PERHITUNGAN VOLUME PEKERJAAN PROGRAM KEGIATAN LOKASI KEGIATAN TAHUN ANGGARAN
: KOTA TANPA KUMUH (KOTAKU) : BPM-DFAT : KERENG BANGKIRAI : TPS3R : 2021
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
I 1
PEKERJAAN PERSIAPAN Pembersihan Awal
2
Pengukuran dan Pemasangan Bowplank
II 1
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan
2
Pek. Galian Tanah Pondasi Pondasi P1 Pondasi P2 Pondasi P3
3
Pek. Urugan Bekas Galian
4
Pek. Urugan Pasir bawah lantai
5
Pek. Pemancangan Cerucuk Kayu Galam Pondasi P1 Pondasi P2 Pondasi P3
III 1
b
Pek. Lantai Kerja Beton K.100 t=5 cm
c
Pek. Bekisting Pondasi
d
Cor Beton Mutu k.200
SATUAN
4
5
=
Panjang 20
m
x
Lebar 10.00
m
= = = =
Panjang 12.00 12.00 17.00 17.00
m m m m m
+ + + + +
1 m kiri 1 1 1 1
m m m m
+ + + + +
1 m kanan 1 1 1 1
m m m m
= = = =
66.00 14.00 14.00 19.00 19.00
m m m m m
= Depan jembatan = Jalan masuk =
Panjang 20 5.5 4
m m m
x x x
Lebar 20.00 6.00 5.00
m m m
x x x
Tebal 0.50 0.35 0.35
m m m
= = =
218.55 200.00 11.55 7.00
m3 m3 m3 m3
= = =
Panjang 0.8 0.60 1.20
m m m
x x x
Lebar 0.80 0.60 0.80
m m m
x x x
Tebal 0.55 0.55 0.55
m m m
= = =
11.68 7.39 3.76 0.53
m3 m3 m3 m3
x x
1/4 0.25
m m m m m
x x x x x
Lebar 11.80 2.83 3.23 2.85 1.60
m m m m m
x x x x x
Jumlah cerucuk Bh 9 Bh 9 Bh 12
x x x
Panjang 2 2 2
m m m
x x x
= =
Lantai Hanggar TPS3R = = = Lantai Kantor = Lantai WC =
PEKERJAAN BETON BERTULANG Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian
JUMLAH
= = =
ø 12
Volume galian 11.68 Panjang 13.42 3.23 5.83 3.33 2.30
200.00 m2 200.00 m2
x x x
Jumlah
21 19 1
= Tebal 0.20 0.20 0.20 0.15 0.15
m m m m m
x x x x x
Jumlah Pondasi 21 Bh 19 Bh 1 Bh
/ / /
Berat jenis Jumlah Besi 10.00 bh 0.888 kg/m x
x
Jumlah
2.92 m3 2.92 m3
1 2 2 1 1
= = = = =
44.84 31.67 3.66 7.53 1.42 0.55
m3 m3 m3 m3 m3 m3
2 2 2
= = =
372.00 189.00 171.00 12.00
m m m m
Jumlah Pondasi 21
=
316.93 Kg 316.93 Kg
=
0.67 m3 0.67 m3
1/3 =
2.24 m2 2.24 m2
=
2.69 m3 2.69 m3
=
Panjang 1.70
m
x
=
Panjang 0.80
m
x
Lebar 0.80
m
x
Tebal 0.05
m
x
Jumlah Pondasi 21
=
Panjang 0.8
m
x
Lebar 0.20
m
x
Jumlah 2.00
Bh
x
Jumlah Pondasi 21
=
Panjang 0.80
m
x
Lebar 0.80
m
x
Tebal 0.20
m
x
Jumlah Pondasi 21
x
NO 1 2
3
2
URAIAN PEKERJAAN 2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian
b
Pek. Lantai Kerja Beton K.100 t=5 cm
c
Pek. Bekisting Pondasi
d
Cor Beton Mutu k.200
x
Lebar 0.60
=
Panjang 2.80
m
x
=
Panjang 1.20
m
x
Lebar 0.80
m
x
Tebal 0.05
=
Panjang 1.2
m
x
Lebar 0.80
m
x
=
Panjang 1.20
m
x
Lebar 0.80
m
= = = = =
Panjang 4.60 3.85 3.40 4.10 0.52
m m m m m
x x x x x
Berat jenis 0.888 0.888 0.888 0.888 0.395
Hanggar TPS3R WC Pagar
= = = =
Panjang 4.60 3.85 3.40 4.10
m m m m
x x x x
Hanggar TPS3R bawah sloof Atas sloof WC bawah sloof Atas sloof Pagar bawah sloof Atas sloof bawah sloof Atas sloof
= = = = = = = =
Panjang 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m
= = = = =
Panjang 3.85 2.50 3.40 4.10 0.65
= = = = bawah sloof Atas sloof bawah sloof Atas sloof bawah sloof Atas sloof bawah sloof Atas sloof
ø 10 ø 10 ø8
Pek Kolom K1 a Pek. Pembesian
Pek Kolom K2 a Pek. Pembesian Kantor Pagar
Kantor Pagar
4
ø 12
ø 12 ø 12 ø 12 ø 12 ø8
ø 12 ø 12 ø 12 ø 12 ø8
Pek. Bekisting Kolom
Cor Beton Mutu k.200
Pek Kolom K3 a Pek. Pembesian Pagar
b
Pek. Bekisting Kolom
c
Cor Beton Mutu k.200
=
m
Cor Beton Mutu k.200
c
Panjang 0.6 Panjang 0.60
d
b
=
x
Lebar 0.20
Hanggar TPS3R WC Pagar
3
m
m
x
Pek. Bekisting Pondasi
Cor Beton Mutu k.200
=
Panjang 0.60
m
c
c
=
Berat jenis Jumlah Besi 0.888 kg/m x 10.00 bh
m
Pek. Lantai Kerja Beton K.100 t=5 cm
Pek. Bekisting Kolom
ø 12
Panjang 1.29
Pagar
bawah sloof Atas sloof bawah sloof Atas sloof
SATUAN
4
x
b
b
3
Lebar 0.60
Pondasi Footplat P3 (60 cm x 60 cm x 20 cm) a Pek. Pembesian
JUMLAH
PERHITUNGAN VOLUME
5
Jumlah Pondasi x 19
=
217.59 Kg 217.59 Kg
=
0.34 m3 0.34 m3
=
1.52 m2 1.52 m2
x
Tebal 0.05
m
Jumlah Pondasi x 19
m
x
Jumlah 2.00
Bh
x
Jumlah Pondasi 19 x
m
x
Tebal 0.20
m
x
Jumlah Pondasi 19
=
1.37 m3 1.37 m3
Berat jenis Jumlah Besi 16.00 bh 0.888 kg/m x
x
Jumlah Pondasi 1
=
39.77 Kg 39.77 Kg
m
x
Jumlah Pondasi 1
=
0.05 m3 0.05 m3
Jumlah 2.00
Bh
x
Jumlah Pondasi 1
=
1.92 m2 1.92 m2
x
Tebal 0.20
m
x
Jumlah Pondasi 1
=
0.19 m3 0.19 m3
kg/m kg/m kg/m kg/m kg/m
x x x x x
Jumlah Besi 4.00 4.00 4.00 4.00 529.00
bh bh bh bh bh
x x x x
Jumlah Kolom 18 4 1 1
Lebar 0.20 0.20 0.20 0.20
m m m m
x x x x
Jumlah 4.00 4.00 4.00 4.00
Bh Bh Bh Bh
x x x x
Jumlah Kolom 18 x 4 1 1
x x x x x x x x
Lebar 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m
x x x x x x x x
Tinggi 0.80 3.80 0.80 3.05 0.80 2.60 0.80 3.30
m m m m m m m m
x x x x x x x x
Jumlah Kolom 18 18 4 4 1 1 1 1
m m m m m
x x x x x
Berat jenis 0.888 0.888 0.888 0.888 0.395
kg/m kg/m kg/m kg/m kg/m
x x x x x
Jumlah Besi 4.00 4.00 4.00 4.00 196.00
bh bh bh bh bh
x x x x
Jumlah Kolom 3 8 1 1
Panjang 3.85 2.50 3.40 4.10
m m m m
x x x x
Lebar 0.15 0.15 0.15 0.15
m m m m
x x x x
Jumlah 4.00 4.00 4.00 4.00
Bh Bh Bh Bh
x x x x
Jumlah Kolom 3 8 x 1 1
= = = = = = = =
Panjang 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
m m m m m m m m
x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m
x x x x x x x x
Tinggi 0.80 3.05 0.80 1.70 0.80 2.60 0.80 3.30
m m m m m m m m
x x x x x x x x
Jumlah Kolom 3 3 8 8 1 1 1 1
= = =
Panjang 3.40 4.10 0.41
m m m
x x x
Berat jenis Jumlah Besi 0.617 kg/m x 8.00 bh kg/m x 8.00 bh 0.617 0.395 kg/m x 58.00 bh
x x
Jumlah Kolom 1 2
= =
Panjang 3.40 4.10
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 4.00 4.00
Bh Bh
x x
Jumlah Kolom 1 2
= =
6.96 m2 2.04 m2 4.92 m2
= = = =
Panjang 0.15 0.15 0.15 0.15
m m m m
x x x x
Lebar 0.15 0.15 0.15 0.15
m m m m
x x x x
Tinggi 0.80 2.60 0.80 3.30
m m m m
x x x x
Jumlah Kolom 1 1 2 2
= = = =
0.26 0.02 0.06 0.04 0.15
1/3
1/3
1/3
= = = = =
484.00 294.03 54.69 12.07 14.56 108.66
Kg Kg Kg Kg Kg Kg
= = = =
40.40 22.08 12.32 2.72 3.28
m2 m2 m2 m2 m2
= = = = = = = =
4.23 0.58 2.74 0.13 0.49 0.03 0.10 0.03 0.13
m3 m3 m3 m3 m3 m3 m3 m3 m3
= = = = =
147.98 41.01 71.02 12.07 14.56 50.32
Kg Kg Kg Kg Kg Kg
= = = =
15.43 6.93 4.00 2.04 2.46
m2 m2 m2 m2 m2
= = = = = = = =
1.76 0.11 0.41 0.29 0.61 0.04 0.12 0.04 0.15
m3 m3 m3 m3 m3 m3 m3 m3 m3
= = =
66.65 16.78 40.48 9.39
Kg Kg Kg Kg
m3 m3 m3 m3 m3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1 3
2
3
Pekerjaan Sloof 20x30 a Pek. Pembesian Hanggar TPS3R
7
b
Pek. Bekisting Sloof
c
Cor Beton Mutu k.200
Pekerjaan Sloof 15x20 a Pek. Pembesian Hanggar TPS3R Kantor WC Pagar
b
c
Kiri Kanan Belakang Depan
Pek. Bekisting Sloof
Cor Beton Mutu k.200
Hanggar TPS3R Kantor WC Pagar
JUMLAH
= = =
Panjang 17.00 12.00 0.73
m m m
x x x
= =
Panjang 17 12
m m
x x
Lebar 0.20 0.20
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi 2 x 2 x
= =
Panjang 17.00 12.00
m m
x x
Lebar 0.20 0.20
m m
x x
Tinggi 0.30 0.30
m m
x x
Jumlah sisi 2 2
= = = = = = = = = =
Panjang 12.00 3.50 3.00 2.45 1.75 2.57 20.00 2.83 11.20 0.47
m m m m m m m m m m
x x x x x x x x x x
Berat jenis 0.888 0.888 0.888 0.888 0.888 0.888 0.888 0.888 0.888 0.395
kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m
x x x x x x x x x x
Jumlah Besi 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 338
bh bh bh bh bh bh bh bh bh bh
x x x x x x x x x
Jumlah sisi 1 2 2 1 2 1 1 1 1
= = = = = = = = =
Panjang 12.00 3.50 3.00 2.45 1.75 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m m
x x x x x x x x x
Jumlah 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh
x x x x x x x x x
Jumlah sisi 1 2 x 2 x 1 2 x 1 1 1 1
= = = = = Kiri = Kanan = Belakang = Depan =
Panjang 12.00 3.50 3.00 2.45 1.75 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
Tinggi 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m m
x x x x x x x x x
Jumlah sisi 1 2 2 1 2 1 1 1 1
ø 12 ø 12 ø8
ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø8
SATUAN
4
Berat jenis Jumlah Besi 0.888 kg/m x 6.00 bh 6.00 bh 0.888 kg/m x bh 0.395 kg/m x 290.00
Jumlah sisi x 2 x 2
= = =
1/2 1/2
1/2 1/2 1/2
5
392.56 181.10 127.84 83.62
Kg Kg Kg Kg
= =
11.60 m2 6.80 m2 4.80 m2
= =
3.48 m3 2.04 m3 1.44 m3
= = = = = = = = = =
302.62 42.61 24.86 21.31 8.70 12.43 9.13 71.02 10.05 39.77 62.75
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
= = = = = = = = =
23.72 4.80 1.40 1.20 0.98 0.70 1.03 8.00 1.13 4.48
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = = = = = = =
2.03 0.36 0.21 0.18 0.07 0.11 0.08 0.60 0.08 0.34
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
NO 1 10
URAIAN PEKERJAAN 2 Pekerjaan Ring Balok 20x20 a Pek. Pembesian
3
Hanggar TPS3R TPS
11
b
Pek. Bekisting Ring Balok
c
Cor Beton Mutu k.200
Pekerjaan Balok 15x20 a Pek. Pembesian
b
Pek. Bekisting Ring Balok
c
Cor Beton Mutu k.200
Pekerjaan Ring Balok 15/15 a Pek. Pembesian Hanggar TPS3R WC Kantor Pagar
b
c
Kiri Kanan Belakang Depan
Hanggar TPS3R WC Kantor Pagar
13
Pekerjaan lantai beton bertulang a Pek. Pembesian Hanggar TPS3R Halaman
b
14
m m m
x x x
= =
Panjang 17 12
m m
x x
Lebar 0.20 0.20
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi 2 x 2 x
= =
Panjang 17.00 12.00
m m
x x
Lebar 0.20 0.20
m m
x x
Tinggi 0.20 0.20
m m
x x
Jumlah sisi 2 2
= = = =
Panjang 2.45 3.00 1.75 0.73
m m m m
x x x x
Berat jenis 0.617 0.617 0.617 0.395
kg/m kg/m kg/m kg/m
x x x x
Jumlah Besi 6.00 6.00 6.00 40.00
bh bh bh bh
x x x
Jumlah sisi 1 1 2
= =
Panjang 2.45 1.75
m m
x x
Lebar 0.20 0.20
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi 2 2
= =
3.36 m2 1.96 m2 1.40 m2
= =
Panjang 2.45 1.75
m m
x x
Lebar 0.15 0.15
m m
x x
Tinggi 0.20 0.20
m m
x x
Jumlah sisi 2 2
= =
0.25 m3 0.15 m3 0.11 m3
= = = = = = = = = =
Panjang 12.00 2.45 1.75 3.50 3.00 2.57 20.00 2.83 11.20 0.41
m m m m m m m m m m
x x x x x x x x x x
Berat jenis 0.617 0.617 0.617 0.617 0.617 0.888 0.888 0.888 0.888 0.395
kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m
x x x x x x x x x x
Jumlah Besi 4.00 6.00 6.00 6.00 6.00 4.00 4.00 4.00 4.00 335.00
bh bh bh bh bh bh bh bh bh bh
x x x x x x x x x
Jumlah sisi 1 2 2 2 1 1 1 1 1
= = = = = = = = =
Panjang 12.00 2.45 1.75 3.50 3.00 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
Jumlah 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh
x x x x x x x x x
Jumlah sisi 1 2 x 2 x 2 x 1 1 1 1 1
= = = = = Kiri = Kanan = Belakang = Depan =
Panjang 12.00 2.45 1.75 3.50 3.00 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
Tinggi 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
Jumlah sisi 1 2 2 2 1 1 1 1 1
= = = = = = = = = =
Panjang 13.4 11.8 13.8 7.3 1.5 0.35 1.75 0.77 19.35 0.6
m m m m m m m m m m
x x x x x x x x x x
Berat jenis 0.395 0.395 0.617 0.617 0.617 0.617 0.617 0.617 0.617 0.617
kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m
x x x x x x x x x x
Jumlah Besi 59.00 67.00 25.00 46.00 2.00 5.00 3.00 6.00 2.00 65.00
= = = = = Area Ram =
Panjang 13.4 13.8 1.5 1.75 19.35 8.5
m m m m m m
x x x x x x
Lebar 11.8 7.3 0.35 0.77 0.6 2
m m m m m m
x x x x x x
Tebal 0.15 0.15 0.15 0.15 0.15 0.20
= =
Panjang 2.45 1.75
m m
x x
=
Panjang 2.45
m
x
Lebar 1.75
m
=
Panjang 2.45
m
x
Lebar 1.75
m
ø 10 ø 10 ø 10 ø 10 ø 10 ø 12 ø 12 ø 12 ø 12 ø8
Cor Beton Mutu k.175
Hanggar TPS3R Halaman
Pek. Plat /Dak Beton a Pembesian WC
b
Pek. Bekisting
c
Cor Beton Mutu k.200
ø 8-20 ø 8-20 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30
ø 10-15 ø 10-15
Berat jenis Jumlah Besi 0.617 kg/m x 6.00 bh 6.00 bh 0.617 kg/m x bh 0.395 kg/m x 290.00
Jumlah sisi x 2 x 2
5
= = =
ø 10 ø 10 ø8
Pek. Bekisting Ring Balok
Cor Beton Mutu k.200
SATUAN
4
Panjang 17.00 12.00 0.53
ø 10 ø 10 ø 10 ø8
WC
12
JUMLAH
PERHITUNGAN VOLUME
= = =
1/2 1/2
275.43 125.87 88.85 60.71
Kg Kg Kg Kg
= =
11.60 m2 6.80 m2 4.80 m2
= =
2.32 m3 1.36 m3 0.96 m3
= = = =
44.67 9.07 11.11 12.96 11.53
Kg Kg Kg Kg Kg
= = = = = = = = = =
281.95 29.62 18.14 12.96 25.91 11.11 9.13 71.02 10.05 39.77 54.25
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
= = = = = = = = =
17.79 3.60 0.74 0.53 1.05 0.90 0.77 6.00 0.85 3.36
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = = = = = = =
0.62 0.27 0.11 0.08 0.16 0.07 0.06 0.45 0.06 0.25
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
bh bh bh bh bh bh bh bh bh bh
= = = = = = = = = =
1,101.59 312.29 312.29 212.87 207.19 1.85 1.08 3.24 2.85 23.88 24.06
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
m m m m m m
= = = = = =
42.55 23.72 15.11 0.08 0.20 1.74 1.70
m3 m3 m3 m3 m3 m3 m3
= =
36.50 m3 18.14 m3 18.36 m3
Berat jenis Jumlah Besi bh 0.617 kg/m x 12.00 0.617 kg/m x 17.00 bh
x
1/2
1/2 1/2 1/2
4.29 m2 4.29 m2
x
Tebal 0.15
m
=
0.64 m3 0.64 m3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
IV 1
PEKERJAAN DINDING, LANTAI DAN PLESTERAN Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R Samping Kanan = Depan = Area Dalam = Samping Kiri = Bawah Sloof Kiri = Kanan = Belakang = Depan =
b
Kantor
Depan Samping Kiri Samping Kanan Belakang Bawah Sloof
2
c
WC
d
Pagar
Pek. Plesteran Dinding a Bangunan Hanggar TPS3R
b
3
Kantor
Depan Samping Kanan Belakang Bawah Sloof
= = = = = = Kiri = = Kanan = = Belakang = Depan =
= = = Kanan = Belakang = Depan =
Depan
= Box tanaman = = = Samping Kiri = = Samping Kanan = Belakang = Bawah Sloof Kiri = = Kanan = Belakang = Depan = = = Samping Kanan Samping Kiri Depan Area Dalam
= = = =
Depan Samping Kiri Samping Kanan Belakang
= = = =
c
WC
Depan Samping Kanan Belakang
= = =
d
Pagar
Depan Samping Kiri Samping Kanan Belakang
= = = =
Cor Beton Lantai Beton Mutu k.200 Hanggar TPS3R Gudang = Area Penyimpanan = Tempat Barang Lapak = KM/WC = Kantor =
Panjang 3.8 3.8 3.8 2.8 2.8 2.8 2.8 2.8
Lebar 3.35 2.28 0.37 2.85 1.35 3.35 2.28 0.37 2.85 1.35 3.35 3.35
m m m m m m m m
m m m m m m m m m m m m
x x x x x x x x
x x x x x x x x x x x x
Lebar 2.8 3.2 2.8 2.0 0.8 0.8 0.8 0.8
Tinggi 3.05 3.05 3.05 3.05 3.05 4.2 0.8 0.8 0.8 0.8 0.8 0.8
m m m m m m m m
x x x x x x x x
JUMLAH
Jumlah sisi 4 1 4 4 4 4 5 5
-
Luas pintu/ Jendela/ kerawang/G lasblok m m m m m m m m m m m m
SATUAN
4
-
3.47
-
1.11
Luas pintu/ Jendela/ kerawang/ Glasblok
1.87 1.69 13.48
sisi
5
= = = = = = = =
142.96 40.69 10.48 29.08 22.40 8.96 8.96 11.20 11.20
m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = = = = = = = = = =
60.60 13.69 6.95 1.13 8.69 4.12 15.18 1.82 0.30 2.28 1.08 2.68 2.68
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = = = =
23.50 7.21 7.02 4.88 1.84 1.28 1.28
m2 m2 m2 m2 m2 m2 m2
= = = = = = = = = = = = = = =
73.61 4.05 2.85 1.23 0.88 27.14 3.05 3.93 3.38 13.16 1.48 1.90 1.64 2.40 4.56 1.96
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = =
205.28 81.37 44.80 20.95 58.16
m2 m2 m2 m2 m2
= = = =
89.03 27.38 13.91 17.39 30.36
m2 m2 m2 m2 m2
Luas pintu/ Jendela/ kerawang/G lasblok
