DAILY PLAN – 11 April 2022
KINTAP EAST Senin, 11 April 2022 FLEET SETTING OB
OB FLEET Production Plan Fleet (Bcm)
Scania
400
4.968
-
ST 4
400
-
-
-
SY500
ST 1 STRIP
6
-
SY500
ST 1 MPP
220 132
5.768 3.062 1.441
6
-
No
Digger
Model
Area
1
HEX3104
PC1250
ST 4
2
HEX3106
PC1250
3
EX1370
4
EX1352
Pdty (bcm/jam)
HAULER QTY Plan Quester Hino 700 HD465 CWE280T 4
Dumping Point
Material
Distance (m)
OB
1.708
4
OB
1.710
IPD BC3 RL+6
-
-
1.401
IPD BANK SPOIL
-
-
Top Soil Wet Mud
1.411
IPD BANK SPOIL
Location IPD BC3 RL+6
5
EX1346
SY500
ST2 LW
220
3.018
6
-
-
-
OB
2.768
IPD BC3 RL+5
6
EX1351
SY500
ST 2
220
3.018
6
-
-
-
OB
2.761
IPD BC3 RL+5
7
EX1369
SY500
ST 2
220
3.062
6
-
-
-
OB
2.722
IPD BC3 RL+5
8
EX1353
SY500
ST 2
220
3.018
6
-
-
-
OB
2.696
IPD BC3 RL+5
9
EX1349
SY500
ST 2
220
3.062
6
-
-
-
OB
2.611
IPD BANK SPOIL
10
EX1348
SY500
ST 2
220
6
-
-
-
OB
2.609
IPD BANK SPOIL
11
EX1344
SY500
ST 2
220
3.062 3.018
OB
2.762
IPD BC3 RL+4
Total
11
6
-
36.501
COAL FLEET
54
-
-
8
2.251
FLEET SETTING COAL MINING
No
Digger
Model
Area
1 2 3
EX1368 EX1347 EX1379
SY500 SY500 SY500
PIT KINTAP EAST PIT KINTAP EAST PIT KINTAP EAST
Total
3
Productivity Digger (ton/jam) 220 220 220
Production (Ton) 3.062 3.018 3.062
FUSO
9.145
Dibuat oleh :
Short Term
GnG
Alfred/Ilham/Galih
Irwan
HAULER QTY HINO 7 7 7 14
7
Scania -
SEAM EU1 EU1 EU1
Distance (m) 6.041 6.267 6.277
Dumping Point CPP CPP CPP
6.193
Disetujui oleh: Diketahui oleh :
Diterima oleh :
HSE Amrih W
HOS HOS MED MED
HOD MOD
HOS MOD
A.Ghani A.Ghani
Arofik Anwar
Fransisco Y. M/Mas Mawardi/Agus.R
COAL EXPOSE MAP PIT EAST QUANTITY PLAN TON EU1 88 16,000 FU3 98 4,000 11-Apr-22 96 1,000 EU0 90 2,000 EUOL 90 2,000 Ready to getting Ready to getting 24,000 PIT
Exposed
SEAM
BLOCK
PIT EAST
24,000
Exposed
-
PIT EAST Expose progress Expose progress
-
STATUS
QUALITY BASED ON MODEL ASH TS SE
REMARK
Ready to getting Seam FU3 est. 4,000 MT.
Mined out area FU3
Water ponded dan covered by mud
1,000
PIT EAST
1,000
Total Coal
24,000
N
Ready to getting Ready to getting Expose progress Ready to getting Ready to getting
Exclude expose progress & water ponded/covered by mud
Mined out area EU1
Expose progress Seam EU0 est. 1,000 MT.
1 Ready to getting Seam EU0L est. 2,000 MT. Ready to getting Seam EU0 est. 2,000 MT.
Ready to getting Seam EU1 est 16,000 MT.
