21 0 218 KB
ANALISA VOLUME PEKERJAAN (RUANG KELAS BARU) Kegiatan Pekerjaan
: :
Lokasi Tahun Anggaran
: : Tahun 2020
NO
URAIAN
I 1 2 3 4 5 6 7 8 9 II 1 2 3 4 5 6 7 8 9 III 1 2 3 IV 1 2 3 4 5 6 7 8 9
BNYK.
PEMASANGAN LAMPU OKTAGONAL PENERANGAN UTAMA SINGLE LAMP L1 dan L2 Pas. Tiang PJU Oktagonal h = 4 meter Single Lamp (L1&L2) Pondasi Tiang PJU Beton Bertulang 1Pc : 1Ps : 3Kr 4.00 Pembesian 4.00 Kap Lampu Led 50 watt Kabel NYM 2 x 2,5 mm2 Kabel NYY 2 x 2,5 mm2 4.00 Klem Kabel Stainlees Steel 4.00 mcb 10 a 4.00 Durados 10.00 #REF! PEMASANGAN LAMPU ORNAMEN (L3) Pas. Tiang PJU Oktagonal h = 4 meter Single Lamp (L3) Pondasi Tiang PJU Beton Bertulang, 1Pc : 1Ps : 3Kr 13.00 Pembesian 13.00 Kap Lampu larkin carla hitam 13.00 Lampu Taman 15 watt (Philiph warna kuning) 10.00 Kabel NYM 2 x 2,5 mm2 52.00 Kabel NYY 2 x 2,5 mm2 186.00 Klem Kabel Stainlees Steel 13.00 mcb 10 a 13.00 #REF! PEMASANGAN LAMPU TAMAN PAGAR Kabel NYY 2 x 2,5 mm2 Lampu LED 10 Watt Pas. Box Lampu #REF! PEMASANGAN PANEL APP Box Panel APP 45 x 30 x 20 cm MCB 25 A Aksesoris Panel APP ( Rel MCB, Konektor, Rel Tembaga, dan Kabel NYA ) Arde / Pentanahan Pipa PVC Dia 1 " Keni 1" PVC Konektor Twested Pipa PVC 5/8" Klem Panel APP
8,957,564.00
PANJ.
LBR
ANG KELAS BARU)
TGI.
3.20
25.00 5.00
3.20 2.00
5.00
VOL.
4.00 1.22 12.80 10.00 228.53 100.00 20.00 4.00 10.00
SAT
bh m3 Kg bh m1 m1 bh bh bh
13.00 Bh 3.95 m3 41.60 Kg 26.00 bh 10.00 bh 52.00 m1 186.00 m1 65.00 bh 13.00 bh
677.00 m1 90.00 bh 90.00 bh
1.00 10.00 1.00 1.00 8.00 6.00 2.00 8.00 2.00
bh bh Psg Ttk m1 bh bh m1 bh
KET
PEMERINTAH KABUPATEN NGANJUK DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
RENCANA ANGGARAN BIAYA ( RAB ) ENGINEER ESTIMATE (EE) Kegiatan Pekerjaan
: :
Lokasi : Tahun Anggaran : Tahun 2020
NO
URAIAN
Sat
Vol.
Harga Satuan (Rp)
I 1 2 3 4 5 6 7 8 9
PEMASANGAN LAMPU OKTAGONAL PENERANGAN UTAMA SINGLE LAMP L1 dan L2 Pas. Tiang PJU Oktagonal h = 4 meter Single Lamp (L1&L2) bh 4.00 Rp 2,357,278.00 Pondasi Tiang PJU Beton Bertulang 1Pc : 1Ps : 3Kr m3 1.22 #REF! Pembesian Kg 12.80 #REF! Kap Lampu Led 50 watt bh 10.00 Rp 1,802,513.90 Kabel NYM 2 x 2,5 mm2 m1 228.53 Rp 14,762.55 Kabel NYY 2 x 2,5 mm2 m1 100.00 Rp 21,500.00 Klem Kabel Stainlees Steel bh 20.00 Rp 34,866.15 mcb 10 a bh 4.00 Rp 98,392.80 Durados bh 10.00 Rp 21,000.00 #REF! II PEMASANGAN LAMPU ORNAMEN (L3) 1 Pas. Tiang PJU Oktagonal h = 4 meter Single Lamp (L3) Bh 13.00 Rp 2,907,278.00 2 Pondasi Tiang PJU Beton Bertulang, 1Pc : 1Ps : 3Kr m3 3.95 #REF! 3 Pembesian Kg 41.60 #REF! 4 Kap Lampu Led 50 watt bh 26.00 Rp 1,802,513.90 5 Lampu Taman 15 watt (Philiph warna kuning) bh 10.00 Rp 14,762.55 6 Kabel NYM 2 x 2,5 mm2 m1 52.00 Rp 14,762.55 7 Kabel NYY 2 x 2,5 mm2 m1 186.00 Rp 21,500.00 8 Klem Kabel Stainlees Steel bh 65.00 Rp 34,866.15 9 mcb 10 a bh 13.00 Rp 98,392.80 #REF! III PEMASANGAN LAMPU TAMAN PAGAR 1 Kabel NYY 2 x 2,5 mm2 m1 677.00 Rp 21,500.00 2 Lampu LED 10 Watt bh 90.00 Rp 34,866.15 3 Pas. Box Lampu bh 90.00 Rp 135,000.00 IV 1 1 2 3 4 5 6 7 8 9
PEMASANGAN PANEL APP Pasang daya Baru 4,4KVA ls Box Panel APP 45 x 30 x 20 cm bh MCB 25 A bh Aksesoris Panel APP ( Rel MCB, Konektor, Rel Tembaga, dan Ka Psg Arde / Pentanahan Ttk Pipa PVC Dia 1 " m1 Keni 1" PVC bh Konektor Twested bh Pipa PVC 5/8" m1 Klem Panel APP bh
2.00 10.00 1.00 1.00 8.00 6.00 2.00 8.00 2.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
