INSPECTION & TEST PLAN ( ITP )
CONTRACT NO.
:
Revision No.
JOB NO.
:
PROJECT NAME
:
CLIENT
:
CONTRACTOR
:
DESCRIPTION
:
PIPING WORKS
DESIGN CODE
:
AS PER SPECIFICATION
REFFERENCE
:
BID DOCUMENT BOOK I, II, IIIA, IIIB, IVA, IVB
INSPECTION AUTHORITY
:
TO BE ADVISE
:0
PLTU BANTEN 2 X 300 MW LABUAN, BANTEN
DISTRIBUTION CHENGDA PROJECT /SITE MANAGER
PREPARED BY :
SIGN :
DATE :
CHENGDA QA/QC MANAGER
CHECKED BY
:
SIGN :
DATE :
SITE MANAGER
APPROPVED BY :
SIGN :
DATE :
QA/QC MANAGER FIELD ENGINEER AND SUPERVISOR
NOTE : ALTHOUGH ACTIVITIES IN THIS INSPECTION TEST PLAN ARE ARRANGED SEQUENTIALLY, THE ACTUAL SEQUENCE MAY VARY TO SUIT SITE CIRCUMTANCES
C/qc cilacap/itp cilacap/i-t3104-qaqc-003 rev. 0
INSPECTION & TEST PLAN ( ITP ) Rev. CONTRACT No. : JOB No.
:
0
:0
PROJECT NAME
:
PLTU BANTEN 2 X 300 MW LABUAN, BANTEN
DISCRIPTION
:
PIPING WORKS
LEGENT CLASSIFICATION NOTIFICATION
: Inspection Request in writing and require a minimum of 24 hours notice of impending inspection / test.
H
- HOLD POINT
: As notification point, however work may not proceed beyond this point without acceptance or formal waiver from Inspection Authority ( Client / Owner )
A1
- 100% INSPECTION OR TEST
: Execution or inspection by TJE
A2
- RANDOM INSPECTION
: nspection by TJE at random sample.
W
- WITNESS
: Witness of inspection by Client/Owner & Sub-Contractor may proceed if Client/Owner not appearance at the pointed time Witness point shall be given by Notification
SW - SPOT WITNESS
: Witness of inspection by Client / Owner and to be done at spot or random ( random sample )
R
- REVIEW
: Review of certificate / document to ensure compliance with specification.
A
- APPROVAL
: Approval documentation ( Procedure, Work instruction, Inspection report, etc. )
ABBREVIATIONS AWS
=
American Welding Society
PWHT
=
Post Weld Heat Treatment
ASME
=
American Society Mechanical Engineers
CSA
=
Canadian Standard Association
ITP
=
Inspection Test Plan
ASNT
=
American Societ Non Destructive Testing
WPS
=
Welding Procedure Specification
Tech. Spec.
=
Technical Specification
ASTM
=
American Societ Testing of Material
PQR
=
Procedure Qualification Report
N/A
=
Not Applicable
API
=
American Petrolium Institute
NDE
=
Non Destructive Examination
WQTR
=
Welder Qualification Test Record
NOTES 1) Ref. Inspection activities & Approval Section of Document. a : Where there is a Subcontractor element, the Subcontractor involved will sign the approval of the activity ( NDE/PWHT ) b : Where there is no Subcontractor element, TJE will sign approval of activity and present to the Client. c : This Inspection Test Plan at INSPECTION ACTIVITY COLUM should be understood to all concers person will be incharge of tank work. 2) Inspection Test Plan Status It is to be understood that the Inpection forms an integeral parts of the control/verification documentation is needed However, where no other documents are required or exit " The Inspection Test Plan " only will be understood to be the control/verification document.
INSPECTION & TEST PLAN (ITP)
PIPE WORKS INSPECTION ACTIVITIES NO
DESCRIPTION & ACTIVITIES CHECK LIST
REFERENCE DOCUMENT
1.0 REVIEW & CHECK OF THE SPECIFICATIONS, PROCEDURES & CONTRACT DOCUMENTS 1.1 Review all technical specifications, procedures & work instructions Drawing 1.2 All tech. spec., procedures, work instruction shall be clarified, understood and Tech. Specification implemented accordingly Construction Execution Plan 1.3 Finalise deviation, generate new procedure and work instruction if required 1.1 PIPING WORKS (ABOVE GROUND) 1.1 MATERIAL RECEIVING REPORT 1.1.1 Verification document; packing list, mill certificates, if required etc. 1.1.2 Dimensional check if necessary 1.1.3 Check for damage 1.1.4 Raise NCR of any Non Comformance
VERIFYING DOCUMENT
Approved Tech. Spec. & Procedure
Material Receiving, Handling, and Storage Procedure Tech. Specification, Packing List, Drawing, NCR/CAR Proc.
