,000
0
3,090,000 3,090,000
0
600,000 600,000
0
600,000 600,000
0
800,000 800,000
0
800,000 800,000
0
1,000,000 1,000,000
0
1,000,000 1,000,000
0
500,000 500,000
0
500,000 500,000
0
0
4,000,000 4,000,000
Total
0
3,399,000
0
1,875,000 1,875,000
0
0
0
0
0
1,269,000 2,691,000 125,000 4,085,000
0
1,875,000 1,875,000
0
1,269,000 3,737,500 5,006,500
0
200,000 969,000 100,000 1,269,000
0
3,000 11,550 400 14,950
200,000 969,000 100,000 1,069,000
200,000
3,000 11,550 400 11,950
3,000
75,000 62,500 70,000 16,000 2,000 150,500
75,000 62,500 70,000 16,000 2,000 225,500
75,000 50,000
50,000 4,000 54,000
50,000 50,000 4,000 104,000
50,000 250,000
7,500,000 500,000 8,000,000
250,000
0
250,000 7,500,000 500,000 8,250,000
0
500,000 25,000,000 1,000,000 26,500,000
500,000 25,000,000 1,000,000 26,000,000
500,000
325,600
325,600
29,600 5,920 236,800 272,320
0
325,600 29,600 5,920 236,800 597,920
0
102,300 9,300 1,860 74,400 187,860
0
137,500 12,500 2,500 100,000 252,500
0
134,200 12,200 2,440 97,600 246,440
0
2,000,000 2,000,000
0
82,060 7,460 1,492 59,680 150,692
102,300
102,300
9,300 1,860 74,400 85,560
137,500
137,500
12,500 2,500 100,000 115,000
134,200
134,200
2,000,000 2,000,000
12,200 2,440 97,600 112,240
0
82,060
82,060
7,460 1,492 59,680 68,632
100,000 240,000 240,000
100,000 240,000 340,000
100,000 5,000
60,000 60,000
5,000 60,000 65,000
5,000 75,000
90,000 90,000
75,000
0
75,000 90,000 165,000
75,000 360,000 360,000
75,000
0
75,000 360,000 435,000
0
50,000 300,000 350,000
0
500,000 2,750,000 3,250,000
50,000 300,000 300,000
50,000
500,000 2,750,000 2,750,000
500,000
RENCANA ANGGARAN BIAYA REPLACEMENT DERMAGA SUNGAI SIDANG KAB. MESUJI LAMPUNG TAHUN 2014 NO
URAIAN PEKERJAAN
SATUAN
HARGA SATUAN
1 Pengadaan tiang pancang 355,6 mm t: 12 mm
m'
23,170.50
2 Pembuatan sepatu tiang pancang
bh
2,725,500.00
3 Pengangkatan tiang ketitik pancang
m'
217,680.00
4 Pemancangan tiang tegak
m'
837,245.00
5 Penyambungan tiang
bh
716,812.50
6 Pemotongan tiang
bh
487,962.50
7 Beton K-300 pengisi tiang pancang
m3
8,072,337.50
8 Perlindungan tiang dengan splash guard
m2
3,783,250.00
9 PDATest
titik
19,967,425.00
10 Beton K-300 balok
m3
9,942,954.00
11 Beton K-300 pile cap
m3
8,892,544.65
12 Beton K-300 lantai
m3
8,419,088.00
13 Pemasangan Fender type V.200-1100L
bh
8,462,125.00
14 Pemasangan bollad
bh
9,789,625.00