5 0 125 KB
ANALISA HARGA SATUAN Bagian Proyek
:
Nama Paket / Pekerjaan
:
REVITALISASI TAMAN PANORAMA DAN LUBANG JEPANG
Lokasi / Propinsi
:
KOTA BUKITTINGGI
Tahun Anggaran
:
2004
No Item
:
Pekerjaan
:
Shotcrete, t = 10 Cm; heavy wire mesh,(150 x 150 x dia.4 mm)
Harga satuan
:
Rp.
No
Uraian
2,892,000 / m3
satuan
Volume
Harga satuan ( Rp )
A.
Upah / Tenaga
1.
Shotcrete Master
org/hr
0.100
50,000.00
2.
Shotcreter / Nozleman
org/hr
0.100
40,000.00
3.
Electrical
org/hr
0.150
40,000.00
4.
Mekanik
org/hr
0.150
40,000.00
5.
Tenaga Bantu (Local Labor)
org/hr
2.500
20,000.00
B.
Material / Bahan
1.
Solar
Lt
5.000
2,100.00
2.
Oil ( SAE.10, 40, 90 )
Lt
1.000
12,000.00
3.
Grease
Kg
0.500
12,000.00
7.
Water Hose & ass.
m
0.030
25,000.00
8.
Water Swivel
nos
0.002
250,000.00
9.
Rubber Piston MG.10
nos
0.010
50,000.00
10.
Air Hose, dia.2" & Rubber Pad
m
0.200
50,000.00
11.
Angker dia.13 Deformed
m
0.500
10,200.00
12.
Heavy Wire mesh,(15 x 15 cm,dia.4 mm)
m2
1.000
13,500.00
13.
Kawat tali, Mesh Clip
kg
0.100
8,500.00
14.
Semen, type.1
zak
1.500
29,000.00
15.
Pasir
m3
0.150
55,000.00
16.
Kerikil
m3
0.150
75,000.00
17.
Sika, Sigunit 49 AF
kg
0.500
15,000.00
18.
Drain PVC, Type D, dia.3"
m
0.400
25,000.00
C.
Peralatan
1.
Shotcrete Machine"ALIVA" & Electric Motor, 5,50 Kw
jam
0.600
50,000.00
2.
Compressor, 175 Cfm, Air Hose, L=50 m, dia.3"
jam
0.600
45,000.00
3.
Generator Set, 25 Kva
jam
0.600
25,000.00
4.
Concrete Mixer & Diesel, 8 PK
jam
0.600
5,000.00
5.
Blower & Diesel, 5,5 Kw
jam
0.600
5,000.00
Jumlah Harga per m2 Jumlah Harga per m3
DAFTAR KWANTITAS DAN HARGA PROYEK REVITALISASI PANORAMA DAN LUBANG JEPANG Bagian Proyek
:
BAGIAN PROYEK PERTANAMAN KOTA
Nama Paket / Pekerjaan
:
REVITALISASI PANORAMA DAN LUBANG JEPANG
Lokasi / Propinsi
:
KOTA BUKITTINGGI
Tahun Anggaran
:
2004
NO.
URAIAN
SAT.
A
PEKERJAAN SHOTCRETE
1.
Mobilisasi - Demobilisasi Alat & Personil
2.
Persiapan - Seting Peralatan Shotecrete
Ls
3.
Shotcrete, t = 10 cm
m3
VOLUME
HARGA SATUAN ( Rp )
Ls 395.00
2,892,000.00
Jumlah : Terbilang : ## Satu Milyard Dua Ratus Dua Puluh Dua Juta Tiga Ratus Empat Puluh Ribu Rupiah ##
ESTIMASI RENCANA ANGGARAN BIAYA PROYEK ( REAL COST ) Bagian Proyek
:
BAGIAN PROYEK PERTANAMAN KOTA
Nama Paket / Pekerjaan
:
REVITALISASI PANORAMA DAN LUBANG JEPANG
Lokasi / Propinsi
:
KOTA BUKITTINGGI
Tahun Anggaran
:
2004
NO.
