GAJI KARYAWAN No 1 2 3 4 5 6 7 8 9
Karyawan Project Manager Pelaksana Logistik Ceker Oil Man Administrasi (Kantor) Keamanan Flag Man / Klebet Pekerja Harian Perawatan Jalan dll
Volume 1 2 3 4 1 2 4 2 6
Satuan Org Org Org Org Org Org Org Org Org
Gaji/Bln
Jumlah Total
10,000,000 7,500,000 6,000,000 5,500,000 5,500,000 5,500,000 5,500,000 4,500,000 4,500,000
10,000,000 15,000,000 18,000,000 22,000,000 5,500,000 11,000,000 22,000,000 9,000,000 27,000,000
TOTAL
139,500,000
OPERASIONAL NO
Uraian Pekerjaan
Volume
Satuan
Harga Satuan
Jumlah Harga
OPERASIONAL KANTOR 1 2 3 4 5
Peralatan Kantor Operasional kantor Koordinasi Polsek, Koramil & Polres Sumbangan Masyarakat Sekitar Sewa Mobil Operasional
1 1 2 1 2
Bulan Bulan Bulan Bulan Unit
5,000,000 22,750,000 5,000,000 2,500,000 7,500,000
5,000,000 22,750,000 10,000,000 2,500,000 15,000,000 55,250,000
liter liter Org
8,500 7,500 6,000,000
34,000,000 7,500,000 18,000,000 59,500,000
TOTAL
114,750,000
OPERASIONAL PRODUKSI 1 BBM Stone Crusher 2 BBM Mobil Operasional 3 Operator
4,000 1,000 3
PERHITUNGAN PRODUKSI TAMBANG No
Jenis Bahan
Tinggi (m)
1 Tanah Urug 2 Sirtu 3 Batu Belah 4 Split Crusher
Volume Harga Jual Luas (m2) Volume Total (M3) Bahan (Rp)
8 1 1 2
100,000 100,000 100,000 100,000
800,000 100,000 100,000 200,000
6,000 50,000 70,000 120,000
PRODUKSI TAMBANG PER BULAN No Hasil Produksi / Bulan
Volume
1 Tanah Urug 2 Sirtu 3 Batu Belah 4 Split
Jumlah Hari
1,300 130 130 250
Harga / m3
25 25 25 25
1 Modal Investasi
6,000 50,000 70,000 120,000
75,000,000
2 Gaji Karyawan per Bulan 3 Biaya Operasional Kantor per Bulan 4 Biaya Operasional Produksi per Bulan Biaya Gaji, Ops. Kantor & Produksi per Bulan
139,500,000 55,250,000 59,500,000 254,250,000
5 Penghasilan Kotor Tambang per Bulan
1,335,000,000
6 Keuntungan Bersih Tambang per bulan
1,080,750,000
7 BEP Modal investasi
8 Masa Produksi Tambang 9 Penghasilan Bersih Tambang
75,000,000 1,080,750,000
0.07
Bulan
8
Bulan
30
Bulan
32,422,500,000
ANG Jumlah Harga Total 4,800,000,000 5,000,000,000 7,000,000,000 24,000,000,000 40,800,000,000
N Jumlah Harga Total 195,000,000 162,500,000 227,500,000 750,000,000 1,335,000,000
RENCANAN ANGGARAN BIAYA STONE CRUSHER NO
Uraian Pekerjaan
1 Biaya Royalti Lahan 2 Perijinan Lokasi 3 pagar dan eksplorasi 4 pintu gerbang 5 pos satpam 6 Stone Crusher 80/jam 7 Harga Excavator baru (on road) 8 Whell Loader Baru (on road) 9 Rumah mesin 10 Pembuatan Ruang Kerja 5 x 20 11 Genset 15.000 VA + lampu 12 Elektrical dan instalasi 13 Water tank 14 Pembuatan Kantor dan Pondasi 15 Biaya Operasional Awal 16 timbangan 60 ton
Volume 37,000 1 1 1 1 1 1 1 1,000 3 1 1 1 1 1 1
Satuan m2 ls ls set Unit set Unit Unit m2 Unit Unit set Unit unit bulan unit
Harga Satuan 200,000 500,000,000 100,000,000 25,000,000 15,000,000 1,800,000,000 1,700,000,000 1,200,000,000 500,000 50,000,000 55,000,000 50,000,000 50,000,000 75,000,000 50,000,000 500,000,000
14,170,00 Akumulasi presentasi
TONE CRUSHER Jumlah Harga 7,400,000,000 500,000,000 100,000,000 25,000,000 15,000,000 1,800,000,000 1,700,000,000 1,200,000,000 500,000,000 150,000,000 55,000,000 50,000,000 50,000,000 75,000,000 50,000,000 500,000,000
14,170,000,000 Akumulasi presentasi
FOTO LOKASI TAMBANG
Laporan Laba Rugi proyek di Ngawi Summary Rencana Anggran pelaksanaan Tambang Batu Sea Pekerjaan Owner Lokasi Paket
: : : :
Ketinggian minimal Urugan Ketinggian maximal Urugan Ketinggian Rata-Rata Layer Jarak quary Volume Padat rencana Nilai Proyek Harga Padat Kontrak
: : : : : : :
Harga Padat
:
Jaminan Pembayaran Invoice Per Jangka Waktu Pelaksanaan bulan
: : : : : : : : : : : : : : : : : : : :
Target pelaksanaan Total Padat Tanah Vibro Rencana Laiyer Maks Persentase Kehilangan Laiyer Volume Curah Jumlah Armada Muatan Rencana Per 1 Dumptruk Ritase 1 dumptruk Perhari Total Ritase perhari Total Produksi curah Perhari Produksi dalam 1 bulan (28hari) Produksi Curah Produksi Padat Vibro Biaya Produksi Harga Tanah diatas Dumtruck
Ongkos Angkut sampai Lokasi Biaya Alat Berat Total Persentase Kehilangan Laiyer nilai Laiyer Jumlah Total Biaya Operasional Biaya Operasional Kantor gaji Pegawai Total Total Biaya yang dikeluarkan Biaya SCF Bank perbulan Koordinasi Jalan dll Total RAB Harga dari Pengelola ( OT) Rancangan Anggaran Pelaksanaan Keuntungan Netto
: : : : : : : : : : 5% : : : : : : :
Tambang Batu Sea AAAAAA Desa Sea Kec. Pineleng Kab. Minahasa
M M M M KM m3 hasil volume padat rencana dibagi nilai proyek
hasil volume padat rencana dibagi nilai proyek
hasil volume padat rencana dibagi nilai proyek Supply Chain Finance (SCF Bank) minggu hari
0 bulan - m3 kali
-
m3 unit m3 rit rit m3 m3 m3 bulan /m3
/m3 /m3 /m3 0% - /m3 - /m3 /m3 /m3 - /m3 - /m3 /m3 /m3 /m3 hasil volume padat rencana dibagi nilai proyek /m3 - /m3 /m3 #VALUE! /m3