Report No. Date Time Start Time Finish
PILE DRIVING RECORD
: : : :
PT. BERDIKARI PONDASI PERKASA Main Contractor
:
Drawing no
:
Project
:
Drawing Rev. no
: -
Location
:
Joint
:
Contract no.
:
Rig
:
Equipment no Pile no Pile Length Pile Type Hammer Type Type of cushion Height of Ram (Hr Design Cap. (Ton)
: : : : : : : :
Pile Dia. : Weight of pile(Wp) : Weight of ram(Wr) : s (m) : k (m) : Sefety Factor (SF) :
mm ton ton m m
Ra (Ton)
ton
Depth
Blows
Ru =
2*W*H W * (s + k) W+P
No
Pile Type
m
m ton
Total Blow
:
Depth
Location:
: : :
X pcs
Y Z
Depth Penetration Total Blow
Blows Total Blow
Depth
: :
m Blow
Blows Total Blow
Final Position N Casting date
No of Pile
Pile length
1 2 3 4 Prepared by: Name
:
Witnessed by: Name
:
Approved by: Name
: