7 0 36 KB
PROYEK : PEMBANGUNAN & RENOVASI TOYOTA VSP-BP AMBON LOKASI : JL. PIERE TENDEAN NO. 02, HALONG, KOTA AMBON - MALUKU OWNER
: PT. HASJRAT ABADI
RENCANA ANGGARAN BIAYA - BAJA No.
URAIAN PEKERJAAN
B
PEKERJAAN STRUKTUR
B.1 B.1.1
PEKERJAAN STRUKTUR TAHAP 1 STRUKTUR B&P WORKSHOP
VOLUME
SAT
HARGA SATUAN UPAH
HARGA
MATERIAL
UPAH
MATERIAL
JUMLAH
B.1.1.d PEKERJAAN KOLOM B 1
Kolom Strukur Baja WF Kolom WF 200x100 - Pekerjaan Grouting t: 25 mm (upah + bahan) - Pekerjaan Base Plate
0.66 m² 45.27 kg
70,000 3,300
195,000 16,000
- Pekerjaan Stiffener
12.07 kg
3,300
16,000
39,834
193,135
232,969
44.00 bh 972.16 kg
17,500 3,300
38,000 15,500
770,000 3,208,128
1,672,000 15,068,480
2,442,000 18,276,608
1,029.50 kg
980
1,300
1,008,910
1,338,350
2,347,260 -
- Pekerjaan Grouting t: 25 mm (upah + bahan) - Pekerjaan Base Plate
0.16 m² 9.88 kg
70,000 3,300
195,000 16,000
11,025 32,592
30,713 158,022
41,738 190,614
- Pekerjaan Stiffener
- Pekerjaan Anchor Bolt - Kolom Baja WF 200.100.5,5.8 2
3
- Finishing Cat Kolom WF 250x125
128,700 724,268
174,900 873,648
2.63 kg
3,300
16,000
8,691
42,139
50,830
- Pekerjaan Anchor Bolt - Kolom Baja WF 250.125.6.9
8.00 bh 240.94 kg
17,500 3,300
38,000 15,500
140,000 795,102
304,000 3,734,570
444,000 4,529,672
- Finishing Cat Kolom WF 300x150
253.45 kg
980
1,300
248,381
329,485
577,866 -
- Pekerjaan Grouting t: 25 mm (upah + bahan)
1.70 m²
70,000
195,000
119,000
331,500
450,500
111.93 kg 55.97 kg
3,300 3,300
16,000 16,000
369,377 184,686
1,790,916 895,445
2,160,293 1,080,131
- Pekerjaan Anchor Bolt - Kolom Baja WF 300.150.6,5.9
102.00 bh 3,606.88 kg
17,500 3,300
38,000 15,500
1,785,000 11,902,704
3,876,000 55,906,640
5,661,000 67,809,344
- Finishing Cat
3,774.77 kg
980
1,300
3,699,275
4,907,201
8,606,476 -
24,518,284
91,431,564
115,949,848
24,518,284
91,431,564
115,949,848
- Pekerjaan Base Plate - Pekerjaan Stiffener
Sub Total Pekerjaan Kolom Baja Total Pekerjaan Kolom B.1.1.e Pekerjaan Balok Baja 1 2
46,200 149,380
Balok dobel Besi CNP 150.50.20.2,3 Balok Baja WF 250.125.6.9
1,261.82 kg 3,024.53 kg
3,300 3,300
13,000 15,500
4,164,019 9,980,942
16,403,712 46,880,184
20,567,731 56,861,126
- Joint Balok ke Kolom
212.29 kg
3,300
16,500
700,572
3,502,858
4,203,429
- Joint Balok ke Rafter - Finishing Cat
4.08 kg 4,498.65 kg
3,300 980
18,200 1,300
13,471 4,408,673
74,297 5,848,240
87,768 10,256,914
19,267,678
72,709,291
91,976,969
Total Pekerjaan Balok Baja B.1.1.g Pekerjaan Rangka Atap 1 Rafter Skema - A -> Baja WF 300.150.6,5.9 / WF 200.100.5,5.8
1,087.77 kg
3,300
15,500
3,589,641
16,860,435
20,450,076
2 3 4
Rafter Skema - B -> Baja WF 300.150.6,5.9 / WF 200.100.5,5.8 Rafter Skema - B' - Baja WF 300.150.6,5.9 / WF 200.100.5,5.8 Rafter Skema - C -> Baja WF 300.150.6,5.9 / WF 200.100.5,5.8
2,789.71 kg 955.50 kg 1,152.53 kg
3,300 3,300 3,300
15,500 15,500 15,500
9,206,043 3,153,161 3,803,338
43,240,505 14,810,302 17,864,163
52,446,548 17,963,463 21,667,501
5 6
Rafter Skema - D -> Baja WF 200.100.5,5.8 Joint Rafter ke Kolom
652.80 kg 1,948.09 kg
3,300 3,300
15,500 18,200
2,154,240 6,428,710
10,118,400 35,455,308
12,272,640 41,884,018
7
Gording Besi CNP 150.50.20.2,3
2,475.63 kg
3,300
13,000
8,169,572
32,183,164
40,352,736
8 9
Trekstang Besi Beton Ø10 Ikatan Angin Besi Beton Ø16
124.91 kg 183.28 kg
3,300 3,300
15,500 15,500
412,187 604,824
1,936,031 2,840,840
2,348,218 3,445,664
10
Finishing Cat