Lebar 1.60 2.30 1.60 2.30 1.60 1.60
m m m m m m
x x x x x x
Tinggi 3.05 3.05 3.05 0.8 0.8 0.8
m m m m m m
-
2.33
Panjang 3 2.85 2.45 0.5 2.35 1.85 2.38 2.05 2.35 1.85 2.38 2.05 3 2.85 2.45
m m m m m m m m m m m m m m m
x x x x x x x x x x x x x x x
Lebar 1.35 0.5 0.5 0.35 1.65 1.65 1.65 1.65 0.8 0.8 0.8 0.8 0.8 0.8 0.8
m m m m m m m m m m m m m m m
x x x x x x x x x x x x x x x
Jumlah sisi 1 2 1 5 7 1 1 1 7 1 1 1 1 2 1
Luas bidang 40.69 22.40 10.48 29.08
m2 m2 m2 m2
x x x x
Sisi 2 2 2 2
Bh Bh Bh Bh
luar-dalam
m2 m2 m2 m2
x x x x
2 2 2 2
Bh Bh Bh Bh
luar-dalam
7.21 m2 7.02 m2 4.88 m2
x x x
2 2 2
Bh Bh Bh
= = =
38.21 14.42 14.03 9.76
m2 m2 m2 m2
m2 m2 m2 m2
x x x x
2 2 2 2
Bh Bh Bh Bh
= = = =
93.01 18.00 60.39 7.85 6.77
m2 m2 m2 m2 m2
m m m m m
x x x x x
Lebar 3.23 3.23 3.23 1.60 2.85
m m m m m
= = = = =
5.04 1.88 0.92 0.92 0.37 0.95
m3 m3 m3 m3 m3 m3
13.69 6.95 8.69 15.18
9.00 30.20 3.93 3.38
Panjang 5.83 2.85 2.85 2.30 3.33
luar-dalam luar-dalam luar-dalam
luar-dalam luar-dalam luar-dalam
x x x x x
Tebal 0.10 0.10 0.10 0.10 0.10
m m m m m
NO
URAIAN PEKERJAAN
1 4
2 Pek Keramik lantai Uk.40x40
5
Pek Keramik lantai WC Uk.20x20
6
Pek Keramik dinding WC Uk.10x20
7
Pek. Tawing layar
V 1
PEKERJAAN ATAP, PLAFOND, LISPLANK Rangka Atap Baja Ringan a Hanggar TPS3R
b
c 2
3
JUMLAH
PERHITUNGAN VOLUME 3
4 46.73 9.49 18.83 9.21 9.21
SATUAN 5
Kantor = Gudang = Area Penyimpanan = Tempat Barang Lapak =
Panjang 3.33 5.83 2.85 2.85
m m m m
x x x x
Lebar 2.85 3.23 3.23 3.23
m m m m
= = = =
=
Panjang 2.30
m
x
Lebar 1.60
m
=
3.68 m2 3.68 m2
= = =
Panjang 2.3 1.6 0.6
m m m
x x x
Lebar 1.2 1.2 1.2
m m m
x x x
sisi 2 1 1
= = =
8.16 5.52 1.92 0.72
m2 m2 m2 m2
Hanggar TPS3R T.Layar kanan = T. Layar kiri = Kantor T. Layar kiri = T. Layar kanan = WC T. Layar kiri = T. Layar kanan =
Panjang 12.2 12.2 2.7 2.7 2.7 2.7
m m m m m m
x x x x x x
Lebar 3.25 3.25 1 1 1 1
m m m m m m
x x x x x x
1/2 1/2 1/2 1/2 1/2 1/2
= = = = = =
45.05 19.83 19.83 1.35 1.35 1.35 1.35
m2 m2 m2 m2 m2 m2 m2
x
Lebar + overstek 13
/
Derajat Kemiringan (Cos15) 0.966
=
242.24 m2 242.24 m2
x
Lebar + overstek 4
/
Derajat Kemiringan (Cos15) 0.966
=
18.63 m2 18.63 m2
x
Lebar + overstek 3.5
/
Derajat Kemiringan (Cos15) 0.966
=
9.96 m2 9.96 m2
= Volume Rangka Atap = 242.24
= =
242.24 m2 242.24 m2
Kantor
WC
Pek Atap Genteng Metal Zincalume a Hanggar TPS3R
=
Panjang+ overstek 18
=
Panjang+ overstek 4.5
=
Panjang+ overstek 2.75
m
m
m
m
m
m
m2 m2 m2 m2 m2
b
Kantor
= Volume Rangka Atap = 18.63
= =
18.63 m2 18.63 m2
d
WC
= Volume Rangka Atap = 9.96
= =
9.96 m2 9.96 m2
Pek. Lisplank Superplank Eksterior Hanggar TPS3R Kantor WC
= = =
Panjang/ cos15 13.46 4.14 3.62
m m m
+ + +
Panjang 18 4.5 2.75
m m
=
Panjang 3.35
m
x
Lebar 2.85
m
=
9.55 m2 9.55 m2
=
9.55 m2 9.55 m2
sisi x x
= = = =
2 2
57.34 31.46 13.14 12.75
m m m m
4
Rangka Hollow Plafond Kantor
5
Pek. Pas. Plafond Kalsiboard
=
Panjang 3.35
m
x
Lebar 2.85
m
V 1
PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R P1 = = J1 = =
Panjang 0.1 0.1 0.1 0.1
m m m m
x x x x
Lebar 0.05 0.05 0.05 0.05
m m m m
x x x x
Panjang Kusen 2.1 1.02 1.45 1
m m m m
x x x x
Jumlah Kusen 2 1 3 2
x x x x
Jumlah P/J 2 2 2 2
= = = =
0.12 0.04 0.01 0.04 0.02
m3 m3 m3 m3 m3
= = = =
Panjang 0.1 0.1 0.1 0.1
m m m m
x x x x
Lebar 0.05 0.05 0.05 0.05
m m m m
x x x x
Panjang Kusen 2.1 1.05 1.45 1
m m m m
x x x x
Jumlah Kusen 2 1 3 2
x x x x
Jumlah P/J 1 1 1 1
= = = =
0.06 0.02 0.01 0.02 0.01
m3 m3 m3 m3 m3
P1
=
Panjang 0.1
m
x
Lebar 0.05
m
x
Panjang Kusen 2.1 m
x
Jumlah Kusen Jumlah P/J 2 x 1
=
0.02 m3 0.02 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 2
=
3.60 m3 3.60 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 1
=
1.80 m3 1.80 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 1
=
1.80 m3 1.80 m3
J1
= =
Lebar 0.1 0.1
m m
x x
Panjang 1.45 0.43
m m
x x
= =
2.26 m2 1.74 m2 0.52 m2
b
Kantor
P1 J1
c 2
3
WC
Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R
b
Kantor
c
WC
Pek. Rangka Jendela Kaca Kayu Klas II
Jumlah Rangka 4 Bh 4 Bh
x x
Jumlah Jendela 3 3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
4
Pek.Pemasangan Kaca Tebal 5 mm
5
Pek. Engsel Pintu
6
Pek. Engsel Jendela
7
Kunci Tanam
=
8
Hak angin Jendela
=
J1
=
Panjang 1.45
=
SATUAN
4
=
=
12.00 Bh 12.00
=
12.00 Bh 12.00
4.00
=
4.00 Bh
6.00
=
6.00 Bh
m
Jumlah engsel 4 bh
x
m
Jumlah Kaca x 4 Bh
Jumlah Jendela x 3
5 7.48 m3 7.48 m3
Jumlah engsel = 3 bh
Lebar 0.43
JUMLAH
banyak pintu 4 x
x
banyak jendela 3
9
Gerendel Jendela
=
6.00
=
6.00 Bh
10
Handel Jendela
=
6.00
=
6.00 Bh
11
Pekerjaan Ventilasi Kerawang
V3
=
Panjang 2.7
m
x
Lebar 1.5
m
x
Jumlah 4
=
16.20 m2 16.20 m2
12
Pekerjaan Pas. Glasblock
Hanggar 1 Hanggar 2 Kantor
= = =
Panjang 2.8 3.2 1.4
m m m
x x x
Lebar 0.6 0.6 0.2
m m m
x x x
Jumlah 4 1 1
= = =
8.92 6.72 1.92 0.28
VI 1
PEKERJAAN PENGECATAN Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar
= = = = =
= = = =
205.28 89.03 38.21 93.01
m2 m2 m2 m2
2
Pengecatan Plafond Kantor
=
=
9.55
m2
3
Pengecatan Kusen Pintu dan Jendela
m2 m2 m2 m2 m2
P1 J1
4
5
Pengecatan Pintu Panel a Hanggar TPS3R
b
Kantor
c
WC
Pengecatan Rangka Jendela Kaca
Pek. Urugan Pasir t=5 cm
c
Pek Cor Beton K.175 tebal 10 cm
d
Pek. Sloof 15/15 - Pek. Pembesian
- Pek. bekisting
- Pek cor beton K.175
x x x x
Lebar 0.2 0.2 0.2 0.2
m m m m
x x x x
Jumlah Kusen Bh 2 Bh 1 Bh 3 Bh 2
x x x x
Jumlah P/J 5 5 4 4
= = = =
10.08 4.10 0.90 3.48 1.60
Jumlah sisi 2 Bh
x
Jumlah Pintu 3
=
10.80 m3 10.80 m3
Panjang 2
m
x
Lebar 0.9
m
x
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 2
Bh
x
Jumlah Pintu 1
=
3.60 m3 3.60 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 2
Bh
x
Jumlah Pintu 1
=
3.60 m3 3.60 m3
J1
= =
Panjang 0.1 0.1
m m
x x
Lebar 1.55 0.45
m m
x x
Jumlah Rangka 4 Bh 4 Bh
x x
= =
3.20 m2 2.48 m2 0.72 m2
=
Panjang 2.50
m
x
Lebar 1.5
m
x
Tinggi 1.85
x
=
Panjang 2.50
m
x
Lebar 1.5
m
x
Tinggi 0.05
Panjang 2.20
m
x
Lebar 1.2
m
x
Tinggi 0.1
= = =
Panjang 2.5 1.5 0.40
m m m
x x x
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 2.00 2.00
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Tinggi 0.15 0.15
= =
Panjang 1.70 0.41
m m
x x
=
Panjang 1.70
m
x
Lebar 0.15
m
x
Jumlah 4.00
Bh
=
Panjang 1.70
m
x
Lebar 0.15
m
x
Tinggi 0.15
m
ø 10 ø 10 ø8
- Pek cor beton K.175
Pek. Kolom 15/15 - Pek. Pembesian
Panjang Kusen 2.05 m 0.9 m 1.45 m 1 m
=
- Pek. bekisting
e
9.55
P1
VII PEKERJAAN SANITASI 1 Pekerjaan Septictank 2 unit a. Galian Septictank b
= = = =
volume pekerjaan plesteran 205.28 89.03 38.21 93.01
m2 m2 m2 m2
ø 10 ø8
Jumlah Jendela 4 4
Jumlah 2
unit
=
13.88 m3 13.88 m3
x
Jumlah 2
unit
=
0.38 m3 0.38 m3
x
Jumlah 2
unit
=
0.53 m3 0.53 m3
Berat jenis Jumlah Besi bh 0.617 kg/m x 4.00 0.617 kg/m x 4.00 bh bh 0.395 kg/m x 54.00
m
x x
Sisi 2 2
x x x
Jumlah unit 2 2 2
= = =
Bh Bh
x x
Jumlah sisi 2 2
m m
x x
Berat jenis Jumlah Besi 4.00 bh 0.617 kg/m x 0.395 kg/m x 46.00 bh
x
56.55 24.68 14.81 17.06
Kg Kg Kg Kg
x x
Jumlah unit 2 2
= =
4.80 m2 3.00 m2 1.80 m2
Jumlah sisi Jumlah unit 2 x 2 2 x 2
= =
0.36 m3 0.23 m3 0.14 m3
Jumlah Kolom Jumlah unit 4 x 2 x 2
= =
48.46 Kg 33.56 Kg 14.90 Kg
x
Jumlah sisi Jumlah unit 4 x 2
=
8.16 m2 8.16 m2
x
Jumlah sisi Jumlah unit 4 x 2
=
0.31 m3 0.31 m3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
f
Pek. Pas. Batako
9
Pek. Plesteran
h
Pek. Ring Balk 15/15 - Pek. Pembesian
ø 10 ø 10 ø8
- Pek. bekisting
- Pek cor beton K.175
i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian
ø 8-15 ø 8-15 ø 8-15
- Pek. bekisting
- Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian
ø 8-15 ø 8-15 ø 8-15
- Pek. bekisting
- Pek cor beton K.175 k. Bioseptictank BF-08
l
Urugan Pasir dalam septictank
JUMLAH
SATUAN
4 5 23.12 m2 14.96 m2 8.16 m2
= =
Panjang 2.2 1.2
m m
x x
Lebar 1.7 1.7
m m
x x
Jumlah sisi 2 2
x x
Jumlah unit 2 2
= =
= =
Panjang 2.2 1.2
m m
x x
Lebar 1.7 1.7
m m
x x
Jumlah sisi 2 2
x x
Jumlah unit 2 2
= =
23.12 m2 14.96 m2 8.16 m2
= = =
Panjang 2.5 1.5 0.40
m m m
x x x
Jumlah unit 2 2 2
= = =
56.55 24.68 14.81 17.06
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi Jumlah unit 2 x 2 2 x 2
= =
4.80 m2 3.00 m2 1.80 m2
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Tinggi 0.15 0.15
m m
x x
Jumlah sisi Jumlah unit 2 x 2 2 x 2
= =
0.36 m3 0.23 m3 0.14 m3
= = =
Panjang 2.2 0.3 0.15
m m m
x x x
Berat jenis Jumlah Besi 0.395 kg/m x 4.00 bh bh 0.395 kg/m x 8.00 0.395 kg/m x 4.00 bh
x x x
Jumlah unit 2 2 2
= = =
9.32 6.95 1.90 0.47
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
x x
Jumlah unit 2 2
= =
2.40 m2 1.50 m2 0.90 m2
=
Panjang 2.5
m
x
Lebar 1.50
m
-
Volume tutup mainhole 0.098
=
0.17 m3 0.55 m3
= = =
Panjang 0.7 0.7 0.15
m m m
x x x
Berat jenis Jumlah Besi 0.395 kg/m x 5.00 bh kg/m x bh 0.395 5.00 bh 0.395 kg/m x 4.00
x x x
Jumlah unit 2 2 2
= = =
6.00 2.77 2.77 0.47
= =
Panjang 0.7 0.7
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah unit 2 2
= =
0.84 m2 0.42 m2 0.42 m2
=
Panjang 0.7
m
x
Lebar 0.70
m
x
Tinggi 0.10
m
x
Jumlah unit 2
=
0.10 m3 0.10 m3
=
2
=
2.00 Bh
=
Panjang 2.2
m
x
Lebar 1.2
= =
0.34 Bh 0.34 m3
=
Panjang 1.7
m
+
Pipa Air Lindi 1.8
=
3.50 m
=
Panjang 0.5
m
+
0.78
m
+
0.65
=
1.93 m
m
+
13.42
m
+
4.84
=
36.66 m
Berat jenis Jumlah Besi 0.617 kg/m x 4.00 bh bh 0.617 kg/m x 4.00 0.395 kg/m x 54.00 bh
m m
m
m
x x
Jumlah 2.00 2.00
x
Tinggi 0.10
x
Tinggi 1.2
Bh Bh
m
Sisi x x
-
2 2
x x x
Volume Biofil 3
x
x
Jumlah unit 2
Jumlah unit 2
Kg Kg Kg Kg
m3 Kg Kg Kg
m3 Kg Kg Kg
2
Pekerjaan Pipa 4"
3
Pekerjaan Pipa 2"
4
Pekerjaan Pipa 3/4" (Air Bersih)
=
Panjang 4.1
5
Pek. Sumur Bor+pompa
=
1.00
=
1.00 Bh
6
Pekerjaan kran air
=
2.00
=
2.00 Bh
7
Pekerjaan stop kran
=
1.00
=
1.00 Bh
8
Profil tank 1200 L
=
1.00
=
1.00 Bh
9
Pek. Closed Duduk
=
1.00
=
1.00 Bh
10
Pek. Wastafel+cermin
=
1.00
=
1.00 Bh
= = =
Panjang 5.70 5.30 1.40
= = =
Panjang 5.30 3.80 0.73
= = =
= =
m
+
6.6
+
7.7
VIII PEKERJAAN JEMBATAN
1
Pekerjaan Pondasi Batu Belah
2
Pekerjaan Sloof 20/30 a Pek. Pembesian
b
Pekerjaan Bekisting Sloof
c
Cor Beton k.200
A B
ø 10 ø 10 ø8
x x x
(Lebar atas+lebar bawah)/2 0.75 0.75 0.75
m m m
x x x
Berat jenis Jumlah Besi 6.00 bh 0.617 kg/m x 0.617 kg/m x 6.00 bh bh 0.395 kg/m x 122.00
Panjang 5.30 3.80 3.80
m m m
x x x
Lebar 0.3 0.3 0.2
m m m
x x x
Jumlah 4 4 2
Bh Bh Bh
Panjang 5.30 3.80
m m
x x
Lebar 0.3 0.3
m m
x x
Tebal 0.2 0.2
m m
m m m
m m m
x x x
Tinggi 1.6 1.6 0.7
x
m
2
Jumlah sisi x 2 x 2
x x
Jumlah sisi 2 2
= = =
14.67 6.84 6.36 1.47
m3 m3 m3 m3
= = =
102.56 39.24 28.14 35.18
Kg Kg Kg Kg
= = =
12.44 6.36 4.56 1.52
m2 m2 m2 m2
= =
1.09 m2 0.64 m2 0.46 m2
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
3
4
5
Pekerjaan Balok 20/30 a Pek. Pembesian
b
Pekerjaan Bekisting Balok
c
Cor Beton k.200
Pekerjaan Plat beton a Pek. Pembersian
b
Pekerjaan Bekisting Plat
c
Cor Beton K200 tebal 20 cm
Pekerjaan Reling jembatan a Pembesian Kolom 15/15
b
Pek. Bekisting Kolom
c
Cor Beton k.200
d
Pek. Pas Batako
e
Pek. Plesteran
f
Pek Besi Galvanis 2"
X 1 2 3 4 5 6 7 8
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
XI 1
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC
2
Pekerjaan Pintu Pagar Besi
3
Pekerjaan Handrailing Pintu Masuk
4
Pekerjaan Rolling door
5
Pek. Handrail WC
6
Pekerjaan ukiran kayu
Panjang 5.30 3.80 0.73
m m m
x x x
= = = =
Panjang 5.30 5.30 3.80 3.80
m m m m
x x x x
Lebar 0.3 0.2 0.3 0.2
m m m m
x x x x
Jumlah 2 1 2 1
Bh Bh Bh Bh
= =
Panjang 5.30 3.80
m m
x x
Lebar 0.3 0.3
m m
x x
Tebal 0.2 0.2
m m
x x
= =
Panjang 5.3 3.8
m m
x x
Berat jenis Jumlah Besi bh 0.617 kg/m x 2.00 bh 0.617 kg/m x 2.00
x x
= = =
Panjang 5.30 5.30 3.80
m m m
x x x
Lebar 3.8 0.2 0.2
m m m
x x x
Jumlah 1 2 2
m m m
=
Panjang 5.30
m
x
Lebar 3.8
m
x
Tebal 0.2
m
= =
Panjang 1.00 0.36
m m
x x
=
Panjang 1.00
m
x
Lebar 0.15
m
x
=
Panjang 1.00
m
x
Lebar 0.15
m
x
Tebal 0.15
m
=
Panjang 3.10
m
x
Lebar 0.5
m
x
Jumlah 2
Bh
= =
Panjang 3.10 0.20
m m
x x
Lebar 0.5 0.5
m m
x x
=
3.70
x
2
= = = = = = = =
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
= =
Panjang 2.00 2.00
m m
x x
Lebar 2.85 2.45
=
Panjang 5.00
m
x
Lebar 1.89
Hanggar TPS3R = Kantor = WC =
Panjang 1.96 0.95 0.75
m m m
=
Panjang 2.85
m
=
4.00
ø 10 ø 10
ø 10 ø8
Depan = Samping Kiri =
Luas ukiran 2.64 m2 2.16 m2
7
Pek. Plesteran letter timbul PERALATAN TPS3R
=
1.00
= = =
1.00 1.00 1.00
XI A 1 2 3 4 5 6 7 8 B
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA 4.00 = Sosialisasi K3 dan Prokes (Spanduk) 21.00 = Helm Keselamatan 21.00 = Rompi Kerja 21.00 Sarung Tangan (Safety Glove) = 21.00 Sepatu Keselamatan (Rubber Shoes) = 3.00 Tali Pengaman = 2.00 = Kotak P3K 1.00 = Asuransi Tenaga Kerja KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
Berat jenis Jumlah Besi 6.00 bh 0.617 kg/m x 6.00 bh 0.617 kg/m x bh 0.395 kg/m x 61.00
Berat jenis Jumlah Besi 0.617 kg/m x 4.00 bh bh 0.395 kg/m x 20.00 Jumlah Papan 4 m
Jumlah Sisi 2 Bh 2 Bh
Jumlah x x
x x x
1 1
Jumlah
1 1
Banyak Besi bh 19.00 bh 27.00
50% 50% 50%
x
Jumlah Kolom 8
x
Jumlah Kolom 8x
x
Jumlah Kolom 8
x x
Jumlah 2 2
= = =
51.28 19.62 14.07 17.59
Kg Kg Kg Kg
= = = =
7.28 3.18 1.06 2.28 0.76
m2 m2 m2 m2 m2
= =
0.55 m2 0.32 m2 0.23 m2
= =
250.87 Kg 124.26 Kg 126.61 Kg
= = =
50%
5
11.89 10.07 1.06 0.76
4.03 m2 4.03 m2
= =
22.59 Kg 19.74 Kg 2.84 Kg
=
2.40 m2 2.40 m2
=
0.18 m2 0.18 m2
=
3.10 m2 3.10 m2
= =
6.60 m2 6.20 m2 0.40 m2 7.40 M
m m
x x
Jumlah 2 1
Jumlah 2 1 1
x x
Lebar 2.55
m2 m2 m2 m2
=
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
x
SATUAN
4
= = =
ø 10 ø 10 ø8
X 1 2 3
Mesin Pencacah Plastik Mesin Pencacah Kompos Mesin Pengayak
JUMLAH
Unit Titik Bh Bh Bh Bh Titik Bh
.= .=
16.30 m2 11.40 m2 4.90 m2
.=
9.45 m2 9.45 m2
.= .= .=
2.00 Bh 1.00 Bh 1.00 Bh
.=
7.27 m2 7.27 m2
=
4.00 Bh
jumlah 4 4
19.20 m2 10.56 m2 8.64 m2 =
1.00 Paket
1.00 1.00 1.00
Unit Unit Unit
4.00 21.00 21.00 21.00 21.00 3.00 2.00 1.00
Bh Bh Bh Bh Bh Bh Bh Paket
NO 1 1 2 3 4 5 6 7 XII 1 2 3 4 5 6
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
2 Alat ukur suhu badan nir-sentuh (Thermoscan) Vitamin C (1 Box isi 100 tablet) Tempat Cuci Tangan Sabun Cuci Tangan (Cair) 200ml/btl Masker kain Alat penyemprot desinfektan Cairan Desinfektan 5L
3 = = = = = = =
2.00 20.00 2.00 4.00 20.00 2.00 3.00
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
= = = = = =
1.00 1.00 1.00 8.00 1.00 1.00
6.00
JUMLAH 4
SATUAN 5
2.00 20.00 2.00 4.00 20.00 2.00 3.00
Bh Bh Bh Bh Bh Bh Bh
1.00 1.00 1.00 8.00 1.00 1.00
Ls Ls Ls Bh Paket Paket
Form - RAB1
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
HASIL KESEPAKATAN HARGA SATUAN UPAH/BAHAN/ALAT
Provinsi Kota
No.
I.
Uraian Tenaga Kerja
TENAGA KERJA 1 Mandor 2 Kepala Tukang 3 Tukang Batu 4 Tukang Kayu 5 Tukang Besi 6 Tukang Cat 7 Pekerja
No.
II.
