DATA DASAR RENCANA DI LAPANGAN PENGASPALAN JALAN DESA ......................KECAMATAN..................
KABUPATEN BATANG Lapis penetrasi (Lapen) PANJANG JALAN LEBAR JALAN LEBAR BAHU JALAN
= = =
500 M 3 M 0.5 M
Tabur Dua (Burda) PANJANG JALAN LEBAR JALAN LEBAR BAHU JALAN
= = =
0 M 0 M 0 M
Latasir (Sandsheet) PANJANG JALAN LEBAR JALAN LEBAR BAHU JALAN
= = =
500 M 3 M 0 M
DAFTAR HARGA SATUAN BAHAN DAN ALAT NO
MATERIAL
1 2 3
Batu Pecah 3-5 Batu Pecah 2-3 Batu Pecah 1-2
4 5 6 7
Batu Pecah / Ciping 0,5 Abu Batu Aspal Penetrasi 60/70 155kg Kayu Bakar
8
Pasir Beton
SATUAN
HARGA+PAJAK
HARGA
M M3 M3
Rp Rp Rp
207,500.00 207,500.00 207,500.00
Rp Rp Rp
183,600.00 183,600.00 183,600.00
M3 M3 Drum M3
Rp Rp Rp Rp
207,500.00 207,500.00 1,700,000.00 200,000.00
Rp Rp Rp Rp
183,600.00 183,600.00 1,504,400.00 200,000.00
M3
Rp
340,000.00
Rp
340,000.00
1 1 1
Rp Rp Rp
350,000.00 150,000.00 200,000.00
Bh Kg M Jam Ls Jam Jam kg bh bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
10,000.00 2,500.00 2,500.00 550,000.00 1,500,000.00 38,500.00 55,000.00 15,000.00 50,000.00 250,000.00
3
KETERANGAN
Rp
10,967.74
ALAT ADMINISTRASI 1 2 3
Prasasti Papan Informasi Papan Proyek
ALAT PROYEK 1 2 3 4 5 6 7 8 9 10
Keranjang Benang Selang timbangan Wals Mobilisasi Walls Sprayer Dump Truk Paku Ompreng arco
DAFTAR HARGA SATUAN UPAH TENAGA NO 1 2 3 4 5 6
TENAGA Mandor Operator Terlatih Pekerja Buruh Terlatih ( Tenaga Aspal ) Sopir Juru Godog
SATUAN Hari Hari Hari Hari Hari Hari
UPAH Rp Rp Rp Rp Rp Rp
72,000.00 132,000.00 54,000.00 78,000.00 72,000.00 78,000.00
KETERANGAN
/KG
PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET DESA ........................ Perkerasan Jalan Aspal No
Uraian
1 LUAS JALAN
Panjang Lapen Tabur dua Latasir (sandsheet)
Lebar
Tinggi
Luas
koef. Loss
500.00
3.00
1,500.00
-
-
-
500.00
3.00
1,500.00
DI HITUNG OLEH
.........................
Volume 1,500.00 1,500.00 1,500.00 1,500.00
m2 m2 m2 m2 m2 m2
360 60 120.00 100 48.00 688
ANALISA PERHITUNGAN JALAN ASPAL Desa : 5 No K.618
K.615
K.612
K.617
Uraian Pekerjaan LAPEN 5 cm Batu pecah 5-3 cm Batu pecah 2-3 cm Batu pecah 1-2 cm Batu pecah 0,5 cm Abu batu Aspal Kayu Bakar Operator Terlatih Juru Godok Buruh terlatih Buruh tak terlatih Mesin Gilas 3 roda 6T
Analisa
0.0400 0.0221 0.0111 0.0051 0.0025 4.0000 0.0100 0.0114 0.0057 0.0114 0.0707 0.0286
Pekerjaan Burtu Batu pecah 1-2 cm Batu pecah 0,5 cm Abu batu Aspal Kayu Bakar Operator Terlatih Juru Godok Buruh terlatih Buruh tak terlatih Mesin Gilas 3 roda 6T
0.006666667 0.006666667 0.006666667 2.100000 0.0100 0.0133 0.0089 0.0089 0.0444 0.0222
Pekerjaan Buras Abu batu Aspal Kayu Bakar Operator Terlatih Juru Godok Buruh terlatih Buruh tak terlatih Mesin Gilas 3 roda 6T
0.017916667 1.21 0.0100 0.0067 0.0067 0.0067 0.0333 0.0167
Pekerjaan Burda Batu pecah 2-3cm Batu pecah 1-2 cm Batu pecah 0,5 cm Abu batu Aspal Kayu Bakar Operator Terlatih Juru Godok Buruh terlatih Buruh tak terlatih Mesin Gilas 3 roda 6T
0.0075 0.0075 0.0075 0.0075 2.5000 0.0100 0.0133 0.0089 0.0089 0.0444 0.0296
KPUT. MPekerjaan Latasir (sandsheet) M2 Pasir Beton 0.0200 Aspal 1.2500 Kayu Bakar 0.0180 Operator Terlatih 0.0200 Juru Godok 0.0067 Buruh terlatih 0.0067 Buruh tak terlatih 0.0333 Mesin Gilas 3 roda 6T 0.0222
Batu pecah 5-3 cm Batu pecah 2-3 cm Batu pecah 1-2 cm Batu pecah 0,5 cm Abu batu Pasir Beton Aspal Kayu Bakar Operator Terlatih Juru Godok Buruh terlatih Buruh tak terlatih
= = = = = = = = = = = =
Volume
1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00
-
-
1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00 1,500.00
Harga sat. Rp.