A
URAIAN
SAT.
VOLUME
HARGA SATUAN ( Rp )
PEKERJAAN SHOTCRETE ( V = 395 m3 ~ A = 3.950 m2 )
Peralatan 1
Sewa alat Shotcrete ( Produksi, @ = 25 m2 / hari )
jam
1,000.00
50,000.00
2
Sewa Compressor, Q = 175 Cfm
jam
1,000.00
45,000.00
3
Sewa Generator Set, 25 Kva
jam
1,000.00
25,000.00
4
Sewa Concrete Mixer & Diesel 10 PK
jam
1,000.00
5,000.00
5
Sewa Pompa Air, dia.3" & Diesel 10 PK
jam
1,000.00
5,000.00
6
Sewa Pick Up
jam
1,000.00
15,000.00
B
Material
1
Wiremesh ( 150 x 150 x 4 mm )
Roll
160.00
1,500,000.00
395 ( 2,10 x 53 m )
1 m2 Shotecrete : ( 1 Zak Semen, = 145 Kg Pasir = 70 Kg Koral = 1,5 Kg Sika ) 2
Semen Type. 1, @ = 50 Kg/zak, V = 3.950 Zak, Lf = 0,35
Zak
5,332.00
29,000.00
3
Pasir, V = 300 m3, Lf = 0,35
m3
405.00
55,000.00
4
Koral, V = 120 m3, Lf = 0,35
m3
162.00
75,000.00
5
Sika, Sigunit 49 AF, @ = 25 kg/zak, V = 240 Zak, Lf = 0,35
zak
324.00
350,000.00
6
Angker, dia.13
kg
7
Matahari Shotcrete
8
Rubber Pad
9
Air Hose, dia ( per 500 m2 = 50 m air hose)
10
Bearing, dia.4"
11
Solar :
12
Olie Mesin:
Compressor 15 L / jam
1,955.00
6,500.00
13
buah
15.00
3,500,000.00
198
buah
200.00
350,000.00
= utk 5 bulan = 1000 jam
8
m
400.00
75,000.00
buah
20.00
250,000.00
Liter
15,000.00
1,750.00
Genset 10 L / jam
Liter
10,000.00
1,750.00
Mixer Concrete 5 L/jam
Liter
5,000.00
1,750.00
Pompa Air 2 L/jam
Liter
2,000.00
1,750.00
Compressor = 50 L / 500 jam
Liter
100.00
12,500.00
Genset = 25 L / 500 jam
Liter
50.00
12,500.00
13
Olie Hydraulic, SAE. 10
Liter
400.00
12,500.00
14
BBM / Premium 10 L / hari
Liter
1,500.00
2,000.00
14
Masker & Topi
buah
3,000.00
500.00
15
Sparepart ( shotecrete,Compressor,Genset,Kabel,Selang Air,dll )
C
TENAGA
1
Koordinator
1 orang
org/bln
5.00
3,000,000.00
2
Nozelman
2 orang
org/bln
10.00
2,000,000.00
3
Mekanik
1 orang
org/bln
5.00
2,000,000.00
4
Mixer Man
1 orang
org/bln
5.00
2,000,000.00
5
Shotcrete
2 orang
org/bln
10.00
2,000,000.00
6
Electrician
1 orang
org/bln
5.00
2,000,000.00
7
Hoseman
4 orang
org/bln
20.00
1,500,000.00
8
Tk. Bantu Pasir
org/bln
10.00
1,500,000.00
9
Tk.Semen
2 orang
org/bln
10.00
1,500,000.00
10
Tk.Kerikil
2 orang
org/bln
10.00
1,500,000.00
D
MOBILISASI
1
Mobilisasi - Demobilisasi Alat
Ls
2
Mobilisasi - Demobilisasi Personil
Ls
E
BASE CAMP / SEWA RUMAH
1
Sewa Runah
Ls
2
Base Camp Lapangan
Ls
Ls
F
NATURA ( MAKAN & MINUM )
org/hari
2,700.00
10,000.00 Jumlah :
Terbilang : ## Satu Milyard Seratus Sembilan Puluh Satu Juta Tiga Puluh Lima Ribu Lima Ratus Rupiah ##
DAFTAR PERALATAN PEKERJAAN SHOTCRETE & GROUTING
Nama Perusahaan
:
PT.KARYA PRIMA CIPTA UTAMA
Divisi
:
GEOTEKNIK
Lokasi
:
DENPASAR - BALI
NO.