BULAN :
: Kalimantan Tengah : Palangka Raya
Uraian Tenaga Kerja
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25 26 27
28 29 30 31 32 33 34 35 36 37 38 39 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63
Satuan
HOK HOK HOK HOK HOK HOK HOK
Satuan
BAHAN/MATERIAL : Cat Menie Kayu Platone Kg Cat dasar kayu platone Kg Cat penutup kayu platone Kg Cat tembok Kg Kwas 4" Bh Paku 5 - 12 cm Kg Pasir beton m3 Pasir Pasang m3 Semen Portland Kg Semen Portland Gresik 40 Kg/zak Minyak Cat/Thinner Cemerlang Kg Ampelas Kayu Flexigo Lbr Kran air stainless Duffi Bh Seal Tape Onda Kg Papan Informasi Kegiatan Lbr Kunci Tanam Bh Engsel Pintu Bh Lem Kayu Kg Bata Merah Bh Pipa PVC 4" AW Btg Pipa PVC 3/4" AW Btg Pipa PVC 2" AW Btg Elboh/Knee Bh Stop Kran 3/4 Bh TanahUrug m3 Besi Beton Polos Kg Besi beton polos dia. 8 Batang Besi beton polos dia. 10 Batang Besi beton polos dia. 12 Batang Kawat Beton/Bendrat Kg Plywood 9 mm Lbr Batako Bh Keramik lantai uk.40x40 Doz Semen Warna Kg Keramik lantai uk.20x20 Doz Keramik dinding uk.10x20 Doz Baja ringan 75x35x0,75 MM Batang Hollow 30x30x0,3 MM Batang Paku Skrup Bh Atap Metal Zincalume Spandek (106x600) Lbr Paku Anti Karat Kg Papan Plank Kalsiboard tbl.8 mm (30x240mm Lbr Besi Hollow Plafond 1,3x 3,3 mm Batang Kalsiboard tebal 6 mm Lbr Paku Kalsiboard Kg Kaca Bening 5 mm m2 Sealant Kaca Kg Engsel Pintu 4" Bh Engsel Jendela Bh Kunci pintu tanam lengkap Bh Hak/Kait Angin Bh Gerendel/Kunci slot Bh Handel Jendela Bh Bioseptictank BF-08 Bh Profil tank 1200 L Bh Closed duduk Unit Batu Belah (Tangkiling-Dalam Kota) m3 Roster/Kerawang uk. 30cmx30cm Bh Glasblock uk. 20x20 Bh KalsiBoard tebal 8 mm (120x240) Bh Wastafel lengkap+cermin putih Unit Box panel 20x80x60 Bh Penyambungan Daya Baru PLN Unit Instalasi Titik Lampu Titik
Kecamatan Kelurahan
: Sebangau : Kereng Bangkirai
HARGA SATUAN SESUAI STANDAR KOTA/KABUPAT EN 225,000 170,000 155,000 150,000 150,000 150,000 140,000
L.04
L.01
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN SESUAI Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3 STANDAR Nama: Nama: KABUPATEN/KO Nama: TA Almt : Almt : Almt : Telp : Telp : Telp :
62,400 62,400 62,400 120,000 45,000 22,000 200,000 190,000 1,325 53,000 28,100 10,000 65,000 12,000 200,000 195,000 26,000 33,000 800 295,000 42,000 127,500 25,000 65,000 100,000 12,000 47,000 70,500 101,500 25,000 130,000 3,000 75,000 5,000 65,000 65,400 82,000 50,000 3,500 255,000 35,000 155,000 15,000 110,000 25,000 135,000 47,500 35,000 41,000 95,000 20,800 35,000 8,000 10,643,500 1,600,000 1,828,300 400,000 25,000 27,000 190,000 940,000 760,000 4,000,000 325,000
60,000 60,000 60,000 110,000 45,000 22,000 180,000 180,000 1,275 51,000 28,100 10,000 65,000 12,000 200,000 195,000 26,000 33,000 800 295,000 42,000 127,500 25,000 65,000 100,000 12,000
25,000 130,000 2,800 75,000 5,000 65,000 65,400 82,000 50,000 3,500 250,000 35,000 155,000 15,000 110,000 25,000 135,000 47,500 35,000 41,000 95,000 20,800 35,000 8,000 10,643,500 1,600,000 1,800,000 400,000 25,000 27,000 190,000 940,000 760,000 4,000,000 325,000
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
60,000 60,000 60,000 110,000 45,000 22,000 180,000 150,000 1,275 51,000 28,100 10,000 65,000 12,000 200,000 195,000 26,000 33,000 800 295,000 42,000 127,500 25,000 65,000 100,000 12,000 45,000 70,000 101,000 25,000 130,000 2,800 75,000 5,000 65,000 65,400 125,000 50,000 3,500 250,000 35,000 155,000 15,000 110,000 25,000 135,000 47,500 35,000 41,000 95,000 20,800 35,000 8,000 10,643,500 1,600,000 1,800,000 400,000 25,000 26,000 190,000 940,000 760,000 4,500,000 325,000
Nama Toko/Pemasok
A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21 A22 A23 A25 A26 A27
A28 A29 A30 A31 A32 A33 A34 A35 A36 A37 A38 A39 A41 A42 A43 A44 A45 A46 A47 A48 A49 A50 A51 A52 A53 A54 A55 A56 A57 A58 A59 A60 A61 A62 A63
No.
Uraian Tenaga Kerja
Satuan
64 65 66 67 68 69 70 71 72
Lampu SL 18 Watt Bh Saklar Tunggal Bh Saklar Ganda Bh Pek. Pas. Panel Listrik Bh Pek. Instalasi stop kontak Titik Stop Kontak Bh Pipa Besi Galvanis tbl 1,2 mm P=6 m Batang Rolling door manual m2 Pagar BRC Hot Deep Galvanized T.90-P.240 Lembar Pagar BRC Hot Deep Galvanized M2 73 Pipa Stainless Steel 2" btg/6m Pipa Stainless Steel 2" m 75 Glassblock Bh 76 Sumur Bor+Pompa Unit
No.
Uraian Tenaga Kerja
1 2 3 4 5 6 7 8
No.
III.
Uraian Tenaga Kerja
m3 m3 m3 m3 m3 m3 Batang Batang
Satuan
206,000
205,800 26,000 2,500,000
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 STANDAR Nama: Nama: KABUPATEN/KO Nama: TA Almt : Almt : Almt : Telp : Telp : Telp : 4,000,000.00 4,000,000.00 1 5,000,000.00 5,000,000.00 1 6,500,000.00 6,000,000.00 1 2,250,000.00 2,200,000.00 1 2,500,000.00 2,450,000.00 1 475,000.00 450,000.00 1 35,000.00 35,000.00 1 30,000.00 30,000.00 1
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 SESUAI STANDAR Nama: Nama: Nama: KABUPATEN/KO Almt : Almt : Almt : TA Telp : Telp : Telp :
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 1 Sosialisasi K3 dan Prokes (Spanduk) 2 Helm Keselamatan 3 Rompi Kerja 4 Sarung Tangan (Safety Glove) 5 Sepatu Keselamatan (Rubber Shoes) 6 Tali Pengaman 7 Kotak P3K 8 Asuransi Tenaga Kerja 9 Alat ukur suhu badan nir-sentuh (Thermoscan) 10 Vitamin C (1 Box isi 100 tablet) 11 Tempat Cuci Tangan 12 Sabun Cuci Tangan (Cair) 200ml/btl 13 Masker kain 14 Alat penyemprot desinfektan 15 Cairan Desinfektan 5L
No.
XIX
Balok Kayu Klas II (Lanan) Papan Kayu Klas II (Lanan) Papan Kayu Klas II (Benuas) Balok Kayu Klas III Papan Kayu Klas III Kerikil (Maks 30mm) Kayu Galam diameter 10-12 cm P=4 m Kayu Galam diameter 6-10 cm P=4 m
Satuan
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 STANDAR Nama: Nama: KABUPATEN/KO Nama: TA Almt : Almt : Almt : Telp : Telp : Telp : 35,000 35,000 20,000 20,000 20,000 20,000 760,000 760,000 325,000 325,000 20,000 20,000 179,500 179,500 500,000 500,000 577,500 577,500
Uraian Tenaga Kerja
1 2 3 4 5 6
Satuan
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
35,000 20,000 20,000 760,000 325,000 20,000 179,500 500,000 577,500 320,000 308,700 52,000 26,000 2,500,000
A64 A65 A66 A67 A68 A69 A70 A71 A72 A73
A75 A76
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
4,000,000.00 5,000,000.00 6,000,000.00 2,200,000.00 2,450,000.00 450,000.00 35,000.00 30,000.00
1 1 1 1 1 1 1 1
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
75,000 100,000 60,000 5,000 100,000 231,500 40,000 912,000 350,000 25,000 250,000 25,000 5,000 65,000 75,000
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 SESUAI STANDAR Nama: Nama: Nama: KABUPATEN/KO Almt : Almt : Almt : TA Telp : Telp : Telp :
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
270,000.00 250,000.00 150,000.00 10,000.00 500,000.00 250,000.00
*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport)
…………., Tgl. …………….20…..
Diverifikasi Oleh : Askot Infrastruktur,
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
Dibuat Oleh :
UPL
RAB-2
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
DAFTAR KUANTITAS PEKERJAAN PAKET : PEMBANGUNAN TPS3R
Kab./Kota Kecamatan
: Palangka Raya : Sebangau
NO.
Kelurahan BKM URAIAN PEKERJAAN
: Kereng Bangkirai : Kereng Membangun SATUAN
VOLUME
I
PEKERJAAN PERSIAPAN
1
Pembersihan Awal
m2
200.00
2
Pengukuran dan Pemasangan Bowplank
m
66.00
II
PEKERJAAN TANAH
1
Pek urugan tanah lokasi kegiatan
m3
218.55
2
Pek. Galian Tanah Pondasi
m3
11.68
3
Pek. Urugan Bekas Galian
m3
2.92
4
Pek. Urugan Pasir bawah lantai
m3
44.84
5
Pek. Pemancangan Cerucuk Kayu Galam
btg
372.00
III
PEKERJAAN BETON BERTULANG
1
2
3
4
5
6
Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a
Pek. Pembesian
Kg
316.93
b
Pek. Lantai Kerja Beton K.100 t=5 cm
m3
0.67
c
Pek. Bekisting Pondasi
m2
2.24
d
Cor Beton Mutu k.200
m3
2.69
Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a
Pek. Pembesian
Kg
217.59
b
Pek. Lantai Kerja Beton K.100 t=5 cm
m3
0.34
c
Pek. Bekisting Pondasi
m2
1.52
d
Cor Beton Mutu k.200
m3
1.37
Pondasi Footplat P3 (60 cm x 60 cm x 20 cm) a
Pek. Pembesian
Kg
39.77
b
Pek. Lantai Kerja Beton K.100 t=5 cm
m3
0.05
c
Pek. Bekisting Pondasi
m2
1.92
d
Cor Beton Mutu k.200
m3
0.19
Pek Kolom K1 a
Pek. Pembesian
Kg
484.00
b
Pek. Bekisting Kolom
m2
40.40
c
Cor Beton Mutu k.200
m3
4.23
Pek Kolom K2 a
Pek. Pembesian
Kg
147.98
b
Pek. Bekisting Kolom
m2
15.43
c
Cor Beton Mutu k.200
m3
1.76
Pek Kolom K3
NO.
7
8
9
10
11
12
13
IV 1
2
URAIAN PEKERJAAN
SATUAN
VOLUME
a
Pek. Pembesian
Kg
66.65
b
Pek. Bekisting Kolom
m2
6.96
c
Cor Beton Mutu k.200
m3
0.26
Pekerjaan Sloof 20x30 a
Pek. Pembesian
Kg
392.56
b
Pek. Bekisting Sloof
m2
11.60
c
Cor Beton Mutu k.200
m3
3.48
Pekerjaan Sloof 15x20 a
Pek. Pembesian
Kg
302.62
b
Pek. Bekisting Sloof
m2
23.72
c
Cor Beton Mutu k.200
m3
2.03
Pekerjaan Ring Balok 20x20 a
Pek. Pembesian
Kg
275.43
b
Pek. Bekisting Ring Balok
m2
11.60
c
Cor Beton Mutu k.200
m3
2.32
Pekerjaan Balok 15x20 a
Pek. Pembesian
Kg
44.67
b
Pek. Bekisting Ring Balok
m2
3.36
c
Cor Beton Mutu k.200
m3
0.25
Pekerjaan Ring Balok 15/15 a
Pek. Pembesian
Kg
281.95
b
Pek. Bekisting Ring Balok
m2
17.79
c
Cor Beton Mutu k.200
m3
0.62
Pekerjaan lantai beton bertulang a
Pek. Pembesian
Kg
1101.59
b
Cor Beton Mutu k.175
m3
42.55
Pek. Plat /Dak Beton a
Pembesian
Kg
36.50
b
Pek. Bekisting
m2
4.29
c
Cor Beton Mutu k.200
m3
0.64
PEKERJAAN DINDING, PLESTERAN DAN KERAMIK Pek. Pasangan dinding Bataco a
Bangunan Hanggar TPS3R
m2
142.96
b
Kantor
m2
60.60
c
WC
m2
23.50
d
Pagar
m2
73.61
Pek. Plesteran Dinding a
Bangunan Hanggar TPS3R
m2
205.28
b
Kantor
m2
89.03
c
WC
m2
38.21
d
Pagar
m2
93.01
3
Cor Beton Lantai Beton Mutu k.200
m3
5.04
4
Pek Keramik lantai Uk.40x40
m2
46.73
5
Pek Keramik lantai WC Uk.20x20
m2
3.68
NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
6
Pek Keramik dinding WC Uk.10x20
m2
8.16
7
Pek. Tawing layar
m2
45.05
V
PEKERJAAN ATAP, PLAFOND, LISPLANK
1
Rangka Atap Baja Ringan
2
a
Hanggar TPS3R
m2
242.24
b
Kantor
m2
18.63
c
WC
m2
9.96
Pek Atap Genteng Metal Zincalume a
Hanggar TPS3R
m2
242.24
b
Kantor
m2
18.63
c
WC
m2
9.96
3
Pek. Lisplank Superplank Eksterior
m
57.34
4
Rangka Hollow Plafond Kantor
m2
9.55
5
Pek. Pas. Plafond Kalsiboard
m2
9.55
VI 1
2
PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG Pek. Kusen Pintu dan Jendela Kayu Klas II a
Hanggar TPS3R
m3
0.12
b
Kantor
m3
0.06
c
WC
m3
0.02
Pek. Daun Pintu Panel Kayu Klas II a
Hanggar TPS3R
m2
3.60
b
Kantor
m2
1.80
c
WC
m2
1.80
3
Pek. Rangka Jendela Kaca Kayu Klas II
m2
2.26
4
Pek.Pemasangan Kaca Tebal 5 mm
m2
7.48
5
Pek. Engsel Pintu
bh
12.00
6
Pek. Engsel Jendela
bh
12.00
7
Kunci Tanam
bh
4.00
8
Hak angin Jendela
bh
6.00
9
Gerendel Jendela
bh
6.00
10
Handel Jendela
bh
6.00
11
Pekerjaan Ventilasi Kerawang
m2
16.20
12
Pekerjaan glasblock
m2
8.92
VII
PEKERJAAN PENGECATAN
1
Pengecatan dinding a
Hanggar TPS3R
m2
205.28
b
Kantor
m2
89.03
c
WC
m2
38.21
d
Pagar
m2
93.01
2
Pengecatan Plafond Kantor
m2
9.55
3
Pengecatan Kusen Pintu dan Jendela
m2
10.08
4
Pengecatan Pintu Panel
NO.
5
URAIAN PEKERJAAN
SATUAN
VOLUME
a
Hanggar TPS3R
m2
10.80
b
Kantor
m2
3.60
c
WC
m2
3.60
m2
3.20
Pengecatan Rangka Jendela Kaca
VIII PEKERJAAN SANITASI 1
Pekerjaan Septictank 2 unit a
Galian Septictank
m3
13.88
b
Pek. Urugan Pasir t=5 cm
m2
0.38
c
Pek Cor Beton K.175 tebal 10 cm
m3
0.53
d
Pek. Sloof 15/15 - Pek. Pembesian
Kg
56.55
- Pek. bekisting
m2
4.80
- Pek cor beton K.175
m3
0.36
- Pek. Pembesian
Kg
48.46
- Pek. bekisting
m2
8.16
- Pek cor beton K.175
m3
0.31
f
Pek. Pas. Batako
m2
23.12
g
Pek. Plesteran
m2
23.12
h
Pek. Ring Balk 15/15 - Pek. Pembesian
Kg
56.55
- Pek. bekisting
m2
4.80
- Pek cor beton K.175
m3
0.36
- Pek. Pembesian
Kg
9.32
- Pek. bekisting
m2
2.40
- Pek cor beton K.175
m3
0.17
- Pek. Pembesian
Kg
6.00
- Pek. bekisting
m2
0.84
- Pek cor beton K.175
m3
0.10
k
Bioseptictank Kapasitas 3000L
Bh
2.00
l
Urugan Pasir dalam septictank
e
i
j
Pek. Kolom 15/15
Pek. Plat penutup septictank tebal 10 cm
Pek. Tutup mainhole
m3
0.34
2
Pekerjaan Pipa 4"
m
3.50
3
Pekerjaan Pipa 2"
m
1.93
4
Pekerjaan Pipa 3/4" (Air Bersih)
m
36.66
5
Pek. Sumur Bor+pompa
Bh
1.00
6
Pekerjaan kran air
Bh
2.00
7
Pekerjaan stop kran
Bh
1.00
8
Profil tank 1200 L
Bh
1.00
9
Pek. Closed Duduk
Bh
1.00
10
Pek. Wastafel+cermin
Unit
1.00
11
Pek. Grill besi penutup saluran
m2
3.75
NO.
URAIAN PEKERJAAN
IX
PEKERJAAN JEMBATAN
1
Pekerjaan Pondasi Batu Belah
2
Pekerjaan Sloof 20/30
3
4
5
SATUAN
VOLUME
m3
14.67
a
Pek. Pembesian
kg
102.56
b
Pekerjaan Bekisting Sloof
m2
12.44
c
Cor Beton k.200
m3
1.09
Pekerjaan Balok 20/30 a
Pek. Pembesian
kg
51.28
b
Pekerjaan Bekisting Balok
m2
7.28
c
Cor Beton k.200
m3
0.55
Pekerjaan Plat beton a
Pek. Pembersian
kg
250.87
b
Pekerjaan Bekisting Plat
m2
11.89
c
Cor Beton K200 tebal 20 cm
m3
4.03
Pekerjaan Reling jembatan a
Pembesian Kolom 15/15
Kg
22.59
b
Pek. Bekisting Kolom
m2
2.40
c
Cor Beton k.200
m3
0.18
d
Pek. Pas Batako
m2
3.10
e
Pek. Plesteran
m2
6.60
f
Pek Besi Galvanis 2"
m
7.40
X
PEKERJAAN LISTRIK
1
Penyambungan Daya Baru PLN
Unit
1.00
2
Instalasi Titik Lampu
Titik
13.00
3
Lampu SL 18 Watt
Bh
13.00
4
Saklar Tunggal
Bh
4.00
5
Saklar Ganda
Bh
4.00
6
Pek. Pas. Panel Listrik
Bh
1.00
7
Pek. Instalasi stop kontak
Titik
6.00
8
Stop Kontak
Bh
6.00
XI
PEKERJAAN LAIN-LAIN
1
Pekerjaan Pagar Besi BRC
m2
16.30
2
Pekerjaan Pintu Pagar Besi
m2
9.45
3
Pekerjaan Handrail difabel stainless a
Hanggar TPS3R panjang 2 m
m
13.54
b
Kantor panjang 0,95 m
m
4.75
c
WC Panjang 0,75
m
4.29
d
Biaya pengelasan (100% fisik)
m
22.58
m2
7.27
4
Pekerjaan Rolling door
5
Pek. Handrail WC
m
1.20
6
Pekerjaan ukiran kayu
m2
19.20
7
Pek. Plesteran letter timbul
Paket
1.00
NO. XII
URAIAN PEKERJAAN
SATUAN
VOLUME
PERALATAN TPS3R
1
Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP
Unit
1.00
2
Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP
Unit
1.00
3
Mesin Pengayak Kapasitas 500 Kg/Jam
Unit
1.00
XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 A
KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1
Sosialisasi K3 dan Prokes (Spanduk)
Bh
4.00
2
Helm Keselamatan
Bh
21.00
3
Rompi Kerja
Bh
21.00
4
Sarung Tangan (Safety Glove)
Bh
21.00
5
Sepatu Keselamatan (Rubber Shoes)
Bh
21.00
6
Tali Pengaman
Bh
3.00
7
Kotak P3K
Bh
2.00
8
Asuransi Tenaga Kerja
Paket
1.00
B
KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
1
Alat ukur suhu badan nir-sentuh (Thermoscan)
Bh
2.00
2
Vitamin C (1 Box isi 100 tablet)
Bh
20.00
3
Tempat Cuci Tangan
Bh
2.00
4
Sabun Cuci Tangan (Cair) 200ml/btl
Bh
4.00
5
Masker kain
Bh
20.00
6
Alat penyemprot desinfektan
Bh
2.00
7
Cairan Desinfektan 5L
Bh
3.00
XIV ADMINISTRASI KEGIATAN 1
Pelaporan KSM
Ls
1.00
2
Photo Copy / Penggandaan
Ls
1.00
3
Biaya Alat Tulis Kantor (ATK)
Ls
1.00
4
Materai
Ls
8.00
5
Pengujian Lab
Bh
1.00
6
Papan Nama Kegiatan
Paket
1.00
Diverifikasi Oleh : Askot Infrastruktur
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
Dibuat Oleh :
UPL
Alfiansyah
Form - RAB 3
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
FORMAT PEREKAMAN ANALISA HARGA SATUAN Pekerjaan Satuan Pembayaran No. A.
: (K3) Pembersihan 1 m2 lapangan dan perataan : M2 Uraian
Tenaga Kerja Pekerja Mandor
B.
Bahan
C.
Peralatan
D.
Satuan
L.01 L.04
OH OH
Koefisien 0.1000 0.0500
Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga Jumlah Bahan Jumlah Peralatan
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
Kode
Kode Analisa A.2.2.1.9
: (Pengukuran dan pemasangan 1 m’ Bouwplank : M2 Uraian
Tenaga Kerja Pekerja Tukang Kayu Kepala tukang Mandor
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Koefisien 0.1000 0.1000 0.0100 0.0050
C.
Bahan Kayu balok 5/7 Klas III Paku 5-10 cm Kayu papan 2/20 Klas III
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00
2,200,000.00 22,000.00 2,450,000.00 Jumlah Bahan Jumlah Peralatan
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
: Penggalian 1 m3 tanah biasa sedalam 1 m : M3 Uraian
Tenaga Kerja Pekerja Mandor
B.
Bahan
C.
Peralatan
D.
0.012 0.02 0.0070
Peralatan
D.
A.
m3 Kg m3
Kode
Satuan
L.01 L.04
OH OH
Koefisien 0.7500 0.0250
Harga Satuan Pekerjaan (A+B+C)
14,000.00 14,000.00
14,000.00 Kode Analisa A. 2.2.1.4.
Jumlah Tenaga B.