428,392.80 98,392.80 172,876.00 285,566.60 26,473.70 24,467.30 24,564.10 20,067.30 56,701.15
Jumlah Harga (Rp)
Rp
Rp Rp Rp Rp Rp Rp
9,429,112.00 #REF! #REF! 18,025,139.00 3,373,611.74 2,150,000.00 697,323.00 393,571.20 210,000.00
Rp 37,794,614.00 #REF! #REF! Rp 46,865,361.40 Rp 147,625.50 Rp 767,652.60 Rp 3,999,000.00 Rp 2,266,299.75 Rp 1,279,106.40
Rp 14,555,500.00 Rp 3,137,953.50 Rp 12,150,000.00
Rp Rp Rp Rp Rp Rp Rp Rp Rp
856,785.60 983,928.00 172,876.00 285,566.60 211,789.60 146,803.80 49,128.20 160,538.40 113,402.30
UK N RAKYAT
TOTAL Biaya (Rp) #REF!
#REF!
Rp 29,843,453.50
Rp
2,980,818.50
DAFTAR UPAH PEKERJA KABUPATEN NGANJUK 2019
NO 1 2 3 4 5 6 7 8 9 10
URAIAN TENAGA
Tukang Batu Tukang Kayu Tukang Besi Tukang Aspal Tukang Cat Tukang listrik Tukang las konstruksi Kepala Tukang Pekerja Mandor
SATUAN UPAH 1 Hr
92,200.00
1 Hr
92,200.00
1 Hr
92,200.00
1 Hr
92,200.00
1 Hr 1 Hr 1 Hr 1 Hr 1 Hr 1 Hr
92,200.00 92,200.00 92,200.00 97,500.00 75,500.00 102,700.00
DAFTAR HARGA BAHAN BANGUNAN KABUPATEN NGANJUK 2019
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
URAIAN BAHAN
Lampu LED Power 60 W - 90 W Tiang PJU Oktagonal h = 4,8 Meter single lamp Tiang PJU Oktagonal h = 4,8 Meter Dobel lamp Tiang PJU Oktagonal h = 1 Meter Tripepel lamp Stang Ornamen PJU Cabang Satu Pipa GI. Dia 2" Kabel NYM 2 x 2,5 mm2 Kabel Twisted 2 x 10 mm2 Klem Kabel Stainless Steel Service Klem Konektor Twisted Box APP 45 x 30 x 20cm Box APP 70 x 50 x 30 cm MCB 10 A MCB 25 A Magnetik Kontaktor 32 A Pemasangan Sensor Cahaya (Photo Switch) Rel MCB Kabel NYA Kabel BC 6mm Tembaga Arde Pipa PVC dia 1" Infureng Keni PVC 1" Pipa PVC 5/8" Klem Biaya Pasang Listrik PLN per VA
SATUAN HARGA (Rp)
Set
5,800,000.00
Bh
2,100,000.00###
Bh
2,600,000.00###
Bh
1,750,000.00###
M'
250,000.00
M'
6,000.00###
M'
5,500.00###
Bh
20,000.00
Bh
5,500.00
Bh
12,500.00
Bh
365,000.00
Bh
850,000.00
Bh
44,500.00
Bh
65,000.00
Bh
450,000.00
Bh
125,000.00
Bh
30,000.00
M'
2,800.00
M'
7,500.00
Bh
85,000.00###
M'
7,500.00
Bh
20,000.00
Bh
5,500.00
M'
1,500.00
Bh
43,000.00
VA
969.00
27 28 29 30
Uang Jaminan Listrik SLO Sewa Crane Alat Bantu Listrik
VA
298.00
Hari
200.00
Hari Hari
600,000.00 35,000.00
Nganjuk, .......................... .,2019 Perencana
MOHAMAD NURHADI, ST
DAFTAR ANALISA KABUPATEN NGANJUK 2018
NO
URAIAN
KODE
SAT
1
2
3
4
L.01 L.02 L.03 L.04
OH OH OH OH
A.4.2.1.1
Lampu PJU LED Power 50 Watt A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
KOEFISIENHARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
5
6
0.290 0.160 0.010 0.010
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Lampu LED Power 60 W
Unit
1.000
1,600,000.00
Jumlah Harga Bahan
C PERALATAN Sewa Crane Alat Bantu Listrik
Hari Hari
0.04 0.100
10%
21,895.00 14,752.00 975.00 1,027.00 38,649.00 1,600,000.00 1,600,000.00
600,000.00 35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
7
1,638,649.00
0.00 1,638,649.00 163,864.90 1,802,513.90
A.4.2.1.2
Tiang PJU Cabang Satu Oktagonal h = 4,8 Meter A TENAGA Pekerja L.01 Tukang listrik L.02 Kepala Tukang L.03 Mandor L.04
OH OH OH OH
0.250 0.100 0.100 0.050
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Tiang PJU Oktagonal h = 4,8 Meter single lamp
Kg
1.000
2,100,000.00
Jumlah Harga Bahan
18,875.00 9,220.00 9,750.00 5,135.00 42,980.00 2,100,000.00 2,100,000.00
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.2 Tiang PJU Cabang Dua Oktagonal h = 4,8 Meter A TENAGA Pekerja L.01 Tukang listrik L.02 Kepala Tukang L.03 Mandor L.04
