AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders



Item Cryogenic Pipe Size



From:



Appendix 1 – TOR



PGN-JK-F006-EPS-PH-0001



Operating and Control Philosophy



2 x 16” Cryogenic Pipe to accommodate 4000 m3/h LNG transfer.



Appendix 1 – TOR



PGN-JK-F006-EPS-BD-0001



Process Design Basis



Appendix 1 – TOR



PGN-JK-F006-EPS-DG-0001



PFD LNG Storage & Regasification System



Appendix 1 – TOR



PGN-JK-F006-EPS-DG-0005



PnID Jetty and Transfer Line



Appendix 1 – TOR



PGN-JK-F006-EPS-DG-0006



Appendix 2 – TOR



PGN-JK-F005-EPS-CA-0204



Appendix 1 – TOR



PGN-JK-F006-EPS-RE-0001



Appendix 2 – TOR



PGN-JK-F005=EOF-AS-0201



Jetty Assessment



2 x 14” Cryogenic Pipe to accommodate 4000 m /h LNG transfer.



Appendix 1 – TOR



PGN-JK-F006-EPG-DG-0002



Piping Plan Layout For Line Process Regasification Terminal



From:



Appendix 2 – TOR



PGN-JK-F005-ECV-DG-0215



Regas Terminal – Pipe Rack Member Schedule, Plan and Elevation



Appendix 2 – TOR



PGN-JK-F005=EOF-AS-0201



Jetty Assessment



Appendix 1 – TOR



PGN-JK-F006-EPG-DG-0002



Piping Plan Layout For Line Process Regasification Terminal



From:



Appendix 1 – TOR



PGN-JK-F006-EPL-BD-0001



Pipeline Design Basis



See Appendix 1 – PGN-JK-F006-EPL-DG-0001 Alignment Sheet Pipeline Cilacap Rev.0



Appendix 1 – TOR



PGN-JK-F006-EPL-DG-0001



Alignment Sheet Pipeline Cilacap



Appendix 2 – TOR



PGN-JK-F005-EPL-RE-0205



Pipeline Route Selection Report



To become: 3



2



Pipe Rack Modification at Jetty-1



PnID ORU LNG Storage Tank System Stage 1 Line Sizing Calculation (FEED Doc.) Process Simulation Study Report (Re-FEED Doc)



Pipe rack foundation installed by relocating existing 16” crude pipe. See Attachment – PGN-JK-F005-ECV-DG-0215 Rev. 0 Regas Terminal – Pipe Rack Member Schedule, Plan and Elevation, Sheet 2 of 10 To become: Pipe rack foundation installed by relocating existing 4” freshwater pipe. See Attachment – PGN-JK-F005-ECV-DG-0215 Rev. 1 Regas Terminal – Pipe Rack Member Schedule, Plan and Elevation, Sheet 2 of 10



3



Gas Pipeline Route



No



AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders



Item To become:



5



6



Gas Pipeline Wall Thickness



Design Factor of Pipeline



Mill tolerance for line pipe



PGN-JK-F005-EPL-DG-0201



Pipeline Overall Field Layout



Appendix 2 – TOR



PGN-JK-F005-EPL-DG-0203



Pipeline Route Drawing



Appendix 2 – TOR



PGN-JK-F005-EPL-DG-0205



Pipeline Road Crossing Typical Details



From:



Appendix 1 – TOR



PGN-JK-F006-EPG-PS-0001



Specification for Piping and Pipeline Material Class



Pipeline NPS 14, Grade X46, Wall Thickness 0.5”



Appendix 1 – TOR



PGN-JK-F006-EPL-BD-0001



Pipeline Design Basis



Appendix 1 – TOR



PGN-JK-F006-EPL-RE-0001



Pipeline Road Crossing Analysis



To become:



Appendix 1 – TOR



PGN-JK-F006-EPL-CA-0001



Pipeline Wall Thickness Calculation



Pipeline NPS 14, Grade X46, Wall Thickness 0.375”



Appendix 1 – TOR



PGN-JK-F006-EPL-DS-0001



Data Sheet for Line Pipe



Appendix 1 – TOR



PGN-JK-F006-EPL-DG-0001



Alignment Sheet Pipeline Cilacap



From:



Appendix 1 – TOR



PGN-JK-F006-EPL-BD-0001



Pipeline Design Basis



Design Factor 0.3



Appendix 1 – TOR



PGN-JK-F006-EPL-RE-0001



Pipeline Road Crossing Analysis



To become:



