5 0 63 KB
No I 1 2 3 4
Uraian Pekerjaan PEKERJAAN BEKISTING Bekisting Balok 20/35 Lantai 2 Bekisting Balok 20/35 Lantai 3 Bekisting Pelat Lantai 2 Bekisting Pelat Lantai 3
VOL
SAT
Harga Satuan (Rp)
72.97 72.97 98.92 98.92
M2 M2 M2 M2
Rp Rp Rp Rp
468,662.47 468,662.47 478,233.44 478,233.44
824.28 275.15 824.28 275.15 1413 1413
Kg Kg Kg Kg Kg Kg
Rp Rp Rp Rp Rp Rp
19,313.24 18,727.77 19,313.24 18,727.77 17,397.83 17,397.83
5.18 5.18 13.74 13.74
M3 M3 M3 M3
Rp Rp Rp Rp
1,231,962.60 1,231,962.60 1,231,962.60 1,231,962.60
SUB TOTAL II 1 2 3 4 5 6 III 1 2 3 4
PEKERJAAN PEMBESIAN Pembesian Balok 20/35 (D14) Lantai 2 Pembesian Balok 20/35 (D6) Lantai 2 Pembesian Balok 20/35 (D14) Lantai 3 Pembesian Balok 20/35 (D6) Lantai 3 Pembesian Pelat (D10) Lantai 2 Pembesian Pelat (D10) Lantai 3 SUB TOTAL PEKERJAAN BETON Beton Balok 20/35 Lantai 2 Beton Balok 20/35 Lantai 3 Beton Pelat Lantai 2 Beton Pelat Lantai 3 SUB TOTAL
TOTAL DIBULATKAN TERBILANG : TIGA RATUS JUTA SEMBILAN RATUS TIGA PULUH RIBU RUPIAH
Jumlah Harga (Rp) Rp Rp Rp Rp Rp
34,196,425.62 34,196,425.62 47,305,894.97 47,305,894.97 163,004,641.18
Rp Rp Rp Rp Rp Rp Rp
15,919,427.38 5,153,022.13 15,919,427.38 5,153,022.13 24,581,921.91 24,581,921.91 91,308,742.84
Rp Rp Rp Rp Rp Rp Rp
6,381,566.28 6,381,566.28 16,927,166.15 16,927,166.15 46,617,464.86 300,930,848.89 300,930,000.00
UH RIBU RUPIAH