URAIAN
SAT.
Merk
Jumlah
Type
A
PERALATAN SHOTCRETE
1
Shotcrete, Aliva 240.5
unit
1
Shotcrete, Shiva 211
unit
1
Shiva 211
2
Compressor, Screw Pump
unit
1
Mitshuseiki, 175 Cfm
3
Compressor, Rotray Pump
unit
1
Atlas Copco,175 Cfm
4
Genset, 25 Kva
unit
1
Mitshubisi
5
Concrete Mixer
unit
1
Kubota
6
Air Hose. Dia.3" ( for Sand Blast )
Mondea, 3 Ply
Aliva 240.5
m
70
Nozle
unit
2
Shiva
Water Jet Pump
unit
2
Koken, MG 5
Blower
unit
1
Mitsui, M.1
B
DRILLING & GROUTING
1
Boring Machine, TOHO. D2G 58
unit
1.00
2
Boring Machine, TOHO. D1
unit
2.00
TOHO. D1
3
Boring Machine, TONE TDC. 1 G
unit
1.00
TONE. TDC. 1G
4
Boring Machine, Longyear. 24
unit
1.00
Longyear. 24
5
Boring Machine, YSO. 1
unit
1.00
YBM. 1
6
Grouting Pump, KOKEN. MG.10
unit
2.00
KOKEN.MG.10
7
Grouting Pump, KOKEN. MG.5
unit
1.00
KOKEN.MG.5
8
Grouting Pump, Bell. 1
unit
2.00
BELL.1
9
Grouting Pump, NPOT.5
unit
1.00
NPOT
TOHO. D2G 58
10
Core Barrel TONE 76 mm
unit
6.00
TONE.
11
Core Barrel TONE 66 mm
12
Core Barrel TONE 56 mm
unit
6.00
TONE
unit
10.00
13
TONE
Mixer Grouting TONE
unit
4.00
TONE
14
Mixer Grouting TOHO
unit
2.00
TOHO
15
Water Pump
unit
12.00
LUYUAN
16
Rubber Packer ( Air Packer )
unit
4.00
17
Mekanic Packer
unit
4.00
TONE
Jumlah Harga ( Rp )
5,000.00 4,000.00 6,000.00 6,000.00 50,000.00
10,500.00 12,000.00 6,000.00 750.00 500.00 500.00 10,000.00 5,100.00 13,500.00
13,716.81
850.00 43,500.00 8,250.00 11,250.00 7,500.00
14000
10,000.00
30,000.00 27,000.00 15,000.00 3,000.00 3,000.00
37500 25000
289,200.00 2,892,000.00
JUMLAH HARGA
60 % EE
( Rp )
1,735,200.0
70,000,000.00 10,000,000.00 1,142,340,000.00
1,222,340,000.00
piah ##
JUMLAH HARGA ( Rp )
per jam
50,000,000.00 45,000,000.00
50,000.00 45,000.00
400,000.00 360,000.00
25
10,000,000.00
25,000.00 5,000.00 5,000.00 15,000.00
25,000,000.00 5,000,000.00 5,000,000.00 15,000,000.00
200,000.00 40,000.00 120000
240,000,000.00 1 zak 154,628,000.00 22,275,000.00 12,150,000.00 113,400,000.00 12,707,500.00 52,500,000.00 70,000,000.00 30,000,000.00 5,000,000.00 26,250,000.00 17,500,000.00 8,750,000.00 3,500,000.00 1,250,000.00 625,000.00 5,000,000.00 3,000,000.00 1,500,000.00 5,000,000.00
15,000,000.00 20,000,000.00 10,000,000.00 10,000,000.00 20,000,000.00 10,000,000.00 30,000,000.00 15,000,000.00 15,000,000.00 15,000,000.00
60,000,000.00 9,000,000.00
2,500,000.00 2,500,000.00
67 kg koral
136 pasir
1.5 kg sika
27,000,000.00 1,191,035,500.00
