Data Center Site Selection Checklist



Laporan Analisis Perancangan Data Center



Anggota Tim: Hillary Goretha Pasaribu Melinda Putra Imanuel Harefa Verdiyanto Saputra Zulfikar Akbar Muzakki



- 1106054883 - 1106015983 - 1106003623 - 1106015195 - 1106010912



Fakultas Ilmu Komputer Universitas Indonesia 2014



Data Center Site Selection Checklist Abstrak Merancang data center merupakan hal yang sangat kompleks karena banyak aspek yang harus dipertimbangkan ketika kita ingin membangun data center. Dalam paper ini diberikan pertimbangan berupa essential criteria, secondary criteria, dan pertimbangan lokasi dalam membangun data center. Pertimbangan yang diberikan lebih mengarah pada perencanaan pembangunan data center baik berupa analisis lokasi bangunan data center, design lokasi data center, maupun daftar pembelian barang-barang yang diperlukan untuk membangun data center. Semua perencanaan pembangunan ini didasarkan dengan dana sejumlah 20 milyar sebagai plafon dalam perencaannya beserta running cost dan maintenance cost selama enam bulan. Kata Kunci : data center, 20 milyar



Data Center Site Selection Checklist 1. Pendahuluan Seiring dengan perkembangan teknologi, perubahan ke era digital mengubah bentuk media penyimpanan selama ini. Data-data yang tersimpan tidak lagi dalam bentuk kertas. Data-data elektronik tersimpan dalam media seperti harddisk, CD, DVD, flash memory, dan sebagainya. Seiring berjalannya waktu, data-data yang akan disimpan dalam media penyimpanan data akan bertambah besar sehingga dibutuhkan media penyimpanan dengan kapasitas yang besar. Mengolah dan mengatur data dalam jumlah yang banyak tentulah tidak mudah. Sehingga pada sebuah organisasi yang besar untuk memanajemen data, mereka memusatkan data pada sebuah data center. Data center akan menyimpan semua data yang dibutuhkan oleh suatu organisasi. Data tersebut diambil, diolah, dan disimpan kembali pada data center. Agar data center dapat memberikan dukungan yang baik terhadap operasional organisasi, maka perlu manajemen data yang baik. Data yang disimpan pada data center merupakan data yang memiliki nilai bagi suatu organisasi. Maka dari itu, dibutuhkan suatu fasilitas data center yang memiliki manajemen data yang baik sehingga membuat data terlindungi baik dari segi infrastruktur maupun dari segi keamanan virtual. Dalam melakukan perancangan data center, banyak hal-hal yang perlu diperhatikan antara lain penempatan komputer, storage, penentuan ruangan, serta perangkat lainnya. Selain itu, dibutuhkan sumber energi (power), suhu yang sesuai, dan konektivitas yang baik antar perangkat di luar atau di dalam data center. Secara singkat, ada 3 kriteria elemen pada data center yang harus dipenuhi, yaitu essential criteria, secondary criteria, dan location. Essential criteria terdiri dari kapasitas fisik, power source, pendingin, dan bandwidth. Secondary criteria sangat bergantung pada added value dan bersifat tidak wajib. Contoh dari secondary criteria ini adalah lighting, walls, door, windows, loading docks, security camera, access control, command center, serta perlengkapan lainnya. Kriteria terakhir adalah location, di mana kriteria tersebut sangat bergantung pada budget dan infrastruktur publik. Tim kami ditugaskan untuk membuat data center dengan diberi uang modal sebesar 20 milyar yang akan digunakan untuk membeli perangkat-perangkat data center. Selain untuk membeli perangkat-perangkat data center, diperlukan juga biaya maintenance data center selama kurang lebih selama 6 bulan. Maintenance tersebut meliputi biaya pemeliharaan, biaya listrik, biaya air bersih, biaya koneksi jaringan, pembayaran sumber daya manusia yang memelihara data center tersebut, serta biaya tidak terduga. Dalam membuat data center ini, kami harus memperhatikan essential criteria, secondary criteria, dan location.



