5 0 175 KB
No 1
AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders
Item Cryogenic Pipe Size
From:
Appendix 1 – TOR
PGN-JK-F006-EPS-PH-0001
Operating and Control Philosophy
2 x 16” Cryogenic Pipe to accommodate 4000 m3/h LNG transfer.
Appendix 1 – TOR
PGN-JK-F006-EPS-BD-0001
Process Design Basis
Appendix 1 – TOR
PGN-JK-F006-EPS-DG-0001
PFD LNG Storage & Regasification System
Appendix 1 – TOR
PGN-JK-F006-EPS-DG-0005
PnID Jetty and Transfer Line
Appendix 1 – TOR
PGN-JK-F006-EPS-DG-0006
Appendix 2 – TOR
PGN-JK-F005-EPS-CA-0204
Appendix 1 – TOR
PGN-JK-F006-EPS-RE-0001
Appendix 2 – TOR
PGN-JK-F005=EOF-AS-0201
Jetty Assessment
2 x 14” Cryogenic Pipe to accommodate 4000 m /h LNG transfer.
Appendix 1 – TOR
PGN-JK-F006-EPG-DG-0002
Piping Plan Layout For Line Process Regasification Terminal
From:
Appendix 2 – TOR
PGN-JK-F005-ECV-DG-0215
Regas Terminal – Pipe Rack Member Schedule, Plan and Elevation
Appendix 2 – TOR
PGN-JK-F005=EOF-AS-0201
Jetty Assessment
Appendix 1 – TOR
PGN-JK-F006-EPG-DG-0002
Piping Plan Layout For Line Process Regasification Terminal
From:
Appendix 1 – TOR
PGN-JK-F006-EPL-BD-0001
Pipeline Design Basis
See Appendix 1 – PGN-JK-F006-EPL-DG-0001 Alignment Sheet Pipeline Cilacap Rev.0
Appendix 1 – TOR
PGN-JK-F006-EPL-DG-0001
Alignment Sheet Pipeline Cilacap
Appendix 2 – TOR
PGN-JK-F005-EPL-RE-0205
Pipeline Route Selection Report
To become: 3
2
Pipe Rack Modification at Jetty-1
PnID ORU LNG Storage Tank System Stage 1 Line Sizing Calculation (FEED Doc.) Process Simulation Study Report (Re-FEED Doc)
Pipe rack foundation installed by relocating existing 16” crude pipe. See Attachment – PGN-JK-F005-ECV-DG-0215 Rev. 0 Regas Terminal – Pipe Rack Member Schedule, Plan and Elevation, Sheet 2 of 10 To become: Pipe rack foundation installed by relocating existing 4” freshwater pipe. See Attachment – PGN-JK-F005-ECV-DG-0215 Rev. 1 Regas Terminal – Pipe Rack Member Schedule, Plan and Elevation, Sheet 2 of 10
3
Gas Pipeline Route
No
AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders
Item To become:
5
6
Gas Pipeline Wall Thickness
Design Factor of Pipeline
Mill tolerance for line pipe
PGN-JK-F005-EPL-DG-0201
Pipeline Overall Field Layout
Appendix 2 – TOR
PGN-JK-F005-EPL-DG-0203
Pipeline Route Drawing
Appendix 2 – TOR
PGN-JK-F005-EPL-DG-0205
Pipeline Road Crossing Typical Details
From:
Appendix 1 – TOR
PGN-JK-F006-EPG-PS-0001
Specification for Piping and Pipeline Material Class
Pipeline NPS 14, Grade X46, Wall Thickness 0.5”
Appendix 1 – TOR
PGN-JK-F006-EPL-BD-0001
Pipeline Design Basis
Appendix 1 – TOR
PGN-JK-F006-EPL-RE-0001
Pipeline Road Crossing Analysis
To become:
Appendix 1 – TOR
PGN-JK-F006-EPL-CA-0001
Pipeline Wall Thickness Calculation
Pipeline NPS 14, Grade X46, Wall Thickness 0.375”
Appendix 1 – TOR
PGN-JK-F006-EPL-DS-0001
Data Sheet for Line Pipe
Appendix 1 – TOR
PGN-JK-F006-EPL-DG-0001
Alignment Sheet Pipeline Cilacap
From:
Appendix 1 – TOR
PGN-JK-F006-EPL-BD-0001
Pipeline Design Basis
Design Factor 0.3
Appendix 1 – TOR
PGN-JK-F006-EPL-RE-0001
Pipeline Road Crossing Analysis
To become:
Appendix 1 – TOR
PGN-JK-F006-EPL-CA-0001
Pipeline Wall Thickness Calculation