10%
OH OH OH OH
2,142,980.00
0.250 0.100 0.100 0.050
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Tiang PJU Oktagonal h = 4,8 Meter double lamp
Kg
1.000
2,600,000.00
Jumlah Harga Bahan
2,142,980.00 214,298.00 2,357,278.00
18,875.00 9,220.00 9,750.00 5,135.00 42,980.00 2,600,000.00 2,600,000.00
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
A.4.2.1.3
Kabel NYM 2 x 2,5 mm2 A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
2,642,980.00
0.020 0.010 0.010 0.005
75,500.00 92,200.00 97,500.00 102,700.00
M'
1.000
6,000.00
6,000.00 6,000.00
35,000.00
3,500.00 3,500.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
10%
1,510.00 922.00 975.00 513.50 3,920.50
Jumlah Tenaga Kerja
B BAHAN Kabel NYM 2 x 2,5 mm2
2,642,980.00 264,298.00 2,907,278.00
13,420.50
13,420.50 1,342.05 14,762.55
A.4.2.1.5
Klem Kabel Stainless Steel A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.025 0.025 0.020 0.020
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
1,887.50 2,305.00 1,950.00 2,054.00 8,196.50
B BAHAN Klem Kabel Stainless Steel
Unit
1.000
20,000.00
20,000.00 20,000.00
35,000.00
3,500.00 3,500.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.7
Konektor Twisted A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
0.020 0.020 0.020 0.010
31,696.50
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Konektor Twisted
Unit
1.000
Hari
0.100
12,500.00 12,500.00
35,000.00
3,500.00 3,500.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
A.4.2.1.8
Box APP 45 x 30 x 20cm A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
0.200 0.020 0.020 0.020
22,331.00
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Box APP 45 x 30 x 20cm
Unit
1.000
365,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.9
MCB 25 A A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
0.200 0.020 0.020 0.020
389,448.00
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN MCB 10 A
Unit
1.000
Hari
0.100 Jumlah Harga Alat
22,331.00 2,233.10 24,564.10
15,100.00 1,844.00 1,950.00 2,054.00 20,948.00 365,000.00 365,000.00 3,500.00 3,500.00 389,448.00 38,944.80 428,392.80
15,100.00 1,844.00 1,950.00 2,054.00 20,948.00
65,000.00
65,000.00 65,000.00
35,000.00
3,500.00 3,500.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
1,510.00 1,844.00 1,950.00 1,027.00 6,331.00
12,500.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
31,696.50 3,169.65 34,866.15
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
10%
89,448.00
89,448.00 8,944.80 98,392.80
A.4.2.1.12 Pemasangan Aksesoris Panel APP ( Rel MCB, Konektor, Rel Tembaga, dan Kabel NYA ) A TENAGA Pekerja L.01 OH 0.500 75,500.00 Tukang listrik L.02 OH 0.200 92,200.00 Kepala Tukang L.03 OH 0.200 97,500.00 Mandor L.04 OH 0.100 102,700.00 Jumlah Tenaga Kerja
B BAHAN Rel MCB Konektor Twisted Kabel NYA
M' Unit M'
1.000 1.000 4.000
30,000.00 12,500.00 2,800.00
30,000.00 12,500.00 11,200.00 53,700.00
35,000.00
17,500.00 17,500.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.500 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
37,750.00 18,440.00 19,500.00 10,270.00 85,960.00
157,160.00 10%
157,160.00
15,716.00 172,876.00
A.4.2.1.13 Pemasangan Arde / Pentanahan A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.250 0.030 0.030 0.200
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Kabel BC 6mm Tembaga Arde
M' Bh
5.000 2.000
7,500.00 85,000.00
37,500.00 170,000.00 207,500.00
