20 0 157 KB
LAMPIRAN BERITA ACARA CONTRACT CHANGE ORDER PEKERJAAN
:
PENGADAAN BANGUNAN RUMAH DINAS
INSTANSI
:
DINAS PENDAPATAN, PENGELOLAAN KEUANGAN DAN ASET
LOKASI
:
PELAIHARI
KONTRAKTOR
:
CV. ADIL MAKMUR
MATA PEMBAYARAN / URAIAN PEKERJAAN
NO.
ANALISA
VOLUME
VOLUME
SATUAN
ASAL
CCO
SAT.
SELISIH VOLUME
HARGA
HARGA
PENAWARAN
PENAWARAN
ASAL
CCO
Rp
Rp
JUMLAH HARGA ASAL
JUMLAH HARGA CCO
JUMLAH HARGA SELISIH
Rp
Rp
Rp
I. PEKERJAAN PERSIAPAN 1
Pembersihan Lokasi
-
1,000
1,000
-
ls
1.355.000,00
1.355.000,00
1.355.000,00
1.355.000,00
-
2
Pengukuran dan pemasangan bouwplank
-
1,000
1,000
-
ls
1.100.000,00
1.100.000,00
1.100.000,00
1.100.000,00
-
3
Papan nama proyek
-
-
1,000
1,000
ls
4
Izin Mendirikan Bangunan ( IMB )
-
-
1,000
1,000
ls
-
-
-
-
-
-
-
-
-
2.455.000,00
2.455.000,00
-
II. PEKERJAAN PONDASI DAN STRUKTUR 1
Galian tanah pondasi
1
25,768
25,768
-
m3
43.500,00
43.500,00
1.120.895,82
1.120.895,82
-
2
Urugan tanah kembali
2
25,768
25,768
-
m3
32.000,00
32.000,00
824.567,04
824.567,04
-
3
Urugan pasir bawah pondasi tb: 5 cm
3
0,868
0,868
-
m3
101.400,00
101.400,00
87.974,64
87.974,64
-
4
Lantai kerja tb: 5 cm Camp. 1:3:5
18
0,868
0,868
-
m3
626.700,00
626.700,00
543.724,92
543.724,92
-
5
Pondasi batu gunung
5
8,814
8,814
-
m3
650.250,00
650.250,00
5.731.108,43
5.731.108,43
6
Sloof beton bertulang Uk. 15/20
21
0,868
1,009
0,141
m3
3.958.674,61
3.958.674,61
3.434.546,10
3.992.719,22
558.173,12
7
Kolom beton bertulang Uk.15/15 (T = 50 CM)
22
-
0,270
0,270
m3
3.958.674,61
3.958.674,61
1.068.842,15
1.068.842,15
8
Kolom beton bertulang Uk.15/15
22
0,433
0,520
0,087
m3
4.464.744,29
4.464.744,29
1.933.792,37
2.320.550,84
386.758,47
9
Kolom beton bertulang Uk.25/25 ( TERAS )
23
0,481
0,481
-
m3
3.176.743,45
3.176.743,45
1.528.807,79
1.528.807,79
-
10
Balok beton bertulang Uk. 15/20
25
0,177
0,177
-
m3
4.376.205,42
4.376.205,42
775.901,22
775.901,22
-
11
Ringbalk beton bertulang Uk.15/15
28
1,962
1,962
-
m3
4.464.744,29
4.464.744,29
8.757.819,16
8.757.819,16
-
12
Kanopi beton tul .1 rangkap ( d:10-15 )
30
0,623
0,623
-
m3
2.736.888,62
2.736.888,62
1.704.534,24
1.704.534,24
-
13
Cor beton jalan masuk t. 10 cm
30
0,320
0,320
-
m3
2.736.888,62
2.736.888,62
875.804,36
875.804,36
27.319.476,07
29.333.249,81
2.013.773,74
-
-
-
III. PEKERJAAN PASANGAN ATAP & PLAFOND 1
Rangka atap baja truss ringan
1
156,161
193,956
37,795
m2
120.000,00
120.000,00
18.739.355,58