Design Factor 0.4
Appendix 1 – TOR
PGN-JK-F006-EPL-DS-0001
Data Sheet for Line Pipe
From:
Appendix 1 – TOR
PGN-JK-F006-EPL-RE-0001
Pipeline Road Crossing Analysis
Mill tolerance ± 0.1 tselected
Appendix 1 – TOR
PGN-JK-F006-EPL-CA-0001
Pipeline Wall Thickness Calculation
Appendix 1 – TOR
PGN-JK-F006-EPL-DS-0001
Data Sheet for Line Pipe
Appendix 1 – TOR
PGN-JK-F006-EIC-DG-0001
ICSS Architecture ORU & ORF
See Attachment – PGN-JK-F006-EPL-DG-0001 Alignment Sheet Pipeline Cilacap Rev.1 4
Appendix 2 – TOR
To become: Mill tolerance + 0.1 tselected; - 0.05 tselected 7
Instrumentation Data Communication from ICSS ORU to ICSS Marine Area 70
From: No instrument data communication from ICSS ORU to ICSS Marine Area 70. See Appendix 1 – PGN-JK-F006-EIC-DG-0001 ICSS Architecture
No
AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders
Item
ORU & ORF Rev 0, Sheet 3 & 4. See Appendix 2 – PGN-JK-F005-ETL-PS-0201 Specification for Interface and Exchange Data Rev 0. To become: Instrument data communication from ICSS ORU to ICSS Marine Area 70 is provided. See Attachment – PGN-JK-F006-EIC-DG-0001 ICSS Architecture ORU & ORF Rev 1, Sheet 3 & 4.
Appendix 2 – TOR
PGN-JK-F005-ETL-PS-0201
Specification for Interface and Exchange Data
Appendix 2 – TOR
PGN-JK-F005-ECV-DG-0206
ORF – Modification Control Building Layout
Appendix 1 – TOR
PGN-JK-F006-EEL-DG-0002
Single Line Diagram
See Attachment – PGN-JK-F005-ETL-PS-0201 Specification for Interface and Exchange Data Rev. 1 8
Control Building Layout
From: Utilizing Ground Floor and 1st Floor. See Appendix 2 – PGN-JK-F005-ECV-DG-0206 ORF – Modification Control Building Layout Rev. 0 To become: Utilizing Ground Floor only. See Attachment – PGN-JK-F005-ECV-DG-0206 ORF – Modification Control Building Layout Rev. 1
9
Single Line Diagram
From: See PGN-JK-F006-EEL-DG-0002 Single Line Diagram Rev. 0 To become: See PGN-JK-F006-EEL-DG-0002 Single Line Diagram Rev. 1
No 10
AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders
Item Datasheet – Power Generation Gas Engine
From: See PGN-JK-F006-EEL-DS-0001 Datasheet – Power Generation Gas Engine Generator Rev. 0 Appendix 1 – TOR
PGN-JK-F006-EEL-DS-0001
Datasheet– Power Generation Gas Engine Generator
Appendix 1 – TOR
PGN-JK-F006-EEL-PS-0002
Specification - General Electrical Installation
To become: See PGN-JK-F006-EEL-DS-0001 Datasheet – Power Generation Gas Engine Generator Rev. 1 11
Datasheet – Neutral Grounding Resistor
From: None To become: Provided. See PGN-JK-F006-EEL-DS-0003 Datasheet – Neutral Grounding Resistor Rev. 0
12
Specification – General Electrical Installation
From: See PGN-JK-F006-EEL-PS-0002 Specification - General Electrical Installation Rev. 0 To become: See PGN-JK-F006-EEL-PS-0002 Specification - General Electrical Installation Rev. 1
13
ORF Cable Layout
From: None
No
AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders
Item To become: Provided.
See Attachment – PGN-JK-F006-EEL-DG-0003 ORF Power and Control Wiring Layout Rev 0. 14
Datasheet – Variable Speed Drive (VSD)
From: None To become: Provided. See Attachment – PGN-JK-F006-EEL-DS-0004 Datasheet – Variable Speed Drive Rev 0.