35,000.00
7,000.00 7,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
0.200 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.14 Pemasangan Pipa PVC Dia 1 " A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03
OH OH OH
L.04
OH
259,606.00
M'
75,500.00 92,200.00 97,500.00
7,550.00 3,688.00 2,925.00
0.020
102,700.00
2,054.00 16,217.00
1.000
7,500.00
7,500.00 7,500.00
35,000.00
350.00 350.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.010 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
259,606.00 25,960.60 285,566.60
0.100 0.040 0.030 Jumlah Tenaga Kerja
B BAHAN Pipa PVC dia 1"
18,875.00 2,766.00 2,925.00 20,540.00 45,106.00
10%
24,067.00
24,067.00 2,406.70 26,473.70
A.4.2.1.16 Pemasangan Keni 1" PVC A TENAGA Pekerja Tukang listrik
L.01 L.02
OH OH
0.050 0.050
75,500.00 92,200.00
3,775.00 4,610.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.040 0.040
97,500.00 102,700.00
3,900.00 4,108.00 16,393.00
Jumlah Tenaga Kerja
B BAHAN Keni PVC 1"
Unit
1.000
5,500.00
5,500.00 5,500.00
35,000.00
350.00 350.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.010 Jumlah Harga Alat
D E F A.4.2.1.17 A
Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemasangan Pipa PVC 5/8" TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
0.050 0.050 0.040 0.040
22,243.00
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Pipa PVC 5/8"
M'
1.000
Hari
0.010
1,500.00 1,500.00
35,000.00
350.00 350.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
10%
3,775.00 4,610.00 3,900.00 4,108.00 16,393.00
1,500.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
22,243.00 2,224.30 24,467.30
18,243.00
18,243.00 1,824.30 20,067.30
Pemasangan Klem Panel APP A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.025 0.025 0.020 0.020
75,500.00 92,200.00 97,500.00 102,700.00
Jumlah Tenaga Kerja
B BAHAN Klem
M'
1.000
43,000.00
43,000.00 43,000.00
35,000.00
350.00 350.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.010 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
10%
1,887.50 2,305.00 1,950.00 2,054.00 8,196.50
51,546.50
Nganjuk, .......................... .,2019 Perencana
MOHAMAD NURHADI, ST
51,546.50 5,154.65 56,701.15
PEMERINTAH KABUPATEN NGANJUK DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
REKAPITULASI RENCANA ANGGARAN BIAYA ( REKAP RAB ) ENGINEER ESTIMATE (EE) Kegiatan
:
Pekerjaan
:
Lokasi
:
Tahun Anggaran
: Tahun 2020
NO
URAIAN PEKERJAAN
I
PEMASANGAN LAMPU OKTAGONAL PENERANGAN UTAMA SINGLE LAMP L1 dan L2
JUMLAH HARGA #REF!
II
PEMASANGAN LAMPU ORNAMEN (L3)
III
PEMASANGAN LAMPU TAMAN PAGAR
Rp
29,843,453.50
#REF!
IV
PEMASANGAN PANEL APP
Rp
2,980,818.50
JUMLAH ( A ) PPn 10% ( B ) TOTAL = (A) + (B)
#REF! #REF! #REF!
PEMBULATAN
#REF!
RENCANA JADWAL PELAKSANAAN PEKERJAAN Kegiatan
:
Pekerjaan
:
Lokasi
:
Tahun Anggaran
: Tahun 2020
No
I II III
JENIS PEKERJAAN
BOBOT (%)
1
2
PEMASANGAN LAMPU OKTAGONAL PENERANGAN UTAMA SINGLE LAMP L1 dan L2
#REF!
#REF!
#REF!
PEMASANGAN LAMPU ORNAMEN (L3)
#REF!
PEMASANGAN LAMPU TAMAN PAGAR
#REF!
Jumlah
#REF!
Prosentase
BULAN 1 3
4
Fisik 100%
#REF!
50%
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Nganjuk, .......................... .,2019 Dibuat PERENCANA
MOHAMAD NURHADI, ST
KET
DAFTAR ANALISA KABUPATEN NGANJUK 2018
NO
URAIAN
1
KODE 2
A.4.1.1.28 Membuat 1 M³ Beton 1Pc : 2Ps : 3Kr A TENAGA Pekerja Tukang Batu Tukang Besi Kepala Tukang Mandor
SAT
KOEFISIEN HARGA SATUAN (R JUMLAH HARGA (Rp.
