7 0 55 KB
LOADING PLAN DATE: Port:
4-Dec-18 TANJUNG
Last Cargo(es):COAL
Tons Grade
Cargo Hold No.
2 3 4 5 6 7 8
10 TOTAL
SF:1.160980
Loading or unloaing:
Ballast Pumping Rate: 1600 m3/h
Number of loaders/ dischargers:
LOADING
Dock water Density: 1.020
Load discharge rate:
2
Voyage No.
1806
Max draught available(H/W) :
17.3+2M
Min. Air Drafr
7500/H
22.0M
7
6
5
4
3
2
1
9800.00MT
13000.00MT
12300.00MT
11080.00MT
12900.00MT
10180.00MT
8900.00MT
97.20/SLACK
95.80/SLACK
96.30/SLACK
93.50/SLACK
97.20/SLACK
75.00/SLACK
96.90/SLACK
Max.sailing/ draft vailable:117.30+2M
78160.00MT
Pour No.
1
M/V WEI HE
BULK COAL
To/from S. KOREA Port
Totals:
Vessel:
3 5 2 6 4 7 1 4 3 6 2 7 1 7 1 5 2 4
Time Require Ballast Operation d Tons (hours) ARR TANJUNG DRAFT(NO.4 CH BALLAST:6000MT) 6000 PO:(NO.4 CH:4500MT,NO.3 TST) 1.6 6000 5000 PO:(NO.4 CH:1500MT, 1.5 NO.2TST,NO.6 DBT) 5000
4000 PO:(NO.4 TST,NO.7DBT) 1.1 4000 5580 PO:(NO.1TST, DBT FPT) 1.6 5580 6900 8000 3680 3680 EDUCTION BALLAST 9.0 2120 2120 1200 6300 BALANCE 2000 MT,STOP LOADING,CHECK BALANCE,TRIMMING 1500 1500 78160.00
Remark: No any deviation from above mention plan should be made without prior approval of chief officer. The above figures are approximate only & are subject to change depending on the prevailing circumstances and conditions
Comments
FULL FULL
FULL FULL FULL FULL FULL
Calculated Values Draft Maximum FWD AFT SF% BM% 4.39 6.79 51.00 67.90
Calculated Values Air MS Trim Draft Draft 18.03 5.59 -2.40
5.33
7.80
43.50
56.40
17.39
6.57
-2.47
6.45
8.31
38.60
53.40
15.93
7.38
-1.86
6.55
9.78
24.50
43.60
16.37
8.17
-3.23
8.69
9.89
-32.10
41.50
14.24
9.29
-1.20
10.50
12.44
67.70
-67.50
12.33
11.47
-1.94
11.59
13.48
35.00
-46.40
11.46
12.54
-1.89
12.45
13.85
43.00
-25.50
10.65
13.15
-1.40
13.72
14.76
-55.70
-55.30
-0.30
14.24
-1.04
14.69
14.69
-55.70
-59.90
14.69
0.00
14.8 Terminal Superintendent: SIGNATURE BY MASTER :DENG YINGLI Chief Officer:WANG LU
Observed Values Draft FWD AFT MS