Rupiah ##
31,304,500.00 301,527.97
NG
Kapasitas
P = 30 m2 / day
1,995
P = 20 m2 / day
1,995
Q = 175 Cfm
1,995
Q = 175 Cfm
1,995
W = 25 Kva
1,995
Q = 0,25 m3
1,995
P = 20 Bar / 300 PSI
1,995 1,995
80 L / menit
1,995
2 m3 / menit
1,995
D = 250 m D = 200 m D = 250 m D = 250 m D = 250 m Q = 120 L / menit Q = 80 L / menit Q = 100 L / menit Q = 50 L / menit
1,998 1,998 1,998 1,998 1,998 1,998 1,998 1,998 1,998
V = 200 Liter V = 200 Liter Q = 80 L / menit
1,998 1,998 1,998 1,998 1,998 1,998 1,998 1,998
ANALISA HARGA SATUAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
No Item
:
Pekerjaan
:
PENGEBORAN DENGAN DIAMOND BIT
Harga satuan
:
Rp.
No
Uraian
A.
Upah / Tenaga
1. 2. 3.
Drilling Master (bor master) Drilling Mechanic Tenaga Bantu (Local Labor)
B.
Material / Bahan
1. 2. 3. 4. 5.
Diamond Bit Solar Oil Grease Sparepart
C
Peralatan
1. 2. 3.
Water Pump & Diesel Boring Machine & Diesel (rotary type) Packer (pneumatic air packer dia 56)
203,500
/ m'
satuan
Volume
Harga satuan
Jumlah Harga
( Rp )
( Rp )
org/hr org/hr org/hr
0.200 0.100 1.000
50,000.00 55,000.00 30,000.00
10,000.00 5,500.00 30,000.00
bh Lt Lt Kg Ls
0.035 3.500 0.100 0.020
1,991,740.00 2,100.00 12,000.00 12,000.00
69,710.90 7,350.00 1,200.00 240.00 3,500.00
jam jam jam
1.600 1.600 1.600
10,000.00 30,000.00 7,500.00
16,000.00 48,000.00 12,000.00
Jumlah
203,500.90
ANALISA HARGA SATUAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
No Item
:
Pekerjaan
:
PENGEBORAN DENGAN CROSS BIT
Harga satuan
:
Rp.
No
Uraian
A.
Upah / Tenaga
1. 2. 3.
Drilling Master (bor master) Drilling Mechanic Tenaga Bantu (Local Labor)
B.
Material / Bahan
1. 2. 3. 4. 5. 6.
Single Barrel Metal Bit Solar Oil Grease Sparepart
C
Peralatan
1. 2. 3.
Water Pump & Diesel Boring Machine & Diesel (rotary type) Packer (pneumatic air packer dia 56)
178,000
/ m'
satuan
Volume
Harga satuan
Jumlah Harga
( Rp )
( Rp )
org/hr org/hr org/hr
0.200 0.100 1.000
50,000.00 55,000.00 30,000.00
10,000.00 5,500.00 30,000.00
bh bh Lt Lt Kg Ls
0.010 0.200 3.500 0.100 0.020
1,260,000.00 235,550.00 2,100.00 12,000.00 12,000.00
12,600.00 47,110.00 7,350.00 1,200.00 240.00 3,500.00
jam jam jam
1.600 1.600 1.600
10,000.00 30,000.00 7,500.00
16,000.00 48,000.00 12,000.00
Jumlah
178,000.00
ANALISA HARGA SATUAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
No Item
:
Pekerjaan
:
SEMENTASI (Grouting)
Harga satuan
:
Rp.