23.274.720,00
4.535.364,42
2
Atap genteng metal
2
156,161
193,956
37,795
m2
68.990,00
68.990,00
10.773.567,85
13.381.024,44
2.607.456,59
3
Pemuung type C
3
51,480
51,480
-
m'
50.770,00
50.770,00
2.613.653,54
2.613.653,54
-
4
Plafond kalsiboard ( luar dalam )
18
150,397
150,397
-
m2
36.130,00
36.130,00
5.433.832,77
5.433.832,77
-
5
Rangka Plafond lanan ( luar dalam )
5
150,397
150,397
-
m2
81.300,00
81.300,00
12.227.251,71
12.227.251,71
-
6
List Gypsum 10 cm ( dalam )
21
127,570
127,570
-
m'
33.420,00
33.420,00
4.263.389,40
4.263.389,40
-
7
List Plafond kayu profil 1/4 lanan ( Kisi - kisi )
22
109,920
109,920
-
m'
19.730,00
19.730,00
2.168.721,60
2.168.721,60
8
List plank kalsiplank 2 lapis
23
61,511
66,014
4,503
m'
30.000,00
30.000,00
1.845.330,00
1.980.420,00
9
Tawing Layar Ulin + cat
25
1,000
1,000
-
bh
349.500,00
349.500,00
349.500,00
349.500,00
58.414.602,44
65.692.513,46
135.090,00 7.277.911,01
MATA PEMBAYARAN / URAIAN PEKERJAAN
NO.
ANALISA
VOLUME
VOLUME
SATUAN
ASAL
CCO
SAT.
SELISIH VOLUME
HARGA
HARGA
PENAWARAN
PENAWARAN
JML HARGA
ASAL
CCO
ASAL
Rp
Rp
Rp
HARGA CCO
SELISIH HARGA CCO
Rp
Rp
IV. PEKERJAAN LANTAI & PASANGAN DINDING 1
Urugan tanah laterit
4
11,049
11,049
-
m3
106.000,00
106.000,00
1.171.146,30
1.171.146,30
-
2
Urugan Pasir di bawah lantai tb: 5 cm
3
5,524
5,524
-
m3
101.400,00
101.400,00
560.161,49
560.161,49
-
3
Cor rabat lantai tb: 5 cm Camp. 1:3:5
18
5,524
5,524
-
m3
626.700,00
626.700,00
3.462.063,14
3.462.063,14
4
Keramik lantai polos 60x60 cm
34
86,457
90,049
3,593
m2
134.260,00
134.260,00
11.607.663,12
12.090.005,59
482.342,48
5
Keramik lantai antislip 20x20cm
32
4,984
5,245
0,261
m2
118.236,00
118.236,00
589.335,52
620.195,11
30.859,60
6
keramik dinding polos 20x25 cm
33
16,770
16,770
-
m2
180.252,00
180.252,00
3.022.826,04
3.022.826,04
7
Plint Tegel Keramik 7x20 cm
35
11,180
11,180
-
m1
42.779,00
42.779,00
478.269,22
478.269,22
8
Pas. Dinding 1/2 bata Camp. 1:4
6
99,052
108,012
8,960
m2
87.180,00
87.180,00
8.635.366,44
9.416.455,65
781.089,21
-
-
9
Plesteran dinding tb: 1.5 cm Camp. 1:4
7
198,104
216,023
17,919
m2
40.254,00
40.254,00
7.974.490,49
8.695.801,92
721.311,43
10
Acian ( Dinding )
8
198,104
216,023
17,919
m2
11.475,00
11.475,00
2.273.246,84
2.478.867,37
205.620,53
11
Variasi Plesteran
-
1,000
1,000
-
Ls
500.000,00
500.000,00
500.000,00
500.000,00
-
12
Pas. Batu Alam alur bergaris
-
5,034
5,034
-
