4 0 9 MB
NUGA SIGMA POTENZIA
company
profile
Perumahan YKP Pandugo I Jl. Penjaringan Timur XV PN-20, Rungkut, Surabaya 60297 Phone: 031-81523375 Fax: 031-5350462 nugasigma.com [email protected]
LEGAL ASPECT AKTE No: 25 Notary: HEROE DJATMIKO, S. H. Date: 30 September 2016 Authorization: Kepmen Hukum dan HAM RI No. AHU-0045270. AH.01.01.TAHUN 2016 NPWP No: 81.316.697.2-615.000 (Tax ID Number) PT. NUGA SIGMA POTENZIA (Bill of Company Establishment)
SIUP No: 503/4379.A/436.7.17/2017 Date: 12 April 2017
(Trade License)
TDP No: 13.01.1.46.35428 Date: 13 Juni 2017
(Sign Companies List)
TABLE OF CONTENTS table of contents introduction our expertise project experience manufacturing capabilities
PROFILE COMPANY
1 2 4 10 18
1
Introduction Our aim at PT. NUGA SIGMA POTENZIA is to create “Appropriate problem solving solutions for industry to generate greater benefits for all people to live happier, safer and healthier lives”. Above all, We as an Indonesian new generation company that takes responsibility to dedicate our knowledge and experience to provide our Clients and Partners with cost effective developments of technology and theoryapplications to achieve a better future. We believe that the Indonesian competitive
2
PROFILE COMPANY
“We, Nuga Sigma Potenzia respond quickly and listen carefully then provide reliable solutions to our dear customer’s request for both emergency and planned works”
edge must be based on sound science and sound development. The benefits of applied science in the industrial world feedback to the community that supports it, and in this way, science provides real positive results and real positive value. 1. PT. NUGA SIGMA POTENZIA serves as a bridge between academia and industry, and also provides quality engineering manpower resources and consultancy services to Clients in several Industry sectors. 2. PT. NUGA SIGMA POTENZIA are applying sound
marketing concepts to encourage satisfied clients to make onward recommendations to generate an extending client base by direct Client / Client networking. 3. PT. NUGA SIGMA POTENZIA uphold the core values of transparency and accountability, and provides the highest quality service, achieves on time, on budget delivery and maintains the highest international project standards. 4. We believe these commitments to be an inspiration and encouragement for our stakeholders and our Clients to move forward with PT. NUGA SIGMA POTENZIA.
Services
Intro & Services
Our
• We act as consultants who provide feedback and information about the industry and what they need • We guided in the creation and implementation of technical guidelines • We provide training/workshops and man powers • We also do fabrication and providing the necessary equipment based on the results of consultations
Business Industry
PROFILE COMPANY
3
Our
Expertise Engineering, Reliability Maintenance, Energy Reliability, Fabrication, Onsite Installation
4
PROFILE COMPANY
ENGINEERING Capabilities -
Our
-
Expertise
General Mechanical Engineering Design andSimulation Mechanical, Electrical, and ControlBoiler pressure/non-pressure PartsFuel Handling SystemReverse Mechanical Engineering-
Project Credentials
Component ReplacementComponent Modification/ImprovementComponent Upgrading)LPG Piping Design (Monsanto)Cold Storage Design (Monsanto)Belt & Screw Conveyors (MonsantoSPBE Mechanical Equipment Design)Agam Seulawah, Asaperkasa Abimulya()Crude oil Burner (PT. BBS-
-
Sample Project
Conveyor and Material Handling Design
PROFILE COMPANY
5
RELIABILITY
MAINTENANCE Capabilities
Our
- Plant Reliability Assessment - Maintenance Strategy Development - Maintenance System Assessment - Condition Based Monitoring Solution - Root Cause & Failure Analysis (RCFA) - Failure Mode & Effect Analysis (FMEA) - Computerize Maintenance Management System (CMMS) - Reliability Based Inspection (RBI) - Micro structure Analysis - Fluid Dynamic Analysis - Stress Analysis - Heat Transfer Analysis Piping Design - Cold Storage Design - Conveyors & Material Handling Design - General Mechanical Engineering Design