Jumlah Harga (Rp)
Jumlah Harga (Rp) 14,000.00 15,000.00 1,700.00 30,700.00 26,400.00 440.00 17,150.00 43,990.00 74,690.00 Kode Analisa A. 2.3.1.1
Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 105,000.00 105,000.00
105,000.00
Pekerjaan Satuan Pembayaran No. A.
: Pengurugan kembali 1 m3 galian tanah : M3 Uraian
Tenaga Kerja Pekerja Mandor
B.
Bahan
C.
Peralatan
No.
C.
Uraian Tenaga Kerja Pekerja Mandor
D.
0.5000 0.0500
Satuan
L.01 L.04
OH OH
Koefisien 0.3000 0.0100
m3
1.2000
Peralatan Harga Satuan Pekerjaan (A+B+C)
No.
C.
Kode
Bahan Tanah urug
Pekerjaan Satuan Pembayaran
B.
OH OH
Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga -
: Pengurugan 1 m3 dengan tanah urug : M3
D.
A.
L.01.01 L.04.01
Koefisien
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
B.
Satuan
Jumlah Bahan Jumlah Peralatan
D.
A.
Kode
Kode Analisa A.2.3.1.9.
Tenaga Kerja Pekerja Mandor Bahan Pasir Urug
Kode
Satuan
L.01 L.04
OH OH
m3
70,000.00 70,000.00
70,000.00 Kode Analisa A.2.3.1.11.a
Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga 100,000 Jumlah Bahan Jumlah Peralatan
: Pengurugan 1 m3 dengan Pasir : M3 Uraian
Jumlah Harga (Rp)
Jumlah Harga (Rp) 42,000.00 42,000.00 120,000.00 120,000.00 162,000.00 Kode Analisa A.2.3.1.11.
Koefisien 0.3000 0.0100
1.2000
Peralatan Harga Satuan Pekerjaan (A+B+C)
Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga 150,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 42,000.00 42,000.00 180,000.00 180,000.00 222,000.00
Pekerjaan Satuan Pembayaran No.
: 1 M Pancang Cerucuk Kayu atau Dolken dia. 8 - 10 Cm :M Uraian
A.
Tenaga Kerja Pekerja Tukang Kayu
B.
Bahan Dolken Kayu Galam ø 10-12 m Alat Bantu
C.
Peralatan
D.
No.
B.
C.
Kode
Satuan
Harga Satuan (Rp.)
L.01 L.02
OH OH
0.045 0.012
140,000 150,000 Jumlah Tenaga
6,300.00 1,800.00 8,100.00
Btg
1.000 0.200
35,000 35,000 Jumlah Bahan
35,000.00 7,000.00 42,000.00
Jumlah Peralatan
50,100.00
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
A.
Koefisien
: Pembesian 10 kg dengan besi polos atau besi ulir : Kg Uraian
Tenaga Kerja Pekerja Tukang Besi Kepala Tukang Mandor
Bahan Besi beton Kawat Beton
Kode Analisa P.07.a
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Kg Kg
Koefisien 0.0700 0.0700 0.0070 0.0040
10.5000 0.1500
Kode Analisa A.4.1.1.17
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 -
Jumlah Harga (Rp)
Jumlah Tenaga
9,800.00 10,500.00 1,190.00 21,490.00
12,000.00 25,000.00 Jumlah Bahan
126,000.00 3,750.00 129,750.00
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
151,240.00
Pembesian 1 Kg Besi
15,124.00
Pekerjaan Satuan Pembayaran No. A.
B.
: Membuat 1 m3 beton mutu f’c = 7,4 Mpa (K.100) : M3 Uraian
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Semen Portland Pasir beton Split Air
Satuan
Koefisien
Kode Analisa A.4.1.1.1
Harga Satuan (Rp.)
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
231,000.00 42,625.00 4,760.00 278,385.00
kg kg kg Liter
247.0000 869.0000 999.0000 215.0000
1,275.00 128.57 250.00
314,925.00 111,728.57 249,750.00 676,403.57
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
954,788.57
: Membuat 1 m3 beton mutu f’c = 14,5 Mpa (K.175) : M3 Uraian
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor Bahan Semen Portland Pasir beton Split Air
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.4.1.1.5.
Harga Satuan (Rp.)
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
231,000.00 42,625.00 4,760.00 278,385.00
kg kg kg Liter
326.0000 760.0000 1,029.0000 215.0000
1,275.00 128.57 250.00
415,650.00 97,714.29 257,250.00 770,614.29
Jumlah Bahan C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
1,048,999.29
Pekerjaan Satuan Pembayaran No. A.
B.
: Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225) : M3 Uraian
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Semen Portland Pasir beton Split Air
Satuan
Koefisien
Kode Analisa A.4.1.1.7.
Harga Satuan (Rp.)
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
231,000.00 42,625.00 4,760.00 278,385.00
kg kg kg Liter
352.0000 731.0000 1,031.0000 215.0000
1,275.00 128.57 250.00
448,800.00 93,985.71 257,750.00 800,535.71
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
1,078,920.71
: (K3) Pemasangan 1 m2 bekisting untuk pondasi : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.4.1.1.20 Harga Satuan (Rp.)
OH OH OH OH
0.5200 0.2600 0.0260 0.0260
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
72,800.00 39,000.00 4,420.00 116,220.00
m3 kg kg
0.0400 0.3000 0.1000
2,450,000.00 22,000.00
98,000.00 6,600.00 104,600.00
Jumlah Bahan C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
220,820.00
Pekerjaan Satuan Pembayaran No. A.
B.
: (K3) Pemasangan 1 m2 bekisting untuk sloof : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting
Satuan
Koefisien
Kode Analisa A.4.1.1.21 Harga Satuan (Rp.)
OH OH OH OH
0.5200 0.2600 0.0260 0.0260
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
72,800.00 39,000.00 4,420.00 116,220.00
m3 kg kg
0.0400 0.4000 0.2000
2,450,000.00 22,000.00 -
98,000.00 8,800.00 106,800.00
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
223,020.00
: (K3) Pemasangan 1 m2 bekisting untuk kolom : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting Balok kayu kelas II uk.5/7 Plywood tebal 9 mm Dolken kayu φ 8-10cm
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.4.1.1.22 Harga Satuan (Rp.)
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
92,400.00 49,500.00 5,610.00 147,510.00
m3 kg kg m3 Lbr Batang
0.0400 0.4000 0.2000 0.0150 0.3500 2.0000
2,450,000.00 22,000.00
98,000.00 8,800.00 60,000.00 60,000.00 226,800.00
4,000,000.00 30,000.00 Jumlah Bahan
C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
374,310.00
Pekerjaan Satuan Pembayaran No. A.
B.
: (K3) Pemasangan 1 m2 bekisting untuk balok : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10cm
Satuan
Koefisien
Kode Analisa A.4.1.1.23 Harga Satuan (Rp.)
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
92,400.00 49,500.00 5,610.00 147,510.00
m3 kg kg m3 Lbr Batang
0.0400 0.4000 0.2000 0.0180 0.3500 2.0000
2,450,000.00 22,000.00 4,000,000.00 30,000.00
98,000.00 8,800.00 72,000.00 60,000.00 238,800.00
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
386,310.00
: (K3) Pemasangan 1 m2 bekisting untuk plat : M2 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10cm
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.4.1.1.24 Harga Satuan (Rp.)
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
92,400.00 49,500.00 5,610.00 147,510.00
m3 kg kg m3 Lbr Batang
0.0400 0.4000 0.2000 0.0150 0.3500 6.0000
2,450,000.00 22,000.00
98,000.00 8,800.00 60,000.00 45,500.00 180,000.00 392,300.00
4,000,000.00 130,000.00 30,000.00 Jumlah Bahan
C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
539,810.00
Pekerjaan Satuan Pembayaran No. A.
B.
: 1 m2 Pengecatan bidang kayu baru : M2 Uraian
Tenaga Kerja Pekerja Tukang cat Kepala tukang Mandor
Kode L.01 L.02 L.03 L.04
Bahan Cat menie Kayu Plamuur Cat dasar Kayu Cat penutup Kayu Kuas Pengencer Ampelas
Satuan
Koefisien
Kode Analisa A.4.7.1.4. Harga Satuan (Rp.)
OH OH OH OH
0.0700 0.0090 0.0060 0.0030
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
9,800.00 1,350.00 1,020.00 12,170.00
Kg Kg Kg Kg Bh Kg Lbr
0.2000 0.1500 0.1700 0.2600 0.0100 0.0300 0.2000
60,000.00 60,000.00 60,000.00 45,000.00 28,100.00 10,000.00
12,000.00 10,200.00 15,600.00 450.00 843.00 2,000.00 41,093.00
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
: Pengecatan 1 m2 tembok baru : M2 Uraian
Tenaga Kerja Pekerja Tukang cat Kepala tukang Mandor
B.
Bahan Plamuur Cat dasar Tembok Cat Penutup Tembok
C.
Peralatan
D.
53,263.00
Kode L.01 L.02 L.03 L.04
Satuan
Kode Analisa A.4.7.1.10.
Koefisien
OH OH OH OH
0.0200 0.0630 0.0063 0.0030
Kg Kg Kg
0.1000 0.1200 0.1800
Harga Satuan Pekerjaan (A+B+C)
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 110,000.00 110,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 2,800.00 9,450.00 1,071.00 13,321.00 13,200.00 19,800.00 33,000.00 46,321.00
Pekerjaan Satuan Pembayaran No. A.
B.
: (K3) Pemasangan 1 buah closet duduk/monoblock : Bh Uraian
Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.5.1.1.1.
Harga Satuan (Rp.)
OH OH OH OH
3.300 1.100 0.010 0.160
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
462,000.00 170,500.00 1,700.00 634,200.00
Unit %
1.000 6.000
1,800,000.00 1,800,000.00
1,800,000.00 108,000.00 1,908,000.00
Bahan Closed duduk Perlengkapan
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
2,542,200.00
: Pemasangan 1 buah kran diameter ½” atau ¾ ” : Bh Uraian
Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.5.1.1 19. Harga Satuan (Rp.)
OH OH OH OH
0.010 0.400 0.040 0.005
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
1,400.00 62,000.00 6,800.00 70,200.00
Bh Bh
1.000 0.025
65,000.00 12,000.00
65,000.00 300.00 65,300.00
Bahan Kran Air Seal Tape
Jumlah Bahan C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
135,500.00
Pekerjaan Satuan Pembayaran No. A.
B.
: Pemasangan 1 buah Stop Kran 3/4 : Bh Uraian
Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.5.1.1 19.a Harga Satuan (Rp.)
OH OH OH OH
0.010 0.400 0.040 0.005
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
1,400.00 62,000.00 6,800.00 70,200.00
Bh Bh
1.000 0.025
65,000.00 12,000.00
65,000.00 300.00 65,300.00
Bahan Stop Kran 3/4 Seal Tape
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m’ pipa PVC tipe AW diameter 4” :M Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Pipa PVC 4” Perlengkapan
C.
Peralatan
D.
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
OH OH OH OH
0.0810 0.1350 0.0135 0.0040
M %
1.200 35.000
No.
Kode Analisa A.5.1.1 32.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 73,750 73,750 Jumlah Bahan Jumlah Peralatan
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
: Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” :M Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Pipa PVC 3/4” Perlengkapan
C.
Peralatan
D.
135,500.00
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
OH OH OH OH
0.0360 0.0600 0.0060 0.0020
M %
1.200 35.000
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 11,340.00 20,925.00 2,295.00 34,560.00 88,500.00 25,812.50 114,312.50 148,872.50 Kode Analisa A.5.1.1 26.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 10,500 10,500 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 5,040.00 9,300.00 1,020.00 15,360.00 12,600.00 3,675.00 16,275.00 31,635.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m’ pipa PVC tipe AW diameter 2” :M Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Pipa PVC 2” Perlengkapan
C.
Peralatan
D.
Kode
L.01 L.02 L.03 L.04
No.
Uraian Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
0.0540 0.0900 0.0090 0.0030
M %
1.200 35.000
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Bh
Batako
Semen Portland
Kg
Pasir pasang
140,000.00 155,000.00 170,000.00 Jumlah Tenaga 31,875 31,875 Jumlah Bahan Jumlah Peralatan
m3
Koefisien
Harga Satuan (Rp.)
0.3000 0.1000 0.0100 0.0150
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
12.500
2,800.00 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
12.130
0.388
Peralatan
D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Semen Portland
Pasir pasang
D.
OH OH OH OH
Harga Satuan (Rp.)
: Pemasangan 1 cm2 dinding conblock HB10/Batako 1SP : 4PP : M2
A.
C.
Koefisien
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
C.
Satuan
Kode Analisa A.5.1.1 29.
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Kg
m3
Koefisien
0.3000 0.1500 0.0150 0.0150
6.240
0.024
Peralatan Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 7,560.00 13,950.00 1,530.00 23,040.00 38,250.00 11,156.25 49,406.25 72,446.25 Kode Analisa A.4.4.1.21a. Jumlah Harga (Rp) 42,000.00 15,500.00 1,700.00 59,200.00 35,000.00 15,465.75 58,200.00 108,665.75 167,865.75 Kode Analisa A.4.4.2.4.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 42,000.00 23,250.00 2,550.00 67,800.00 7,956.00 3,600.00 11,556.00 79,356.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
0.700 0.350 0.035 0.035
Doz Kg
10.000
Ubin keramik 40x40 Semen Portland
Pasir pasang Semen warna C.
M3 Kg
No.
Jumlah Tenaga
1.050
75,000.00 1,275.00 150,000.00 5,000.00 Jumlah Bahan Jumlah Peralatan
0.045 0.500
: Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
0.700 0.350 0.035 0.035
Doz Kg
10.400
Ubin keramik 20x20 Semen Portland
Pasir pasang Semen warna
M3 Kg
Koefisien
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
1.050
65,000.00 1,275.00 150,000.00 5,000.00 Jumlah Bahan Jumlah Peralatan
0.045 0.500
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m2 dinding keramik 10 cm x 20 cm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
Ubin keramik 10x20 Semen Portland
Pasir pasang Semen warna
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
0.900 0.450 0.045 0.045
Doz Kg
1.050
M3 Kg
Koefisien
9.300
0.180 2.750
Peralatan Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 98,000.00 54,250.00 5,950.00 158,200.00 78,750.00 12,750.00 6,750.00 2,500.00 100,750.00 258,950.00 Kode Analisa A.4.4.3.36.
Harga Satuan (Rp.)
Peralatan
D.
D.
140,000.00 155,000.00 170,000.00
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
C.
Harga Satuan (Rp.)
Peralatan
D.
C.
Koefisien
Kode Analisa A.4.4.3.35.a
Jumlah Harga (Rp) 98,000.00 54,250.00 5,950.00 158,200.00 68,250.00 13,260.00 6,750.00 2,500.00 90,760.00 248,960.00 Kode Analisa A.4.4.3.53.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 65,400.00 1,275.00 150,000.00 5,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 126,000.00 69,750.00 7,650.00 203,400.00 68,670.00 11,857.50 27,000.00 13,750.00 121,277.50 324,677.50
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m2 Rangka Kuda-kuda Baja Ringan : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan baja ringan 75x35x0,75 MM baja ringan 30x30x0,3 MM Paku Skrup
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.060 0.060 0.006 0.003
M M Bh
2.000 1.500 19.000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 20,833.33 8,333.33 3,500.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Genteng Metal Paku Genteng Metal
C.
Peralatan
D.
Kode
Kode Analisa A.4.2.1.2 d
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.200 0.100 0.010 0.001
M2 Kg
1.020 0.200
Harga Satuan Pekerjaan (A+B+C)
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 39,308.18 35,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 8,400.00 9,000.00 1,020.00 18,420.00 41,666.67 12,500.00 66,500.00 120,666.67 139,086.67 Kode Analisa A.4.5.2.32. Jumlah Harga (Rp) 28,000.00 15,000.00 1,700.00 44,700.00 40,094.34 7,000.00 47,094.34 91,794.34
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m’ Listplank Kalsiboard Exterior :M Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Papan Plank Kalsiboard Paku 5-10 cm
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.100 0.200 0.020 0.005
M' Kg
1.10000 0.100
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Uraian Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Besi Hollow Plafond 1,3x 3,3 mm Assesoris (Perkuatan, Las dll)
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.350 0.350 0.035 0.018
M' Ls
4.000 (100%xRangka)
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 64,583.33 22,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 Rangka Besi Hollow Modul 60x60 cm : M2
A.
Uraian Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Kalsiboard 6 mm Paku Kalsiboard
C.
Peralatan
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.100 0.100 0.010 0.005
Lbr Kg
0.375 0.030
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 14,000.00 30,000.00 3,400.00 47,400.00 71,041.67 2,200.00 73,241.67 120,641.67 Kode Analisa A.4.2.1.21.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 2,500.00 2,500.00 Rp Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 Langit2 Kalsiboard uk 1,2x2,4 m tebal 9mm : M2
A.
D.
Kode
Kode Analisa A.4.6.1.21.a
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 110,000.00 25,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 49,000.00 52,500.00 5,950.00 107,450.00 10,000.00 10,000.00 20,000.00 127,450.00 Kode Analisa A.4.5.1.1a Jumlah Harga (Rp) 14,000.00 15,000.00 1,700.00 30,700.00 41,250.00 750.00 42,000.00 72,700.00
Pekerjaan Satuan Pembayaran No.
: Pembuatan dan pas 1 m3 kusen pintu dan kusen jendela Kayu Klas II : M3 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala Tukang Mandor
B.
Bahan Balok kayu kelas II Paku Skrup Lem Kayu
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
6.000 18.000 1.800 0.300
M3 Kg Kg
1.200 1.250 1.000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Uraian Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Papan Kayu Klas II Lem Kayu
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.000 3.000 0.300 0.050
M3 Kg
0.040 0.500
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 4,000,000.00 22,000.00 33,000.00 Jumlah Bahan Jumlah Peralatan
: Pembuatan dan pemasangan 1 m2 daun pintu panel, Kayu Klas II : M2
A.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 5,000,000.00 33,000.00 Jumlah Bahan Jumlah Peralatan
: Pembuatan dan pemasangan 1 m2 pintu jendela kaca, Kayu Klas II : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Papan Kayu Klas II Lem Kayu
C.
Peralatan
D.
Kode
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.800 2.400 0.240 0.040
M3 Kg
0.024 0.300
Harga Satuan Pekerjaan (A+B+C)
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 5,000,000.00 33,000.00 Jumlah Bahan Jumlah Peralatan
Kode Analisa A.4.6.1.2. Jumlah Harga (Rp) 840,000.00 2,700,000.00 306,000.00 3,846,000.00 4,800,000.00 27,500.00 33,000.00 4,860,500.00 8,706,500.00 Kode Analisa A.4.6.1.5. Jumlah Harga (Rp) 140,000.00 450,000.00 51,000.00 641,000.00 200,000.00 16,500.00 200,000.00 841,000.00 Kode Analisa A.4.6.1.6. Jumlah Harga (Rp) 112,000.00 360,000.00 40,800.00 512,800.00 120,000.00 9,900.00 120,000.00 632,800.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m2 kaca tebal 5 mm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Kaca Tebal 5 mm Sealant
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.001
M2 Kg
1.100 0.050
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Uraian Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Engsel pintu
C.
Peralatan
D.
140,000.00 150,000.00 170,000.00 Jumlah Tenaga 135,000.00 47,500.00 Jumlah Bahan Jumlah Peralatan
Pekerjaan Satuan Pembayaran
Kode
Satuan
Koefisien
L.01 L.02b L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0008
Bh
1.000
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 35,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 buah engsel jendela kupu-kupu : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Engsel jendela
C.
Peralatan
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 148,500.00 2,375.00 148,500.00 175,650.00 Kode Analisa A.4.6.2.5
Harga Satuan Pekerjaan (A+B+C)
No.
Harga Satuan (Rp.)
: Pemasangan 1 buah engsel pintu : Bh
A.
D.
Kode
Kode Analisa A.4.6.2.17
Kode
Satuan
Koefisien
L.01 L.02b L.03 L.04
OH OH OH OH
0.010 0.100 0.010 0.0005
Bh
1.000
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 35,000.00 35,000.00 62,150.00 Kode Analisa A.4.6.2.6.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 41,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 1,400.00 15,000.00 1,700.00 18,100.00 41,000.00 41,000.00 59,100.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 buah kunci tanam biasa : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Kunci tanam biasa
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.010 0.500 0.050 0.0050
Bh
1.000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Uraian Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Kait angin
C.
Peralatan
D.
140,000.00 150,000.00 170,000.00 Jumlah Tenaga 95,000.00 Jumlah Bahan Jumlah Peralatan
Pekerjaan Satuan Pembayaran
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0080
Bh
1.000
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 20,800.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 buah kunci slot : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Grendel/Kunci Slot
C.
Peralatan
Jumlah Harga (Rp) 1,400.00 75,000.00 8,500.00 84,900.00 95,000.00 95,000.00 179,900.00 Kode Analisa A.4.6.2.9.
Harga Satuan Pekerjaan (A+B+C)
No.
Harga Satuan (Rp.)
: Pemasangan 1 buah kait angin : Bh
A.
D.
Kode
Kode Analisa A.4.6.2.2.
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 20,800.00 20,800.00 47,950.00 Kode Analisa A.4.6.2.11.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0080
Bh
1.000
Harga Satuan Pekerjaan (A+B+C)
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 35,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 35,000.00 35,000.00 62,150.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 buah Handel Jendela : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Handel Jendela
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0080
Bh
1.000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Uraian Tenaga Kerja Pekerja Tukang batu Kepala Tukang Mandor
B.
Bahan Batu belah Semen Portland Pasir pasang
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.500 0.750 0.075 0.0750
m3 Kg m3
1.200 163.000 0.520
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 8,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP : m3
A.
Uraian Tenaga Kerja Pekerja Tukang batu Kepala Tukang Mandor
B.
Bahan Roster/Kerawang Semen Portland Pasir pasang
C.
Peralatan
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.300 0.100 0.010 0.0150
Bh Kg m3
12.000 11.000 0.035
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 8,000.00 8,000.00 35,150.00 Kode Analisa A.3.2.1.2.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 400,000.00 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 dinding terawang (rooster) : m2
A.
D.
Kode
Kode Analisa A.4.6.2.8.a
Jumlah Harga (Rp) 210,000.00 116,250.00 12,750.00 339,000.00 480,000.00 207,825.00 78,000.00 765,825.00 1,104,825.00 Kode Analisa A. 4.4.1.23
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 25,000.00 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 42,000.00 15,500.00 1,700.00 59,200.00 300,000.00 14,025.00 5,250.00 319,275.00 378,475.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m2 dinding pemisah GRC Board : m3 Uraian
A.
Tenaga Kerja Pekerja Tukang Kayu Kepala Tukang Mandor
B.
Bahan Balok Kayu Klas II Paku Kalsiboard GRC Board tebal 8 m Lem Kayu
C.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.2000 0.6000 0.0600 0.0100
m3 Kg Lbr Kg
0.0280 0.1500 0.4300 0.5600
Peralatan
D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00
Uraian Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
B.
Bahan Wastafel+cermin Semen Portland Pasir pasang Perlengkapan
C.
Peralatan
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.2000 1.4500 0.1500 0.0600
Unit Kg M3 %
1.2000 6.0000 0.0100 12.0000
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp)
Jumlah Tenaga
28,000.00 90,000.00 10,200.00 128,200.00
25,000.00 190,000.00
3,750.00 81,700.00
Jumlah Bahan Jumlah Peralatan
: (K3) Pemasangan 1 buah wastafel : m3
A.