Over, Shortage and Damage (OSD) Report, NCR
Construction Execution Plan WPS/WPQT
Qualification Test Report ( WPS/PQR Approved )
Material Receiving Inspect. Report,
REPR
REPR.
PLN REPR
R R
R/A R/A
R/A R/A
R
R/A
R/A
A1
W
R/A
A1 A1
R/A W/A
R/A W/A
A1 A2
SW SW
SW SW
1.2 INITIAL PREPARATION BEFORE STARTING WORK 1.2.1 1.2.2
Generate a new WPS ( if required ) Welder Performance Qualification Test
1.3 PIPING WORKS 1.3.1 Identification & Marking 1.3.2 1.3.3
Fit-up Inprocess Inspection
1.3.4 1.3.5
Preheat, Interpass Temperature Check Visual After Welding
1.3.6 1.3.7
NDT (if required) PWHT (if required)
1.3.8 Punchlisting 1.3.9 Pressure Test (Hydrostatic, Pneumatic, Leakage) 1.3.10 Cleaning and Flushing
Drawing Construction Execution Plan Teshnical Spec NDE Procedure PWHT Procedure
Visual Insp. Report
A1 A1
SW SW
SW SW
Hydrotest Procedure Flushing Procedure
NDE Report PWHT Report
A2 A1
W/R W/R
W/R W/R
Painting Procedure Insulation Procedure
Punchlist Report Pressure Test Report Flushing Report
A1 A1 A1
W/A W/A W/A
W/A W/A W/A
Painting Report
A1 A1
SW SW
SW SW
Insulation Report
A1
SW
SW
Material Receiving Inspect. Report,
A1
W/R
W/R
1.3.11 Hanger Installation & Adjustment Verification 1.3.12 Painting 1.3.13 Insulation (if any) 1.2 PIPING WORKS (UNDER GROUND) 1.2.1 MATERIAL RECEIVING REPORT 1.2.1.1 Verification document; packing list, mill certificates, if required etc. 1.2.1.2 Dimensional check if necessary 1.2.1.3 Check for damage 1.2.1.4 Raise NCR of any Non Comformance
Material Receiving, Handling, and Storage Procedure Tech. Specification, Packing List, Drawing, NCR/CAR Proc.
Over, Shortage and Damage (OSD) Report, NCR
INSPECTION & TEST PLAN (ITP)
PIPE WORKS INSPECTION ACTIVITIES NO
DESCRIPTION & ACTIVITIES CHECK LIST
REFERENCE DOCUMENT
VERIFYING DOCUMENT
Construction Execution Plan
Inspection Report Qualification Test Report
A1 A1
R R
R R
( WPS/PQR Approved )
A1
W/A
W/A
Inspection Report
A1
R/A
R/A
A1 A1 A1 A2 A1
SW SW SW SW SW
SW SW SW SW SW
Test Record
A1 A1
W/A SW
W/A SW
Material Receiving, Handling, and Storage Procedure Tech. Specification, Packing List, Drawing, NCR/CAR Proc.
Material Receiving Inspect. Report, Over, Shortage and Damage (OSD) Report, NCR
A1
W
W
Handover Report Drawing
Inspection Report
R A1
R/A R/A
R/A R/A
A1 A1
SW W/A
SW W/A
A1
W
W
R A1
R/A R/A
R/A R/A
A1
SW
SW
REPR
REPR.