15
Process Flow Diagram
From: Unloading Hose Package Size: • •
2 x 16” (Liquid Hose) 1 x 12” (Vapor Hose)
See Appendix 1 – PGN-JK-F006-EPS-DG-0001 PFD LNG Storage & Regasification System Rev 0. Appendix 1 – TOR
To become: Unloading Hose Package Size: • •
4 x 8” (Liquid Hose) 2 x 6” (Vapor Hose)
Capacity: •
Unloading Rate 4000 m3/h
PGN-JK-F006-EPS-DG-0001
PFD LNG Storage & Regasification System
No
AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders
Item •
Vapor Return Rate 11500 m3/h
See Attachment – PGN-JK-F006-EPS-DG-0001 PFD LNG Storage & Regasification System Rev 1. 16
Approved Manufacturer List (AML) of Pertamina RU IV
From: None. To become:
Appendix 1 – TOR
PGN-JK-F006-PMN-LS-0001
Approved Manufacturer List Regas Terminal, Pipeline, & ORF
TOR
PMO-LNG-F006-GEN-SW-0001
Terms of Reference (“TOR”) Proyek EPC Terminal Regasifikasi LNG Cilacap
From:
Appendix 1 – TOR
PGN-JK-F006-EEL-BD-0001
Electrical Design Basis
Back up power supply in ORU is supplied by Emergency Diesel Engine Generator.
Appendix 1 – TOR
PGN-JK-F006-EEL-LS-0001
Electrical Equipment List
Appendix 1 – TOR
PGN-JK-F006-EEL-RE-0001
Electrical Load Analysis
Appendix 1 – TOR
PGN-JK-F006-EEL-DG-0202
Single Line Diagram
Appendix 1 – TOR
PGN-JK-F006-EEL-DS-0002
Datasheet – Power Generation Emergency Diesel Generator (EDG)
Provided for interfacing facility between PGN and Pertamina RU IV. See Attachment – PGN-JK-F006-PMN-LS-0001 Rev. 1 Approved Manufacturer List Regas Terminal, Pipeline, & ORF. 17
Power Generator
From: “Engineering Design for Dual Fuel Engine” Refer to Terms of Reference (“TOR”) Proyek EPC Terminal Regasifikasi LNG Cilacap, Doc No. PMO-LNG-F006-GEN-SW-0001 Rev.0, Page 26, Part 9. Electrical, poin j. To become: “Engineering Design for Gas Engine Generator.”
18
Back Up Power Supply in ORU
To become:
No
AMENDMENT TO TERMS OF REFERENCE (“TOR”) PROYEK EPC TERMINAL REGASIFIKASI LNG CILACAP Document Impacted to be Considered by Amendment Bidders
Item
Back up power supply in ORU is supplied by RU IV and/or PLN.
19
Sea Water Piping Material
Appendix 1 – TOR
PGN-JK-F006-EEL-CA-0002
Cable Sizing
Appendix 2 – TOR
PGN-JK-F005-EEL-PS-0202
Specification – Power Generation Emergency Diesel Generator
Appendix 2 – TOR
PGN-JK-F005-EEL-RE-0201
Power System Studies
Appendix 1 – TOR
PGN-JK-F006-EPG-PS-0001
Specification for Piping and Pipeline Material Class
Appendix 1 – TOR
PGN-JK-F006-EPG-DG-0022
ORU Vent Flare System
Appendix 2 – TOR
PGN-JK-F005-EMC-DS-0217
Datasheet ORU HP Flare Stack
Appendix 6 – TOR
PMO-LNG-F006-ECE-CE-0002
Bill of Quantity
From: Sea Water Piping shall use GRE material. To become: Contractor may propose using materials lower than GRE, such as GRV and GRP as long as they have sufficient allowable span, UV resistance, and operating pressure and temperature range according to with the Piping Class E01N. The brand and type of glass pipe material proposed by Contractor shall be approved by PGN. From: Design Pressure of Flare KO Drum is 28.6 barg
20
Flare KO Drum
See Appendix 1 – PGN-JK-F006-EPS-DG-0022 Rev 0 ORU Vent Flare System Sheet 2 of 2. To become: Design Pressure of Flare KO Drum is 18.6 barg. From: See Appendix 6 – PMO-LNG-F006-ECE-CE-0002 Rev.0 Bill of Quantity
21
Bill of Quantity
To become: See Appendix 6 – PMO-LNG-F006-ECE-CE-0002 Rev.1 Bill of Quantity
ATTACHMENT – AMENDED DOCUMENTS Attachment of the Amended Documents can be accessed in the following link: http://tiny.cc/AttachmentAmendment Password: SaptaPGN2021!