YAYASAN BUSTANUL ULUM AL-MANSYUR DINIYAH TAKMILIYAH AWALIYAH MA’ARIF PANGADEGAN LINGK. PANGADEGAN RT. 005 RW. 019 KEL. HEGARSARI KEC. PATARUMAN
KOTA BANJAR
GAMBAR RENCANA PELAKSANAAN PEKERJAAN PEMBANGUNAN 2 (DUA) RUANG KELAS BARU DTA MA’ARIF PANGADEGAN KECAMATAN PATARUMAN KOTA BANJAR
CATATAN
PEKERJAAN PEMBANGUNAN RUANG KELAS BARU DTA MA’ARIF PANGADEGAN KECAMATAN PATARUMAN KOTA BANJAR
MENGETAHUI/MENYETUJUI : KEPALA MADRASAH
IRFAN FAUZI, S.Pd.I
MENGETAHUI : KETUA KOMITE
SARYONO, S.Pd.I
PERENCANA :
ARIES WIDIATMIKA
JUDUL GAMBAR - DENAH - TAMPAK
TAHUN
2019
SKALA 1 ; 100 1 ; 100
NO. LBR
JML. LBR
CATATAN
PEKERJAAN PEMBANGUNAN 2 RUANG KELAS BARU DTA MA’ARIF PANGADEGAN KECAMATAN PATARUMAN KOTA BANJAR
MENGETAHUI/MENYETUJUI : KEPALA MADRASAH
IRFAN FAUZI, S.Pd.I
MENGETAHUI : KETUA KOMITE
SARYONO, S.Pd.I
PERENCANA :
ARIES WIDIATMIKA
JUDUL GAMBAR - DENAH - TAMPAK
TAHUN
2019
SKALA 1 ; 100 1 ; 100
NO. LBR
JML. LBR
CATATAN
PEKERJAAN PEMBANGUNAN 2 RUANG KELAS BARU DTA MA’ARIF PANGADEGAN KECAMATAN PATARUMAN KOTA BANJAR
MENGETAHUI/MENYETUJUI : KEPALA MADRASAH
IRFAN FAUZI, S.Pd.I
MENGETAHUI : KETUA KOMITE
SARYONO, S.Pd.I
PERENCANA :
ARIES WIDIATMIKA
JUDUL GAMBAR - DENAH - TAMPAK
TAHUN
2019
SKALA 1 ; 100 1 ; 100
NO. LBR
JML. LBR
RENCANA ANGGARAN BIAYA PEMBANGUNAN RUANG KELAS BARU (2 RUANG ) DINIYAH TAKMILIYAH AWALIYAH MA'ARIF PANGADEGAN No. I
Uraian Pekerjaan Pekerjaan Persiapan 1. Papan Nama Proyek 2. Pembuatan Bouwplank 3. Biaya Administrasi dan Dokumentasi 4. Pengadaan Air dan Listrik
Volume Kerja Jml Satuan 1 96 1 1
M2 M2 LS LS
Harga Satuan (Rp.) 240,000 3,000 300,000 600,000
Sub Total I II
Pekerjaan Tanah dan Pondasi 1. Galian Tanah Pondasi 2. Pek. Urugan Pasir di bawah pondasi 3. Pek. Pasangan Pondasi Batu Belah 4. Pek. Urugan Tanah Bekas Galian Pondasi
Pekerjaan Beton 1. Pek. Beton Kolom 20/30 2. Pek. Balok Linter 3. Pek. Ring Balk
70 8 24 37.5
M3 M3 M3 M3
23,000 140,000 300,000 2,000
Pekerjaan Dinding dan Plesteran 1. Pas. Bata Merah 1: 3 2. Pas. Bata Merah 1 : 5 3. Plesteran dan Acian Dinding 1 : 3 4. Plesteran dan Acian Dinding 1 : 5 5. Plesteran dan Acian Beton 6. Plin : 10 cm
6.75 1.6 3.6
M3 M3 M3
1,080,000 1,058,000 1,012,000
Pekerjaan Lantai 1. Urugan Pasir 2. Pekerjaan Keramik 30 x 30 3. Rabat Beton 1 : 35