PLN REPR
1.2.2 INITIAL PREPARATION BEFORE STARTING WORK 1.2.2.1 Checking Equipment and tool for painting application, inspection, etc. 1.2.2.2 Production Fusion Joint Demontration (if any) 1.2.2.3 Operator Performance Qualification Test 1.2.3 UNDERGROUND PIPING WORKS 1.2.3.1 Clarification Foundation Handover (Civil Work to Mechanical Work) 1.2.3.2 1.2.3.3 1.2.3.4 1.2.3.5 1.2.3.6
Basic Center Line Check Excavation & Elevation Check Check Cutting, Fit_up & Alignment Visual Check AFTER Fusion Joint Lower_in HDPE Pipe
Handover Report Drawing Construction Execution Plan Tehnical Specification
Visual Report
1.2.3.7 Test Pressure 1.2.3.8 Backfilling as per the Drawing Requirements 1.3 FIRE HYDRANT AND MONITOR STATIONS 1.3.1 MATERIAL RECEIVING REPORT 1.3.1..1 Verification document; packing list, mill certificates, if required etc. 1.3.1..2 Dimensional check if necessary 1.3.1..3 Check for damage 1.3.1..4 Raise NCR of any Non Comformance 1.3.2 FIRE HYDRANT AND MONITOR STATIONS INSTALLATION 1.3.2.1 Clarification Foundation Handover (Civil Work to Mechanical Work) 1.3.2.2 Basic Center Line Check 1.3.2.3 Installation 1.3.2.4 Punchlisting 1.4 DELUGE VALVE STATION AND SPRINKLE SYSTEM 1.4.1 MATERIAL RECEIVING REPORT 1.4.1.1 Verification document; packing list, mill certificates, if required etc. 1.4.1.2 Dimensional check if necessary 1.4.1.3 Check for damage 1.4.1.4 Raise NCR of any Non Comformance
Construction Execution Plan Tehnical Specification
Material Receiving, Handling, and Storage Procedure Tech. Specification, Packing List, Drawing, NCR/CAR Proc.
Material Receiving Inspect. Report, Over, Shortage and Damage (OSD) Report, NCR
Handover Report Drawing
Inspection Report
1.4.2 DELUGE VALVE STATION & SPRINKLE SYSTEM 1.4.2.1 Clarification Foundation Handover (Civil Work to Mechanical Work) 1.4.2.2 Basic Center Line Check 1.4.2.3 Installation
Construction Execution Plan
INSPECTION & TEST PLAN (ITP)
PIPE WORKS INSPECTION ACTIVITIES NO
DESCRIPTION & ACTIVITIES CHECK LIST 1.4.2.4 Punchlisting
1.5 PIPING SUPPORT 1.5.1 MATERIAL RECEIVING REPORT 1.5.1.1 Verification document; packing list, mill certificates, if required etc. 1.5.1.2 Dimensional check if necessary 1.5.1.3 Check for damage 1.5.1.4 Raise NCR of any Non Comformance
REFERENCE DOCUMENT
VERIFYING DOCUMENT
Tehnical Specification
Material Receiving, Handling, and Storage Procedure Tech. Specification, Packing List, Drawing, NCR/CAR Proc.
Material Receiving Inspect. Report, Over, Shortage and Damage (OSD) Report, NCR
Handover Report Drawing
Inspection Report
REPR
REPR.
PLN REPR
A1
W/A
W/A
A1
W
W
R A1
R/A R/A
R/A R/A
A1 A1
R/A W/A
R/A W/A
A1
W
W
R A1
R/A R/A
R/A R/A
A1
R/A W/A
R/A W/A
A1
R/A
R/A
A1
R/A
R/A
A1
R/A
R/A
1.5.2 PIPING SUPPORT INSTALLATION 1.5.2.1 Clarification Foundation Handover (Civil Work to Mechanical Work) 1.5.2.2 Basic Center Line Check 1.5.2.3 Installation 1.5.2.4 Punchlisting 1.6 MISCELLANEOUS PIPING SUPPORT 1.6.1 MATERIAL RECEIVING REPORT 1.6.1.1 Verification document; packing list, mill certificates, if required etc. 1.6.1.2 Dimensional check if necessary 1.6.1.3 Check for damage 1.6.1.4 Raise NCR of any Non Comformance
Construction Execution Plan Tehnical Specification
Material Receiving, Handling, and Storage Procedure Tech. Specification, Packing List, Drawing, NCR/CAR Proc.
Material Receiving Inspect. Report, Over, Shortage and Damage (OSD) Report, NCR
Handover Report Drawing
Inspection Report
1.6.2 MISCELLANEOUS PIPING SUPPORT INSTALLATION 1.6.2.1 Clarification Foundation Handover (Civil Work to Mechanical Work) 1.6.2.2 Basic Center Line Check 1.6.2.3 Installation 1.6.2.4 Punchlisting 33.0 DOCUMENTATION 4.0 All documents dossier required as per contract shall collected and submitted to Client and copy for file 4.1 All Inspection as per Manual or this ITP already done & the inspection report already generated and signed 4.2 All NCR or any deviation of contract already closed and documented C/qc cilacap/itp cilacap/i-t3104-qaqc-002 rev. 0
Construction Execution Plan Tehnical Specification
Drawing Tech. Specification Construction Execution Plan
All of Inspection Report