B86
B87
B88 B89
B90
B91
B92
B94
B93
B95
B96
Keterangan: = Ready to getting telah terekspose dan cleaning = Expose progress alokasi fleet OB < 2 m to coal roof = Exposed
1
= Coal cleaning priority
B97
B98
B99
GEOTECHNICAL ISSUE - PIT EAST 313500,000000
314400,000000
315300,000000
9580500,000000
312600,000000
,000000
311700,000000
Void AMJ 5
Stage 2 East 9580000,000000
,000000
TS02 4 Stage 2 Creek
2
3 Void Ambalat
Void MPP
Stage 4 6
MPP_Road ,000000
Stage 1 1
TS03 IPD P9D (Ex PAMA)
8 Bundwall_HW
9579500,000000
7
9579000,000000
,000000
IPD BC3
,000000
Ramp_CoalHaul_KM3
115°10'0"E
311700,000000
115°20'0"E
312600,000000
Mine Engineering Departement Pit Geologist & Geotechnical Engineer
KALIMANTAN SELATAN
Satui
3°40'0"S
Aranio
3°50'0"S
115°10'0"E
115°20'0"E
180
360
720
1.080
Geotech Issue
Tingkat Resiko
1 Utara LW PIT 9 Meranti
Crack longsor busur IPD
Menengah
2 Project diversi AMJ
Crack pada lereng diversi
Menengah Tinggi
3 Stage 2 timur
Longsor pada lereng stage 2 timur
313500,000000
4 Stage 2 timur
314400 Failure material
5 Stage 2 timur
Bahaya longsor
Menengah
6 Lereng Jalan Hauling Stage 4
Longsor busur (Rembesan air diatas EU1)
Signifikan
7 HW Stage 1 project jalan Mandalika
Bahaya longsor
Menengah
8 Mud Stage 1
Bahaya tanggul penyekat lumput hancur
Menengah
1.440 meters
Legend :
Kintap Jorong
0
Area
Area Kritikal Longsor - Menengah
ct_wk58_p9.dxf Polyline
Area Kritikal Longsor - Tinggi
Block_Eastt_KCP
Area Kritikal Lonsor - Signifikan
PIT_Area
,000000
Tinggi
Rekomendasi 1. Reshaping crack 2. Tidak diperbolehkan melakukan dumping / penambahan material di area ini 1. Slope sesuai dengan desain 2. RL sesuaikan dengan desain 1. Observasi geoteknik rutin dilapangan 2. Sloping lereng sesuai dengan desain ,000000 1. Observasi geoteknik rutin dilapangan 315300 2. Sloping lereng sesuai dengan desain 1. Observasi geoteknik rutin dilapangan 2. Tidak membuat double bench pada area ini 1. Melakukan peralihan jalan 2. Tidak dilalui untuk hauling 1. Lakukan penurunan pada RL sesuai dengan desain 2. Observasi geoteknik rutin dilapangan 1. Observasi Geoteknik rutin dilapangan 2. Tidak memotong/meniping lereng tanggul sekatan lumpur
9578500,000000
Geotech Issue February Week 58 No
DAILY (PIT 9 EAST) – 11 April 2022
PIT OVERVIEW
3 4 8
2
N 1
Stock Soil 02
11 10 3
1
7
12
Divertions
Stage 4
1
9
4
2
Stage 1
4
13
6
7 Stage 2 8
Stock Soil 03
2 10
5
3
5 6
9 12
IPD P9D EX-PAMA 14
3
1b 2 1
IPD BC3
1a
Dumping IPD Pama flat RL +36, elv. aktual +35
Fleet Allocation Stage 2 – 11 April 2022
PLAN
OB
Activity
No
Unit
Pit
Material
Block
Dump
Dist
Elv From
To
Plan Hauler
6
EX1351
ST 2
ST 2
B97
IPD BC3 RL+5
2.761
29,2
26
6
7
EX1369
ST 2
ST 2
B94
IPD BC3 RL+5
2.722
29
26
6
8
EX1353
ST 2
ST 2
B95
IPD BC3 RL+5
2.696
23,6
21
6
9
EX1349
ST 2
ST 2
B93
IPD BANK SPOIL
2.611
29,4
26
6
10
EX1348
ST 2
ST 2
B97
IPD BANK SPOIL
2.609
37
34
6
11
EX1344
ST 2
ST 2
B97
IPD BC3 RL+4
2.762
27,6
25
6
Note : 1. 6 x SY500 Steriping OB di area Stage 2 2. Fokus kepada pembuatan akses jalan to RL 7 3. Segera coal getting seam EU 0 di area stage 2 timur Coal Getting EU 0
Striping Area Create Access to RL 7
1 3
Create Access to RL 9
Striping Area to expose
5 4 6b
2 1
Setting Unit Support Dozer : 1 x Dozer Shantui Stage 2 East Setting Unit Support Grader : 1xGrader CAT 14M stage 2 support to IPD BC3 1xGrader XCMG stage 2 support to IPD Ex Pama
Fleet Allocation Stage 2 LW – 11 April 2022 PLAN No
O B
Activity
5
Activity
No
COAL
Unit EX1346 Unit
Pit
Material
ST2 LW Pit
Elv
Block
Dump
Dist
ST2 LW
B97
IPD BC3 RL+5
2.768
30
27
6
Seam
Blok
Dump
Dist
RL Elv
Act Elv
Plan Hauler
From
To
Plan Hauler
2
EX1347
PIT KINTAP EAST
EU1
B97
CPP
6.267
0
Mineout
7
3
EX1379
PIT KINTAP EAST
EU1
B87
CPP
6.267
0
Mineout
7
Note : • Pastikan untuk kordinasi terkait keamanan dengan pihak arutmin saat kegiatan berlangsung. • 1 x Stripping OB • Loading/ expose dengan acuan patok pita yang sudah ada. Fokus layer by layer untuk memperluas area expose FU3 sesuai direct/arah penambangan
Area Optimasi
Area Coal Getting
1
7
Plan area priority : Priority 1 : Stripping OB area No 1 ke RL 30 (Ekspose seam FU3), Segera lakukan Coal Getting apabila terdapat pergerakan dari PETI Priority 2 : Priority 3 : Plan Area General Activity :
Fleet Allocation Stage 4 – 11 April 2022
PLAN
OB
Activity
No
Unit
Pit
Material
Block
Dump
Dist
Elv From
To
Plan Hauler
1
HEX3104
ST 4
ST 4
B96
IPD BC3 RL+6
1.708
30
27
4
2
HEX3106
ST 4
ST 4
B95
IPD BC3 RL+6
1.710
30
27
4
Coal Getting EU 0
1 RL 20
2 1
Note : • Pastikan jalur untuk HD ke area Box Cut Stage 4 sesuai dengan geometri kebutuhan jalan
Setting Unit Support Grader : 1xGrader CAT 14M stage 2 support to IPD BC3
Fleet Allocation Stage 1 – 11 April 2022
PLAN
OB
Activity
No
Unit
Pit
Material
Block
Dump
Dist
Elv From
To
Plan Hauler
3
EX1370
ST 1 STRIP
ST 1 STRIP
B88
IPD BANK SPOIL
1.401
21,5
19
6
4
EX1352
ST 1 MPP
ST 1 MPP
B97
IPD BANK SPOIL
1.411
0
-3,0
6
Pit
Seam
Blok
Dump
Dist
RL Elv
Act Elv
Plan Hauler
PIT KINTAP EAST
EU1
B90
CPP
6.267
28
Mineout
7
Activity
No
COAL
1
Unit EX1368
Stripping Top Soil 1. 2.
6
8 4
Sidecast material OB ke Barat untuk blending lumpur Loading Material yang sudah terblending dari Loading point mud ke arah selatan
Stage Plan : 1. 1x SY 500 mud getting 2. Sidecast material OB ke Barat untuk blending lumpur 3. Loading Material yang sudah terblending dari Loading point mud ke arah selatan
Note : • Perhatikan atau selalu monitoring FK dari jalan yang berpotensi terjadi retakan/sliding • Buat 2x jenjang & bench di sisi utara stage area / selatan fast track • Pastikan area loading aman untuk aktivitas loading lumpur • Pengawasan lebih di area lumpur
Setting Unit Support Dozer : 1xDozer Shantui Setting Unit Support Grader : 1xGrader CAT 14M stage 2 support to IPD BC3
WASTE DUMP ALLOCATION
IPD BC 3
Key Point: 1. Prioritas dumpingan ke arah no 1 dan 3 (sisi low wall dan high wall) lalu bergeser ke tengah (area no.2) 2. Pastikan pembuatan tanggulan (pad) untuk batas area dumping 10-15 meter dari ujung arah dumpingan 3. Pastikan agar material dumpingan tidak menutupi jalur air/paritan. 4. Selalu periksa/pengecekan secara berkala area bibir/crest dumpingan. 5. Pastikan alat bantu sling dan sackle tersedia di dumpingan
3 2 1
WASTE DUMP ALLOCATION
IPD BC 3 – Bank Spoil Key Point: 1. Prioritas dumpingan ke arah utara, dan lakukan ramp down pada area tersebut 2. Pastikan pembuatan pad pada top ramp 3. Pastikan jarak dumping 10-15 meter dari tp ramp
Ramp down area ini
WASTE DUMP ALLOCATION
STOCKSOIL TS02
Act +60
Act +60
Final bdy Monthly
BM Survey (Jangan sampai tertutup)
Setting Unit Support Dozer : 1xDozer Class Shantui (untuk 2 Fleet Small) Setting Unit Support Grader : 1x Grader XCMG front small stage 2 support to TS02
OB Hauling Road Design to Disposal BC3
+16
Bench RL+25
OB Hauling Road Design to BC3 Grade : 7,7 % Volume Cut : 13,324 BCM
+22
RE-CONSTRUCT SP 10
4
1
3
2
Project – Reconstruct SP10
N
Line HDPE
Key Point: •
Settpond capacity existing (5,6,7,8,9) = 12.000 m3
•
Additional settpond capacity design by AI (1,2,3,4) = 39.216 m3
•
Maintenance settpond existing (5,6,7,8,9)
•
Material additional settpond design by material non insitu (waste material), with average thickness about 10m.
SP Capacity SP 10 Control Box Mud Pond Total
Inlet
N
Pump Type DnD 200
1
2 3
4 5 7 8
6 9 Outlet
Location
Width (m)
Kompartemen 1 Kompartemen 2 Kompartemen 3 Kompartemen 4
Debit (m3/hr) 850
50 30 30 40
Geometry Length (m) Depth (m) 70 50 50 127
Qty Pump
WH
3
20
5 5 5 5
Capacity Volume (m3) 12,900 4,936 4,954 16,426 39,216
Max Debit
SP Capacity
(m3/day) 51,000
(m3) 52,241
Material Non Insitu Non Insitu Non Insitu Parsial Non Insitu
Retention Time (hours) 24.6
Remarks New Construct New Construct New Construct Pond Widening
Overview N
N
Photo: 5 April 2022
Photo: 5 April 2022
Photo: 5 April 2022
Photo: 5 April 2022
Summary: Total progress 46,45% dari keseluruhan pekerjaan reconstruct SP10
Project – Reconstruct SP10 PROJECT
1
TASK
Clearing area
Total
UoM
Unit
PRIORITY
START
PLAN END
ACTUAL END
% COMPLETE
Status
1,000.00
BCM
SY215
HIGH
2-Mar-22
3-Mar-22
10-Mar-22
100.0%
Closed
Prepare Area 2
Prepare Access
49,338
BCM
PR754
HIGH
3-Mar-22
9-Mar-22
100.0%
Closed
3
Construct Setpond (Comp 1)
45,000
BCM
ZX370
HIGH
3-Mar-22
4-Apr-22
0.0%
Open
Construct Setpond (Comp 2)
5,368
BCM
ZX370
HIGH
4-Apr-22
8-Apr-22
100.0%
Progress
Construct Setpond (Comp 3)
4,559
BCM
ZX370
HIGH
8-Apr-22
12-Apr-22
38.6%
Open
Pond Widening
9,024
BCM
ZX370
HIGH
12-Apr-22
19-Apr-22
2.2%
4
Control Box
5
6
Mud Pond
11.46%
Progress
Note: • Reconstruct SP10 continue widening comp 2 & 3