Data Center Site Selection Checklist 2. Isi 2.1 Scope Data center yang akan dibangun awalnya digunakan hanya oleh tim kami saja yang terdiri dari lima orang sehingga infrastruktur yang digunakan adalah SOHO (Small Office/Home Office) dengan struktur organisasi dan kebijakan IT yang masih sederhana. Tim kami juga diberikan dana yang terbatas dalam membuat data center, yaitu dua puluh milyar rupiah. Untuk memenuhi kriteria location, tim kami hanya menyurvei 5 lokasi saja, yaitu lokasi tempat tinggal masingmasing anggota. Kapasitas data center juga tidak ditentukan dari awal, sehingga kami bebas dalam menentukan kapasitas data center itu sendiri sesuai dengan ketersediaan dana. 2.2 Budget Dalam melakukan perancangan data center ini, seperti yang sudah dijelaskan pada bab Pendahuluan bahwa kami diberi modal sebesar 20 milyar. Uang sebesar itu akan dimanfaatkan untuk pembelian barang-barang yang terkait dalam perancangan sebuah data center. Penggunaan uang tidak hanya dalam tahap pembangunan saja, akan tetapi meliputi budget untuk maintenance selama 6 bulan. Pembangunan fasilitas data center tersebut nantinya harus memperhatikan essential criteria, secondary criteria, dan location agar tercipta fasilitas data center yang baik. Pada tahap pembangunan data center kami, budget yang akan dikeluarkan disebut dengan building budget. Building budget yang kami keluarkan sekitar Rp 18.559.501.145,20 . Sementara tahap maintenance data center selama 6 bulan disebut dengan run budget. Run budget yang kami keluarkan sebesar Rp 1.435.745.454,00. Sehingga total budget yang kami keluarkan untuk pembangunan dan maintenance data center ini adalah sebesar Rp 19.995.246.599,20. Perincian penggunaan budget akan dijelaskan pada point 2.3 di bagian kriteria. 2.3 Kriteria a. Lokasi Pemilihan lokasi data center ini dipilih berdasarkan analisis yang dilakukan terhadap rumah ataupun kosan tempat tinggal anggota kelompok. Dari hal tersebut, maka akan ada 5 lokasi yang akan dilakukan penelitian terkait lokasi yang akan dijadikan data center. Untuk dapat menemukan lokasi yang benar-benar sesuai dengan kriteria lokasi data center maka dilakukan risk assesment terhadap masing-masing rumah dan kosan. Berikut ini merupakan analisis terhadap rumah atau kosan tempat tinggal masing-masing anggota kelompok :



Data Center Site Selection Checklist 1. Tempat tinggal Zulfikar Akbar Muzakki: Selection A – Pium: Selection Advice



Introduction: How to Use This Tool Use this checklist to aid in the process of selecting a new site for the data center. When visiting potential building sites, print the checklist off and take it along to record impressions and comments on the building and/or its location. Fill in Table 1 with the sites details on location, ownership, and size. To use Table 2, check off the appropriate columns for each item as they are assessed. Columns are recorded using the following: • Yes – the site fully conforms. • PAR – Partial conformity. NOTE: If a partial conformity exists, an explanation describing the partial conformity along with planned actions to remediate should be entered in the comments field. • No – Does not conform. NOTE: If a non-conformity exists describe the non-conformity and if any action to remediate is planned. Also note where no remediation is possible. • N/A – Not applicable



Table 1. Site Details Site Address:



Jl. Bambon Raya 86, Beji Timur, Beji, Depok



Location Type: (i.e. Urban, Suburban, Industrial complex) Is it in an existing building or a new building?



Urban



Floor Number



1



Leased or owned?



Leased



Existing Building



Floor space (square feet):



Table 2. Building Site Selection Checklist ITA – Premium: Selection Advice



Item # 1



Item



Yes



PAR



NO



v



Are there low risks from environmental threats such as: Aircraft traffic?



1.1



Earthquakes?



1.2



Floods?



1.3



Hurricanes or tornados?



N/A



v v v



Comments



Data Center Site Selection Checklist 1.4



Heavy ice or snow?



1.5



Nearby hazardous industry?



1.6



Does the location have a high crime rate? Are there secure utility service entries? Does the site have the ability to limit or restrict physical access to the data center? Is hard water a potential problem? Are multiple-grid commercial power services available? Are there data/voice communications nearby and capable of supporting requirements? Is there public transportation available nearby? Is there adequate parking available? Is the parking area physically separated from the building by barriers? Is the labor market adequate to support requirements? Is the loading dock access at truck bed height? Are there ramps for loading dock? Are there local ordinance restricting truck/delivery traffic? Is loading dock and staging area secure and segregated from sensitive areas?



