19 0 54 KB
Onshore Rig Move Plan - Table of Content 1. Rig move preparation Location survey Road Survey Preparation of advanced loads Administration (Rig move plan) Equipment Inspection 2. Preparation of new location and camp 3. Logistics Number of Cranes Number of truck loads Lowboy truck loads 4. Load dimensions and weight Description of loads in their sequence List of wide loads for convoy 5. Rig move descriptions 5.1 Preparation 5.2 Pre-move loads 5.3 Rig release 5.4 Move safety meeting 5.5 Line of responsibility -- 1. Chart of responsibility & 2. Job Descriptions 5.6 Daily move plan 5.7 Lower/ Raise mast procedures 5.8 Re-assembly substructure 6. Rig checklist Lowering Derrick Raising Derrick 7. Critical lifts 8. Lay-outs Rig Lay out Camp Lay-out rig site Camp Lay-out 9. Pre-spud inspection Safety General Drill floor Derrick Mud tanks Mud pumps Engines Equipment Drawworks 10. Daily move report 11. Rig drawing 12. Medivac procedures Ambulance Drill Notification chart Emergency Instructions