m2
125.000,00
125.000,00
629.200,00
629.200,00
-
13
Rolag Tangga
-
1,000
1,000
-
Ls
500.000,00
500.000,00
500.000,00
500.000,00
41.403.768,59
43.624.991,83
2.221.223,23
-
V. PEKERJAAN PEMBUATAN GARASI PAVING 1
Rangka truss baja ringan + atap gavalum + penutup kalsiboard + talang air
-
36,000
43,200
7,200
m2
250.000,00
250.000,00
9.000.000,00
10.800.000,00
1.800.000,00
2
Cor lantai t: 5 cm
18
1,800
2,262
0,462
m3
626.700,00
626.700,00
1.128.060,00
1.417.595,40
289.535,40
3
Pasir urug bawah paving t: 10 cm
3
5,945
5,945
-
m2
101.400,00
101.400,00
602.823,00
602.823,00
-
4
Pas. Paving block
9
37,700
37,700
-
m2
160.500,00
160.500,00
6.050.850,00
6.050.850,00
-
5
Cor Beton Pengunci Pas. Paving
18
0,601
0,601
-
m3
626.700,00
626.700,00
376.396,02
376.396,02
6
Galian tanah pondasi
1
-
3,122
3,122
m3
43.500,00
43.500,00
-
135.801,56
135.801,56
7
Urugan tanah kembali
2
-
1,041
1,041
m3
32.000,00
32.000,00
-
33.300,00
33.300,00
8
Urugan pasir bawah pondasi tb: 5 cm
3
-
0,278
0,278
m3
101.400,00
101.400,00
-
28.138,50
28.138,50
9
Lantai kerja tb: 5 cm Camp. 1:3:5
18
-
0,278
0,278
m3
626.700,00
626.700,00
-
173.909,25
173.909,25
10
Pondasi batu gunung
5
-
2,914
2,914
m3
650.250,00
650.250,00
-
1.894.665,94
1.894.665,94
11
Kolom beton bertulang Uk.15/15
22
0,315
0,315
-
m3
4.464.744,29
4.464.744,29
1.406.394,45
1.406.394,45
12
Sloof beton bertulang Uk. 15/20
21
0,270
0,278
0,007
m3
4.376.205,42
4.376.205,42
1.181.575,46
1.214.397,00
32.821,54
13
Ringbalk beton bertulang Uk.15/15
22
0,203
0,208
0,006
m3
4.464.744,29
4.464.744,29
904.110,72
929.224,90
25.114,19
14
Pas. Dinding 1/2 bata Camp. 1:4
6
31,500
32,375
0,875
m2
87.180,00
87.180,00
2.746.170,00
2.822.452,50
76.282,50
15
Plesteran dinding tb: 1.5 cm Camp. 1:4
7
63,000
64,750
1,750
m2
40.254,00
40.254,00
2.536.002,00
2.606.446,50
70.444,50
16
Acian ( Dinding )
8
63,000
64,750
1,750
m2
11.475,00
11.475,00
722.925,00
743.006,25
20.081,25
17
Cat tembok (dinding & Plafond )
43
63,000
64,750
1,750
m2
18.084,00
18.084,00
1.139.292,00
1.170.939,00
31.647,00
18
Listplank Kalsiplank 2 Lapis
23
-
13,800
13,800
m'
30.000,00
30.000,00
414.000,00
414.000,00
19
Pintu lipat besi hollow 50 x 50 + plat tebal 5 mm
4,000
4,000
-
bh
1.200.000,00
1.200.000,00
-
4.800.000,00
4.800.000,00
32.594.598,65
37.620.340,28
-
-
5.025.741,63
MATA PEMBAYARAN / URAIAN PEKERJAAN
NO.
ANALISA
VOLUME
VOLUME
SATUAN
ASAL
CCO
SAT.
SELISIH VOLUME
HARGA
HARGA
PENAWARAN
PENAWARAN
JML HARGA
ASAL
CCO
ASAL
Rp
Rp
Rp
HARGA CCO
SELISIH HARGA CCO
Rp
Rp
VI. PEKERJAAN KUSEN, DAUN PINTU & JENDELA & VENTILASI 1
Kusen ulin
-
14,800
48,330
33,530
m'
60.000,00
60.000,00
888.000,00
2.899.800,00
2
Daun pintu panil meranti 2 daun
-
1,000
1,000
-
psg
900.000,00
900.000,00
900.000,00
900.000,00
-
3
Daun pintu panil meranti 1 daun
-
7,000
7,000
-
bh
450.000,00
450.000,00
3.150.000,00
3.150.000,00
-
4
Daun pintu wc panil ulin 1 daun
-
2,000
2,000
-
bh
750.000,00
750.000,00
1.500.000,00
1.500.000,00
-
5
Daun jendela meranti + kaca polos t: 5 mm
-
21,000
21,000
-
bh
250.000,00
250.000,00
5.250.000,00
5.250.000,00
6
Ventilasi kusen ulin
-
23,000
29,000
6,000
bh
55.000,00
55.000,00
1.265.000,00
1.595.000,00
7
Kaca mati polos tb: 5 mm
-
1,250
1,250
-
m2
100.000,00
100.000,00
125.000,00
125.000,00
8
Perbaikan dinding ventilasi kusen
-
1,000
1,000
-
ls
450.000,00
450.000,00
450.000,00
450.000,00
9
Ventilasi atap
-
-
2,000
2,000
bh
-
150.000,00
-
2.011.800,00
330.000,00 -
300.000,00
300.000,00
13.528.000,00
16.169.800,00
2.641.800,00
VII.PEKERJAAN INS. LISTRIK, ALAT PENGGANTUNG & SANITAIR
a. Instalasi Listrik 1
Instalasi titik lampu
-
15,000
15,000
-
ttk
165.000,00
165.000,00
2.475.000,00
2.475.000,00
-
2
Instalasi Stop kontak
-
6,000
6,000
-
ttk
165.000,00
165.000,00
990.000,00
990.000,00
-
3
Instalasi Stop kontak AC
-
4,000
4,000
-
ttk
165.000,00
165.000,00
660.000,00
660.000,00
-
4
Stop kontak
-
6,000
6,000
-
bh
35.000,00
35.000,00
210.000,00
210.000,00
-
5
Saklar tunggal
-
11,000
11,000
-
bh
20.000,00
20.000,00
220.000,00
220.000,00
-
6
Saklar Ganda
-
2,000
2,000
-
bh
30.000,00
30.000,00
60.000,00
60.000,00
-
7
Lampu SL 20 Watt
-
15,000
15,000
-
bh
45.000,00
45.000,00
675.000,00
675.000,00
-
8
Penyambungan inst. List dr bang. Lama ke bang. Baru
-
1,000
1,000
-
ls
350.000,00
350.000,00
350.000,00
350.000,00
-
b. Alat Penggantung 1
Kunci tanam 2 slagg
-
10,000
10,000
-
Psg
125.000,00
125.000,00
1.250.000,00
1.250.000,00
-
2
Engsel pintu kuningan
-
33,000
33,000
-
bh
16.000,00
16.000,00
528.000,00
528.000,00
-
3
Engsel jendela kuningan
-
42,000
42,000
-
bh
12.000,00
12.000,00
504.000,00
504.000,00
-
4
Kait angin kuningan
-
42,000
42,000
-
bh
8.000,00
8.000,00
336.000,00
336.000,00
-
5
Grendel jendela
-
42,000
42,000
-
bh
10.000,00
10.000,00
420.000,00
420.000,00
-
6
Pegangan jendela
-
21,000
21,000
-
bh
9.000,00
9.000,00
189.000,00
189.000,00
-
c. Sanitair 1
Closet Jongkok
-
1,000
1,000
-
bh
125.000,00
125.000,00
125.000,00
125.000,00
-
2
Closet Duduk
-
1,000
1,000
-
bh
750.000,00
750.000,00
750.000,00
750.000,00
-
3
Kran Air
-
4,000
4,000
-
bh
35.000,00
35.000,00
140.000,00
140.000,00
-
4
Floor Drain
-
2,000
2,000
-
bh