2 3



4 5



6



7 8 9



10 11 12 13



14



ITA – Premium: Selection Advice



v v v



v



v v



v v



v v v



v v v v



v



Data Center Site Selection Checklist 15



16



17



18



19



20



21



22 23



24



25



26



Can elevators, ramps, doors, and other passageways accommodate large equipment? Is the stand-by generator physically isolated and secured? Is the UPS (batteries) located in a separate, secured, and ventilated area? v Is special floor loading required for UPS, generators, cooling or other heavy equipment? Can the computer room(s) be v made air-tight if a gaseous fire suppression agent is to be used? Computer room(s): Positive drainage of area under raised floor? Computer room(s): Positive check valve to prevent sewer gases or other drain backup? v No external windows in computer room(s)? If there are internal windows are they shatter-proof and secure? Raised floor does not require ramps for access (e.g., sunken floor design). Are water lines under computer room floor only used for cooling equipment? Is the flooring surface able to withstand freight handling equipment without damage?



ITA – Premium: Selection Advice



v



v



v



v



v



v



v



v



Data Center Site Selection Checklist 27



28



29



30



31



32 33



34



35



36



Are equipment staging areas secure, conditioned, and physically separated from computer room(s)? Is there no evidence of power outages to the facility? If evidence of outages exists describe frequency and durations. Does power to the facility appear clean? Is there visual evidence of light flicker, or the existence of motors and other industrial equipment on the site? Is there a record of the electrical utility’s performance data (interruptions)? Does the site have power metering and monitoring solutions? Is computer room(s) supplied by separate power feed? Does the facility have isolated equipment grounding in place? Is the facility protected from transient ground faults and lighting? Is there a secure, building code compliant fuel storage area for generators? Does adequate hot water supply exist for humidifiers servicing the data center?



v



v



Kadang mati lampu lama banget, 2 jaman lebih



v



v



v



v v



v



v



v



Data Center Site Selection Checklist 37



38



Is external cooling equipment (chillers, pumps, towers) able to be secured and made accessible only by authorized personnel? Is there room for expansion?



v



v



2. Tempat tinggal Verdiyanto Saputra



Table 1. Site Details Site Address:



Jl. Bima blok J5 No. 5-6, RT 010/007, Tegal Alur, Kalideres, Jakarta Barat



Location Type: (i.e. Urban, Suburban, Industrial complex)



Suburban



Is it in an existing building or a new building?



Existing Building



Floor Number



1



Leased or owned?



Owned



Floor space (square feet):



28m x 40m (tanah) 20m x 25m (bangunan)



Table 2. Building Site Selection Checklist Item # 1



Item



Yes PAR NO N/A



Are there low risks from environmental threats such as: v Aircraft traffic?



1.1



Earthquakes?



v



1.2



Floods?



v



1.3



Hurricanes or tornados?



v



–Premium: Selection Advice



1.4



Heavy ice or snow?



v



1.5



Nearby hazardous industry?



v



1.6



Does the location have a high crime rate?



2



Are there secure utility service entries?



v



3



Does the site have the ability to limit or restrict physical access to the data center?



v



4



Is hard water a potential problem?



5



Are multiple-grid commercial power services



v



V v



V



Comments



available? V



6



Are there data/voice communications nearby and capable of supporting requirements?



7



Is there public transportation available nearby?



v



8



Is there adequate parking available?



v



9



Is the parking area physically separated from the building by barriers?



v



10



Is the labor market adequate to support requirements?



11



Is the loading dock access at truck bed height?



v



12



Are there ramps for loading dock?



v



13



Are there local ordinance restricting truck/delivery traffic?



14



Is loading dock and staging area secure and segregated from sensitive areas?



v



v v



– Premium: Selection Advice



v



15



Can elevators, ramps, doors, and other passageways accommodate large equipment?



16



Is the stand-by generator physically isolated and secured?



v



17



Is the UPS (batteries) located in a separate, secured, and ventilated area?



v



18



Is special floor loading required for UPS, generators, cooling or other heavy equipment?



19



Can the computer room(s) be made air-tight if a gaseous fire suppression agent is to be used?



v



20



Computer room(s): Positive drainage of area under raised floor?



v



21



Computer room(s): Positive check valve to prevent sewer gases or other drain backup?



v



22



No external windows in computer room(s)?