Appendix 1 – TOR



PGN-JK-F006-EPL-CA-0001



Pipeline Wall Thickness Calculation



Design Factor 0.4



Appendix 1 – TOR



PGN-JK-F006-EPL-DS-0001



Data Sheet for Line Pipe



From:



Appendix 1 – TOR



PGN-JK-F006-EPL-RE-0001



Pipeline Road Crossing Analysis



Mill tolerance ± 0.1 tselected



Appendix 1 – TOR



PGN-JK-F006-EPL-CA-0001



Pipeline Wall Thickness Calculation



Appendix 1 – TOR



PGN-JK-F006-EPL-DS-0001



Data Sheet for Line Pipe



Appendix 1 – TOR



PGN-JK-F006-EIC-DG-0001



ICSS Architecture ORU & ORF



See Attachment – PGN-JK-F006-EPL-DG-0001 Alignment Sheet Pipeline Cilacap Rev.1 4



Appendix 2 – TOR



To become: Mill tolerance + 0.1 tselected; - 0.05 tselected 7



Instrumentation Data Communication from ICSS ORU to ICSS Marine Area 70



From: No instrument data communication from ICSS ORU to ICSS Marine Area 70. See Appendix 1 – PGN-JK-F006-EIC-DG-0001 ICSS Architecture



No



AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders



Item



ORU & ORF Rev 0, Sheet 3 & 4. See Appendix 2 – PGN-JK-F005-ETL-PS-0201 Specification for Interface and Exchange Data Rev 0. To become: Instrument data communication from ICSS ORU to ICSS Marine Area 70 is provided. See Attachment – PGN-JK-F006-EIC-DG-0001 ICSS Architecture ORU & ORF Rev 1, Sheet 3 & 4.



Appendix 2 – TOR



PGN-JK-F005-ETL-PS-0201



Specification for Interface and Exchange Data



Appendix 2 – TOR



PGN-JK-F005-ECV-DG-0206



ORF – Modification Control Building Layout



Appendix 1 – TOR



PGN-JK-F006-EEL-DG-0002



Single Line Diagram



See Attachment – PGN-JK-F005-ETL-PS-0201 Specification for Interface and Exchange Data Rev. 1 8



Control Building Layout



From: Utilizing Ground Floor and 1st Floor. See Appendix 2 – PGN-JK-F005-ECV-DG-0206 ORF – Modification Control Building Layout Rev. 0 To become: Utilizing Ground Floor only. See Attachment – PGN-JK-F005-ECV-DG-0206 ORF – Modification Control Building Layout Rev. 1



9



Single Line Diagram



From: See PGN-JK-F006-EEL-DG-0002 Single Line Diagram Rev. 0 To become: See PGN-JK-F006-EEL-DG-0002 Single Line Diagram Rev. 1



No 10



AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders



Item Datasheet – Power Generation Gas Engine



From: See PGN-JK-F006-EEL-DS-0001 Datasheet – Power Generation Gas Engine Generator Rev. 0 Appendix 1 – TOR



PGN-JK-F006-EEL-DS-0001



Datasheet– Power Generation Gas Engine Generator



Appendix 1 – TOR



PGN-JK-F006-EEL-PS-0002



Specification - General Electrical Installation



To become: See PGN-JK-F006-EEL-DS-0001 Datasheet – Power Generation Gas Engine Generator Rev. 1 11



Datasheet – Neutral Grounding Resistor



From: None To become: Provided. See PGN-JK-F006-EEL-DS-0003 Datasheet – Neutral Grounding Resistor Rev. 0



12



Specification – General Electrical Installation



From: See PGN-JK-F006-EEL-PS-0002 Specification - General Electrical Installation Rev. 0 To become: See PGN-JK-F006-EEL-PS-0002 Specification - General Electrical Installation Rev. 1



13



ORF Cable Layout



From: None



No



AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders



Item To become: Provided.



See Attachment – PGN-JK-F006-EEL-DG-0003 ORF Power and Control Wiring Layout Rev 0. 14



Datasheet – Variable Speed Drive (VSD)



From: None To become: Provided. See Attachment – PGN-JK-F006-EEL-DS-0004 Datasheet – Variable Speed Drive Rev 0.