Expertise
Sample Project
Air Preheater on Burning Generating Units
6
PROFILE COMPANY
Project Credentials
- PLN Spare Part Study and Assessment - Maintenance System Assessment (PT. BADAK, NGL) - RCFA Pipe Failure (PT. BOC) - RBI Development (PT PETROKIMIA) - RCFA Gas Turbine Compressor (PERTAMINA GAS) - RCFA Air Heater (PT Indonesia Power)
Unburned carbon that covered the remaining oil
Surface element water heater cleaned
Sample Project
Air Preheater on Burning Generating Units
Our
Expertise PROFILE COMPANY
7
E N E R G Y AUDIT & ASSESMENT
Capabilities
Energy Audit Energy Cost Reduction Strategy Equipments Energy Consumption Optimization -
Our
Software Supports
Project Credentials
Energy Audit PT Petrokimia -
Expertise
Title Function Energy Audit and Assesments Toolkit General Energy Usage Audit and Assessments Software SSAT(Steam System Assessment Tool) Steam Assessment and Analysis SSST (Steam System Scoping Tool) Steam Assessment and Analysis 3EPlus Steam Insulation Analysis PSAT (Pumping System Assessment Tool) PumpingSystem Analysis AirMaster+ Compressed AirAssessment andAnalysis MotorMaster+ Electric Motor Assessment andAnalysis FSAT(Fan System Assessment Tool) FanAssessment andAnalysis ChemPEP Chemical Plant Energy Profiler and Analysis CHPAT CombinedHeat and PowerAssessment andAnalysis CWSATV23 Chilled WaterSystem Analysis NxEAT NOXand EnergyAssessment PHAST Process Heating Assessment
8
PROFILE COMPANY
Capabilities
- General Steel Construction - Mechanical & Electrical - Piping Installation - Steel Parts Fabrication
FA B R I C AT I O N &
Our
I N S TA L L AT I O N
Expertise
Project Credentials & Sample
- Dryer Building & Facilities (Monsanto Indonesia)
(Building, LPG Piping, Belt Conveyor, BIN Dryer, Blower, Instalation, Hydrant Piping, Compressed Air System)
- SPBE Piping & Equipment Installation (PT Agam Seulawah & PT Asaperkasa Abimulya)
(LPG Piping, LPG Tank Installation, LPG Filling Machine Installation, Hydrant Piping, Electrical Installation)
- Cold Storage Building & Equipment (Monsato Indonesia) - Air Preheater #1 Basket Element Washing Modul Reparation (S2P) - Air Preheater #2 Basket Element Installation & ModulReparation (S2P) - Secondary Cold Air Duct #2 Fabrication & Installation (S2P) - Outlet Condenser #2A Broken Part Fabrication & Installation (S2P) PROFILE COMPANY
9
Our
Project
Experience
10
PROFILE COMPANY
PT Sumber Segara Primadaya (S2P)
Our
Pekerjaan dan Pengadaan Material Replating Outlet Condenser 2A
Experience
(Emergency)
-- Engineering analysis majorly on-site -- Trial and error in stopping leakage -- Fabricating water box to covers the leakage area -- Fabricated waterbox installation -- Temporary support equipment to overcome the leakage until unit outage -- Machine, Manpower, and Material Provision
PROFILE COMPANY
11
PT Sumber Segara Primadaya (S2P)
Our
Pekerjaan dan Pengadaan Material Replating Outlet Condenser 2A
Experience
Engineering analysis- Main material procurement- with minimum given (Stainless steel) required specification Broken pipe part replacement- fabrication Fabricated pipe package and- deliver to site Old broken pipe part- dissasembly New stainless stell pipe- installation Inspection and examination- Machine, Manpower, and- Material Provision
12
PROFILE COMPANY
PT Sumber Segara Primadaya (S2P) Our
Pekerjaan Penggantian Secondary Cold Air Duct (Section 7, 8, 9, 10, 11, 12, 13, 14, & 15) Boiler Unit #2
Experience