D.
Kode
Kode Analisa A.4.6.1.25.a
85,450.00 213,650.00 Kode Analisa A.5.1.1 5.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 940,000.00 1,275.00 150,000.00 940,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 168,000.00 224,750.00 25,500.00 418,250.00 1,128,000.00 7,650.00 1,500.00 112,800.00 1,249,950.00 1,668,200.00
Pekerjaan Satuan Pembayaran
: Pemasangan 1 m2 rolling door alluminium : m3
No.
Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala Tukang Mandor
B.
Bahan Rolling Door
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.0000 1.0000 0.1200 0.0060
Unit
1.0000
Harga Satuan Pekerjaan (A+B+C)
Kode Analisa A.4.2.1.10 Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 500,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 140,000.00 150,000.00 20,400.00 310,400.00 500,000.00 500,000.00 810,400.00
Dibuat oleh : UPL
Tim Faskel
Tim Verifikasi, Tim Korkot
Alfiansyah
Hengky Pradana, ST
Wiwit Whindari, ST
RAB-4
PROGRAM KOTA TANPA KUMUH (KOTAKU) DAFTAR HARGA SATUAN JADI PEKERJAAN Kab./Kota Kecamatan Kelurahan BKM
NO.
: Palangka Raya : Sebangau : Kereng Bangkirai : Kereng Membangun
JENIS PEKERJAAN
Nama Paket Pekerjaan : Pembangunan TPS3R
SATUAN
HARGA (Rp.)
I 1. 2.
PEKERJAAN PERSIAPAN Pembersihan Awal Pengukuran dan Pemasangan Bowplank
m2 m
Rp Rp
14,000.00 74,690.00
II 1. 2. 3. 4. 5.
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam
m3 m3 m3 m3 btg
Rp Rp Rp Rp Rp
162,000.00 105,000.00 70,000.00 222,000.00 50,100.00
Kg m3 m2 m3
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Kg m3 m2 m3
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Kg m3 m2 m3
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 374,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 374,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 374,310.00 1,078,920.71
III PEKERJAAN BETON BERTULANG 1. Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 2. Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 3. Pondasi Footplat P3 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 4. Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 5. Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 6. Pek Kolom K3 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200
NO. 7.
8.
9.
10.
11.
12.
13.
JENIS PEKERJAAN Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu k.200 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu k.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu k.175 Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu k.200
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK 1. Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 2. Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 3. Cor Beton Lantai Beton Mutu k.200 4. Pek Keramik lantai Uk.40x40 5. Pek Keramik lantai WC Uk.20x20 6. Pek Keramik dinding WC Uk.10x20 7. Pek. Tawing layar
SATUAN
HARGA (Rp.)
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
Kg m3
Rp Rp
15,124.00 1,048,999.29
Kg m2 m3
Rp Rp Rp
15,124.00 539,810.00 1,078,920.71
m2 m2 m2 m2
Rp Rp Rp Rp
167,865.75 167,865.75 167,865.75 167,865.75
m2 m2 m2 m2 m3 m2 m2 m2 m2
Rp Rp Rp Rp Rp Rp Rp Rp Rp
79,356.00 79,356.00 79,356.00 79,356.00 1,078,920.71 258,950.00 248,960.00 324,677.50 213,650.00
NO. V 1.
2.
3. 4. 5.
JENIS PEKERJAAN PEKERJAAN ATAP, PLAFOND, LISPLANK Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC Pek. Lisplank Superplank Eksterior Rangka Hollow Plafond Kantor Pek. Pas. Plafond Kalsiboard
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG 1. Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R b Kantor c WC 2. Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R b Kantor c WC 3. Pek. Rangka Jendela Kaca Kayu Klas II 4. Pek.Pemasangan Kaca Tebal 5 mm 5. Pek. Engsel Pintu 6. Pek. Engsel Jendela 7. Kunci Tanam 8. Hak angin Jendela 9. Gerendel Jendela 10. Handel Jendela 11. Pekerjaan Ventilasi Kerawang 12. Pekerjaan glasblock VII PEKERJAAN PENGECATAN 1. Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar 2. Pengecatan Plafond Kantor 3. Pengecatan Kusen Pintu dan Jendela 4. Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC 5. Pengecatan Rangka Jendela Kaca
SATUAN
HARGA (Rp.)
m2 m2 m2
Rp Rp Rp
139,086.67 139,086.67 139,086.67
m2 m2 m2 m m2 m2
Rp Rp Rp Rp Rp Rp
91,794.34 91,794.34 91,794.34 120,641.67 127,450.00 72,700.00
m3 m3 m3
Rp Rp Rp
8,706,500.00 8,706,500.00 8,706,500.00
m2 m2 m2 m2 m2 bh bh bh bh bh bh m2 m2
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
841,000.00 841,000.00 841,000.00 632,800.00 175,650.00 62,150.00 59,100.00 179,900.00 47,950.00 62,150.00 35,150.00 378,475.00 650,000.00
m2 m2 m2 m2 m2 m2
Rp Rp Rp Rp Rp Rp
46,321.00 46,321.00 46,321.00 46,321.00 46,321.00 53,263.00
m2 m2 m2 m2
Rp Rp Rp Rp
53,263.00 53,263.00 53,263.00 53,263.00
NO.
JENIS PEKERJAAN
VIII PEKERJAAN SANITASI 1. Pekerjaan Septictank 2 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank 2. Pekerjaan Pipa 4" 3. Pekerjaan Pipa 2" 4. Pekerjaan Pipa 3/4" (Air Bersih) 5. Pek. Sumur Bor+pompa 6. Pekerjaan kran air 7. Pekerjaan stop kran 8. Profil tank 1200 L 9. Pek. Closed Duduk 10. Pek. Wastafel+cermin 11. Pek. Grill besi penutup saluran IX PEKERJAAN JEMBATAN 1. Pekerjaan Pondasi Batu Belah 2. Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof c Cor Beton k.200 3. Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton k.200
SATUAN
HARGA (Rp.)
m3 m2 m3
Rp Rp Rp
105,000.00 222,000.00 1,048,999.29
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,048,999.29
Kg m2 m3 m2 m2
Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,048,999.29 167,865.75 79,356.00
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,048,999.29
Kg m2 m3
Rp Rp Rp
15,124.00 539,810.00 1,048,999.29
Kg m2 m3 Bh m3 m m m Bh Bh Bh Bh Bh Unit m2
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
15,124.00 539,810.00 1,048,999.29 10,643,500.00 222,000.00 148,872.50 72,446.25 31,635.00 2,500,000.00 135,500.00 135,500.00 1,600,000.00 2,542,200.00 1,668,200.00 340,000.00
m3
Rp
1,104,825.00
kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,078,920.71
kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
NO. 4.
5.
JENIS PEKERJAAN Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton k.200 d Pek. Pas Batako e Pek. Plesteran f Pek Besi Galvanis 2"
SATUAN
HARGA (Rp.)
kg m2 m3
Rp Rp Rp
15,124.00 539,810.00 1,078,920.71
Kg m2 m3 m2 m2 m
Rp Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,078,920.71 167,865.75 79,356.00 29,916.67
Unit Titik Bh Bh Bh Bh Titik Bh
Rp Rp Rp Rp Rp Rp Rp Rp
4,500,000.00 325,000.00 35,000.00 20,000.00 20,000.00 760,000.00 325,000.00 20,000.00
X 1. 2. 3. 4. 5. 6. 7. 8.
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
XI 1. 2. 3.
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Pintu Pagar Besi Pekerjaan Handrail difabel stainless a Hanggar TPS3R panjang 2 m b Kantor panjang 0,95 m c WC Panjang 0,75 d Biaya pengelasan (100% fisik) Pekerjaan Rolling door Pek. Handrail WC Pekerjaan ukiran kayu Pek. Plesteran letter timbul
m2 m2
Rp Rp
320,000.00 600,000.00
m m m m m2 m m2 Paket
Rp Rp Rp Rp Rp Rp Rp Rp
52,000.00 52,000.00 52,000.00 52,000.00 810,400.00 52,000.00 625,000.00 800,000.00
XII 1. 2. 3.
PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Mesin Pengayak Kapasitas 500 Kg/Jam
Unit Unit Unit
Rp Rp Rp
36,130,000.00 22,650,000.00 18,150,000.00
XIII A 1. 2. 3. 4. 5. 6. 7. 8.
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA Sosialisasi K3 dan Prokes (Spanduk) Helm Keselamatan Rompi Kerja Sarung Tangan (Safety Glove) Sepatu Keselamatan (Rubber Shoes) Tali Pengaman Kotak P3K Asuransi Tenaga Kerja
Bh Bh Bh Bh Bh Bh Bh Paket
Rp Rp Rp Rp Rp Rp Rp Rp
75,000.00 100,000.00 60,000.00 5,000.00 100,000.00 231,500.00 40,000.00 912,000.00
4. 5. 6. 7.
HARGA
NO.
JENIS PEKERJAAN
SATUAN
B 1. 2. 3. 4. 5. 6. 7.
KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN Alat ukur suhu badan nir-sentuh (Thermoscan) Vitamin C (1 Box isi 100 tablet) Tempat Cuci Tangan Sabun Cuci Tangan (Cair) 200ml/btl Masker kain Alat penyemprot desinfektan Cairan Desinfektan 5L
0.00 Bh Bh Bh Bh Bh Bh Bh
Rp Rp Rp Rp Rp Rp Rp Rp
350,000.00 25,000.00 250,000.00 25,000.00 5,000.00 65,000.00 75,000.00
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
Ls Ls Ls Ls Bh Paket
Rp Rp Rp Rp Rp Rp
270,000.00 250,000.00 150,000.00 10,000.00 500,000.00 250,000.00
XIV 1. 2. 3. 4. 5. 6.
Diverifikasi Oleh : Askot Infrastruktur,
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
(Rp.)
Dibuat Oleh :
UPL
Alfiansyah
RAB-5 BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU) RENCANA ANGARAN BIAYA Kab./Kota Kecamatan Kelurahan BKM NO
Nama Paket Pekerjaan
: Palangka Raya : Sebangau : Kereng Bangkirai : JENIS PEKERJAAN
SATUANVOLUME ANALISA
: Pembangunan TPS3R
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
I 1 2
PEKERJAAN PERSIAPAN Pembersihan Awal Pengukuran dan Pemasangan Bowplank
m2 m
200.00 66.00
A.2.2.1.9 A. 2.2.1.4.
Rp Rp
II 1 2 3 4 5
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam
14,000.00 Rp 74,690.00 Rp Jumlah I Rp
m3 m3 m3 m3 btg
218.55 11.68 2.92 44.84 372.00
A.2.3.1.11.a A. 2.3.1.1 A.2.3.1.9. A.2.3.1.11. P.07.a
Rp Rp Rp Rp Rp
III 1
PEKERJAAN BETON BERTULANG Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 Pondasi Footplat P3 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 Pek Kolom K3 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu k.200 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu k.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu k.175
162,000.00 105,000.00 70,000.00 222,000.00 50,100.00 Jumlah II
Rp Rp Rp Rp Rp Rp
35,405,100.00 1,226,610.00 204,435.00 9,953,479.89 18,637,200.00 65,426,824.89
Kg m3 m2 m3
316.93 0.67 2.24 2.69
A.4.1.1.17 A.4.1.1.1 A.4.1.1.20 A.4.1.1.7.
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Rp Rp Rp Rp
4,793,254.16 641,617.92 494,636.80 2,900,138.88
Kg m3 m2 m3
217.59 0.34 1.52 1.37
A.4.1.1.17 A.4.1.1.1 A.4.1.1.20 A.4.1.1.7.
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Rp Rp Rp Rp
3,290,830.80 326,537.69 335,646.40 1,475,963.54
Kg m3 m2 m3
39.77 0.05 1.92 0.19
A.4.1.1.17 A.4.1.1.1 A.4.1.1.20 A.4.1.1.7.
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Rp Rp Rp Rp
601,506.40 45,829.85 423,974.40 207,152.78
Kg m2 m3
484.00 40.40 4.23
A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 374,310.00 Rp 1,078,920.71 Rp
7,320,039.11 15,122,124.00 4,561,676.78
Kg m2 m3
147.98 15.43 1.76
A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 374,310.00 Rp 1,078,920.71 Rp
2,237,998.10 5,775,603.30 1,895,933.43
Kg m2 m3
66.65 6.96 0.26
A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 374,310.00 Rp 1,078,920.71 Rp
1,008,025.19 2,605,197.60 281,598.31
Kg m2 m3
392.56 11.60 3.48
A.4.1.1.17 A.4.1.1.21 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,078,920.71 Rp
5,937,107.39 2,587,032.00 3,754,644.09
Kg m2 m3
302.62 23.72 2.03
A.4.1.1.17 A.4.1.1.21 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,078,920.71 Rp
4,576,861.96 5,290,034.40 2,186,432.83
Kg m2 m3
275.43 11.60 2.32
A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
4,165,565.51 4,481,196.00 2,503,096.06
Kg m2 m3
44.67 3.36 0.25
A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
675,542.20 1,298,001.60 271,888.02
Kg m2 m3
281.95 17.79 0.62
A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
4,264,274.02 6,872,454.90 665,154.62
Kg m3
1101.59 42.55
A.4.1.1.17 A.4.1.1.7.
Rp Rp
15,124.00 Rp 1,048,999.29 Rp
16,660,432.64 44,636,361.98
2
3
4
5
6
7
8
9
10
11
12
2,800,000.00 4,929,540.00 7,729,540.00
NO
JENIS PEKERJAAN
SATUANVOLUME ANALISA
13
Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu k.200
IV 1
PEKERJAAN DINDING, PLESTERAN DAN KERAMIK Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R b Kantor c WC d Pagar Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar Cor Beton Lantai Beton Mutu k.200 Pek Keramik lantai Uk.40x40 Pek Keramik lantai WC Uk.20x20 Pek Keramik dinding WC Uk.10x20 Pek. Tawing layar
2
3 4 5 6 7 V 1
2
3 4 5 VI 1
2
3 4 5 6 7 8 9 10 11 12 VII 1
2 3 4
5
PEKERJAAN ATAP, PLAFOND, LISPLANK Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC Pek. Lisplank Superplank Eksterior Rangka Hollow Plafond Kantor Pek. Pas. Plafond Kalsiboard
JUMLAH HARGA (Rp)
Kg m2 m3
36.50 4.29 0.64
A.4.1.1.17 A.4.1.1.24 A.4.1.1.7.
Rp Rp Rp
15,124.00 539,810.00 1,078,920.71 Jumlah III
Rp Rp Rp Rp
551,958.70 2,314,435.38 693,880.88 170,731,640.59
m2 m2 m2 m2
142.96 60.60 23.50 73.61
A.4.4.1.21a. A.4.4.1.21a. A.4.4.1.21a. A.4.4.1.21a.
Rp Rp Rp Rp
167,865.75 167,865.75 167,865.75 167,865.75
Rp Rp Rp Rp
23,998,020.47 10,173,168.05 3,945,348.72 12,356,346.06
m2 m2 m2 m2 m3 m2 m2 m2 m2
205.28 89.03 38.21 93.01 5.04 46.73 3.68 8.16 45.05
A.4.4.2.4. A.4.4.2.4. A.4.4.2.4. A.4.4.2.4. A.4.1.1.7. A.4.4.3.35.a A.4.4.3.36. A.4.4.3.53. A.4.6.1.25.a
Rp Rp Rp Rp Rp Rp Rp Rp Rp
79,356.00 79,356.00 79,356.00 79,356.00 1,078,920.71 258,950.00 248,960.00 324,677.50 213,650.00 Jumlah III
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,290,136.20 7,065,382.10 3,031,875.34 7,380,822.20 5,439,098.26 12,101,354.98 916,172.80 2,649,368.40 9,624,932.50 114,972,026.08
m2 m2 m2
242.24 18.63 9.96
A.4.2.1.2 d A.4.2.1.2 d A.4.2.1.2 d
Rp Rp Rp
139,086.67 Rp 139,086.67 Rp 139,086.67 Rp
33,691,801.24 2,591,677.02 1,385,827.29
m2 m2 m2 m m2 m2
242.24 18.63 9.96 57.34 9.55 9.55
A.4.5.2.32. A.4.5.2.32. A.4.5.2.32. A.4.6.1.21.a A.4.2.1.21. A.4.5.1.1a
Rp Rp Rp Rp Rp Rp
0.12 0.06 0.02
A.4.6.1.2. A.4.6.1.2. A.4.6.1.2.
Rp Rp Rp
3.60 1.80 1.80 2.26 7.48 12.00 12.00 4.00 6.00 6.00 6.00 16.20 8.92
A.4.6.1.5. A.4.6.1.5. A.4.6.1.5. A.4.6.1.6. A.4.6.2.17 A.4.6.2.5 A.4.6.2.6. A.4.6.2.2. A.4.6.2.9. A.4.6.2.11. A.4.6.2.8.a A. 4.4.1.23 Ls
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
841,000.00 841,000.00 841,000.00 632,800.00 175,650.00 62,150.00 59,100.00 179,900.00 47,950.00 62,150.00 35,150.00 378,475.00 650,000.00 Jumlah V
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,027,600.00 1,513,800.00 1,513,800.00 1,427,596.80 1,314,213.30 745,800.00 709,200.00 719,600.00 287,700.00 372,900.00 210,900.00 6,131,295.00 5,798,000.00 25,467,560.65
m2 m2 m2 m2 m2 m2
205.28 89.03 38.21 93.01 9.55 10.08
A.4.7.1.10. A.4.7.1.10. A.4.7.1.10. A.4.7.1.10. A.4.7.1.10. A.4.7.1.4.
Rp Rp Rp Rp Rp Rp
46,321.00 46,321.00 46,321.00 46,321.00 46,321.00 53,263.00
Rp Rp Rp Rp Rp Rp
9,508,737.82 4,124,143.91 1,769,740.13 4,308,269.89 442,249.75 536,891.04
m2 m2 m2 m2
10.80 3.60 3.60 3.20
A.4.7.1.4. A.4.7.1.4. A.4.7.1.4. A.4.7.1.4.
Rp Rp Rp Rp
53,263.00 53,263.00 53,263.00 53,263.00 Jumlah VI
Rp Rp Rp Rp Rp
575,240.40 191,746.80 191,746.80 170,441.60 21,819,208.14
PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R m3 b Kantor m3 c WC m3 Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R m2 b Kantor m2 c WC m2 Pek. Rangka Jendela Kaca Kayu Klas II m2 Pek.Pemasangan Kaca Tebal 5 mm m2 Pek. Engsel Pintu bh Pek. Engsel Jendela bh Kunci Tanam bh Hak angin Jendela bh Gerendel Jendela bh Handel Jendela bh Pekerjaan Ventilasi Kerawang m2 Pekerjaan glasblock m2 PEKERJAAN PENGECATAN Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar Pengecatan Plafond Kantor Pengecatan Kusen Pintu dan Jendela Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC Pengecatan Rangka Jendela Kaca
HARGA SATUAN (Rp)
91,794.34 91,794.34 91,794.34 120,641.67 127,450.00 72,700.00 Jumlah IV
Rp Rp Rp Rp Rp Rp Rp
22,235,895.93 1,710,453.53 914,617.51 6,918,162.66 1,216,828.88 694,103.25 71,359,367.32
8,706,500.00 Rp 8,706,500.00 Rp 8,706,500.00 Rp
1,007,342.05 504,977.00 182,836.50
NO VIII 1
2 3 4 5 6 7 8 9 10 11 IX 1 2
3
4
5
JENIS PEKERJAAN PEKERJAAN SANITASI Pekerjaan Septictank 2 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank Pekerjaan Pipa 4" Pekerjaan Pipa 2" Pekerjaan Pipa 3/4" (Air Bersih) Pek. Sumur Bor+pompa Pekerjaan kran air Pekerjaan stop kran Profil tank 1200 L Pek. Closed Duduk Pek. Wastafel+cermin Pek. Grill besi penutup saluran PEKERJAAN JEMBATAN Pekerjaan Pondasi Batu Belah Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof c Cor Beton k.200 Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton k.200 Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton k.200 d Pek. Pas Batako e Pek. Plesteran f Pek Besi Galvanis 2"
SATUANVOLUME ANALISA
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
m3 m2 m3
13.88 0.38 0.53
A. 2.3.1.1 A.2.3.1.11. A.4.1.1.5.
Rp Rp Rp
105,000.00 Rp 222,000.00 Rp 1,048,999.29 Rp
1,456,875.00 83,250.00 553,871.62
Kg m2 m3
56.55 4.80 0.36
A.4.1.1.17 A.4.1.1.21 A.4.1.1.5.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,048,999.29 Rp
855,292.45 1,070,496.00 377,639.74
Kg m2 m3 m2 m2
48.46 8.16 0.31 23.12 23.12
A.4.1.1.17 A.4.1.1.22 A.4.1.1.5. A.4.4.1.21a. A.4.4.2.4.
Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,048,999.29 167,865.75 79,356.00
Rp Rp Rp Rp Rp
732,972.56 3,054,369.60 320,993.78 3,881,056.14 1,834,710.72
Kg m2 m3
56.55 4.80 0.36
A.4.1.1.17 A.4.1.1.21 A.4.1.1.5.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,048,999.29 Rp
855,292.45 1,070,496.00 377,639.74
Kg m2 m3
9.32 2.40 0.17
A.4.1.1.17 A.4.1.1.24 A.4.1.1.5.
Rp Rp Rp
15,124.00 Rp 539,810.00 Rp 1,048,999.29 Rp
140,985.93 1,295,544.00 176,231.88
Kg m2 m3 Bh m3 m m m Bh Bh Bh Bh Bh Unit m2
6.00 0.84 0.10 2.00 0.34 3.50 1.93 36.66 1.00 2.00 1.00 1.00 1.00 1.00 3.75
A.4.1.1.17 A.4.1.1.24 A.4.1.1.5. Ls A.2.3.1.11. A.5.1.1 32. A.5.1.1 29. A.5.1.1 26. Ls A.5.1.1 19. A.5.1.1 19.a Ls A.5.1.1.1. A.5.1.1 5. Ls
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
m3
14.67
A.3.2.1.2.
kg m2 m3
102.56 12.44 1.09
kg m2 m3
15,124.00 539,810.00 1,048,999.29 10,643,500.00 222,000.00 148,872.50 72,446.25 31,635.00 2,500,000.00 135,500.00 135,500.00 1,600,000.00 2,542,200.00 1,668,200.00 340,000.00 Jumlah VII
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
90,804.50 453,440.40 102,801.93 21,287,000.00 74,592.00 521,053.75 139,821.26 1,159,739.10 2,500,000.00 271,000.00 135,500.00 1,600,000.00 2,542,200.00 1,668,200.00 1,275,000.00 51,958,870.55
Rp
1,104,825.00 Rp
16,207,782.75
A.4.1.1.17 A.4.1.1.21 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,078,920.71 Rp
1,551,043.33 2,774,368.80 1,178,181.42
51.28 7.28 0.55
A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
775,521.67 2,812,336.80 589,090.71
kg m2 m3
250.87 11.89 4.03
A.4.1.1.17 A.4.1.1.24 A.4.1.1.7.
