PERHITUNGAN KEBUTUHAN DESINFEKTAN
Jumlah Tempat Tidur = 654 TT Kebutuhan air bersih = Jumlah TT x 550 lt/bed/hari = 654 x 550 = 359.700 liter/hari Jumlah air limbah
= 80% x Jumlah air bersih = 80% x 359.700 liter/hari = 287.760 liter/hari = 287,8 m3/hari
Debit (Q)
= 359.700 liter/hari = 4,2 liter/detik
DPC Sisa Chlor
= 1,5 ppm = 0,7 ppm
Dosis Kaporit 60% (DK)
Kebutuhan kaporit
= 0,7 + 1,5 x 100 60 = 3,7 ppm (mg/lt) = = = =
Q x DK 4,2 lt/dt x 3,7 mg/lt 1,3 kg/hari 39 kg/bulan
kebutuhan / bulan
= = = = =
Q x DK 4,2 lt/dt x 3,6 mg/lt 15,54 mg/dt = 1,3 kg/hari 39 kg/bulan 2,6 Pill dibulatkan 3 Pill / bulan
Harga 1 Pill Harga total
= Rp245.000,= Rp735.000,-
Kebutuhan kaporit
= 15,54 mg/dt = 1.342.656 mg/hari
1 Pill = 15 kg
PERHITUNGAN KEBUTUHUAN KOAGULAN
Jumlah Tempat Tidur = 654 TT BOR = 60% Kebutuhan air bersih = Jumlah TT x BOR x 500 lt/bed/hari = 654 x 60% x 500 = 196.200 liter/hari Jumlah air limbah
= 80% x Jumlah air bersih = 80% x 196.200 liter/hari = 156.960 liter/hari = 157 m3/hari
Debit (Q)
= 156960 liter/hari = 1,8 liter/detik
Density Tawas
= = = =
Kebutuhan tawas
= 0,54 gr/dt x 86400 dt = 46656 gr/hari = 46,7 kg/hari = 1.401 kg/bulan
W (persen)
= Kebutuhan tawas 60%
1,05 kg/lt 0,3 gram = 300 mg/lt 0,3 x 1,8 = 0,54 gr/dt 540 mg/dt
= = 77,8 kg/hari
Volume tawas
=
= = 74,1 lt/hari Perbandingan Volume tawas : Volume air = 20% : 80% Volume Bak = 650 lt = 130 lt Tawas : 520 lt air Debit tetesan = Volume bak / 86400 dt = 650/86400 = 0,00752 lt/dt
= 0,752 ml/dt