75 675 100 500 75 250
M2 M2 M2 M2 M2 ML
28,000 27,000 30,000 18,000 27,000 3,000
Pekerjaan Kusen Pintu dan Jendela 1. Pek. Kusen Pintu dan Jendela 2. Pek. Pintu 3. Pek. Rangka Daun Jendela 4. Pek. Jalusi Datar 5. Pek. Net Kusen 6. Pek. Lis Pintu 1 : 3 7. Pek. Angker Kusen
50 250 6
M3 M2 M2
34,000 70,000 700,000
Sub Total VII
1,700,000 17,500,000 4,200,000 23,400,000
2.25 10.4 7 10.24 6 5 50
M3 M2 M2 M2 Bh ML Bh
2,200,000 120,000 75,000 85,000 12,600 65,000 1,500
Sub Total VI VII Pekerjaan Rangka Atap dan Genting 1. Rangka Atap 2. Genteng Plentong 3. Bubungan 4. Lispang
2,100,000 18,225,000 3,000,000 9,000,000 2,025,000 750,000 35,100,000
Sub Total V VI
7,290,000 1,692,800 3,643,200 12,626,000
Sub Total IV V
1,610,000 1,120,000 7,200,000 75,000 10,005,000
Sub Total III IV
240,000 288,000 300,000 600,000 1,428,000
Sub Total II III
Harga Total (Rp.)
4,950,000 1,248,000 525,000 870,400 75,600 325,000 75,000 8,069,000
264 256 36 56
M2 M2 ML ML
89,000 14,000 14,000 20,000
23,496,000 3,584,000 504,000 1,120,000 28,704,000
VIII Pekerjaan Plafon 1. Rangka Plafon 2. Plafon Eternit
308 308
M2 M2
24,000 8,000
Sub Total VIII
IX
Pekerjaan Penggantung Kunci dan Kaca 1. Kunci 2. Engsel Pintu 3. Engsel Jendela 4. Slot Tanam Pintu 5. Slot Jendela 6. Tarikan Jendela 7. Kait Angin 8. Pek. Kaca 5 mm
9,856,000
6 12 18 6 36 20 36 30
Bh Ps Ps Ps Bh Bh Bh M2
40,000 7,000 65,000 16,000 6,000 6,000 7,000 36,000
Sub Total IX X
Pekerjaan Pengecatan dan Laburan 1. Pengecatan Kayu 2. Pengecatan Dinding 3. Pengecatan Plafon 4. Pengecatan Residu Kuda-kuda & Atap
Pekerjaan Instalasi Listrik 1. Pek. Instalasi Titik Cahaya & Saklar 2. Pek. Instalasi Daya & Stop Kontak 3. Pemasangan Lampu TL 1 x 36 Watt 4. Pemasangan Lampu Pijar 25 Watt 5. Feeder Cable NYY 4 x 6 mm
240,000 84,000 1,170,000 96,000 216,000 120,000 252,000 1,080,000 3,258,000
120 750 300 384
M2 M2 M2 M2
5,500 11,000 14,000 3,000
Sub Total X XI
7,392,000 2,464,000
660,000 8,250,000 4,200,000 1,152,000 14,262,000
25 10 12 5 5
Ttk Ttk Bh Bh LS
40,000 50,000 30,000 40,000 250,000
Sub Total XI
1,000,000 500,000 360,000 200,000 1,250,000 3,310,000
Jumlah Total PEMBULATAN
150,018,000 150,000,000
Bendahara
Banjar, 21 April 2019 Ketua Yayasan
EUIS SITI KOMARIAH
IRFAN FAUZI, S.Pd.I