6 0 97 KB
SHINIL Pharma Ltd. B K Bari, Mirzapur Gazipur. [
Standard Operating Procedure Title SOP for Document Review , Preparation, Update and Upgrade Document No. QA-SOP-30 Revision No. 00 Department Quality Assurance
Issue Date July 02, 2019 Effective Date July 02, 2019 Next Review Date July 01, 2021
Page 1 of 4
Distribution List 1. Archive Copy 2. Plant Manager 3. Quality Assurance Manager 4. Assistant Production Manager 5. Quality Control In-Charge 6. Product Development In-Charge 7. Warehouse In-Charge 1.0 Purpose To provide guidelines for review, preparation, update and upgrade and approval of all documents to lay down clear and concise procedures for effective implementation of quality system as per cGMP at SHINIL Pharma Ltd. 2.0 Scope This procedure is applicable for review, preparation, update and upgrade and approval of all documents for all the concerned department as per the distribution list. 3.0 Responsibility 3.1 Manager, Quality Assurance: Monitoring the system of compliance. 3.2 Function of Department Manager/In-charge: All Department Manager/In-charge will be responsible for department related functions as per written prescribed form and assign by superior which shall be transparent, unambiguous with document evidence. 4.0 Definition / Description: Not Applicable 5.0 Precaution: Not Applicable 6.0 Procedure Prepared By
Checked By
Approved By
Mustafigur Rahman Officer, Microbiologist
Md. Tuhin Kabir Senior Officer, Quality Control
Md. Awlad Hossain Manager- Quality Assurance
SHINIL Pharma Ltd. B K Bari, Mirzapur Gazipur. [
Standard Operating Procedure Title SOP for Document Review , Preparation, Update and Upgrade Document No. QA-SOP-30 Revision No. 00 Department Quality Assurance
Issue Date July 02, 2019 Effective Date July 02, 2019 Next Review Date July 01, 2021
Page 2 of 4
6.1 The requirement of a document for a given process, equipment or, policy shall be identified by the Document Review Committee and issue a letter to QAD/ respective department . 6.2 Any revision in document shall be initiated by concerned department through change control; When a document/ SOP undergoes revision, after the issue of the revised document/SOP, all the superseded controlled copies shall be withdrawn from the respective Department by Document Review Committee / QA within five working days and revised document shall be updated and upgraded, checked and approved. 6.3 The Document for each department except QA shall be updated and upgraded by respective department personnel, checked by the respective department manager/in-charge and approved by QA manager. 6.4 QA Documents shall be prepared by respective QA personnel and checked by Quality Compliance Officer/PD Officer and approved by QA Manager. 6.5 The final document will be approved by signing each page of the document in Blue Ink by the following individual: -Person who review, update and upgrade the Document -Person who Checked the updated and upgraded Document -Person who approved the updated and upgraded Document 6.6 For other format and instructions on document QA-SOP-01 shall be followed. 6.7 The document review committee Shall be as in “Appendix-A”. 7.0 Acceptance Criteria Not Applicable 8.0 Frequency Not Applicable 9.0 Reason for Revision Used on new format and text. 10.0 Appendices Appendix-A: Format for Document Review Committee Appendix-A: Format for Document Review Committee
Prepared By
Checked By
Approved By
Mustafigur Rahman Officer, Microbiologist
Md. Tuhin Kabir Senior Officer, Quality Control
Md. Awlad Hossain Manager- Quality Assurance
SHINIL Pharma Ltd. B K Bari, Mirzapur Gazipur. [
Standard Operating Procedure Title SOP for Document Review , Preparation, Update and Upgrade Document No. QA-SOP-30 Revision No. 00 Department Quality Assurance
Issue Date July 02, 2019 Effective Date July 02, 2019 Next Review Date July 01, 2021
Page 3 of 4
SHINIL Pharma Ltd. B K Bari, Mirzapur Gazipur. Document Review Committee Department
Production Quality Control Quality Assurance Product Development
Warehouse
Purpose
Name
Page No.: 1 of 1
Designation
Document Review By
Production Officer
Checked By
Deputy Manager, Production
Document Review By Checked By Document Review By Checked By Document Review By Checked By Document Review By
QC Officer QC In-charge QA Officer QC In-charge PD Officer PD In-charge Store Officer Deputy Manager, Production Manager, QA
Checked By All Document Approved By Prepared By: _______________
SOP No: QA-SOP-30
Sign & Date
Approved by: ______________ QA Manager
Revision History Revision No: 00 Page No : 1 of 1
Prepared By
Checked By
Approved By
Mustafigur Rahman Officer, Microbiologist
Md. Tuhin Kabir Senior Officer, Quality Control
Md. Awlad Hossain Manager- Quality Assurance
SHINIL Pharma Ltd. B K Bari, Mirzapur Gazipur. [
Standard Operating Procedure Title SOP for Document Review , Preparation, Update and Upgrade Document No. QA-SOP-30 Revision No. 00 Department Quality Assurance Sl. No 01
Date of Revision July 02, 2019
Revision No. 00
Issue Date July 02, 2019 Effective Date July 02, 2019 Next Review Date July 01, 2021 Page No. All
Page 4 of 4
Amendment Summary Before After ------------------------First Issue
Prepared By
Checked By
Approved By
Mustafigur Rahman Officer, Microbiologist
Md. Tuhin Kabir Senior Officer, Quality Control
Md. Awlad Hossain Manager- Quality Assurance