RINCIAN ANGGARAN BIAYA PROJECT KOLAM RENANG L:14 M P:16 M T: 140 M NO
DESKRIPSI
VOLUME
HARGA
QTY
TOTAL
1 Besi behel
16
btg
170,000
10
1,700,000
2 Besi behel
12
btg
80,000
100
8,000,000
3 Besi behel
10
btg
55,000
588
32,340,000
4 Besi behel
8
btg
47,000
488
22,936,000
5 Batako press
30X16X7
pcs
1,500
3,000
4,500,000
6 Pipa Rucika
1 1/4
pcs
65,000
20
1,300,000
7 Mesin kolam Hyward
2 PH
unit
15,000,000
1
15,000,000
8 Filter sand
2 pk
unit
13,000,000
1
13,000,000
18 watt
pcs
450,000
6
2,700,000
10 Grill/saringan
pcs
120,000
2
240,000
11 Mata Itik
pcs
106,000
6
636,000
12 Leher Vaccum
pcs
68,000
2
136,000
13 Teleskopik
pcs
500,000
1
500,000
pcs
950,000
1
950,000
9 Lampu kolam
14 Selang vaccum
1
10 meter
Jasa konsultan, dan upah pemasangan instalasi pipa, pemasangan mesin dan filter sampai selesai
Sub Total
103,938,000
7,500,000
7,500,000
Grand total Catatan: Rincian Anggaran Biaya Belum termasuk bahan material seperti: 1 Pasir 2 Semen 3 Keramik 4 Pipa Pembuangan 3" 5 Stop kran Bogor 4 Oktober 2020
M. Furqon
111,438,000