JSA Painting [PDF]

  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

SGD SAIPEM CAMP ACCOMODATION AND BUILDING FACILITIES JOB SAFETY ANALYSIS PROJECT OPERATIONAL CAMP



JSA NO. 003



Page 1 of 1 Date 07/01/2013



Activity: Painting work



Steps Painting Work



Hazards



Control Measures to be Enforced



 Inhalation Fumes, vapors and gases generated during use.  Burns due to Hot surface of paint stripper, contact with paint stripper element  Electric shocks due to improper operational & maintenance.



 Properly ventilate work area, use disposable respirators.   Drip trays shall be used to avoid any leakage of painting liquids.  Minimum quantity of the paint shall be store at the site.  All painting material shall be stored at well ventilated areas.  All painting material shall be used as per manufacturer’s provided material safety data sheets.  All painting activities shall be carried out by experienced workers.  All operatives of paints shall be explained the hazards & their precaution associated with the paints.  All workers shall be fully equipped with safety shoes, hand gloves, hard helmet, face shield & cover-alls.  Washing facility shall be available to wash the effected parts of the body by paints.



Name Approved By:



Remarks / Actions



Signature



Supervisor



Date