3
4
L.01 L.02 L.02 L.03 L.04
OH OH OH OH OH
5
6
1.650 0.275 0.275 0.028 0.083
70,000.00 85,000.00 85,000.00 90,000.00 95,000.00
115,500.00 23,375.00 23,375.00 2,520.00 7,885.00 172,655.00
1,325.00 225,000.00 225,000.00
445,200.00 121,500.00 182,250.00 748,950.00
Jumlah Tenaga Kerja
B BAHAN Semen Portland Pasir beton Kerikil
Kg M³ M³
336.000 0.540 0.810
7
Jumlah Harga Bahan
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.1.1.28a Membuat 1 Kg Pembesian A TENAGA Pekerja Tukang Batu Tukang Besi Kepala Tukang Mandor B BAHAN Besi Beton Kawat Bendrat
10%
L.01 L.02 L.03 L.04
OH OH OH OH
921,605.00
0.00700 0.00700 0.00074 0.00040
70,000.00 85,000.00 85,000.00 90,000.00
490.00 595.00 62.90 36.00 1,183.90
9,500.00 13,500.00
9,975.00 202.50 10,177.50
Jumlah Tenaga Kerja
Kg Kg
1.05 0.015 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.1
Lampu PJU LED Power 60 Watt - 90 Watt A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
11,361.40
0.290 0.160 0.010 0.010
Unit
1.000
20,300.00 13,600.00 900.00 950.00 35,750.00
5,800,000.00
5,800,000.00 5,800,000.00
Jumlah Harga Bahan
C PERALATAN Sewa Crane Alat Bantu Listrik
Hari Hari
0.04 0.100
600,000.00 35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit
10%
11,361.40 1,136.14 12,497.54
70,000.00 85,000.00 90,000.00 95,000.00
Jumlah Tenaga Kerja
B BAHAN Lampu LED Power 60 W - 90 W
921,605.00 92,160.50 1,013,765.50
5,835,750.00
0.00 5,835,750.00 583,575.00
A.4.2.1.2
F Harga Satuan Pekerjaaan (D+E) Tiang PJU Cabang Satu Oktagonal h = 7 Meter A TENAGA Pekerja L.01 Tukang listrik L.02 Kepala Tukang L.03 Mandor L.04
6,419,325.00
OH OH OH OH
0.250 0.100 0.100 0.050
70,000.00 85,000.00 90,000.00 95,000.00
17,500.00 8,500.00 9,000.00 4,750.00 39,750.00
3,200,000.00
3,200,000.00 3,200,000.00
Jumlah Tenaga Kerja
B BAHAN Tiang PJU Oktagonal h = 7 Meter single lamp
Kg
1.000
Jumlah Harga Bahan
C PERALATAN Mengetahui Pejabat Pelaksana Teknis Kegiatan (PPTK)
Kontraktor Pelaksana CV. BINTANG PALAPA
Nganjuk, 24 Juni 2019 0.00 Pengawa s
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit ERWIN NANTO, ST. F Harga Satuan Pekerjaaan (D+E) SRI WINARSIH, Direktur SP.M.Si A.4.2.1.2 Tiang PJU Cabang Dua Oktagonal h = 7 Meter Penata Tingkat I A TENAGA NIP. 19670608 199302 2 L.01 OH 001 Pekerja Tukang listrik L.02 OH Kepala Tukang L.03 OH Mandor L.04 OH
10%
3,239,750.00
0.250 0.100 0.100 0.050
70,000.00 85,000.00 90,000.00 95,000.00
Jumlah Tenaga Kerja
B BAHAN Tiang PJU Oktagonal h = 7 Meter double lamp
Kg
1.000
3,700,000.00
Jumlah Harga Bahan
3,239,750.00 323,975.00 3,563,725.00 RACHMA D
17,500.00 BACHTIA R RIFAI, 8,500.00 ST 9,000.00 4,750.00 39,750.00 3,700,000.00 3,700,000.00
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.2Aa Stang Ornamen PJU Cabang Satu Pipa GI. Dia 2", P= 3m A TENAGA Pekerja L.01 Tukang listrik L.02 Kepala Tukang L.03 Mandor L.04
10%
OH OH OH OH
3,739,750.00
0.250 0.050 0.050 0.020
70,000.00 85,000.00 90,000.00 95,000.00
17,500.00 4,250.00 4,500.00 1,900.00 28,150.00
250,000.00
750,000.00 750,000.00
Jumlah Tenaga Kerja
B BAHAN Stang Ornamen PJU Cabang Satu Pipa GI. Dia 2"
m
3.000
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
OH
0.500
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.2Aa Stang Ornamen PJU Cabang Satu Pipa GI. Dia 2", P= 5m A TENAGA Pekerja L.01 Tukang listrik L.02 Kepala Tukang L.03 Mandor L.04
10%
OH OH OH OH
795,650.00
0.250 0.050 0.050 0.020
m
5.000
OH
0.500 Jumlah Harga Alat
795,650.00 79,565.00 875,215.00
17,500.00 4,250.00 4,500.00 1,900.00 28,150.00
250,000.00
1,250,000.00 1,250,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
17,500.00 17,500.00
70,000.00 85,000.00 90,000.00 95,000.00
Jumlah Tenaga Kerja
B BAHAN Stang Ornamen PJU Cabang Satu Pipa GI. Dia 2"