23



If there are internal windows are they shatter-proof and



v v



v v



secure? v



24



Raised floor does not require ramps for access (e.g., sunken floor design).



v



25



Are water lines under computer room floor only used for cooling equipment?



v



26



Is the flooring surface able to withstand freight handling equipment without damage?



v



– Premium: Selection Advice



27



Are equipment staging areas secure, conditioned, and physically separated from computer room(s)?



v



28



Is there no evidence of power outages to the facility? If evidence of outages exists describe frequency and durations.



v



29



Does power to the facility appear clean? Is there visual evidence of light flicker, or the existence of motors and other industrial equipment on the site?



v



30



Is there a record of the electrical utility’s performance data (interruptions)?



31



Does the site have power metering and monitoring solutions?



32



Is computer room(s) supplied by separate power feed?



33



Does the facility have isolated equipment grounding in place?



34



Is the facility protected from transient ground faults and lighting?



v



35



Is there a secure, building code compliant fuel storage area for generators?



v



36



Does adequate hot water supply exist for humidifiers servicing the data center?



v



v v v v



TA – Premium: Selection Advice



37



Is external cooling equipment (chillers, pumps, towers) able to be secured and made accessible only



v



by authorized personnel? 38



Is there room for expansion?



v



3. Tempat tinggal Hillary Goretta Pasaribu



Table 1. Site Details Site Address:



Jl. Stasiun UI No 3 RT 002 RW 07 Pondok Cina Depok



Location Type: (i.e. Urban, Suburban, Industrial complex)



Suburban



Is it in an existing building or a new building?



Existing Building



Floor Number



1



Leased or owned?



Leased



Floor space (square feet):



7,5 m



2



Table 2. Building Site Selection Checklist ITA – Premium: Selection Ad



Item Item # 1



Yes



NO



Are there low risks from environmental threats such as:



1.1 Aircraft traffics?



V



1.2 Earthquakes?



V



1.3 Floods



V



1.4 Hurricanes or tornados? 1.4 Heavy ice or snow?



V



V



1.5 Nearby hazardous industry? 1.6 Does the location have a high crime rate? 2 3



N/A



V V



Are there secure utility service entries?



V



Does the site have the ability to limit or restrict physical access to



V



Comments ds ad



the data center? 4



v



Is hard water a potential problem? ads dfds wds df



5



Are multiple-grid commercial power services available?



v



6



V Are there data/voice communications nearby and capable of supporting requirements?



7



Is there public transportation available nearby?



8



Is there adequate parking available?



V



9



Is the parking area physically separated from the building by barriers?



V



10



Is the labor market adequate to support requirements?



11



Is the loading dock access at truck bed height?



V



12



Are there ramps for loading dock?



V



13



Are there local ordinance restricting truck/delivery traffic?



V



14



Is loading dock and staging area secure and segregated from sensitive areas?



V



V



V



ITA – Premium: Selection Advice



15



Can elevators, ramps, doors, and other passageways accommodate large equipment?



V



16



Is the stand-by generator physically isolated and secured?



V



17



Is the UPS (batteries) located in a separate, secured, and ventilated area?



V



18



Is special floor loading required for V UPS, generators, cooling or other heavy equipment?



19



Can the computer room(s) be made V air-tight if a gaseous fire suppression agent is to be used?



20



Computer room(s): Positive drainage of area under raised floor?



21



Computer room(s): Positive check valve to prevent sewer gases or other drain backup?



22



No external windows in computer room(s)?



V



23



If there are internal windows are they shatter-proof and secure?



V



24



Raised floor does not require ramps V for access (e.g., sunken floor design).



25



Are water lines under computer room floor only used for cooling equipment?



26



Is the flooring surface able to withstand freight handling equipment without damage?



v



v v



V



V



Selection Advice



27



Are equipment staging areas secure, conditioned, and physically separated from computer room(s)?



28



Is there no evidence of power outages to the facility? If evidence of outages exists describe frequency and durations.



29



Does power to the facility appear clean? Is there visual evidence of



V



V



V



light flicker, or the existence of motors and other industrial equipment on the site? 30



Is there a record of the electrical utility’s performance data (interruptions)?



V



31



Does the site have power metering and monitoring solutions?



32



Is computer room(s) supplied by separate power feed?



V



33



Does the facility have isolated equipment grounding in place?



V



34



Is the facility protected from transient ground faults and lighting?



V



35



Is there a secure, building code compliant fuel storage area for generators?



V



36



Does adequate hot water supply exist for humidifiers servicing the data center?



V



V



ITA – Premium: Selection Advice



37



Is external cooling equipment (chillers, pumps, towers) able to be secured and made accessible only by authorized personnel?



38



Is there room for expansion?



V



V



4. Tempat tinggal Putra Imanuel Harefa Selection Adve



Table 1. Site Details Site Address:



Gang Boni 31 RT 01 RW 09 Pondok Cina Beji Depok



Location Type: (i.e. Urban, Suburban, Industrial complex) Is it in an existing building or a new building? Floor Number



Urban



Leased or owned?



Leased



Floor space (square feet):



9m2 (Room), 196m2 (House)



Existing Building 1



Table 2. Building Site Selection Checklist ITA – Premium: Sen Advice



Item # 1



Item



Yes



PAR



NO



N/A v



Are there low risks from environmental threats such as: Aircraft traffic?



1.1



Earthquakes?



v



1.2



Floods?



v



1.3



Hurricanes or tornados?



v



1.4



Heavy ice or snow?



v



Comments



1.5



Nearby hazardous industry?



1.6



Does the location have a high crime rate? Are there secure utility service entries? Does the site have the ability to limit or restrict physical access to the data center? Is hard water a potential problem? Are multiple-grid commercial power services available? Are there data/voice communications nearby and capable of supporting requirements? Is there public transportation available nearby?



2 3



4 5



6



7



v v



v



v v



Sumber listrik berasal dari PLN dimana. v v



Is there adequate parking available?



9



Is the parking area physically v separated from the building by barriers? Is the labor market adequate v to support requirements? Is the loading dock access at truck bed height? Are there ramps for loading dock?



11 12



Sekitar 10 meter dekat rel kereta dan 100 meter dari jalan raya



v



8



10



Jalan akses kontrakan sempit, sulit dilewati mobil



v



Karena berada dilingkungan padat penduduk, tidak ada tempat untuk parking dan kondisi rumah tidak memiliki teras. Ada lapangan sekitar 50 meter dari bangunan.



v V



13



14



Are there local ordinance restricting truck/delivery traffic? Is loading dock and staging area secure and segregated from sensitive areas?



v



V



ITA – Premium: Selection Advice



15



16



17



18



19



20



21



22



Can elevators, ramps, doors, V and other passageways accommodate large equipment? Is the stand-by generator physically isolated and secured? Is the UPS (batteries) located in a separate, secured, and ventilated area? V Is special floor loading required for UPS, generators, cooling or other heavy equipment? Can the computer room(s) be V made air-tight if a gaseous fire suppression agent is to be used? Computer room(s): Positive drainage of area under raised floor? Computer room(s): Positive check valve to prevent sewer gases or other drain backup? No external windows in computer room(s)?



V



V



V



V



V



23



24



25



26



V



If there are internal windows are they shatter-proof and secure? Raised floor does not require ramps for access (e.g., sunken floor design). Are water lines under computer room floor only used for cooling equipment? Is the flooring surface able to withstand freight handling equipment without damage?



V



perlu



V



Tidak ada water lines



V



ITA – Premium: Selection Advice



27



28



29



30



Are equipment staging areas secure, conditioned, and physically separated from computer room(s)? Is there no evidence of power outages to the facility? If evidence of outages exists describe frequency and durations. Does power to the facility appear clean? Is there visual evidence of light flicker, or the existence of motors and other industrial equipment on the site? Is there a record of the electrical utility’s performance data (interruptions)?



V



V



Jarang terjadi



V



V



31



32 33



34



35



36



37



38



V Does the site have power metering and monitoring solutions? Is computer room(s) supplied by separate power feed? Does the facility have isolated equipment grounding in place? Is the facility protected from transient ground faults and lighting? Is there a secure, building code compliant fuel storage area for generators? Does adequate hot water supply exist for humidifiers servicing the data center?



Is external cooling equipment (chillers, pumps, towers) able to be secured and made accessible only by authorized personnel? Is there room for expansion?



V V



V



V



V



V



5. Tempat tinggal Melinda



Table 1. Site Details Site Address:



Gang Angsana 35A Pondok Cina Beji Depok



Location Type: (i.e. Urban, Suburban, Industrial complex) Is it in an existing building or a new building? Floor Number



Urban



Leased or owned?



Leased



Floor space (square feet):



36m2



Existing Building 2



Table 2. Building Site Selection Checklist Item # 1



Item



Yes



PAR



NO



Earthquakes?



1.2



Floods?



1.3



Hurricanes or tornados?



1.4



Heavy ice or snow?



1.5



Nearby hazardous industry?



