To Open New Project
Te Prepare Main DataBase
Design Mode
To Import Data Reserve
From Data Hirarci
Data SR yg masih Additive di rubah ke Weight Average
To Import Polygon
To Prepare Polygon Graphic
Menghitung secara keseluruhan
To Set Up Calender by Fleet
To Scheduling Set Up
To Scheduling Running Video
Set Up by Legend
To Scheduling report
Shedule Report by ALL Volume
M (Kode Mine DataBase) dan didalamnya code dari data base
Shedule Report by Seam
Shedule Report by Seam
Memunculkan Code
Shedule Report by Resource
Membuat Gantt Chart (Sequence)
Save As to Excel
To Prepare DataBase Report & Bus Graphic (Graphic Reserve LOM)
Excample Graphic LOM
To Prepare Range
To Prepare Preshedule Path / Mine Out Quantities
To Prepare Out Put Path
To Mine Status Plot
To Periode Plot Progress
Periode Status untuk Sequence Stripping
To Prepare Disposal
Kemudian ke Mincom untuk membuat Batter Block Disposal dan seterusnya hingga sama dengan mengeluarkan Reserve Disposal dan Polygon Graphical Output
Import Data Reserv. Disposal
Harus Di Nol kan
Setiap Unit Diganti seperti contoh di bawah
Dimulai dari Elevasi terendah (Dumping kearah Elevasi yang terendah, contrengan pertama di artikan awal dari Dumpingan Activity)
Continue to Run Scenario
Note : Vol. Pit Harus Lebih Kecil Dari Disposal
Edit Legend -- > Shading (input seperti contoh di bawah)
To Run Video
Note : Program Run Disposal Harus di Plot Type “Mine Status Plot”
1. Xpac Calender, Schedule Set Up, Running Scenario, Gantt Chart, Schedule Report