Kebutuhan
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
60.00 33.21 16.61 7.64 3.75 6,000.00 15.00 17.14 8.60 17.14 106.07 43.00
m3 m3 m3 m3 m3 kg M3 HOK HOK HOK HOK jam
207,500 207,500 207,500 207,500 207,500 10,968 200,000 132,000 78,000 78,000 54,000 550,000
Bahan Rp
Upah Rp.
12,450,000 6,891,075 3,446,575 1,585,300 778,125 65,806,452 3,000,000 2,262,480 670,800 1,336,920 5,727,780 23,650,000
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
-
m3 m3 m3 kg M3 HOK HOK HOK HOK jam
207,500 207,500 207,500 10,968 200,000 132,000 78,000 78,000 54,000 550,000
-
m2 m2 m2 m2 m2 m2 m2 m2
-
m3 kg M3 HOK HOK HOK HOK jam
207,500 10,968 200,000 132,000 78,000 78,000 54,000 550,000
-
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
-
m3 m3 m3 m3 kg M3 HOK HOK HOK HOK jam
207,500 207,500 207,500 207,500 10,968 200,000 132,000 78,000 78,000 54,000 550,000
-
m3 kg M3 HOK HOK HOK HOK jam
250,000 10,968 200,000 132,000 78,000 78,000 54,000 550,000
m2 m2 m2 m2 m2 m2 m2 m2
60.00
=
33.21 16.61
= =
7.64 3.75
= =
30.00 7,875.00 42.00 47.14 18.60 67.14 156.07
= = = = = = =
30.00 1,875.00 27.00 30.00 10.00 10.00 50.00 33.33
Kebutuhan m3 60.00 33.00 m3 m3 16.00 m3 7.00 3.00 m3 30.00 m3 51 drum 42 M3 47 HOK 18 HOK 67 HOK 156 HOK
Total Rp.
12,450,000 6,891,075 3,446,575 1,585,300 778,125 65,806,452 3,000,000 2,262,480 670,800 1,336,920 5,727,780 23,650,000 127,605,507
-
-
-
-
-
-
7,500,000 20,564,516 5,400,000 3,960,000 780,000 780,000 2,700,000 18,331,500
7,500,000 20,564,516 5,400,000 3,960,000 780,000 780,000 2,700,000 18,331,500
Mesin Gilas 3 roda 6T
=
76.33
=
9
hr
RENCANA ANGGARAN BIAYA DESA SIDALANG KECAMATAN TERSONO TAHUN ANGGARAN 2015 1. 2. 3. 3. 4. 5.