3,739,750.00 373,975.00 4,113,725.00
35,000.00
17,500.00 17,500.00
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.3
10%
1,295,650.00
Kabel NYM 2 x 2,5 mm2 A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.020 0.010 0.010 0.005
70,000.00 85,000.00 90,000.00 95,000.00
M'
1.000
6,000.00
Hari
0.100
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) Kabel Twisted 2 x 10 mm2 A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
13,125.00
0.010 0.010 0.005 0.005
M'
C PERALATAN Alat Bantu Listrik
Hari
1.100
5,500.00
6,050.00 6,050.00
0.050
35,000.00
1,750.00 1,750.00
10%
Penggalian 1 m³ tanah biasa sedalam 1 meter A TENAGA Pekerja L.01 Tukang Batu L.04
OH OH
13,125.00 1,312.50 14,437.50
700.00 850.00 450.00 475.00 2,475.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
3,500.00 3,500.00
70,000.00 85,000.00 90,000.00 95,000.00
Jumlah Tenaga Kerja
B BAHAN Kabel Twisted 2 x 10 mm2
6,000.00 6,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
1,400.00 850.00 900.00 475.00 3,625.00
Jumlah Tenaga Kerja
B BAHAN Kabel NYM 2 x 2,5 mm2
A.4.2.1.4
1,295,650.00 129,565.00 1,425,215.00
10,275.00
0.750 0.025
70,000.00 85,000.00
10,275.00 1,027.50 11,302.50
Jumlah Tenaga Kerja
52,500.00 2,125.00 54,625.00
Jumlah Harga Bahan
0.00
Jumlah Harga Alat
0.00
B BAHAN
C PERALATAN
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.5
Klem Kabel Stainless Steel A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
54,625.00
54,625.00 5,462.50 60,087.50
L.01 L.02
OH OH
0.025 0.025
70,000.00 85,000.00
1,750.00 2,125.00
L.03 L.04
OH OH
0.020 0.020
90,000.00 95,000.00
1,800.00 1,900.00 7,575.00
20,000.00
20,000.00
Jumlah Tenaga Kerja
B BAHAN Klem Kabel Stainless Steel
Unit
1.000
20,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.6
Service Klem A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
31,075.00
31,075.00 3,107.50 34,182.50
L.01 L.02
OH OH
0.020 0.020
70,000.00 85,000.00
1,400.00 1,700.00
L.03 L.04
OH OH
0.020 0.010
90,000.00 95,000.00
1,800.00 950.00 5,850.00
5,500.00
26,180.00 26,180.00
35,000.00
3,500.00 3,500.00
Jumlah Tenaga Kerja
B BAHAN Service Klem
Unit
4.760 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.7
3,500.00 3,500.00
10%
35,530.00
35,530.00 3,553.00 39,083.00
Konektor Twisted A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
L.01 L.02 L.03 L.04
OH OH OH OH
0.020 0.020 0.020 0.010
70,000.00 85,000.00 90,000.00 95,000.00
1,400.00 1,700.00 1,800.00 950.00 5,850.00
12,500.00
12,500.00 12,500.00
35,000.00
3,500.00 3,500.00
Jumlah Tenaga Kerja
B BAHAN Konektor Twisted
Unit
1.000 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.8 Box APP 45 x 30 x 20cm A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
21,850.00
0.200 0.020 0.020 0.020
21,850.00 2,185.00 24,035.00
70,000.00 85,000.00 90,000.00 95,000.00
14,000.00 1,700.00 1,800.00 1,900.00 19,400.00
365,000.00
365,000.00 365,000.00
Jumlah Tenaga Kerja
B BAHAN Box APP 45 x 30 x 20cm
Unit
1.000
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.8a Box APP 70 x 50 x 30 cm A TENAGA Pekerja Tukang listrik Kepala Tukang
10%
L.01 L.02 L.03
OH OH OH
0.200 0.020 0.020
387,900.00
70,000.00 85,000.00 90,000.00
3,500.00 3,500.00 387,900.00 38,790.00 426,690.00
14,000.00 1,700.00 1,800.00
Mandor
L.04
OH
0.020
95,000.00
1,900.00 19,400.00
850,000.00
850,000.00 850,000.00
Jumlah Tenaga Kerja
B BAHAN Box APP 70 x 50 x 30 cm
Unit
1.000
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.9
MCB 10 A A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
872,900.00
OH
0.200
70,000.00
14,000.00
L.02 L.03 L.04
OH OH OH
0.020 0.020 0.020
85,000.00 90,000.00 95,000.00
1,700.00 1,800.00 1,900.00 19,400.00
44,500.00
44,500.00 44,500.00
35,000.00
3,500.00 3,500.00