Rp Rp Rp
15,124.00 Rp 539,810.00 Rp 1,078,920.71 Rp
3,794,191.15 6,418,340.90 4,345,892.64
Kg m2 m3 m2 m2 m
22.59 2.40 0.18 3.10 6.60 7.40
A.4.1.1.17 A.4.1.1.22 A.4.1.1.7. A.4.4.1.21a. A.4.4.2.4. Ls
Rp Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,078,920.71 167,865.75 79,356.00 29,916.67 Jumlah VIII
Rp Rp Rp Rp Rp Rp Rp
341,620.91 898,344.00 194,205.73 520,383.83 523,749.60 221,383.33 43,146,437.57
NO
JENIS PEKERJAAN
SATUANVOLUME ANALISA
X 1 2 3 4 5 6 7 8
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
XI 1 2 3
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Pintu Pagar Besi Pekerjaan Handrail difabel stainless a Hanggar TPS3R panjang 2 m b Kantor panjang 0,95 m c WC Panjang 0,75 d Biaya pengelasan (100% fisik) Pekerjaan Rolling door Pek. Handrail WC Pekerjaan ukiran kayu Pek. Plesteran letter timbul
XII 1 2 3
PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Mesin Pengayak Kapasitas 500 Kg/Jam
XIII A 1 2 3 4 5 6 7 8 B 1 2 3 4 5 6 7
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 Helm Keselamatan Bh 21.00 Rompi Kerja Bh 21.00 Sarung Tangan (Safety Glove) Bh 21.00 Sepatu Keselamatan (Rubber Shoes) Bh 21.00 Tali Pengaman Bh 3.00 Kotak P3K Bh 2.00 Asuransi Tenaga Kerja Paket 1.00 KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 Vitamin C (1 Box isi 100 tablet) Bh 20.00 Tempat Cuci Tangan Bh 2.00 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 Masker kain Bh 20.00 Alat penyemprot desinfektan Bh 2.00 Cairan Desinfektan 5L Bh 3.00
XIV 1 2 3 4 5 6
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
4 5 6 7
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
Unit Titik Bh Bh Bh Bh Titik Bh
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
Ls Ls Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp Rp
m2 m2
16.30 9.45
Ls Ls
Rp Rp
m m m m m2 m m2 Paket
13.54 4.75 4.29 22.58 7.27 1.20 19.20 1.00
Ls Ls Ls Ls A.4.2.1.10 Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp Rp
52,000.00 52,000.00 52,000.00 52,000.00 810,400.00 52,000.00 625,000.00 800,000.00 Jumlah IX
Rp Rp Rp Rp Rp Rp Rp Rp Rp
704,080.00 247,000.00 223,080.00 1,174,160.00 5,889,582.00 62,400.00 12,000,000.00 800,000.00 31,986,302.00
Unit Unit Unit
1.00 1.00 1.00
Ls Ls Ls
Rp Rp Rp
36,130,000.00 Rp 22,650,000.00 Rp 18,150,000.00 Rp Jumlah IX Rp
36,130,000.00 22,650,000.00 18,150,000.00 76,930,000.00
Ls Ls Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp Rp
75,000.00 100,000.00 60,000.00 5,000.00 100,000.00 231,500.00 40,000.00 912,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
300,000.00 2,100,000.00 1,260,000.00 105,000.00 2,100,000.00 694,500.00 80,000.00 912,000.00
Ls Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp
350,000.00 25,000.00 250,000.00 25,000.00 5,000.00 65,000.00 75,000.00 Jumlah X
Rp Rp Rp Rp Rp Rp Rp Rp
700,000.00 500,000.00 500,000.00 100,000.00 100,000.00 130,000.00 225,000.00 9,806,500.00
Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp
270,000.00 250,000.00 150,000.00 10,000.00 500,000.00 250,000.00 Jumlah IX
Rp Rp Rp Rp Rp Rp Rp
270,000.00 250,000.00 150,000.00 80,000.00 500,000.00 250,000.00 1,500,000.00
TOTAL Rp DIBULATKAN Rp
705,004,278 705,000,000
Ls Ls Ls Ls Bh Paket
1.00 1.00 1.00 8.00 1.00 1.00
Diverifikasi Oleh : Askot Infrastruktur
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
4,500,000.00 325,000.00 35,000.00 20,000.00 20,000.00 760,000.00 325,000.00 20,000.00 Jumlah IX
Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,500,000.00 4,225,000.00 455,000.00 80,000.00 80,000.00 760,000.00 1,950,000.00 120,000.00 12,170,000.00
320,000.00 Rp 600,000.00 Rp
5,216,000.00 5,670,000.00
Dibuat Oleh :
UPL
Alfiansyah
RAB-6 BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU) REKAPITULASI RENCANA ANGGARAN BIAYA Kab./Kota Kecamatan Kelurahan BKM
NO.
: Palangka Raya : Sebangau : Kereng Bangkirai : Kereng Membangun
NAMA PAKET
PEKERJAAN
SATUAN VOLUME
01. PEKERJAAN PERSIAPANPembersihan Awal
02. PEKERJAAN TANAH
03. PEKERJAAN BETON BERTULANG
m2
Pengukuran dan Pemasangan Bowplank
m
Pek urugan tanah lokasi kegiatan
m3
Pek. Galian Tanah Pondasi
m3
JUMLAH HARGA (Rp.)
Rp 200.00 Rp 66.00 JUMLAH
2,800,000.00
218.55
Rp
35,405,100.00
11.68
Rp
4,929,540.00 7,729,540.00 1,226,610.00
Pek. Urugan Bekas Galian
m3
2.92
Rp
Pek. Urugan Pasir bawah lantai
m3
44.84
Rp
9,953,479.89
Pek. Pemancangan Cerucuk Kayu Galam
btg
Rp 372.00 JUMLAH
18,637,200.00
316.93
Rp
4,793,254.16
204,435.00
0.67
Rp
65,426,824.89
Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a
Pek. Pembesian
Kg
b
Pek. Lantai Kerja Beton K.100 t=5 cm
m3
641,617.92
c
Pek. Bekisting Pondasi
m2
2.24
Rp
494,636.80
d
Cor Beton Mutu k.200
m3
2.69
Rp
2,900,138.88
Kg
217.59
Rp
3,290,830.80
Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a
Pek. Pembesian
b
Pek. Lantai Kerja Beton K.100 t=5 cm
m3
0.34
Rp
c
Pek. Bekisting Pondasi
m2
1.52
Rp
335,646.40
d
Cor Beton Mutu k.200
326,537.69
m3
1.37
Rp
1,475,963.54
a
Pek. Pembesian
Kg
39.77
Rp
601,506.40
b
Pek. Lantai Kerja Beton K.100 t=5 cm
m3
0.05
Rp
c
Pek. Bekisting Pondasi
m2
1.92
Rp
d
Cor Beton Mutu k.200
m3
0.19
Rp
207,152.78
Pek. Pembesian
Kg
484.00
Rp
7,320,039.11
b
Pek. Bekisting Kolom
m2
40.40
c
Cor Beton Mutu k.200
m3
Pondasi Footplat P3 (60 cm x 60 cm x 20 cm) 45,829.85 423,974.40
Pek Kolom K1 a
Rp
15,122,124.00
4.23
Rp
4,561,676.78
Kg
147.98
Rp
2,237,998.10
b
Pek. Bekisting Kolom
m2
15.43
Rp
5,775,603.30
c
Cor Beton Mutu k.200
m3
1.76
Rp
1,895,933.43
Kg
66.65
Rp
1,008,025.19 2,605,197.60
Pek Kolom K2 a
Pek. Pembesian
Pek Kolom K3 a
Pek. Pembesian
b
Pek. Bekisting Kolom
m2
6.96
Rp
c
Cor Beton Mutu k.200
m3
0.26
Rp
281,598.31
Pekerjaan Sloof 20x30 a
Pek. Pembesian
Kg
392.56
Rp
5,937,107.39
b
Pek. Bekisting Sloof
m2
11.60
Rp
2,587,032.00
c
Cor Beton Mutu k.200
m3
3.48
Rp
3,754,644.09
302.62
Pekerjaan Sloof 15x20 a
Pek. Pembesian
Kg
b
Pek. Bekisting Sloof
m2
c
Rp
4,576,861.96
23.72
Rp
5,290,034.40
m3
2.03
Rp
2,186,432.83
a
Pek. Pembesian
Kg
275.43
Rp
4,165,565.51
b
Cor Beton Mutu k.200
Pek. Bekisting Ring Balok
m2
11.60
Rp
4,481,196.00
c
Cor Beton Mutu k.200
m3
2.32
Rp
2,503,096.06
Pekerjaan Ring Balok 20x20
Pekerjaan Balok 15x20 a
Pek. Pembesian
Kg
44.67
Rp
675,542.20
b
Pek. Bekisting Ring Balok
m2
3.36
Rp
1,298,001.60
c
Cor Beton Mutu k.200
m3
0.25
Rp
271,888.02
Pekerjaan Ring Balok 15/15 a
Pek. Pembesian
Kg
281.95
Rp
4,264,274.02
b
Pek. Bekisting Ring Balok
m2
17.79
Rp
6,872,454.90
c
Cor Beton Mutu k.200
m3
0.62
Rp
665,154.62
Pekerjaan lantai beton bertulang a
Pek. Pembesian
Kg
b
1101.59
Rp
16,660,432.64
m3
42.55
Rp
44,636,361.98
a
Cor Beton Mutu k.175 Pembesian
Kg
36.50
Rp
551,958.70
b
Pek. Bekisting
m2
c
Cor Beton Mutu k.200
m3
Rp 4.29 Rp 0.64 JUMLAH
170,731,640.59
Pek. Plat /Dak Beton 2,314,435.38 693,880.88
04. PEKERJAAN DINDING, Pek. Pasangan dinding Bataco PLESTERAN DAN a Bangunan Hanggar TPS3R KERAMIK b Kantor
m2
Rp
23,998,020
m2
60.60
Rp
10,173,168
c
WC
m2
23.50
Rp
3,945,349
d
Pagar
142.96
m2
73.61
Rp
12,356,346
a
Bangunan Hanggar TPS3R
m2
205.28
Rp
16,290,136
b
Kantor
m2
89.03
Rp
c
WC
m2
38.21
Rp
d
Pagar
m2
Pek. Plesteran Dinding
05. PEKERJAAN ATAP, PLAFOND, LISPLANK
7,065,382 3,031,875
93.01
Rp
Cor Beton Lantai Beton Mutu k.200
m3
5.04
Rp
5,439,098
Pek Keramik lantai Uk.40x40
m2
46.73
Rp
12,101,355
Pek Keramik lantai WC Uk.20x20
7,380,822
m2
3.68
Rp
Pek Keramik dinding WC Uk.10x20
m2
8.16
Rp
2,649,368
Pek. Tawing layar
m2
45.05 Rp JUMLAH
114,972,026.08
916,173 9,624,933
Rangka Atap Baja Ringan a
Hanggar TPS3R
m2
b
Kantor
m2
c
WC
242.24
Rp
33,691,801
18.63
Rp
m2
9.96
Rp
1,385,827
a
Hanggar TPS3R
m2
242.24
Rp
22,235,896
b
Kantor
m2
18.63
Rp
2,591,677
1,710,454
c
WC
Pek Atap Genteng Metal Zincalume
06. PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG
m2
9.96
Rp
Pek. Lisplank Superplank Eksterior
m
57.34
Rp
Rangka Hollow Plafond Kantor
m2
9.55
Rp
1,216,829
Pek. Pas. Plafond Kalsiboard
m2
9.55 Rp JUMLAH
71,359,367.32
914,618 6,918,163 694,103
Pek. Kusen Pintu dan Jendela Kayu Klas II a
Hanggar TPS3R
m3
0.12
Rp
1,007,342
b
Kantor
m3
0.06
Rp
c
WC
m3
0.02
Rp
182,837
m2
3.60
Rp
3,027,600
504,977
Pek. Daun Pintu Panel Kayu Klas II a
07. PEKERJAAN PENGECATAN
Hanggar TPS3R
b
Kantor
m2
1.80
Rp
1,513,800
c
WC
m2
1.80
Rp
1,513,800
2.26
Pek. Rangka Jendela Kaca Kayu Klas II
Rp
1,427,597
m2
7.48
Rp
1,314,213
Pek. Engsel Pintu
m2
Pek.Pemasangan Kaca Tebal 5 mm
bh
12.00
Rp
745,800
Pek. Engsel Jendela
bh
12.00
Rp
709,200
Kunci Tanam
bh
4.00
Rp
719,600
Hak angin Jendela
bh
6.00
Rp
Gerendel Jendela
bh
6.00
Rp
Handel Jendela
bh
6.00
Rp
210,900
Pekerjaan Ventilasi Kerawang
m2
16.20
Rp
6,131,295
Pekerjaan glasblock
m2
8.92 Rp JUMLAH
25,467,560.65
287,700 372,900
5,798,000
Pengecatan dinding a
Hanggar TPS3R
m2
205.28
Rp
9,508,738
b
Kantor
m2
89.03
Rp
4,124,144
c
WC
m2
38.21
Rp
1,769,740
d
Pagar
m2
93.01
Rp
4,308,270
Pengecatan Plafond Kantor
m2
9.55
Rp
442,250
Pengecatan Kusen Pintu dan Jendela
m2
10.08
Rp
536,891
Pengecatan Pintu Panel a
Hanggar TPS3R
m2
10.80
Rp
b
Kantor
m2
3.60
Rp
c
WC
m2
3.60
Rp
191,747
3.20 Rp JUMLAH
21,819,208.14
Pengecatan Rangka Jendela Kaca
m2
575,240 191,747 170,442
08. PEKERJAAN SANITASI Pekerjaan Septictank 2 unit a
Galian Septictank
m3 m2
0.38
Rp
m3
0.53
Rp
Kg
56.55
b
Pek. Urugan Pasir t=5 cm
c
Pek Cor Beton K.175 tebal 10 cm
d
Pek. Sloof 15/15 - Pek. Pembesian
e
83,250 553,872
Rp
855,292
m2
4.80
Rp
1,070,496
m3
0.36
Rp
377,640
Kg
48.46
Pek. Kolom 15/15 Rp
732,973
- Pek. bekisting
m2
8.16
Rp
3,054,370
- Pek cor beton K.175
m3
0.31
Rp
320,994
Pek. Pas. Batako
m2
23.12
Rp
3,881,056
Pek. Plesteran
m2
23.12
Rp
1,834,711
- Pek. Pembesian
Kg
56.55
Rp
855,292
- Pek. bekisting
m2
4.80
Rp
1,070,496
- Pek cor beton K.175
m3
0.36
Rp
Kg
9.32
Rp
140,986
g
Pek. Ring Balk 15/15
377,640
Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian
j
1,456,875
- Pek. bekisting
h
i
Rp
- Pek cor beton K.175 - Pek. Pembesian
f
13.88
- Pek. bekisting
m2
2.40
Rp
1,295,544
- Pek cor beton K.175
m3
0.17
Rp
176,232
Kg
6.00
Rp
Pek. Tutup mainhole - Pek. Pembesian
90,804
- Pek. bekisting
m2
0.84
Rp
- Pek cor beton K.175
m3
0.10
Rp
102,802
2.00
Rp
21,287,000
453,440
k
Bioseptictank Kapasitas 3000L
Bh
l
Urugan Pasir dalam septictank
m3
0.34
Rp
74,592
m
3.50
Rp
521,054
m
1.93
Rp
139,821
m
36.66
Pekerjaan Pipa 4" Pekerjaan Pipa 2" Pekerjaan Pipa 3/4" (Air Bersih)
Rp
1,159,739
Pek. Sumur Bor+pompa
Bh
1.00
Rp
2,500,000
Pekerjaan kran air
Bh
2.00
Rp
271,000
Bh
1.00
Rp
135,500
Bh
1.00
Rp
1,600,000
Pekerjaan stop kran Profil tank 1200 L
Bh
1.00
Pek. Wastafel+cermin
Pek. Closed Duduk
Unit
1.00
Pek. Grill besi penutup saluran
m2
Rp
2,542,200
Rp
1,668,200
3.75 Rp JUMLAH
1,275,000
09. PEKERJAAN JEMBATANPekerjaan Pondasi Batu Belah
m3 kg
51,958,870.55
14.67
Rp
16,207,783
102.5551
Rp
1,551,043
Pekerjaan Sloof 20/30 a
Pek. Pembesian
b
Pekerjaan Bekisting Sloof
m2
12.44
Rp
2,774,369
c
Cor Beton k.200
m3
1.092
Rp
1,178,181
Pekerjaan Balok 20/30 a
Pek. Pembesian
kg
51.27755
Rp
775,522
b
Pekerjaan Bekisting Balok
m2
7.28
Rp
2,812,337
c
Cor Beton k.200
m3
0.546
Rp
589,091
Pekerjaan Plat beton a
Pek. Pembersian
kg
250.8722
Rp
3,794,191
b
Pekerjaan Bekisting Plat
m2
11.89
Rp
6,418,341
c
Cor Beton K200 tebal 20 cm
m3
4.028
Rp
4,345,893
Pekerjaan Reling jembatan
10. PEKERJAAN LISTRIK
a
Pembesian Kolom 15/15
Kg
22.588
Rp
341,621
b
Pek. Bekisting Kolom
m2
2.4
Rp
898,344
c
Cor Beton k.200
m3
0.18
Rp
194,206
d
Pek. Pas Batako
m2
3.1
Rp
e
Pek. Plesteran
m2
6.6
Rp
523,750
f
Pek Besi Galvanis 2"
m
Rp 7.4 JUMLAH
43,146,437.57
520,384 221,383
Penyambungan Daya Baru PLN
Unit
1
Rp
4,500,000
Instalasi Titik Lampu
Titik
13
Rp
4,225,000
Bh
13
Rp
Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
455,000
Bh
4
Rp
Bh
4
Rp
Bh
1
Rp
760,000
Titik
6
Rp
1,950,000
Rp 6 JUMLAH
12,170,000.00
Bh
11. PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC
m2
Pekerjaan Pintu Pagar Besi
80,000 80,000
120,000
16.30
Rp
5,216,000
m2
9.45
Rp
5,670,000
a
Hanggar TPS3R panjang 2 m
m
13.54
Rp
b
Kantor panjang 0,95 m
m
4.75
Rp
Pekerjaan Handrail difabel stainless 247,000
WC Panjang 0,75
m
4.29
Rp
223,080
Biaya pengelasan (100% fisik)
m
22.58
Rp
1,174,160
Pekerjaan Rolling door
m2
7.27
Rp
5,889,582
Pek. Handrail WC
m
1.20
Rp
62,400
m2
19.20
Rp
12,000,000
1.00 Rp JUMLAH
31,986,302.00
Pekerjaan ukiran kayu Pek. Plesteran letter timbul 12. PERALATAN TPS3R
704,080
c d
Paket
800,000
Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP
Unit
1.00
Rp
36,130,000
Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP
Unit
1.00
Rp
22,650,000
Mesin Pengayak Kapasitas 500 Kg/Jam
Unit
1.00 Rp JUMLAH
76,930,000.00
13. KEBUTUHAN K3 DAN Sosialisasi K3 dan Prokes (Spanduk) PROKES PENCEGAHAN Helm Keselamatan COVID - 19 Rompi Kerja
18,150,000
Bh
4.00
Rp
300,000
Bh
21.00
Rp
2,100,000
Bh
21.00
Rp
1,260,000
Sarung Tangan (Safety Glove)
Bh
21.00
Rp
105,000
Sepatu Keselamatan (Rubber Shoes)
Bh
21.00
Rp
2,100,000
Tali Pengaman
Bh
3.00
Rp
694,500
Bh
2.00
Rp
Kotak P3K Asuransi Tenaga Kerja
80,000
Paket
1.00
Rp
912,000
Alat ukur suhu badan nir-sentuh (Thermoscan)
Bh
2.00
Rp
700,000
Vitamin C (1 Box isi 100 tablet)
Bh
20.00
Rp
500,000
Tempat Cuci Tangan
Bh
2.00
Rp
500,000
Sabun Cuci Tangan (Cair) 200ml/btl
Bh
4.00
Rp
100,000
Masker kain
Bh
20.00
Rp
Alat penyemprot desinfektan
Bh
2.00
Rp
130,000
Cairan Desinfektan 5L
Bh
3.00 Rp JUMLAH
9,806,500.00
14. ADMINISTRASI KEGIATPelaporan KSM
Ls
Photo Copy / Penggandaan
Ls
1.00
Biaya Alat Tulis Kantor (ATK)
Ls
1.00
Materai
Ls
8.00
Pengujian Lab
Bh
1.00
Papan Nama Kegiatan
Paket
100,000 225,000
1.00
270,000 250,000 150,000 80,000 500,000
1.00 JUMLAH
250,000 1,500,000.00
TOTAL
705,004,277.79
PEMBULATAN
Diverifikasi Oleh : Askot Infrastruktur,
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
Dibuat Oleh :
705,000,000.00
UPL
Alfiansyah
RAB-7
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU) RINCIAN KEBUTUHAN TENAGA KERJA/BAHAN/ALAT KEGIATAN: TPS 3R Kab./Kota : Palangka Raya Kecamatan : Sebangau
Kelurahan BKM
: Kereng Bangkirai : Kereng Membangun
HARGA SATUAN
NO.
URAIAN
SATUAN
VOLUME (Rp.)
(1)
(2)
(5)
(4)
JUMLAH BIAYA
(Rp.)
6 = (4) X (5)
TENAGA KERJA
1.
1. Kepala Tukang
HOK
51.00
170,000.00
8,670,000.00
2. Tukang Batu
HOK
149.00
155,000.00
23,095,000.00
3. Tukang Kayu
HOK
132.00
150,000.00
19,800,000.00
4. Tukang Besi
HOK
135.00
150,000.00
20,250,000.00
5. Tukang Cat
HOK
25.00
150,000.00
3,750,000.00
6. Pekerja
HOK
900.00
140,000.00
126,000,000.00
JUMLAH
201,565,000.00
BAHAN 1. Kayu balok 5/7 Klas III 2. Paku 5 -10 cm 3. Kayu papan 2/20 Klas III 4. Tanah Urug 5. Pasir Urug 6. Kayu Galam ø 10-12 m 7. Besi Beton
Batang
57.00
31,250.00
1,781,250.00
Kg
76.00
22,000.00
1,672,000.00
Batang
687.00
39,700.00
27,273,900.00
m3
281.00
100,000.00
28,100,000.00
m3
53.00
150,000.00
7,950,000.00
Batang
195.00
35,000.00
6,825,000.00
4,528.00
12,000.00
Besi beton polos dia. 8
Batang
Kg
445.00
45,000.00
20,025,000.00
Besi beton polos dia. 10
Batang
100.00
70,000.00
7,000,000.00
Besi beton polos dia. 12
Batang
206.00
101,000.00
20,806,000.00
8. Kawat Beton
Kg
70.00
25,000.00
1,750,000.00
9. Semen Portland
40,596,000.00
Zak
796.00
51,000.00
10. Pasir Beton
m3
34.00
180,000.00
6,120,000.00
11. Split
m3
32.00
450,000.00
14,400,000.00
13. Balok Kayu Klas II uk.5/7
Batang
143.00
56,000.00
8,008,000.00
14. Dolken Kayu ø8-10
Batang
308.00
30,000.00
9,240,000.00
15. Plywood 9 mm
Lembar
8.00
130,000
1,040,000.00
Bh
4,100.00
2,800.00
11,480,000.00
17. Pasir Pasang
m3
149.00
150,000.00
22,350,000.00
18. Ubin Keramik 40x40
Doz
49.00
75,000.00
3,675,000.00
19. Semen Warna
Kg
48.00
5,000.00
240,000.00
20. Ubin Keramik 20x20
Doz
4.00
65,000.00
260,000.00
21. Ubin Keramik 10x20
Doz
9.00
65,400.00
588,600.00
16. Batako
22. Paku GRC
Kg
7.00
25,000.00
175,000.00
23. Kalsiboard Tebal 9 mm
Lbr
19.00
190,000.00
3,610,000.00
24. Baja Ringan 75x35x0,75 MM
Batang
193.00
125,000.00
24,125,000.00
25. Baja Ringan 30x30x0,3 MM
Batang
67.00
50,000.00
3,350,000.00
1,200.00
3,500.00
4,200,000.00
Lembar
44.00
250,000.00
11,000,000.00
Kg
54.00
35,000.00
1,890,000.00
Lembar
27.00
155,000.00
4,185,000.00
26. Paku Skrup 27. Genteng Metal 28. Paku Genteng Metal 29. Papan Plank Kalsiboard
Kg
HARGA SATUAN
NO.
