16 0 287 KB
HARGA BORONGAN PEKERJAAN PLUMBING/ INSTALASI AIR (SEPTEMBER 2015)
INSTALASI AIR KOTOR NO 1 2 3 4 5 6 7 8 9 9
UKURAN (INCHI) PIPA PVC 3/4” PIPA PVC 1” PIPA PVC 1 1/4” PIPA PVC 2” PIPA PVC 3 ” PIPA PVC 4” PIPA PVC 6” PIPA PVC 8” PIPA PVC 10” PIPA PVC 12”
SATUAN M M M M M M M M M M
JASA/UPAH 17.500 18.000 20.000 22.000 28.000 30.000 35.000 40.000 50.000 60.000
INSTALASI AIR BERSIH NO 1 2 3 4
UKURAN (INCHI) PIPA PVC 1/2” PIPA PVC 3/4” PIPA PVC 1 ” PIPA PVC 1 1/4”
SATUAN M M M M
JASA/UPAH 15.000 17.000 18.000 20.000
INSTALASI AIR PANAS PIPA PPR NO 1 2 3 4 5 6 7 8
UKURAN (INCHI) PIPA PPR 1/2” PIPA PPR 3/4” PIPA PPR 1 ” PIPA PPR 1 1/4” PIPA PPR 2” PIPA PPR 3” PIPA PPR 4” PIPA PPR 6”
SATUAN M M M M M M M M
JASA/UPAH 15.000 17.000 20.000 22.000 30.000 50.000 80.000 100.000
INSTALASI AIR PANAS PIPA RIFENG NO UKURAN (INCHI) 1 PIPA PPR 1/2” 2 PIPA PPR 5/8”
SATUAN M M
JASA/UPAH 15.000 17.000
PEMASANGAN SANITARY NO 1 2 3 4 5 6 7 8 9 10
PEMASANGAN CLOSET WASTAFEL SHOWER BIASA TUNGGAL SHOWER BIASA DOUBLE SHOWER TANAM KRAN TEMBOK URINOIR BATHUB BIASA BATHUB WERFULL ZET WASHER
SATUAN UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT
JASA/UPAH 215.000 200.000 75.000 100.000 350.000 30.000 250.000 1.500.000 1000.000 50.000
19 20 21
PLAMPUNG BOLA PLAMPUNG RADAR WATER HEATER ARISTON
UNIT UNIT UNIT
150.000 100.000 250.000