No
1,070,000 / Ton
Uraian
A.
Upah / Tenaga
1. 2. 3. 4.
Grout spesialis Mechanic Drilling Master (bor master) Tenaga Bantu (Local Labor)
B.
Material / Bahan
1. 2. 3. 4. 5.
Solar Oil Grease Sparepart Portland cement (tipe I / II) @ 50 kg
C.
Peralatan
1. 2. 3. 4.
Grout Pump & Diesel (reciproc piston type) Grout Mixer & Diesel (min 700rpm) Water Pump & Diesel Packer (pneumatic air packer dia 56)
satuan
Volume
Harga satuan
Jumlah Harga
( Rp )
( Rp )
org/hr org/hr org/hr org/hr
0.526 0.526 0.526 1.053
50,000.00 55,000.00 50,000.00 30,000.00
26,315.79 28,947.37 26,315.79 31,578.95
Lt Lt Kg Ls Zak
30.000 3.000 0.600
2,100.00 12,000.00 12,000.00
20.00
35,000.00
63,000.00 36,000.00 7,200.00 11,695.00 700,000.00
jam jam jam jam
4.211 4.211 4.211 1.684
10,000.00 10,000.00 10,000.00 7,500.00
42,105.26 42,105.26 42,105.26 12,631.58
Jumlah
1,070,000.26
DAFTAR KWANTITAS DAN HARGA PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
NO.
URAIAN
SAT.
VOLUME
HARGA SATUAN
JUMLAH HARGA
( Rp )
( Rp )
I.
PEKERJAAN GROUTING
1.
Mobilisasi & Demobilisasi alat (2 unit)
Ls
2.
Pengeboran dengan diamond bit
m'
500.00
203,500.00
101,750,000.00
3.
Pengeboran dengan cross bit
m'
560.00
178,000.00
99,680,000.00
20,000,000.00
4.
Sementasi (grouting)
Ton
242.00
1,070,000.00
258,940,000.00
4.
Water pressure test (2 step)
kali
10.00
108,000.00
1,080,000.00
Jumlah :
481,450,000.00
Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##
DAFTAR KWANTITAS DAN HARGA ( OE ) PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
NO.
URAIAN
SAT.
VOLUME
I.
PEKERJAAN GROUTING
1.
Mobilisasi & Demobilisasi alat (2 unit)
Ls
2.
Pengeboran dengan diamond bit
m'
500.00
3.
Pengeboran dengan cross bit
m'
4.
Sementasi (grouting)
Ton
4.
Water pressure test (2 step)
kali
HARGA SATUAN
JUMLAH HARGA
( Rp )
( Rp )
20,000,000.00 529,890.00
264,945,000.00
560.00
297,490.00
166,594,400.00
242.00
1,197,070.00
289,690,940.00
10.00
108,000.00
1,080,000.00
Jumlah :
742,310,340.00
Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##
64.86
ANALISA HARGA SATUAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
No Item
:
Pekerjaan
:
PENGEBORAN DENGAN DIAMOND BIT
Harga satuan
:
Rp.
No
A.
213,720
Uraian
/ m'
satuan
Volume
Harga satuan
Jumlah Harga
( Rp )
( Rp )
Upah / Tenaga
1.
Drilling Master/Kep.Tukang (bor master)
org/hr
0.200
28,000.00
2.
Drilling Mechanic
org/hr
0.100
50,000.00
5,000.00
3.
Tenaga Bantu (Local Labor)
org/hr
2.000
17,500.00
35,000.00
B.
Material / Bahan
1.
Diamond Bit
bh
0.030
2,500,000.00
75,000.00
2.
Drilling Road
btg
0.010
1,750,000.00
17,500.00
3.
Doble Core Barrel
btg
0.010
3,500,000.00
35,000.00
4.
Solar
Lt
1.500
2,100.00
3,150.00
5.