-- Engineering analysis -- Main material procurement with minimum given required specification -- Listed section fabrication (workshop) -- Fabricated section package and deliver to site -- Old installed SCAD sections dissasembly -- New fabricated SCAD sections installation -- Inspection and examination -- Machine, Manpower, and Material Provision
PROFILE COMPANY
13
PT Sumber Segara Primadaya (S2P) Our
Jasa Penggantian Elemen Air Heater dan Perbaikan Rotor Modul Air Heater Unit #2A & #2B
Experience 14
Engineering analysis- Old installed basket elements- dissasembly Basket element frame partition- cracked plate reparation Repaired welded crack- inspection New basket elements- installation Inspection and examination- Machine, Manpower, and- Material Provision
PROFILE COMPANY
PT Sumber Segara Primadaya (S2P) Our
Jasa Washing Elemen Air Heater dan Perbaikan Rotor Modul Air Heater Unit #1A & #1B
Experience
-- Engineering analysis -- Installed basket elements dissasembly -- Basket elements washing -- Basket element frame partition cracked plate reparation -- Repaired welded crack inspection -- Basket elements reinstallation -- Inspection and examination -- Machine, Manpower, and Material Provision
PROFILE COMPANY
15
PT Sumber Segara Primadaya (S2P)
Our
Pekerjaan Penggantian (Replacing) dan Pengecatan (Repainting) pada Steel Structure Boiler Unit #1 PLTU Cilacap
Experience 16
Engineering works and- analysis Main material needed- procurement for fabrication Steel Structure parts (beam,- plate, pipe, grating, etc) fabrication and or procurement Finishing with sandblasting- and painting All parts delivery to site - Corroded boiler structure- dismantling New structure installation- Machine, Manpower, and- Material Provision
PROFILE COMPANY
PT Inti Karya Persada Teknik (IKPT) Our
Repair 259 Tubes of WHB 101C Kaltim-5 Project
Experience
(Emergency)
-- Remove weld tube to tube sheet -- Tube pull out -- Marking, cutting, and tube preparation -- Welding tube to tube -- Radiography test (third party) -- PWHT (third party) -- Grind flush -- Marking, cutting, and tube to tubesheet preparation -- Welding tube to tubesheet -- Penetrant test (PT) (third party) -- PWHT (third party)
PROFILE COMPANY
17
manufacturing workshop
Capabilities & Products
experiences
18
PROFILE COMPANY
Various
Machine and Tools
workshop
Equipment
Capabilities
--Overhead Crane 2 Ton --Pressbreak Machine 80 Ton --Radial Drill 1600 mm --Bending Machine 2” --Punch Hydraulic --Automatic Cutting Plate --Welding Machine --Water Jet Pump --Winch
Mobile Services
(with 2-3 container ready to brought to work site)
PROFILE COMPANY
19
PROJECT
Tubular Air Heater Fabrication for new unit Berau 2 x 7 MW 2014/2015
workshop
CUSTOMER
PT Hasta Prajatama
Capabilities
PROJECT
Fabrication of Secondary Cold Air Duct for PLTU Cilacap Unit #2
CUSTOMER
PT Sumber Segara Primadaya
20
PROFILE COMPANY
PROJECT
Fabrication of Boiler (CFB) Wall Tube 2015/2016 (Tube Bending for Opening)
workshop
Capabilities
CUSTOMER
PT Indonesia Toray Synthetics
PROFILE COMPANY
21
PROJECT
Tube Shield Protector
workshop
CUSTOMER
PT Cirebon Electric Power
Capabilities
PROJECT
Joice Heater Fabrication Sugar Mill 2014
CUSTOMER
CV Berlian Sejahtera
22
PROFILE COMPANY
PROJECT
Fabricated Parts Sandblasting and Painting
workshop
CUSTOMER
PT Sumber Segara Primadaya
Capabilities
PROJECT
Steel Structure Fabrication for Cilacap PLTU Unit #1
CUSTOMER
PT Sumber Segara Primadaya
PROFILE COMPANY
23
PROJECT
Supply Bottom Hopper Seal arrangement
workshop
CUSTOMER
PT Cirebon Power Services
Capabilities
PROJECT
Flare Stack Fabrication 2016
CUSTOMER
Dinamika Energitama Nusantara
24
PROFILE COMPANY
Bending Capabilities
--U-shaped bent, arc/angled-bent Ovality < 10% -- Maintain thickness after bend
workshop
PROJECT
Capabilities
U Bend, Opening Door 2014
CUSTOMER
Kopkar Rusamas/ PLTU Suralaya, Labuan Emas PROFILE COMPANY
25
PROJECT
Supply and Fabricate Flight Scraper
workshop
Capabilities CUSTOMER
PT Cirebon Electric Power
26
PROFILE COMPANY