6 0 46 KB
TANG PILING SDN BHD
PILING RECORD FORM Proposed Piling Works for Mixed Development "Jesselton Residence", Kota Kinabalu, Sabah Client:
VINCI Construction Grands Projets Sdn. Bhd
Consultant:
ZONE / BLOCK: DATE:
LOCATION: PILE No: Length: Pile size: Hammer Type: Ram Weight: Drop Heigth: Penetration (m)
415mm X 260mm H-Pile Hydraulic Hammer 7.00 - ton 600 mm No of blow
0.30 0.60 0.90 1.20 1.50 1.80 2.10 2.40 2.70 3.00 3.30 3.60 3.90 4.20 4.50 4.80 5.10 5.40 5.70 6.00 6.30 6.60 6.90 7.20 7.50 7.80 8.10 8.40 8.70 9.00 9.30 9.60 9.90 10.20 10.50 10.80 11.10 11.40
Penetration (m)
No of blow
11.70 12.00 12.30 12.60 12.90 13.20 13.50 13.80 14.10 14.40 14.70 15.00 15.30 15.60 15.90 16.20 16.50 16.80 17.10 17.40 17.70 18.00 18.30 18.60 18.90 19.20 19.50 19.80 20.10 20.40 20.70 21.00 21.30 21.60 21.90 22.20 22.50 22.80
Operator: Welder: Recorder:
Penetration (m)
23.10 23.40 23.70 24.00 24.30 24.60 24.90 25.20 25.50 25.80 26.10 26.40 26.70 27.00 27.30 27.60 27.90 28.20 28.50 28.80 29.10 29.40 29.70 30.00 30.30 30.60 30.90 31.20 31.50 31.80 32.10 32.40 32.70 33.00 33.30 33.60 33.90 34.20
No of blow
REMARKS 34.50 38.40 34.80 38.70 35.10 39.00 35.40 39.30 35.70 39.60 36.00 39.90 36.30 40.20 36.60 40.50 36.90 40.80 37.20 41.10 37.50 41.40 37.80 41.70 38.10 42.00 TOTAL PENETRATION:
SET: (mm)
SKETCH:
REMARKS:
Performed by:
VINCI Construction Grands Projets Sdn. Bhd
C&S Consultant's Representative
TANG PILING SDN BHD
Name:
Name:
Date:
Date:
Date: