5 0 35 KB
XVIII. HARGA SATUAN PEKERJAAN INTERIOR 1.
1 m2 Backdroop Multiplek Lapis HPL
No A
B
C
Uraian TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor
L 01 L 02 L 03 L 04
OH OH OH OH
0.5500 75,000.00 1.0250 95,000.00 1.3350 100,000.00 0.1715 110,000.00 JUMLAH TENAGA KERJA
41,250.00 97,375.00 133,500.00 18,865.00 290,990.00
BAHAN Kayu kaso kls II, uk. 5/7 Multiplek 9 mm, uk. 1,20 x 2,40 Paku 5 - 10 cm Paku 1 - 3 cm Lem Kuning HPL ( 1,2 x 2,4 m )
C.5 E.9 I.2 I.1 A.19 E.13
m3 lbr kg kg kg Lbr
0.0154 2,592,500.00 0.7500 170,800.00 0.2000 15,000.00 0.0300 20,000.00 0.8000 40,000.00 0.7639 188,700.00 JUMLAH HARGA BAHAN 1.0000 200,000.00
39,924.50 128,100.00 3,000.00 600.00 32,000.00 144,145.83 347,770.33 200,000.00
JUMLAH HARGA ALAT
200,000.00
D E F
Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)
2
1 m2 Pemasangan Wallpaper
No A
Uraian
838,760.33 125,814.05 964,574.38
15% X D
Koefisien
Harga Satuan (Rp)
Satuan
Pekerja
L 01
%
0.3500
75,000.00
26,250.00
Tukang Kayu
L 02
%
0.1750
95,000.00
16,625.00
Kepala Tukang
L 03
%
0.0170
100,000.00
1,700.00
Mandor
L 04
%
0.0020
110,000.00
TENAGA
220.00 44,795.00
BAHAN Wallpaper
E.12
m2
2.2000
11,150.00
24,530.00
Lem putih Fox
A.20
kg
0.2500
19,500.00
4,875.00
JUMLAH HARGA BAHAN C
Jumlah Harga (Rp)
Kode
JUMLAH TENAGA KERJA B
Jumlah Harga (Rp)
Satuan
PERALATAN
Koefisien
Harga Satuan (Rp)
Kode
29,405.00
PERALATAN JUMLAH HARGA ALAT
D
Jumlah (A+B+C)
E
Overhead & Profit
F
Harga Satuan Pekerjaan (D+E)
74,200.00 15% X D
11,130.00 85,330.00