Comments



V



Are there low risks from environmental threats such as: Aircraft traffic?



1.1



N/A



v v



20 meter dekat dengan sungai ciliwung V



V V



1.6 2



3



4 5



6



7



v



Does the location have a high crime rate? Are there secure utility service entries? Does the site have the ability to limit or restrict physical access to the data center? Is hard water a potential problem? Are multiple-grid commercial power services available? Are there data/voice communications nearby and capable of supporting requirements? Is there public transportation available nearby?



V



V



Sumber listrik berasal dari PLN. V V



Sekitar 500 meter berada dekat jalan raya Margonda.



V



8



Is there adequate parking available?



V



9



Is the parking area physically separated from the building by barriers? Is the labor market adequate V to support requirements? Is the loading dock access at truck bed height? Are there ramps for loading dock?



V



10 11 12



Tidak ada pengamanan dalam lingkungan tempat tinggal



V V



Karena berada dilingkungan padat penduduk, tidak ada tempat untuk parking dan kondisi rumah tidak memiliki teras.



13



14



Are there local ordinance restricting truck/delivery traffic? Is loading dock and staging area secure and segregated from sensitive areas?



V



V



ITA – Premium: Selection Advice



15



16



17



18



19



20



21



22



Can elevators, ramps, doors, and other passageways accommodate large equipment? Is the stand-by generator physically isolated and secured? Is the UPS (batteries) located in a separate, secured, and ventilated area? V Is special floor loading required for UPS, generators, cooling or other heavy equipment? Can the computer room(s) be V made air-tight if a gaseous fire suppression agent is to be used? Computer room(s): Positive drainage of area under raised floor? Computer room(s): Positive check valve to prevent sewer gases or other drain backup? V No external windows in computer room(s)?



v



v



v



V



V



23



24



25



26



If there are internal windows are they shatter-proof and secure? Raised floor does not require ramps for access (e.g., sunken floor design). Are water lines under computer room floor only used for cooling equipment? Is the flooring surface able to withstand freight handling equipment without damage?



v



V



V



V



ITA – Premium: Selection Advice



27



28



29



30



Are equipment staging areas secure, conditioned, and physically separated from computer room(s)? Is there no evidence of power outages to the facility? If evidence of outages exists describe frequency and durations. Does power to the facility appear clean? Is there visual evidence of light flicker, or the existence of motors and other industrial equipment on the site? Is there a record of the electrical utility’s performance data (interruptions)?



V



V



Terkadang terjadi pemadaman listrik.



V



V



31



32 33



34



35



36



37



38



V Does the site have power metering and monitoring solutions? Is computer room(s) supplied by separate power feed? Does the facility have isolated equipment grounding in place? Is the facility protected from transient ground faults and lighting? Is there a secure, building code compliant fuel storage area for generators? Does adequate hot water supply exist for humidifiers servicing the data center?



Is external cooling equipment (chillers, pumps, towers) able to be secured and made accessible only by authorized personnel? Is there room for expansion?