URAIAN
SATUAN
VOLUME (Rp.)
30. Besi Hollow Plafond 1,3x3,3
(Rp.)
Batang
6.00
15,000.00
90,000.00
32. Kalsiboard 6 mm
Lbr
6.00
110,000.00
660,000.00
33. Paku Kalsiboard
Kg
3.00
25,000.00
75,000.00
117.00
80,000.00
9,360,000.00
34. Balok kayu kelas II 5/10 untuk kusen 35. Lem Kayu
Batang Kg
1.00
33,000.00
33,000.00
Keping
21.00
80,000.00
1,680,000.00
37. Kaca Tebal 5 mm
m2
8.30
135,000.00
1,120,500.00
38. Sealant
Kg
1.00
47,500.00
47,500.00
39. Engsel pintu
Bh
12.00
35,000.00
420,000.00
40. Engsel jendela
Bh
12.00
41,000.00
492,000.00
41. Kunci tanam biasa
Bh
4.00
95,000.00
380,000.00
42. Kait angin
Bh
6.00
20,800.00
124,800.00
43. Grendel/Kunci Slot
Bh
6.00
35,000.00
210,000.00
44. Handel Jendela
Bh
6.00
8,000.00
48,000.00
45. Roster/Kerawang
Bh
195.00
25,000.00
4,875,000.00
46. Glassblock
Bh
223.00
26,000.00
5,798,000.00
47. Cat tembok
Pail
44.00
275,000.00
12,100,000.00
49. Cat Menie kayu
Kg
3.00
60,000.00
180,000.00
50. Cat dasar Kayu
Kg
5.00
60,000.00
300,000.00
51. Cat Penutup Kayu
Kg
8.00
60,000.00
480,000.00
52. Kuas
Bh
1.00
45,000.00
45,000.00
53. Pengencer
Kg
1.00
28,100.00
28,100.00
54. Ampelas
Lbr
8.00
10,000.00
80,000.00
55. Closet Duduk
Bh
1.00
1,800,000.00
1,800,000.00
57. Kran air
Bh
2.00
65,000.00
130,000.00
59. Stop Kran 3/4
Bh
1.00
65,000.00
65,000.00
60. Pipa PVC 4”
Batang
1.00
295,000
295,000.00
62. Pipa PVC 3/4”
Batang
7.00
42,000
294,000.00
64. Pipa PVC 2”
36. Papan Kayu Klas II Benuas
2.
JUMLAH BIAYA
Batang
1.00
127,500
127,500.00
66. Wastafel+cermin
Bh
1.00
940,000.00
940,000.00
68. Bioseptictank Kapasitas 3000L
Bh
2.00
10,643,500.00
21,287,000.00
69. Profil Tank 1200 L
Bh
1.00
1,600,000.00
1,600,000.00
70. Sumur bor+pompa
Unit
1.00
2,500,000.00
2,500,000.00
71. Grill besi penutup saluran
m2
7.45
450,000.00
3,352,500.00
72. Batu belah
m3
18.00
400,000.00
7,200,000.00
74. Penyambungan Daya Baru PLN
Bh
1.00
4,500,000.00
4,500,000.00
75. Instalasi Titik Lampu
Bh
13.00
325,000.00
4,225,000.00
76. Lampu SL 18 Watt
Bh
13.00
35,000.00
455,000.00
77. Saklar Tunggal
Bh
4.00
20,000.00
80,000.00
78. Saklar Ganda
Bh
4.00
20,000.00
80,000.00
79. Pek. Pas Panel Listrik
Ls
1.00
760,000.00
760,000.00
80. Pek. Instalasi Stop Kontak
Ls
6.00
325,000.00
1,950,000.00
81. Stop Kontak
Ls
6.00
20,000.00
120,000.00
82. Pagar Besi BRC
m2
16.30
321,000.00
5,232,000.00
83. Pekerjaan Pintu Pagar Besi
m2
9.45
500,000.00
4,725,000.00
84. Pekerjaan Handrailing difabel stainless
m
22.50
52,000.00
1,170,000.00
85. Biaya pengelasan
m
22.50
52,000.00
1,170,000.00
86. Pekerjaan Rolling door
m2
7.27
810,400.00
5,889,582.00
87. Pek. Handrail WC
m
1.20
52,000.00
62,000.00
HARGA SATUAN
NO.
URAIAN
SATUAN
JUMLAH BIAYA
VOLUME (Rp.)
88. Pekerjaan ukiran kayu 89. Pek. Plesteran letter timbul
(Rp.)
m2
19.20
625,000.00
12,000,000.00
Paket
1.00
800,000.00
800,000.00
JUMLAH
415,152,232.00
ALAT 3.
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP
Unit
1.00
36,130,000
36,130,000.00
2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel
Unit
1.00
22,650,000
22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam
Unit
1.00
18,150,000
18,150,000.00
JUMLAH
76,930,000
TOTAL
693,647,232
TOTAL
693,600,000
*)Rincian Kebutauhan Tenaga Kerja/bahan/alat untuk masing-masing Kegiatan **) Mandor tidak diperhitungkan pada dana BPM, namun dapat diakomodir pada komponen swadaya
Askot Infrastruktur,
Fasilitator Teknik,
UPL
Wiwit Whindari, ST.
Hengky Pradana, ST
Alfiansyah
RAB-8
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU) REKAPITULASI RINCIAN KEBUTUHAN TENAGA KERJA / BAHAN / ALAT PAKET : No. 3 dari 3
Kab./Kota : Palangka Raya Kecamatan : Sebangau
Kelurahan BKM
: Kereng Bangkirai : Kereng Membangun
HARGA SATUAN
NO.
URAIAN
SATUAN
VOLUME (Rp.)
(1)
(2)
(5)
(4)
JUMLAH BIAYA
(Rp.)
6 = (4) X (5)
TENAGA KERJA
1.
1. Kepala Tukang
HOK
51.00
170,000.00
8,670,000.00
2. Tukang Batu
HOK
149.00
155,000.00
23,095,000.00
3. Tukang Kayu
HOK
132.00
150,000.00
19,800,000.00
4. Tukang Besi
HOK
135.00
150,000.00
20,250,000.00
5. Tukang Cat
HOK
25.00
150,000.00
3,750,000.00
6. Pekerja
HOK
900.00
140,000.00
126,000,000.00
JUMLAH
201,565,000.00
BAHAN 1. Kayu balok 5/7 Klas III
Batang
57.00
31,250.00
Kg
76.00
22,000.00
1,672,000.00
Batang
687.00
39,700.00
27,273,900.00
4. Tanah Urug
m3
281.00
100,000.00
28,100,000.00
5. Pasir Urug
m3
53.00
150,000.00
7,950,000.00 6,825,000.00
2. Paku 5 -10 cm 3. Kayu papan 2/20 Klas III
6. Kayu Galam ø 10-12 m 7. Besi Beton
Batang Kg
195.00
35,000.00
4,528.00
12,000.00 45,000.00
1,781,250.00
Besi beton polos dia. 8
Batang
445.00
Besi beton polos dia. 10
Batang
100.00
70,000.00
7,000,000.00
Besi beton polos dia. 12
Batang
206.00
101,000.00
20,806,000.00
20,025,000.00
8. Kawat Beton
Kg
70.00
25,000.00
1,750,000.00
9. Semen Portland
Zak
796.00
51,000.00
40,596,000.00
10. Pasir Beton
m3
34.00
180,000.00
6,120,000.00
11. Split
m3
32.00
450,000.00
14,400,000.00
Batang
143.00
56,000.00
8,008,000.00
14. Dolken Kayu ø8-10
Batang
308.00
30,000.00
9,240,000.00
15. Plywood 9 mm
Lembar
8.00
130,000
1,040,000.00
13. Balok Kayu Klas II uk.5/7
16. Batako
Bh
4,100.00
2,800.00
11,480,000.00
17. Pasir Pasang
m3
149.00
150,000.00
22,350,000.00
18. Ubin Keramik 40x40
Doz
49.00
75,000.00
3,675,000.00
19. Semen Warna
Kg
48.00
5,000.00
240,000.00
20. Ubin Keramik 20x20
Doz
4.00
65,000.00
260,000.00
21. Ubin Keramik 10x20
Doz
9.00
65,400.00
588,600.00
22. Paku GRC
Kg
7.00
25,000.00
175,000.00
23. Kalsiboard Tebal 9 mm
Lbr
19.00
190,000.00
3,610,000.00
24. Baja Ringan 75x35x0,75 MM
Batang
193.00
125,000.00
24,125,000.00
25. Baja Ringan 30x30x0,3 MM
Batang
67.00
50,000.00
3,350,000.00
26. Paku Skrup 27. Genteng Metal 28. Paku Genteng Metal 29. Papan Plank Kalsiboard
1,200.00
3,500.00
4,200,000.00
Lembar
Kg
44.00
250,000.00
11,000,000.00
Kg
54.00
35,000.00
1,890,000.00
Lembar
27.00
155,000.00
4,185,000.00
HARGA SATUAN
NO.
URAIAN
SATUAN
VOLUME (Rp.)
30. Besi Hollow Plafond 1,3x3,3
(Rp.)
Batang
6.00
15,000.00
90,000.00
32. Kalsiboard 6 mm
Lbr
6.00
110,000.00
660,000.00
33. Paku Kalsiboard
Kg
3.00
25,000.00
75,000.00
117.00
80,000.00
9,360,000.00
34. Balok kayu kelas II 5/10 untuk kusen 35. Lem Kayu
Batang Kg
1.00
33,000.00
33,000.00
Keping
21.00
80,000.00
1,680,000.00
37. Kaca Tebal 5 mm
m2
8.30
135,000.00
1,120,500.00
38. Sealant
Kg
1.00
47,500.00
47,500.00
39. Engsel pintu
Bh
12.00
35,000.00
420,000.00
40. Engsel jendela
Bh
12.00
41,000.00
492,000.00
41. Kunci tanam biasa
Bh
4.00
95,000.00
380,000.00
42. Kait angin
Bh
6.00
20,800.00
124,800.00
43. Grendel/Kunci Slot
Bh
6.00
35,000.00
210,000.00
44. Handel Jendela
Bh
6.00
8,000.00
48,000.00
45. Roster/Kerawang
Bh
195.00
25,000.00
4,875,000.00
46. Glassblock
Bh
223.00
26,000.00
5,798,000.00
47. Cat tembok
Pail
44.00
275,000.00
12,100,000.00
49. Cat Menie kayu
Kg
3.00
60,000.00
180,000.00
50. Cat dasar Kayu
Kg
5.00
60,000.00
300,000.00
51. Cat Penutup Kayu
Kg
8.00
60,000.00
480,000.00
52. Kuas
Bh
1.00
45,000.00
45,000.00
53. Pengencer
Kg
1.00
28,100.00
28,100.00
54. Ampelas
Lbr
8.00
10,000.00
80,000.00
55. Closet Duduk
Bh
1.00
1,800,000.00
1,800,000.00
57. Kran air
Bh
2.00
65,000.00
130,000.00
59. Stop Kran 3/4
Bh
1.00
65,000.00
65,000.00
60. Pipa PVC 4”
Batang
1.00
295,000
295,000.00
62. Pipa PVC 3/4”
Batang
7.00
42,000
294,000.00
64. Pipa PVC 2”
36. Papan Kayu Klas II Benuas
2.
JUMLAH BIAYA
Batang
1.00
127,500
127,500.00
66. Wastafel+cermin
Bh
1.00
940,000.00
940,000.00
68. Bioseptictank Kapasitas 3000L
Bh
2.00
10,643,500.00
21,287,000.00
69. Profil Tank 1200 L
Bh
1.00
1,600,000.00
1,600,000.00
70. Sumur bor+pompa
Unit
1.00
2,500,000.00
2,500,000.00
71. Grill besi penutup saluran
m2
7.45
450,000.00
3,352,500.00
72. Batu belah
m3
18.00
400,000.00
7,200,000.00
74. Penyambungan Daya Baru PLN
Bh
1.00
4,500,000.00
4,500,000.00
75. Instalasi Titik Lampu
Bh
13.00
325,000.00
4,225,000.00
76. Lampu SL 18 Watt
Bh
13.00
35,000.00
455,000.00
77. Saklar Tunggal
Bh
4.00
20,000.00
80,000.00
78. Saklar Ganda
Bh
4.00
20,000.00
80,000.00
79. Pek. Pas Panel Listrik
Ls
1.00
760,000.00
760,000.00
80. Pek. Instalasi Stop Kontak
Ls
6.00
325,000.00
1,950,000.00
81. Stop Kontak
Ls
6.00
20,000.00
120,000.00
82. Pagar Besi BRC
m2
16.30
321,000.00
5,232,000.00
83. Pekerjaan Pintu Pagar Besi
m2
9.45
500,000.00
4,725,000.00
84. Pekerjaan Handrailing difabel stainless
m
22.50
52,000.00
1,170,000.00
85. Biaya pengelasan
m
22.50
52,000.00
1,170,000.00
86. Pekerjaan Rolling door
m2
7.27
810,400.00
5,889,582.00
87. Pek. Handrail WC
m
1.20
52,000.00
62,000.00
HARGA SATUAN
NO.
URAIAN
SATUAN
JUMLAH BIAYA
VOLUME (Rp.)
88. Pekerjaan ukiran kayu 89. Pek. Plesteran letter timbul
(Rp.)
m2
19.20
625,000.00
12,000,000.00
Paket
1.00
800,000.00
800,000.00
JUMLAH
415,152,232.00
ALAT 3.
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP
Unit
1.00
36,130,000
36,130,000.00
2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel
Unit
1.00
22,650,000
22,650,000.00
3. Mesin Pengayak Kapasitas 500 Kg/Jam
Unit
1.00
18,150,000
18,150,000.00
JUMLAH
76,930,000
KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
4.
1. Sosialisasi K3 dan Prokes (Spanduk)
Bh
4.00
75,000.00
300,000.00
2. Helm Keselamatan
Bh
21.00
100,000.00
2,100,000.00
3. Rompi Kerja
Bh
21.00
60,000.00
1,260,000.00
4. Sarung Tangan (Safety Glove)
Bh
21.00
5,000.00
105,000.00
5. Sepatu Keselamatan (Rubber Shoes)
Bh
21.00
100,000.00
2,100,000.00
6. Tali Pengaman
Bh
3.00
231,500.00
694,500.00
7. Kotak P3K
Bh
2.00
40,000.00
80,000.00
Paket
1.00
912,000.00
912,000.00
Bh
2.00
350,000.00
700,000.00
10. Vitamin C (1 Box isi 100 tablet)
Bh
25.00
25,000.00
625,000.00
11. Tempat Cuci Tangan
Bh
2.00
250,000.00
500,000.00
12. Sabun Cuci Tangan (Cair) 200ml/btl
Bh
4.00
25,000.00
100,000.00
13. Masker kain
Bh
20.00
5,000.00
100,000.00
14. Alat penyemprot desinfektan
Bh
2.00
65,000.00
130,000.00
15. Cairan Desinfektan 5L
Bh
3.00
75,000.00
225,000.00
8. Asuransi Tenaga Kerja 9. Alat ukur suhu badan nir-sentuh (Thermoscan)
JUMLAH
9,931,500
ADMINISTRASI
4.
1. Pelaporan KSM
Ls
1.00
270,000.00
270,000.00
2. Photo Copy / Penggandaan
Ls
1.00
250,000.00
250,000.00
3. Biaya Alat Tulis Kantor (ATK)
Ls
1.00
150,000.00
150,000.00
4. Materai
Ls
8.00
10,000.00
80,000.00
5. Pengujian Lab
Bh
1.00
500,000.00
500,000.00
Paket
1.00
250,000.00
250,000.00
6. Papan Nama Kegiatan
JUMLAH
1,500,000
TOTAL
705,078,732
TOTAL
705,000,000
*)Rincian Kebutauhan Tenaga Kerja/bahan/alat untuk masing-masing Kegiatan **) Mandor tidak diperhitungkan pada dana BPM, namun dapat diakomodir pada komponen swadaya
Askot Infrastruktur,
Fasilitator Teknik,
UPL
Wiwit Whindari, ST.
Hengky Pradana, ST
Alfiansyah
Pekerjaan Rencana Awal No.
Uraian Pekerjaan
Volume
Harga Satuan
I 1 2
PEKERJAAN PERSIAPAN Pembersihan Awal Pengukuran dan Pemasangan Bowplank
200.00 m2 66.00 m
14,000 74,690
II 1 2 3 4 5
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam
218.55 m3 11.68 m3 2.92 m3 44.84 m3 372.00 btg
162,000 105,000 70,000 222,000 50,100
316.93 Kg 0.67 m3 2.24 m2 2.69 m3
15,124 954,789 220,820 1,078,921
217.59 Kg 0.34 m3 1.52 m2 1.37 m3
15,124 954,789 220,820 1,078,921
39.77 Kg 0.05 m3 1.92 m2 0.19 m3
15,124 954,789 220,820 1,078,921
484.00 Kg 40.40 m2 4.23 m3
15,124 374,310 1,078,921
147.98 Kg 15.43 m2 1.76 m3
15,124 374,310 1,078,921
III PEKERJAAN BETON BERTULANG 1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 3 Pondasi Footplat P3 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu k.200 4 Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 5 Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 6 Pek Kolom K3
7
8
9
10
11
12
13
a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu k.200 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu k.200 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu k.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu k.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu k.175 Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu k.200
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK 1 Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 2 Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 3 Cor Beton Lantai Beton Mutu k.200 4 Pek Keramik lantai Uk.40x40 5 Pek Keramik lantai WC Uk.20x20 6 Pek Keramik dinding WC Uk.10x20 7 Pek. Tawing layar
66.65 Kg 6.96 m2 0.26 m3
15,124 374,310 1,078,921
392.56 Kg 11.60 m2 3.48 m3
15,124 223,020 1,078,921
302.62 Kg 23.72 m2 2.03 m3
15,124 223,020 1,078,921
275.43 Kg 11.60 m2 2.32 m3
15,124 386,310 1,078,921
44.67 Kg 3.36 m2 0.25 m3
15,124 386,310 1,078,921
281.95 Kg 17.79 m2 0.62 m3
15,124 386,310 1,078,921
1101.59 Kg 42.55 m3
15,124 1,048,999
36.50 Kg 4.29 m2 0.64 m3
15,124 539,810 1,078,921
142.96 m2 60.60 m2 23.50 m2 73.61 m2
167,866 167,866 167,866 167,866
205.28 m2 89.03 m2 38.21 m2 93.01 m2 5.04 m3 46.73 m2 3.68 m2 8.16 m2 45.05 m2
79,356 79,356 79,356 79,356 1,078,921 258,950 248,960 324,678 213,650
V PEKERJAAN ATAP, PLAFOND, LISPLANK 1 Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC 2 Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC 3 Pek. Lisplank Superplank Eksterior 4 Rangka Hollow Plafond Kantor 5 Pek. Pas. Plafond Kalsiboard
242.24 m2 18.63 m2 9.96 m2
139,087 139,087 139,087
242.24 m2 18.63 m2 9.96 m2 57.34 m 9.55 m2 9.55 m2
91,794 91,794 91,794 120,642 127,450 72,700
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG 1 Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R 0.12 m3 b Kantor 0.06 m3 c WC 0.02 m3 2 Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R 3.60 m2 b Kantor 1.80 m2 c WC 1.80 m2 3 Pek. Rangka Jendela Kaca Kayu Klas II 2.26 m2 4 Pek.Pemasangan Kaca Tebal 5 mm 7.48 m2 5 Pek. Engsel Pintu 12.00 bh 6 Pek. Engsel Jendela 12.00 bh 7 Kunci Tanam 4.00 bh 8 Hak angin Jendela 6.00 bh 9 Gerendel Jendela 6.00 bh 10 Handel Jendela 6.00 bh 11 Pekerjaan Ventilasi Kerawang 16.20 m2 12 Pekerjaan glasblock 8.92 m2 VII PEKERJAAN PENGECATAN 1 Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar 2 Pengecatan Plafond Kantor 3 Pengecatan Kusen Pintu dan Jendela 4 Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC 5 Pengecatan Rangka Jendela Kaca
8,706,500 8,706,500 8,706,500 841,000 841,000 841,000 632,800 175,650 62,150 59,100 179,900 47,950 62,150 35,150 378,475 650,000
205.28 m2 89.03 m2 38.21 m2 93.01 m2 9.55 m2 10.08 m2
46,321 46,321 46,321 46,321 46,321 53,263
10.80 m2 3.60 m2 3.60 m2 3.20 m2
53,263 53,263 53,263 53,263
VIII PEKERJAAN SANITASI 1 Pekerjaan Septictank 2 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 0 - Pek. Pembesian 0 - Pek. bekisting 0 - Pek cor beton K.175 i Pek. Plat penutup septictank tebal 10 cm 0 - Pek. Pembesian 0 - Pek. bekisting 0 - Pek cor beton K.175 j Pek. Tutup mainhole 0 - Pek. Pembesian 0 - Pek. bekisting 0 - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank 2 Pekerjaan Pipa 4" 3 Pekerjaan Pipa 2" 4 Pekerjaan Pipa 3/4" (Air Bersih) 5 Pek. Sumur Bor+pompa 6 Pekerjaan kran air 7 Pekerjaan stop kran 8 Profil tank 1200 L 9 Pek. Closed Duduk 10 Pek. Wastafel+cermin 11 Pek. Grill besi penutup saluran
IX PEKERJAAN JEMBATAN 1 Pekerjaan Pondasi Batu Belah 2 Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof
13.88 m3 0.38 m2 0.53 m3
105,000 222,000 1,048,999
56.55 Kg 4.80 m2 0.36 m3
15,124 223,020 1,048,999
48.46 Kg 8.16 m2 0.31 m3 23.12 m2 23.12 m2
15,124 374,310 1,048,999 167,866 79,356
56.55 Kg 4.80 m2 0.36 m3
15,124 223,020 1,048,999
9.32 Kg 2.40 m2 0.17 m3
15,124 539,810 1,048,999
6.00 Kg 0.84 m2 0.10 m3 2.00 Bh 0.34 m3 3.50 m 1.93 m 36.66 m 1.00 Bh 2.00 Bh 1.00 Bh 1.00 Bh 1.00 Bh 1.00 Unit 3.75 m2
15,124 539,810 1,048,999 10,643,500 222,000 148,873 72,446 31,635 2,500,000 135,500 135,500 1,600,000 2,542,200 1,668,200 340,000
14.67 m3
1,104,825
102.56 kg 12.44 m2
15,124 223,020
3
4
5
c Cor Beton k.200 Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton k.200 Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton k.200 d Pek. Pas Batako e Pek. Plesteran f Pek Besi Galvanis 2"
X 1 2 3 4 5 6 7 8
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
XI 1 2 3
4 5 6 7
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Pintu Pagar Besi Pekerjaan Handrail difabel stainless a Hanggar TPS3R panjang 2 m b Kantor panjang 0,95 m c WC Panjang 0,75 d Biaya pengelasan (100% fisik) Pekerjaan Rolling door Pek. Handrail WC Pekerjaan ukiran kayu Pek. Plesteran letter timbul
XII 1 2 3
PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel Mesin Pengayak Kapasitas 500 Kg/Jam
XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
1.09 m3
1,078,921
51.28 kg 7.28 m2 0.55 m3
15,124 386,310 1,078,921
250.87 kg 11.89 m2 4.03 m3
15,124 539,810 1,078,921
22.59 Kg 2.40 m2 0.18 m3 3.10 m2 6.60 m2 7.40 m
15,124 374,310 1,078,921 167,866 79,356 29,917
1.00 Unit 13.00 Titik 13.00 Bh 4.00 Bh 4.00 Bh 1.00 Bh 6.00 Titik 6.00 Bh
4,500,000 325,000 35,000 20,000 20,000 760,000 325,000 20,000
16.30 m2 9.45 m2
320,000 600,000
13.54 m 4.75 m 4.29 m 22.58 m 7.27 m2 1.20 m 19.20 m2 1.00 Paket
52,000 52,000 52,000 52,000 810,400 52,000 625,000 800,000
1.00 Unit 1.00 Unit 1.00 Unit
36,130,000 22,650,000 18,150,000
1 2 3 4 5 6 7 8 B 1 2 3 4 5 6 7 XIV 1 2 3 4 5 6
Sosialisasi K3 dan Prokes (Spanduk) 4.00 Bh Helm Keselamatan 21.00 Bh Rompi Kerja 21.00 Bh Sarung Tangan (Safety Glove) 21.00 Bh Sepatu Keselamatan (Rubber Shoes) 21.00 Bh Tali Pengaman 3.00 Bh Kotak P3K 2.00 Bh Asuransi Tenaga Kerja 1.00 Paket KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 Alat ukur suhu badan nir-sentuh (Thermoscan) 2.00 Bh Vitamin C (1 Box isi 100 tablet) 20.00 Bh Tempat Cuci Tangan 2.00 Bh Sabun Cuci Tangan (Cair) 200ml/btl 4.00 Bh Masker kain 20.00 Bh Alat penyemprot desinfektan 2.00 Bh Cairan Desinfektan 5L 3.00 Bh ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
TOTAL DIBULATKAN
1.00 Ls 1.00 Ls 1.00 Ls 8.00 Ls 1.00 Bh 1.00 Paket
75,000 100,000 60,000 5,000 100,000 231,500 40,000 912,000 350,000 25,000 250,000 25,000 5,000 65,000 75,000
270,000 250,000 150,000 10,000 500,000 250,000
Pekerjaan Tambah Kurang Jumlah Harga
No.