11,370.22 kg
980
1,300
11,142,813
14,781,282
25,924,095
48,664,529 92,450,491
190,090,430 354,231,285
238,754,959 446,681,776
Total Pekerjaan Rangka Atap SUB TOTAL STRUKTUR B&P WORKSHOP B.1.2 STRUKTUR B&P RECEPTION B.1.2.d Pekerjaan Kolom Kolom Beton K-250 - Selimut Kolom Baja, t: 1.2 m B 2
Pekerjaan Kolom Baja Kolom WF 250x125 - Pekerjaan Grouting t: 25 mm (upah + bahan)
0.79 m²
70,000
195,000
55,125
153,563
208,688
49.38 kg 13.17 kg
3,300 3,300
16,000 16,000
162,960 43,455
790,110 210,693
953,070 254,148
- Pekerjaan Anchor Bolt - Kolom Baja WF 250.125.6.9
40.00 bh 1,411.92 kg
17,500 3,300
38,000 15,500
700,000 4,659,336
1,520,000 21,884,760
2,220,000 26,544,096
- Finishing Cat
1,474.47 kg
980
1,300
1,444,981
1,916,811
3,361,792
- Pekerjaan Base Plate - Pekerjaan Stiffener
Total Pekerjaan Kolom Baja
7,065,857
26,475,937
33,541,794
Total Pekerjaan Kolom
7,065,857
26,475,937
33,541,794
B.1.2.e Pekerjaan Balok Baja 1 Balok dobel Besi CNP 150.50.20.2,3 2 3
Joint Balok ke Kolom Finishing Cat
475.17 kg
3,300
13,000
1,568,054
6,177,184
7,745,238
23.52 kg 498.69 kg
3,300 980
16,500 1,300
77,614 488,714
388,071 648,294
465,686 1,137,007
2,134,382
7,213,549
9,347,932
Total Pekerjaan Balok Baja B.1.2.g Pekerjaan Rangka Atap 1 2
Rafter Skema - E Joint Rafter ke Kolom
1,759.93 kg 440.21 kg
3,300 3,300
15,500 18,200
5,807,780 1,452,678
27,278,967 8,011,738
33,086,747 9,464,416
3 4
Gording Trekstang Besi Beton Ø10
1,469.30 kg 87.73 kg
3,300 3,300
13,000 15,500
4,848,682 289,509
19,100,868 1,359,815
23,949,549 1,649,324
5
Ikatan Angin Besi Beton Ø16
109.97 kg
3,300
15,500
362,894
1,704,504
2,067,398
6
Finishing Cat
3,867.13 kg
980
1,300
3,789,792
5,027,274
8,817,066
16,551,334 25,751,574
62,483,166 96,172,652
79,034,500 121,924,226
118,202,066
450,403,937
568,606,002
Total Pekerjaan Rangka Atap SUB TOTAL STRUKTUR B&P RECEPTION SUB TOTAL STRUKTUR TAHAP 1 B.1.3 PEKERJAAN PENUTUP ATAP B.1.3.a B&P WORKSHOP 1 Atap Zincalume Spandek & Kliplok 2 3
Nok Listplank
4
Rangka Listplank
5 6
Flashing zincalum t=0,4 mm, L=300-500 mm Talang zincalum t=0,4 mm c/w rangka, L=1000-1250 mm
989.00 m²
18,000
98,000
17,802,000
96,922,000
114,724,000
22.00 m² 152.82 m²
18,000 18,000
98,000 92,000
396,000 2,750,789
2,156,000 14,059,589
2,552,000 16,810,378
5,990.09 kg
3,200
12,600
19,168,274
75,475,080
94,643,354
253.43 m 99.52 m
18,000 18,000
43,000 195,000
4,561,704 1,791,360
10,897,404 19,406,400
15,459,108 21,197,760
46,470,127
218,916,473
265,386,600
5,814,000
31,654,000
37,468,000
Total Pekerjaan Penutup Atap B&P Workshop B.1.3.b B&P RECEPTION 1 Atap Zincalume Spandeks 2
Nok (tidak ada)
3 4
Flashing zincalum t=0,4 mm, L=300-500 mm Talang zincalum t=0,4 mm c/w rangka, L=1000-1250 mm
323.00 m2 -
18,000
98,000
m2
77.70 m 25.95 m
18,000 18,000
43,000 195,000
Total Pekerjaan Penutup Atap B&P Reception SUB TOTAL PENUTUP ATAP TAHAP 1 F
1,398,600 467,100
3,341,100 5,060,250
4,739,700 5,527,350
7,679,700
40,055,350
47,735,050
54,149,827
258,971,823
313,121,650
PEKERJAAN SARANA & UTILITAS
F.7 F.7.6
INSURRANCE PARTS SCRAB Rangka Atap
25.92 m²
35,000
38,000
907,200
984,960
1,892,160
F.7.7
Penutup Atap Spandek zincalum t=0,45 mm
25.92 m²
18,000
98,000
466,560
2,540,160
3,006,720
SUB TOTAL PEKERJAAN INSURRANCE PARTS SCRAB
1,373,760
3,525,120
4,898,880
TOTAL PEKERJAAN SARANA & UTILITAS
1,373,760
3,525,120
4,898,880
173,725,653
712,900,880
886,626,533
TOTAL TAHAP 1