Jumlah Tenaga Kerja
Unit
1.000 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
10%
L.01 L.02 L.03 L.04
OH OH OH OH
67,400.00
0.200 0.020 0.020 0.020
Unit
1.000
14,000.00 1,700.00 1,800.00 1,900.00 19,400.00
450,000.00
450,000.00 450,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.100
35,000.00
Jumlah Harga Alat
Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemasangan Sensor Cahaya (Photo Switch) TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
472,900.00
0.200 0.020 0.020 0.020
Unit
1.000
Hari
0.100
125,000.00
125,000.00 125,000.00
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit
10%
147,900.00
F Harga Satuan Pekerjaaan (D+E) A.4.2.1.12 Pemasangan Aksesoris Panel APP ( Rel MCB, Konektor, Rel Tembaga, dan Kabel NYA ) A TENAGA
472,900.00 47,290.00 520,190.00
14,000.00 1,700.00 1,800.00 1,900.00 19,400.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
3,500.00 3,500.00
70,000.00 85,000.00 90,000.00 95,000.00
Jumlah Tenaga Kerja
B BAHAN Pemasangan Sensor Cahaya (Photo Switch)
67,400.00 6,740.00 74,140.00
70,000.00 85,000.00 90,000.00 95,000.00
Jumlah Tenaga Kerja
B BAHAN Magnetik Kontaktor 32 A
D E F A.4.2.1.11 A
872,900.00 87,290.00 960,190.00
L.01
B BAHAN MCB 10 A
A.4.2.1.10 Magnetik Kontaktor 32 A A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
3,500.00 3,500.00
3,500.00 3,500.00 147,900.00 14,790.00 162,690.00
Pekerja Tukang listrik
L.01 L.02
OH OH
0.500 0.200
70,000.00 85,000.00
35,000.00 17,000.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.200 0.100
90,000.00 95,000.00
18,000.00 9,500.00 79,500.00
30,000.00 12,500.00 2,800.00
30,000.00 12,500.00 11,200.00 53,700.00
35,000.00
17,500.00 17,500.00
Jumlah Tenaga Kerja
B BAHAN Rel MCB Konektor Twisted Kabel NYA
M' Unit M'
1.000 1.000 4.000 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.500 Jumlah Harga Alat
D Jumlah (A+B+C)
150,700.00
E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) A.4.2.1.13 Pemasangan Arde / Pentanahan A TENAGA Pekerja
10%
150,700.00
15,070.00 165,770.00
L.01
OH
0.250
70,000.00
17,500.00
Tukang listrik
L.02
OH
0.030
85,000.00
2,550.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.030 0.200
90,000.00 95,000.00
2,700.00 19,000.00 41,750.00
Jumlah Tenaga Kerja
B BAHAN Kabel BC 6mm Tembaga Arde
M' Bh
5.000 2.000
7,500.00 85,000.00
37,500.00 170,000.00 207,500.00
35,000.00
7,000.00 7,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
0.200 Jumlah Harga Alat
D Jumlah (A+B+C)
256,250.00
E Overhead & Profit
10%
256,250.00
F Harga Satuan Pekerjaaan (D+E) A.4.2.1.14 Pemasangan Pipa PVC Dia 1 " A TENAGA Pekerja
25,625.00 281,875.00
L.01
OH
0.100
70,000.00
7,000.00
Tukang listrik Kepala Tukang
L.02 L.03
OH OH
0.040 0.030
85,000.00 90,000.00
3,400.00 2,700.00
Mandor
L.04
OH
0.020
95,000.00
1,900.00 15,000.00
7,500.00
7,500.00 7,500.00
35,000.00
350.00 350.00
Jumlah Tenaga Kerja
B BAHAN Pipa PVC dia 1"
M'
1.000 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.010 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit
10%
22,850.00
F Harga Satuan Pekerjaaan (D+E)
22,850.00 2,285.00 25,135.00
A.4.2.1.15 Pemasangan Infureng A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
L.01 L.02
OH OH
0.100 0.040
70,000.00 85,000.00
7,000.00 3,400.00
L.03 L.04
OH OH
0.030 0.020
90,000.00 95,000.00
2,700.00 1,900.00 15,000.00
20,000.00
20,000.00 20,000.00
35,000.00
350.00 350.00
Jumlah Tenaga Kerja
B BAHAN Infureng
Unit
1.000 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
0.010 Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
10%
35,350.00
35,350.00 3,535.00 38,885.00
A.4.2.1.16 Pemasangan Keni 1" PVC A TENAGA Pekerja Tukang listrik
L.01 L.02
OH OH
0.050 0.050
70,000.00 85,000.00