v v



v



v



v



V



V



Lokas pertama adalah rumah tempat tinggal Zulfikar yang merupakan sebuah rumah kontakan tipe 36 yang terdiri dari satu lantai dan terletak di Kelurahan Beji Timur, Kecamatan Beji, Depok. Rumah tersebut terletak di perkampungan padat penduduk yang tidak bisa dimasuki mobil, berada di dekat saluran air yang besar, dan lebih rendah dari daerah di sekitarnya. Setiap hujan deras, biasanya daerah tersebut akan banjir setinggi lutut, karena air dari daerah yang lebih tinggi mengalir ke kampung itu dan saluran air yang ada tidak mampu menampung volume air. Walaupun banjir akan langsung surut saat hujan berhenti, namun tempat ini jelas kurang cocok dijadikan lokasi pembangunan data center. Lokasi kedua adalah Rumah Verdi terletak di alamat Jalan Bima blok J5 No. 5-6, RT 010/007, Tegal Alur, Kalideres, Jakarta Barat. Tipe lokasi rumah Verdi adalah suburban serta berupa rumah tinggal. Lokasi rumah Verdi jauh dari pusat keramaian serta jalan raya. Tingkat kriminal cukup rendah, walaupun terkadang terjadi peristiwa pencurian. Akses air bersih sudah tersedia oleh PAM dan akses listrik sudah terjangkau oleh PLN. Untuk kebutuhan air bersih dari PAM, belum pernah ada gangguan sampai saat ini. Sedangkan untuk akses listrik dari PLN, terkadang terjadi mati listrik, tetapi kasus tersebut cukup jarang. Fasilitas transportasi juga tersedia karena lokasi rumah Verdi sudah ada angkutan umum. Lokasi ketiga Rumah tempat Hillary saat ini bermukim adalah kost Pondok Cucu yang berada di Jl. Stasiun UI No 3 RT 002 RW 07 Pondok Cina Depok. Rumah kost ini memang memiliki area yang cukup luas. Hanya saja, struktur bangunannya tidak begitu kokoh dan ketika dibangun juga kurang baik prosesnya sehingga ada beberapa kebocoran pada atapnya. Selain itu area masuk ke dalam kosan hanya dapat dilalui motor dan jalannya walau sudah diaspal masih banyak lubang dimana-mana. Hal ini menyebabkan proses load barang seperti server dan rack server yang harus menggunakan truck sebagai jasa antarnya , akan sangat sulit. Karena kosan ini berada di Depok, maka kondisi cuaca disekitar kosan adalah cuaca yang umum terjadi di Depok yakni sangat sering terjadi hujan, serta kondisi cuaca tidak stabil dimana dalam satu hari cuaca bisa sangat panas namun kemudian hujan lebat disertai dengan petir yang sambar-menyambar. Kosan ini dihimpit oleh banyak gedunggedung tinggi sehingga sulit untuk memperoleh sinyal internet. Rumah kosan ini berada di daerah Kober yang mana juga dekat dengan rel kereta api sehingga masih terasa getaran jikalau kereta lewat. Kelembaban di area kosan juga terbilang tinggi karena hampir semua perabotan disetiap kamar sangat mudah ditumbuhi jamur. Kelembaban yang sangat tinggi ini sangat tidak cocok untuk kondisi lingkungan data center karena dapat menyebabkan korosi pada server maupun peralatan lain dalam data center. Melihat kondisi ini, kelompok kami sangat tidak menyarankan rumah kosan tempat Hillary bermukim sebagai tempat untuk dibangunnya data center. Lokasi keempat adalah rumah kontrakan Putra yang terletak di Gang Boni nomor 31 RT 01 RW 09 Pondok Cina, Kecamatan Beji, Depok. Rumah kontrakan ini berada di tengahtengah pemukiman penduduk yang rumahnya saling berimpitan sehingga lebar jalan yang tersisa untuk mengaksesnya maksimal hanya bisa dilalui oleh kendaraan seukuran angkot D11, atau sekitar dua setengah meter. Hal ini dinilai akan mempersulit proses pengembangan data center di masa mendatang karena tidak ada kendaraan bangunan yang bisa masuk ke area ini. Selain itu rumah kontrakan yang berukuran 12mx15m ini memiliki dinding yang berimpitan dengan rumah warga sehingga untuk memperbaruinya berarti juga ikut merenovasi rumah disekeliling kontrakan tersebut. Pembangunan data center di lingkungan perumahan penduduk juga dinilai dapat mengganggu kenyamanan penduduk di sekitarnya