25.000,00
25.000,00
50.000,00
50.000,00
-
5
Bak air lapis keramik
-
1,000
1,000
-
bh
750.000,00
750.000,00
750.000,00
750.000,00
6
Menara air dari ulin tinggi 2 m
-
-
1,000
1,000
bh
-
2.250.000,00
7
Tandon air 1.200 Liter
-
-
1,000
1,000
ls
-
1.850.000,00
8
Septictank
-
2,000
2,000
-
bh
2.000.000,00
2.000.000,00
4.000.000,00
4.000.000,00
-
9
Instalasi air kotor
-
1,000
1,000
-
ls
250.000,00
250.000,00
250.000,00
250.000,00
-
10
Instalasi air bersih
-
1,000
1,000
-
ls
300.000,00
300.000,00
300.000,00
300.000,00
-
11
Kitchen set + lemari
-
3,500
3,500
-
m'
1.800.000,00
1.800.000,00
6.300.000,00
6.300.000,00
TOTAL VII
21.532.000,00
25.632.000,00
4.100.000,00 660.948,50
-
-
2.250.000,00
2.250.000,00
-
1.850.000,00
1.850.000,00
-
VIII. PEKERJAAN PENGECATAN 1
Cat tembok (dinding & Plafond )
43
704,583
741,132
36,549
m2
18.084,00
18.084,00
12.741.673,55
13.402.622,05
2
Cat kilap (Kusen, Litsplank,list plafond lanan,daun pintu & jendela )
42
104,410
104,410
-
m2
28.700,00
28.700,00
2.996.575,61
2.996.575,61
3
Cat kilap batu alam
1,000
1,000
-
ls
650.000,00
650.000,00
650.000,00
650.000,00
16.388.249,16
17.049.197,66
-
660.948,50
REKAPITULASI CONTRACT CHANGE ORDER BILL OF QUANTITY PEKERJAAN
: PENGADAAN BANGUNAN RUMAH DINAS
INSTANSI
: DINAS PENDAPATAN, PENGELOLAAN KEUANGAN DAN ASET
LOKASI
: PELAIHARI
KONTRAKTOR
: CV. ADIL MAKMUR
KONSULTAN
:
KONTRAK ASAL, NO.
:
HARGA KONTRAK ASAL
:
KONTRAK CCO, NO.
:
HARGA KONTRAK CCO
:
WAKTU PELAKSANAAN
:
NO.
URAIAN PEKERJAAN
KONTRAK ASAL
KONTRAK CCO
JUMLAH HARGA
JUMLAH HARGA
DEVIASI
( Rp )
( Rp )
( Rp )
I
PEKERJAAN PERSIAPAN
2.455.000,00
2.455.000,00
II
PEKERJAAN POONDASI DAN STRUKTUR
27.319.476,07
29.333.249,81
2.013.773,74
-
III
PEKERJAAN PASANGAN ATAP DAN PLAFOND
58.414.602,44
65.692.513,46
7.277.911,01
IV
PEKERJAAN LANTAI DAN PASANGAN DINDING
41.403.768,59
43.624.991,83
2.221.223,23
V
PEKERJAAN PEMBUATAN GARASI DAN PAVING
32.594.598,65
37.620.340,28
5.025.741,63
VI
PEKERJAAN KOSEN, DAUN PINTU, JENDELA DAN VENTILASI
13.528.000,00
16.169.800,00
2.641.800,00
VII
PEKERJAAN INS. LISTRIK, ALAT PENGGANTUNG DAN SANITAIR
21.532.000,00
25.632.000,00
4.100.000,00
VIII
PEKERJAAN PENGECATAN
16.388.249,16
17.049.197,66
660.948,50 23.941.398,11
KONTRAK AWAL
:
KONTRAK CCO DEVIASI
: :
JUMLAH
213.635.694,92
237.577.093,03
PPN 10%
21.363.569,49
23.757.709,30
2.394.139,81
TOTAL HARGA
234.999.264,41
261.334.802,33
26.335.537,93
DIBULATKAN
234.999.000,00
261.334.000,00
26.335.000,00
Rp
234.999.000,00
Rp
261.334.000,00
Rp
26.335.000,00
11,21 %
Diketahui oleh :
Disetujui oleh :
Diperiksa oleh :
Dibuat oleh :
Kuasa Pengguna Anggaran
Pejabat Pengelola Teknis Kegiatan
Konsultan Pengawas
Kontraktor Pelaksana
Penjabat Pembuat Komitmen
Dinas Pendidikan Kota Banjarmasin