Bidang Kegiatan Lokasi Waktu Pelaksanaan Volume Rincian Pendanaan NO. 1 I
: 2.2 ( Pelaksanaan Pembangunan Desa ) : 2.2.1.4 ( Pembangunan Pengaspalan Jalan Latasir(sandsheet) ) : JL DUKUH BONJOR : :P 0 L 0 Rp 160,219,000.00 URAIAN
VOLUME
SATUAN
3
4
2 Belanja Barang Dan Jasa 1 Honor Panitia - Honor Penanggung Jawab - Honor Ketua - Honor Sekretaris - Honor Anggota
HARGA SATUAN (Rp.) 5
1 1 1 3
Orang Orang Orang Orang
400,000 250,000 150,000 100,000
400,000 250,000 150,000 300,000 1,100,000
1 1 1
Orang Orang Orang
150,000 160,000 160,000
150,000 160,000 160,000 470,000
HOK HOK HOK HOK HOK HOK
72,000 132,000 54,000 78,000 78,000 72,000
6,204,000 8,424,000 5,226,000 1,404,000 21,258,000
Rim Bh Pak Bk Lbr Lbr Bh Btl Lbr Bh Lbr Bk Bh Bh
36,000 30,000 15,500 5,000 6,000 3,000 15,000 33,000 200 3,000 3,000 20,000 150,000 350,000
36,000 30,000 15,500 45,000 60,000 30,000 30,000 33,000 23,000 21,000 45,000 80,000 150,000 350,000 948,500 23,776,500
m3 m3 m3 M3 M3 drum m3 m3
207,500 207,500 207,500 207,500 207,500 1,700,000 340,000 200,000
12,450,000 6,847,500 3,320,000 1,452,500 622,500 86,700,000 10,200,000 8,400,000 129,992,500
hr ls
550,000 1,500,000
4,950,000 1,500,000 6,450,000 136,442,500 160,219,000
Jumlah 1 2 Honor Perencanaan Swakelola - Surveyor - Juru Gambar - Penbuatan Desain RAB
JUMLAH (Rp.) 6
Jumlah 1 3 Upah Tenaga Kerja - Mandor - Operator Terlatih - Pekerja - Buruh Terlatih ( Tenaga Aspal ) - Juru godog - Sopir
47 156 67 18 Jumlah 3
4 ATK -Hvs 70 gr -Kalkulator -Bolpoint -Buku Kwitansi -Materai 6000 -Materai 3000 -Buku Kwarto -Tinta Printer -Foto Copy -Stopmap Plastik -Cetak Foto Kegiatan -Pelaporan -Papan Proyek -Prasasti
1 1 1 9 10 10 2 1 115 7 15 4 1 1 Jumlah 4 Jumlah Barang dan Jasa ( 1-4 )
II 1 Material bahan -Batu pecah 5-3 cm -Batu pecah 2-3 cm -Batu pecah 1-2 cm -Batu pecah 0,5 cm -Abu batu -Aspal -Pasir Beton -Kayu Bakar
60.00 33 16 7 3 51 30 42 Jumlah 1
2 Alat -Mesin Gilas 3 roda 6T -Mobilisasi Mesin Gilas 3 roda 6T Jumlah 2 Jumlah Belanja Modal JUMLAH TOTAL ( I-II )
9 1
Terbilang
Disetujui / Mengesahkan Kepala Desa .....................
................., ....September 2016 Pelaksana Kegiatan
................................
.......................................
PETA LOKASI PERENCANAAN PENGASPALAN JALAN PATOK 0+000
JARAK
0+050 0+100 0
PROPINSI JAWA TENGAH
0+150 0 0+200
KABUPATEN BATANG
0+250 KECAMATAN .....................
0+300 DESA SIDALANG
0+350 0+400
JENIS PRASARANA PENINGKATAN JALAN ASPAL
0+450 JUDUL GAMBAR DENAH LOKASI KEGIATAN
0+500 0+550
DIBUAT OLEH TPK
0+600 0+650
.............................
0
MENGETAHUI
0+700 0 0
0+750
0
KADES ...............
0+800
...................................
0+850
MENGETAHUI KASI. PMD
0+900 ..................................
0+950
NIP..................................
0+956,3 0
0
PROPINSI JAWA TENGAH
......m
......m KABUPATEN BATANG
POTONGAN PERKERASAN LAPENSHEET
KECAMATAN .....................
SANDSHEET 1CM ( 1,25 KG ASPAL) ASPAL 1 KG BATU PECAH 1/2 ASPAL 1,75KG BATU PECAH 3/5 kunci 2/3 ASPAL 1,25 KG
DESA SIDALANG
0.02 0.02 0.03
JENIS PRASARANA PENINGKATAN JALAN ASPAL JUDUL GAMBAR DENAH LOKASI KEGIATAN DIBUAT OLEH TPK
............................. MENGETAHUI
......m
......m
KADES ...............
POTONGAN PERKERASAN LAPEN ABU BATU ASPAL 1 KG BATU PECAH 1/2 ASPAL1,75KG BATU PECAH 3/5 kunci 2/3 ASPAL 1,25 KG
...................................
0.01 0.02
MENGETAHUI KASI. PMD
0.03 .................................. NIP..................................