3,500.00 4,250.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.040 0.040
90,000.00 95,000.00
3,600.00 3,800.00 15,150.00
5,500.00
5,500.00 5,500.00
35,000.00
350.00 350.00
Jumlah Tenaga Kerja
B BAHAN Keni PVC 1"
Unit
1.000 Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.010 Jumlah Harga Alat
D E F A.4.2.1.17 A
Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaaan (D+E) Pemasangan Pipa PVC 5/8" TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
21,000.00
0.050 0.050 0.040 0.040
70,000.00 85,000.00 90,000.00 95,000.00
M'
1.000
1,500.00
Hari
0.010
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
Pasang Baru PLN 450 VA A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
17,000.00
2.000 1.000 0.500 0.050
70,000.00 85,000.00 90,000.00 95,000.00
VA VA Hari
450.000 450.000 450.000
350.00 350.00 17,000.00 1,700.00 18,700.00
140,000.00 85,000.00 45,000.00 4,750.00 274,750.00
Jumlah Tenaga Kerja
B BAHAN Biaya Pasang Listrik PLN per VA Uang Jaminan Listrik SLO
1,500.00 1,500.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
3,500.00 4,250.00 3,600.00 3,800.00 15,150.00
Jumlah Tenaga Kerja
B BAHAN Pipa PVC 5/8"
21,000.00 2,100.00 23,100.00
969.00 298.00 200.00
Jumlah Harga Bahan
436,050.00 134,100.00 90,000.00 660,150.00
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
Pasang Baru PLN 900 VA A TENAGA Pekerja Tukang listrik
10%
L.01 L.02
OH OH
2.000 1.000
934,900.00
70,000.00 85,000.00
934,900.00 93,490.00 1,028,390.00
140,000.00 85,000.00
Kepala Tukang Mandor
L.03 L.04
OH OH
0.500 0.050
90,000.00 95,000.00
45,000.00 4,750.00 274,750.00
969.00 298.00 200.00
872,100.00 268,200.00 180,000.00 1,320,300.00
Jumlah Tenaga Kerja
B BAHAN Biaya Pasang Listrik PLN per VA Uang Jaminan Listrik SLO
VA VA Hari
900.000 900.000 900.000 Jumlah Harga Bahan
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
Pasang Baru PLN 1300 VA A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
1,595,050.00
1,595,050.00 159,505.00 1,754,555.00
L.01
OH
2.000
70,000.00
140,000.00
L.02 L.03 L.04
OH OH OH
1.000 0.500 0.050
85,000.00 90,000.00 95,000.00
85,000.00 45,000.00 4,750.00 274,750.00
Jumlah Tenaga Kerja
B BAHAN Biaya Pasang Listrik PLN per VA Uang Jaminan Listrik SLO
VA VA Hari
1300.000 1300.000 1300.000
969.00 298.00 200.00
Jumlah Harga Bahan
1,259,700.00 387,400.00 260,000.00 1,907,100.00
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
Pasang Baru PLN 3500 VA A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
2,181,850.00
2,181,850.00 218,185.00 2,400,035.00
L.01
OH
2.000
70,000.00
140,000.00
L.02 L.03 L.04
OH OH OH
1.000 0.500 0.050
85,000.00 90,000.00 95,000.00
85,000.00 45,000.00 4,750.00 274,750.00
969.00 298.00 200.00
3,391,500.00 1,043,000.00 700,000.00 5,134,500.00
Jumlah Tenaga Kerja
B BAHAN Biaya Pasang Listrik PLN per VA Uang Jaminan Listrik SLO
VA VA Hari
3500.000 3500.000 3500.000 Jumlah Harga Bahan
C PERALATAN 0.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E) Pemasangan Klem Panel APP A TENAGA Pekerja Tukang listrik Kepala Tukang Mandor
10%
L.01 L.02 L.03 L.04
OH OH OH OH
5,409,250.00
0.025 0.025 0.020 0.020
70,000.00 85,000.00 90,000.00 95,000.00
1,750.00 2,125.00 1,800.00 1,900.00 7,575.00
43,000.00
43,000.00
Jumlah Tenaga Kerja
B BAHAN Klem
M'
1.000
5,409,250.00 540,925.00 5,950,175.00
43,000.00
Jumlah Harga Bahan
C PERALATAN Alat Bantu Listrik
Hari
0.010
35,000.00
Jumlah Harga Alat
D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaaan (D+E)
10%
50,925.00
350.00 350.00 50,925.00 5,092.50 56,017.50
Compatibility Report for RAB SDN KAPAS 4.xls Run on 1/13/2012 17:24 The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format. Minor loss of fidelity Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
# of occurrences 500 Defined Names