Oil
Lt
0.050
12,000.00
600.00
6.
Grease
Kg
0.010
12,000.00
120.00
7.
Sparepart
Ls
C
Peralatan
1.
Drilling Pump & Diesel
jam
0.500
25,000.00
12,500.00
2.
Boring Machine & Diesel (rotary type)
jam
0.500
40,000.00
20,000.00
3.
Flow meter
jam
0.500
7,500.00
3,750.00
500.00
Jumlah
ANALISA HARGA SATUAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
No Item
:
Pekerjaan
:
PENGEBORAN DENGAN CROSS BIT
Harga satuan
:
Rp.
180,700
/ m'
5,600.00
213,720.00
No
A.
Uraian
satuan
Volume
Harga satuan
Jumlah Harga
( Rp )
( Rp )
Upah / Tenaga
1.
Drilling Master/Kep.Tukang (bor master)
org/hr
0.200
30,000.00
2.
Drilling Mechanic
org/hr
0.100
50,000.00
6,000.00 5,000.00
3.
Tenaga Bantu (Local Labor)
org/hr
1.200
17,500.00
21,000.00
B.
Material / Bahan
1.
Single Core Barrel
bh
0.010
3,250,000.00
32,500.00
2.
Metal Bit/ Cross Bit
bh
0.035
1,250,000.00
43,750.00
3.
Drilling Road
btg
0.010
1,750,000.00
17,500.00
4.
Solar
Lt
1.500
2,100.00
3,150.00
5.
Oil
Lt
0.050
12,000.00
600.00
6.
Grease
Kg
0.010
12,000.00
120.00
7.
Sparepart
Ls
C
Peralatan
1.
Drilling Pump & Diesel
jam
0.850
25,000.00
21,250.00
2.
Boring Machine & Diesel (rotary type)
jam
0.850
40,000.00
34,000.00
3.
Flow meter
jam
0.850
7,500.00
6,375.00
500.00
Jumlah
180,745.00
ANALISA HARGA SATUAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
No Item
:
Pekerjaan
:
SEMENTASI (Grouting)
Harga satuan
:
Rp.
No
Uraian
1,066,450 / Ton
satuan
Volume
Harga satuan
Jumlah Harga
( Rp )
( Rp )
A.
Upah / Tenaga
1.
Grout spesialis
org/hr
0.100
50,000.00
2.
Mechanic
org/hr
0.100
50,000.00
5,000.00
3.
Drilling Master (bor master)
org/hr
0.600
30,000.00
18,000.00
4.
Tenaga Bantu (Local Labor)
org/hr
2.000
17,500.00
35,000.00
B.
Material / Bahan
1.
Solar
Lt
5.000
2,100.00
10,500.00
5,000.00
2.
Oil
Lt
1.000
12,000.00
3.
Grease
Kg
0.100
12,000.00
4.
Sparepart (Injection Pipe,dll)
Ls
5.
Portland cement (tipe I / II) @ 50 kg
C.
Peralatan
1. 2.
12,000.00 1,200.00 15,000.00
Zak
20.50
35,000.00
717,500.00
Grout Pump & Diesel (reciproc piston type)
jam
2.300
25,000.00
57,500.00
Grout Mixer & Diesel
jam
2.300
20,000.00
46,000.00
3.
Boring / Drilling Machine
jam
2.300
40,000.00
92,000.00
4.
Water Pump & Diesel
jam
2.300
15,000.00
34,500.00
5.
Flow meter
jam
2.300
7,500.00
17,250.00
Jumlah
1,066,450.00
DAFTAR KWANTITAS DAN HARGA PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
NO.
URAIAN
SAT.
VOLUME
I.
PEKERJAAN GROUTING
1.
Mobilisasi & Demobilisasi alat (2 unit)
Ls
2.
Pengeboran dengan diamond bit
m'
500.00
3.
Pengeboran dengan cross bit
m'
4.
Sementasi (grouting)
Ton
4.