dengan suara mesin generator dan mesin lainnya yang dinyalakan di data center. Dari segi cuaca, lokasi ketiga ini memang daerah yang bebas banjir, jarang terkena gempa tektonik, dan jarang mengalami cuaca ekstrem seperti badai topan. Kendala cuaca yang terdapat di lokasi ini hanya petir, yang masih bisa diatasi dengan persiapan grounding yang matang. Dari segi sumber daya, pasokan listrik dan air di lokasi ini cukup baik dan stabil. Jarang terjadi pemadaman listrik dan tegangan listrik sendiri sudah cukup stabil. Untuk sumber daya manusia sendiri, karena lokasi ini terletak di Kota Depok dan dekat dengan beberapa universitas seperti Universitas Indonesia, Universitas Pancasila, Universitas Gunadharma, dan lain-lain, akan ada banyak sumber daya manusia yang bisa dimanfaatkan. Namun lokasi ini letaknya juga sangat dekat dengan rel kereta listrik yaitu sekitar 10 meter dan berjarak sekitar 100 meter dari jalan raya. Akibatnya setiap kereta melalui lokasi ini, masih terasa goncangan yang cukup besar dan suara yang berisik, baik dari kereta listrik maupun dari jalan raya. Lokasi kelima adalah rumah tempat tinggal Melinda yang merupakan sebuah rumah kontakan yang terdiri dari dua lantai. Terletak di jalan angsana gang kapuk pondok cina depok. Rumah yang aman dari badai tornado ataupun hujan salju ini memiliki daya listrik sebesar 1300 watt. Listrik ini adalah model jenis listrik pulsa, sehingga akan dibutuhkan sejumlah uang terlebih dahulu untuk membayar listrik kemudian pulsa tersebut akan berkurang seiring penggunaan daya listrik. Dengan kondisi listrik yang seperti itu, ternyata jarang sekali terjadi mati listrik di daerah tersebut. Rumah yang terletak tidak jauh dari sungai ciliwung ini memiliki kondisi rumah yang cukup panas karena terletak di perkampungan padat penduduk. Panas ini hanya dirasakan dibagian bangunan yang lantai dua saja, di lantai satu kondisinya tidak cukup panas. Rumah ini terbuat dari dinding yang cukup kokoh akan tetapi ada sekat antara dua kamar memakai bahan yang agak kurang kokoh, yaitu dinding triplek. Jalan yang dilalui untuk mencapai bisa dikatakan sempit bahkan hanya bisa dilalui untuk kendaraan roda dua saja. Rumah ini juga terletak sekitar 500 meter dari jalan raya margonda yang notabene merupakan jalan utama kota depok yang dilalui oleh kendaraan besar yang menimbulkan banyak polusi. Kriminalitas di tempat ini jarang terjadi. Untuk sumber daya manusia, karen terletak di daerah padat penduduk maka akan banyak orang yang bisa dimanfaatkan. Dari analisis tersebut, kami menyimpulkan bahwa lokasi yang dipilih yaitu rumah Verdiyanto Saputra. Kami memilih rumah Verdiyanto Saputra karena dibandingkan dengan 4 tempat tinggal yang lainnya, rumah Verdiyanto Saputra dapat dikatakan lebih luas. Selain itu, tersedianya akses untuk mobil masuk ke lokasi. Hal yang tidak kalah pentingnya adalah tempat tinggal ini terbebas dari gangguan lingkungan seperti lalu lintas pesawat terbang, gempa bumi, banjir, dan tornado. Hal tersebut dikarenakan lokasi rumah Verdi cukup jauh dari bandara, jarang terjadi gempa bumi dan tornado, serta lokasi rumah Verdi juga cukup tinggi dari rumah tetangganya sehingga terbebas dari banjir. Keuntungan lainnya dari lokasi rumah Verdi adalah akses parkir dan akses masuk kendaraan yang cukup luas. Lokasi rumah Verdi juga masih bisa diekspansi lebih luas karena masih terdapat tanah kosong di dekat rumah tersebut. Dengan berbagai kelebihan tersebut, lokasi rumah Verdi sangat cocok bila dijadikan tempat untuk fasilitas data center.



Berikut adalah rancangan data center yang akan kami buat sesuai dengan keadaan rumah Verdi.



Akan diperlukan banyak ruangan terkait pembangunan Data Center ini. Ruangan-ruangan tersebut antara lain Data Center room, control room, staging room, network room, backup room, power room, gudang, generator room, gudang, dan loading dock. Tidak lupa juga sebagai bentuk keamanan sebuah data center, diperlukan juga security and staff room yang berada di bagian depan.



b. Essensial Kriteria dan Secondary Kriteria



3. Kesimpulan Membuat data center dan menghabiskan uang dua puluh miliar untuk membangunnya bukanlah hal yang mudah. Untuk dapat merancang sebuah data center yang baik, banyak hal yang perlu dipertimbangkan berupa lokasi, essential criteria, secondary criteria dan biaya operasionalnya. Selain itu dalam membangun data center juga perlu dipertimbangkan dana yang tersedia. Sebagaimana dalam laporan ini kelompok kami dapat menghabiskan uang senilai dua puluh milyar untuk membangun sebuah Small Office Data Center yang teknologinya sudah cukup canggih di tingkatannya. Namun kami tahu teknologi data center ini bukan merupakan yang tercanggih yang pernah ada, sehingga dana dua puluh milyar yang diberikan tidaklah cukup untuk membangun data center yang tercanggih. Daftar Referensi Jayaswal, Kailash. 2006. Administering Data Centers: Servers, Storage, and Voice Over IP. Indianapolis: Wiley Publishing.Inc. Snevely, Rob. 2002. Enterprise Data Center Design and Methodology. USA: Sun Microsystems, Inc.