15



Process Flow Diagram



From: Unloading Hose Package Size: • •



2 x 16” (Liquid Hose) 1 x 12” (Vapor Hose)



See Appendix 1 – PGN-JK-F006-EPS-DG-0001 PFD LNG Storage & Regasification System Rev 0. Appendix 1 – TOR



To become: Unloading Hose Package Size: • •



4 x 8” (Liquid Hose) 2 x 6” (Vapor Hose)



Capacity: •



Unloading Rate 4000 m3/h



PGN-JK-F006-EPS-DG-0001



PFD LNG Storage & Regasification System



No



AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders



Item •



Vapor Return Rate 11500 m3/h



See Attachment – PGN-JK-F006-EPS-DG-0001 PFD LNG Storage & Regasification System Rev 1. 16



Approved Manufacturer List (AML) of Pertamina RU IV



From: None. To become:



Appendix 1 – TOR



PGN-JK-F006-PMN-LS-0001



Approved Manufacturer List Regas Terminal, Pipeline, & ORF



TOR



PMO-LNG-F006-GEN-SW-0001



Terms of Reference (“TOR”) Proyek EPC Terminal Regasifikasi LNG Cilacap



From:



Appendix 1 – TOR



PGN-JK-F006-EEL-BD-0001



Electrical Design Basis



Back up power supply in ORU is supplied by Emergency Diesel Engine Generator.



Appendix 1 – TOR



PGN-JK-F006-EEL-LS-0001



Electrical Equipment List



Appendix 1 – TOR



PGN-JK-F006-EEL-RE-0001



Electrical Load Analysis



Appendix 1 – TOR



PGN-JK-F006-EEL-DG-0202



Single Line Diagram



Appendix 1 – TOR



PGN-JK-F006-EEL-DS-0002



Datasheet – Power Generation Emergency Diesel Generator (EDG)



Provided for interfacing facility between PGN and Pertamina RU IV. See Attachment – PGN-JK-F006-PMN-LS-0001 Rev. 1 Approved Manufacturer List Regas Terminal, Pipeline, & ORF. 17



Power Generator



From: “Engineering Design for Dual Fuel Engine” Refer to Terms of Reference (“TOR”) Proyek EPC Terminal Regasifikasi LNG Cilacap, Doc No. PMO-LNG-F006-GEN-SW-0001 Rev.0, Page 26, Part 9. Electrical, poin j. To become: “Engineering Design for Gas Engine Generator.”



18



Back Up Power Supply in ORU



To become:



No



AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders



Item



Back up power supply in ORU is supplied by RU IV and/or PLN.



19



Sea Water Piping Material



Appendix 1 – TOR



PGN-JK-F006-EEL-CA-0002



Cable Sizing



Appendix 2 – TOR



PGN-JK-F005-EEL-PS-0202



Specification – Power Generation Emergency Diesel Generator



Appendix 2 – TOR



PGN-JK-F005-EEL-RE-0201



Power System Studies



Appendix 1 – TOR



PGN-JK-F006-EPG-PS-0001



Specification for Piping and Pipeline Material Class



Appendix 1 – TOR



PGN-JK-F006-EPG-DG-0022



ORU Vent Flare System



Appendix 2 – TOR



PGN-JK-F005-EMC-DS-0217



Datasheet ORU HP Flare Stack



Appendix 6 – TOR



PMO-LNG-F006-ECE-CE-0002



Bill of Quantity



From: Sea Water Piping shall use GRE material. To become: Contractor may propose using materials lower than GRE, such as GRV and GRP as long as they have sufficient allowable span, UV resistance, and operating pressure and temperature range according to with the Piping Class E01N. The brand and type of glass pipe material proposed by Contractor shall be approved by PGN. From: Design Pressure of Flare KO Drum is 28.6 barg



20



Flare KO Drum



See Appendix 1 – PGN-JK-F006-EPS-DG-0022 Rev 0 ORU Vent Flare System Sheet 2 of 2. To become: Design Pressure of Flare KO Drum is 18.6 barg. From: See Appendix 6 – PMO-LNG-F006-ECE-CE-0002 Rev.0 Bill of Quantity



21



Bill of Quantity



To become: See Appendix 6 – PMO-LNG-F006-ECE-CE-0002 Rev.1 Bill of Quantity



ATTACHMENT – AMENDED DOCUMENTS Attachment of the Amended Documents can be accessed in the following link: http://tiny.cc/AttachmentAmendment Password: SaptaPGN2021!