Water pressure test (2 step)
kali
HARGA SATUAN
JUMLAH HARGA
( Rp )
( Rp )
20,000,000.00 213,720.00
106,860,000.00
560.00
180,700.00
101,192,000.00
242.00
1,066,450.00
258,080,900.00
10.00
108,000.00
1,080,000.00
Jumlah :
487,212,900.00
Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##
DAFTAR KWANTITAS DAN HARGA ( OE ) PROYEK IRIGASI DAN RAWA ANDALAN KALIMANTAN SELATAN Bagian Proyek
:
BAGIAN PROYEK IRIGASI DAN RAWA HST, HSU DAN TABALONG
Nama Paket / Pekerjaan
:
PEMBANGUNAN SEBAGIAN BENDUNG DI. PITAB
Lokasi / Propinsi
:
KABUPATEN BALANGAN
Tahun Anggaran
:
2004
NO.
URAIAN
SAT.
VOLUME
I.
PEKERJAAN GROUTING
1.
Mobilisasi & Demobilisasi alat (2 unit)
Ls
2.
Pengeboran dengan diamond bit
m'
500.00
3.
Pengeboran dengan cross bit
4. 4.
HARGA SATUAN
JUMLAH HARGA
( Rp )
( Rp )
20,000,000.00 529,890.00
264,945,000.00
m'
560.00
297,490.00
166,594,400.00
Sementasi (grouting)
Ton
242.00
1,197,070.00
289,690,940.00
Water pressure test (2 step)
kali
10.00
108,000.00
1,080,000.00
Jumlah :
742,310,340.00
Terbilang : ## Empat Ratus Delapan Puluh Satu Juta Empat Ratus Lima Puluh Ribu Rupiah ##
65.63
CROSS BIT Upah Mandor 0.250 Kep.Tukang Tukang Pekerja 15,500.00 Geologist Mekanik Bahan Drilling Road Single Tube Core Barrel Cross Bit Sparepart
org/hari
0.18
30,000.00
org/hari org/hari org/hari org/hari org/hari
0.54 1.26 0.18 0.18
25,000.00 17,000.00 100,000.00 50,000.00
btg btg bh Ls
0.01 0.01 0.05 1.00
1,875,000.00 3,750,000.00 1,500,000.00 56,000.00
jam jam
0.40 0.40
50,000.00 35,000.00
82,000.90 Alat Drilling Machine Drilling Pump
Biaya umum, 10 % Total
Upah Mandor
org/hari
0.28
30,000.00
Kep.Tukang Tukang Pekerja Geologist Mekanik
org/hari org/hari org/hari org/hari org/hari
0.86 2.02 0.29 0.29
28,000.00 25,000.00 17,500.00 100,000.00 50,000.00
Bahan Drilling Road Double Core Barrel Double Diamond Bit Sparepart
btg btg bh ls
0.01 0.01 0.02 1.00
1,875,000.00 4,750,000.00 10,125,000.00 75,000.00
Drilling Machine Drilling Pump Grout Pump Flowmeter
jam jam jam jam
0.40 0.40 0.40 0.40
50,000.00 35,000.00 30,000.00 7,500.00
Pressure Gauge
jam
1.00
4,000.00
Alat
Biaya umum, 10 %
Total
370,000.26 50 ton
25,000.00
10000
50
20.00 10,000.00 200.00 25.00
203,500.00 178,000.00 1,070,000.00
(%)
19,258,000.00
200
203,500.00
178,000.00
0.526 0.526 0.526 1.053
1,070,000.00
5,400.00 13,500.00 21,420.00 18,000.00 9,000.00 18,750.00 18,750.00 75,000.00 56,000.00 20,000.00 14,000.00 269,820.00 26,982.00 296,802.00
8,430.00 21,600.00 35,280.00 28,800.00 14,400.00 18,750.00 23,750.00 202,500.00 75,000.00
20,000.00 14,000.00 12,000.00 3,000.00 4,000.00 481,510.00 48,151.00
529,661.00