Uraian Pekerjaan
Volume
Harga Satuan
2,800,000 4,929,540
I 1 2
PEKERJAAN PERSIAPAN Pembersihan Awal Pengukuran dan Pemasangan Bowplank
200.00 m2 66.00 m
14,000 74,690
35,405,100 1,226,610 204,435 9,953,480 18,637,200
II 1 2 3 4 5
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam (p. 2m)
218.55 m3 11.68 m3 2.92 m3 45.49 m3 372.00 Btg
162,000 105,000 70,000 222,000 50,100
318.33 Kg 0.67 m3 2.24 m2 2.69 m3
15,124 954,789 220,820 1,078,921
218.55 Kg 0.34 m3 1.52 m2 1.37 m3
15,124 954,789 220,820 1,078,921
39.95 Kg 0.05 m3 1.92 m2 0.19 m3
15,124 954,789 220,820 1,078,921
485.65 Kg 40.40 m2 4.23 m3
15,124 374,310 1,078,921
148.41 Kg 15.43 m2 1.76 m3
15,124 374,310 1,078,921
4,793,254 641,618 494,637 2,900,139 3,290,831 326,538 335,646 1,475,964 601,506 45,830 423,974 207,153 7,320,039 15,122,124 4,561,677 2,237,998 5,775,603 1,895,933
III PEKERJAAN BETON BERTULANG 1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 4 Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 5 Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 6 Pek Kolom K3
1,008,025 2,605,198 281,598 7 5,937,107 2,587,032 3,754,644 8 4,576,862 5,290,034 2,186,433 9 4,165,566 4,481,196 2,503,096 10 675,542 1,298,002 271,888 11 4,264,274 6,872,455 665,155 12 16,660,433 44,636,362 13 551,959 2,314,435 693,881
23,998,020 10,173,168 3,945,349 12,356,346 16,290,136 7,065,382 3,031,875 7,380,822 5,439,098 12,101,355 916,173 2,649,368 9,624,933
a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu K.175 Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu K.200
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK 1 Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 2 Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 3 Cor Beton Lantai Beton Mutu K.200 4 Pek Keramik lantai Uk.40x40 5 Pek Keramik lantai WC Uk.20x20 6 Pek Keramik dinding WC Uk.10x20 7 Pek. Dinding Tawing layar
66.62 Kg 6.96 m2 0.26 m3
15,124 374,310 1,078,921
393.92 Kg 11.60 m2 3.48 m3
15,124 223,020 1,078,921
303.68 Kg 23.72 m2 2.03 m3
15,124 223,020 1,078,921
275.43 Kg 11.60 m2 2.32 m3
15,124 386,310 1,078,921
44.67 Kg 3.36 m2 0.25 m3
15,124 386,310 1,078,921
282.53 Kg 17.79 m2 0.62 m3
15,124 386,310 1,078,921
1053.65 Kg 48.72 m3
15,124 1,048,999
36.50 Kg 4.29 m2 0.64 m3
15,124 539,810 1,078,921
142.96 m2 60.60 m2 23.50 m2 73.61 m2
167,866 167,866 167,866 167,866
205.28 m2 89.03 m2 38.21 m2 93.01 m2 5.04 m3 46.21 m2 3.68 m2 8.16 m2 64.20 m2
79,356 79,356 79,356 79,356 1,078,921 258,950 248,960 324,678 213,650
33,691,801 2,591,677 1,385,827 22,235,896 1,710,454 914,618 6,918,163 1,216,829 694,103
1,007,342 504,977 182,837 3,027,600 1,513,800 1,513,800 1,427,597 1,314,213 745,800 709,200 719,600 287,700 372,900 210,900 6,131,295 5,798,000
9,508,738 4,124,144 1,769,740 4,308,270 442,250 536,891 575,240 191,747 191,747 170,442
V PEKERJAAN ATAP, PLAFOND, LISPLANK 1 Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC 2 Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC 3 Pek. Lisplank Superplank Eksterior 4 Rangka Hollow Plafond Kantor 5 Pek. Pas. Plafond Kalsiboard
242.24 m2 18.63 m2 9.96 m2
139,087 139,087 139,087
242.24 m2 18.63 m2 9.96 m2 57.34 m 9.55 m2 9.55 m2
91,794 91,794 91,794 120,642 127,450 72,700
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG 1 Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R 0.12 m3 b Kantor 0.06 m3 c WC 0.02 m3 2 Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R 3.60 m2 b Kantor 1.80 m2 c WC 1.80 m2 3 Pek. Rangka Jendela Kaca Kayu Klas II 2.26 m2 4 Pek.Pemasangan Kaca Tebal 5 mm 7.48 m2 5 Pek. Engsel Pintu 12.00 bh 6 Pek. Engsel Jendela 12.00 bh 7 Kunci Tanam 4.00 bh 8 Hak angin Jendela 6.00 bh 9 Gerendel Jendela 6.00 bh 10 Handel Jendela 6.00 bh 11 Pekerjaan Ventilasi Kerawang 16.20 m2 12 Pekerjaan glasblock 8.92 m2 VII PEKERJAAN PENGECATAN 1 Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar 2 Pengecatan Plafond Kantor 3 Pengecatan Kusen Pintu dan Jendela 4 Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC 5 Pengecatan Rangka Jendela Kaca
8,706,500 8,706,500 8,706,500 841,000 841,000 841,000 632,800 175,650 62,150 59,100 179,900 47,950 62,150 35,150 378,475 650,000
205.28 m2 89.03 m2 38.21 m2 93.01 m2 9.55 m2 10.08 m2
46,321 46,321 46,321 46,321 46,321 53,263
10.80 m2 3.60 m2 3.60 m2 3.20 m2
53,263 53,263 53,263 53,263
1,456,875 83,250 553,872 855,292 1,070,496 377,640 732,973 3,054,370 320,994 3,881,056 1,834,711 855,292 1,070,496 377,640 140,986 1,295,544 176,232 90,804 453,440 102,802 21,287,000 74,592 521,054 139,821 1,159,739 2,500,000 271,000 135,500 1,600,000 2,542,200 1,668,200 1,275,000
16,207,783 1,551,043 2,774,369
VIII PEKERJAAN SANITASI 1 Pekerjaan Septictank 1 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank 2 Pekerjaan Pipa 4" 3 Pekerjaan Pipa 2" 4 Pekerjaan Pipa 3/4" (Air Bersih) 5 Pek. Sumur Bor+pompa 6 Pekerjaan kran air 7 Pekerjaan stop kran 8 Profil tank 1200 L 9 Pek. Closed Duduk 10 Pek. Wastafel+cermin 11 Pek. Grill besi penutup saluran 12 Pek. Bak air lindi & resapan IX PEKERJAAN JEMBATAN 1 Pekerjaan Pondasi Batu Belah 2 Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof
6.94 m3 0.19 m2 0.26 m3
105,000 222,000 1,048,999
26.06 Kg 2.40 m2 0.18 m3
15,124 223,020 1,048,999
24.23 Kg 4.08 m2 0.15 m3 11.56 m2 11.56 m2
15,124 374,310 1,048,999 167,866 79,356
28.28 Kg 2.40 m2 0.18 m3
15,124 223,020 1,048,999
4.66 Kg 1.20 m2 0.17 m3
15,124 539,810 1,048,999
3.00 Kg 0.42 m2 0.05 m3 1.00 Bh 0.34 m3 3.50 m 1.93 m 36.66 m 1.00 Bh 2.00 Bh 1.00 Bh 1.00 Bh 1.00 Bh 1.00 Unit 37.50 m 1.00 unit
15,124 539,810 1,048,999 12,287,000 222,000 148,873 72,446 31,635 2,500,000 135,500 135,500 1,600,000 2,542,200 1,668,200 89,400 1,360,000
19.18 m3
1,104,825
102.56 kg 12.44 m2
15,124 223,020
1,178,181 3 775,522 2,812,337 589,091 4 3,794,191 6,418,341 4,345,893 5 341,621 898,344 194,206 520,384 523,750 221,383
4,500,000 4,225,000 455,000 80,000 80,000 760,000 1,950,000 120,000
c Cor Beton K.200 Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton K.200 Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton K.200 d Pek. Pas Batako e Pek. Plesteran f Pek Besi Galvanis 2"
X 1 2 3 4 5 6 7 8
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
XI 1 2 3
704,080 247,000 223,080 1,174,160 5,889,582 62,400 12,000,000 800,000
4 5 6 7
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Pintu Pagar Besi Pekerjaan Handrail difabel stainless a Hanggar TPS3R panjang 2 m b Kantor panjang 0,95 m c WC Panjang 0,75 d Biaya pengelasan & pemasangan (100% fisik) Pekerjaan Rolling door Pek. Handrail closet Pekerjaan ukiran kayu Pek. Plesteran letter timbul
36,130,000 22,650,000 18,150,000
XII 1 2 3
PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Mesin Pencacah Kompos kapasitas 500 kg/jam Diese Mesin Pengayak Kapasitas 500 Kg/Jam
5,216,000 5,670,000
1.09 m3
1,078,921
51.28 kg 7.28 m2 0.55 m3
15,124 386,310 1,078,921
250.87 kg 11.89 m2 4.03 m3
15,124 539,810 1,078,921
22.59 Kg 2.40 m2 0.18 m3 3.10 m2 6.60 m2 0.00 m
15,124 374,310 1,078,921 167,866 79,356 29,917
1.00 Unit 13.00 Titik 13.00 Bh 4.00 Bh 4.00 Bh 1.00 Bh 6.00 Titik 6.00 Bh
4,500,000 325,000 35,000 20,000 20,000 760,000 325,000 20,000
XIII KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 A KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA
16.30 m2 9.45 m2
320,000 600,000
13.54 m 4.75 m 4.29 m 22.58 m 7.27 m2 1.20 m 19.20 m2 1.00 Paket
52,000 52,000 52,000 52,000 810,400 52,000 625,000 830,000
1.00 Unit 1.00 Unit 1.00 Unit
36,130,000 22,650,000 18,150,000
300,000 2,100,000 1,260,000 105,000 2,100,000 694,500 80,000 912,000 700,000 500,000 500,000 100,000 100,000 130,000 225,000
1 2 3 4 5 6 7 8 B 1 2 3 4 5 6 7
270,000 250,000 150,000 80,000 500,000 250,000
XIV 1 2 3 4 5 6
Sosialisasi K3 dan Prokes (Spanduk) 4.00 Bh Helm Keselamatan 21.00 Bh Rompi Kerja 21.00 Bh Sarung Tangan (Safety Glove) 21.00 Bh Sepatu Keselamatan (Rubber Shoes) 21.00 Bh Tali Pengaman 3.00 Bh Kotak P3K 2.00 Bh Asuransi Tenaga Kerja 1.00 Paket KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 Alat ukur suhu badan nir-sentuh (Thermoscan) 2.00 Bh Vitamin C (1 Box isi 100 tablet) 25.00 Bh Tempat Cuci Tangan 2.00 Bh Sabun Cuci Tangan (Cair) 200ml/btl 4.00 Bh Masker kain 25.00 Bh Alat penyemprot desinfektan 2.00 Bh Cairan Desinfektan 5L 3.00 Bh ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
705,004,278
TOTAL
705,000,000
DIBULATKAN
1.00 Ls 1.00 Ls 1.00 Ls 8.00 Ls 1.00 Bh 1.00 Paket
75,000 100,000 60,000 5,000 100,000 231,500 40,000 912,000 350,000 25,000 250,000 25,000 5,000 65,000 75,000
270,000 250,000 150,000 10,000 500,000 250,000
Jumlah Harga
Pekerjaan tambah kurang
2,800,000 4,929,540
-
1 1
35,405,100 1,226,610 204,435 10,099,672 18,637,200
146,193 -
1 1 1 1 1
4,814,347 641,618 494,637 2,900,139
21,093 -
1 1 1 1
3,305,312 326,538 335,646 1,475,964
14,482 -
1 1 1 1
604,153 45,830 423,974 207,153
2,647 -
1 1 1 1
7,345,020 15,122,124 4,561,677
24,981 -
1 1 1
2,244,497 5,775,603 1,895,933
6,499 -
1 1 1
1,007,557 2,605,198 281,598
(468) -
1 1 1
5,957,669 2,587,032 3,754,644
20,561 -
1 1 1
4,592,827 5,290,034 2,186,433
15,965 -
1 1 1
4,165,566 4,481,196 2,503,096
-
1 1 1
675,542 1,298,002 271,888
-
1 1 1
4,272,924 6,872,455 665,155
8,650 -
1 1 1
15,935,374 51,102,918
(725,058) 6,466,556
551,959 2,314,435 693,881
-
1 1 1 1 1 1
23,998,020 10,173,168 3,945,349 12,356,346
-
1 1 1 1
16,290,136 7,065,382 3,031,875 7,380,822 5,439,098 11,964,785 916,173 2,649,368 13,716,330
(136,570) 4,091,398
1 1 1 1 1 1 1 1 1
33,691,801 2,591,677 1,385,827
-
1 1 1
22,235,896 1,710,454 914,618 6,918,163 1,216,829 694,103
-
1 1 1 1 1 1
1,007,342 504,977 182,837
-
1 1 1
3,027,600 1,513,800 1,513,800 1,427,597 1,314,213 745,800 709,200 719,600 287,700 372,900 210,900 6,131,295 5,798,000
-
1 1 1 1 1 1 1 1 1 1 1 1 1
9,508,738 4,124,144 1,769,740 4,308,270 442,250 536,891
-
1 1 1 1 1 1
575,240 191,747 191,747 170,442
-
1 1 1 1
728,438 41,625 276,936
(728,438) (41,625) (276,936)
1 1 1
394,192 535,248 188,820
(461,101) (535,248) (188,820)
1 1 1
366,486 1,527,185 160,497 1,940,528 917,355
(366,486) (1,527,185) (160,497) (1,940,528) (917,355)
1 1 1 1 1
427,646 535,248 188,820
(427,646) (535,248) (188,820)
1 1 1
70,493 647,772 176,232
(70,493) (647,772) -
1 1 1
45,402 226,720 51,401 12,287,000 74,592 521,054 139,821 1,159,739 2,500,000 271,000 135,500 1,600,000 2,542,200 1,668,200 3,352,500 1,360,000
(45,402) (226,720) (51,401) (9,000,000) 2,077,500 1,360,000
1 1 1 0 1 1 1 1 1 1 1 1 1 1 0 0
21,190,544
4,982,761
1
1,551,043 2,774,369
-
1 1
1,178,181
-
1
775,522 2,812,337 589,091
-
1 1 1
3,794,191 6,418,341 4,345,893
-
1 1 1
341,621 898,344 194,206 520,384 523,750 -
(221,383)
1 1 1 1 1 1
4,500,000 4,225,000 455,000 80,000 80,000 760,000 1,950,000 120,000
-
1 1 1 1 1 1 1 1
5,216,000 5,670,000
-
1 1
704,080 247,000 223,080 1,174,160 5,889,582 62,400 12,000,000 830,000
36,130,000 22,650,000 18,150,000
30,000
-
1 1 1 1 1 1 1 0
1 1 1
300,000 2,100,000 1,260,000 105,000 2,100,000 694,500 80,000 912,000 700,000 625,000 500,000 100,000 125,000 130,000 225,000
270,000 250,000 150,000 80,000 500,000 250,000
705,002,362 705,000,000
125,000 25,000 -
-
(1,915) -
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1
PERHITUNGAN VOLUME PEKERJAAN PROGRAM KEGIATAN LOKASI KEGIATAN TAHUN ANGGARAN
: KOTA TANPA KUMUH (KOTAKU) : BPM-DFAT : KERENG BANGKIRAI : TPS3R : 2021
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
I 1
PEKERJAAN PERSIAPAN Pembersihan Awal
2
Pengukuran dan Pemasangan Bowplank
II 1
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan
2
Pek. Galian Tanah Pondasi Pondasi P1 Pondasi P2 Pondasi P3
3
Pek. Urugan Bekas Galian
4
Pek. Urugan Pasir bawah lantai
5
Pek. Pemancangan Cerucuk Kayu Galam (p. 2m) Pondasi P1 Pondasi P2 Pondasi P3
III 1
b
Pek. Lantai Kerja Beton K.100 t=5 cm
c
Pek. Bekisting Pondasi
d
Cor Beton Mutu K.200
SATUAN
4
5
=
Panjang 20
m
x
Lebar 10.00
m
= = = =
Panjang 12.00 12.00 17.00 17.00
m m m m m
+ + + + +
1 m kiri 1 1 1 1
m m m m
+ + + + +
1 m kanan 1 1 1 1
m m m m
= = = =
66.00 14.00 14.00 19.00 19.00
m m m m m
= Depan jembatan = Jalan masuk =
Panjang 20.00 5.50 4.00
m m m
x x x
Lebar 20.00 6.00 5.00
m m m
x x x
Tebal 0.50 0.35 0.35
m m m
= = =
218.55 200.00 11.55 7.00
m3 m3 m3 m3
= = =
Panjang 0.8 0.60 1.20
m m m
x x x
Lebar 0.80 0.60 0.80
m m m
x x x
Tebal 0.55 0.55 0.55
m m m
= = =
11.68 7.39 3.76 0.53
m3 m3 m3 m3
x /
1/4 4.00
m m m m m
x x x x x
Lebar 11.80 2.83 3.23 2.85 1.60
m m m m m
x x x x x
Jumlah cerucuk Bh 9 Bh 9 Bh 12
x x x
Panjang 2 2 2
m m m
x x x
= =
Lantai Hanggar TPS3R = = = Lantai Kantor = Lantai WC =
PEKERJAAN BETON BERTULANG Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian
JUMLAH
= = =
ø 12
Volume galian 11.68 Panjang 13.42 3.23 5.83 3.33 2.30
200.00 m2 200.00 m2
x x x
Jumlah
21 19 1
= Tebal 0.20 0.20 0.20 0.20 0.20
m m m m m
x x x x x
Jumlah Pondasi 21 Bh 19 Bh 1 Bh
/ / /
Berat jenis Jumlah Besi 10.00 bh 0.892 kg/m x
x
Jumlah
2.92 m3 2.92 m3
1 2 2 1 1
= = = = =
45.49 31.67 3.66 7.53 1.90 0.74
m3 m3 m3 m3 m3 m3
2 2 2
= = =
372.00 189.00 171.00 12.00
Btg Btg Btg Btg
Jumlah Pondasi 21
=
318.33 Kg 318.33 Kg
=
0.67 m3 0.67 m3
1/3 =
2.24 m2 2.24 m2
=
2.69 m3 2.69 m3
=
Panjang 1.70
m
x
=
Panjang 0.80
m
x
Lebar 0.80
m
x
Tebal 0.05
m
x
Jumlah Pondasi 21
=
Panjang 0.8
m
x
Lebar 0.20
m
x
Jumlah 2.00
Bh
x
Jumlah Pondasi 21
=
Panjang 0.80
m
x
Lebar 0.80
m
x
Tebal 0.20
m
x
Jumlah Pondasi 21
x
NO 1 2
3
2
URAIAN PEKERJAAN 2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian
b
Pek. Lantai Kerja Beton K.100 t=5 cm
c
Pek. Bekisting Pondasi
d
Cor Beton Mutu K.200
x
Lebar 0.60
=
Panjang 2.80
m
x
=
Panjang 1.20
m
x
Lebar 0.80
m
x
Tebal 0.05
=
Panjang 1.2
m
x
Lebar 0.80
m
x
=
Panjang 1.20
m
x
Lebar 0.80
m
= = = = =
Panjang 4.60 3.85 3.40 4.10 0.52
m m m m m
x x x x x
Berat jenis 0.892 0.892 0.892 0.892 0.395
Hanggar TPS3R WC Pagar
= = = =
Panjang 4.60 3.85 3.40 4.10
m m m m
x x x x
Hanggar TPS3R bawah sloof Atas sloof WC bawah sloof Atas sloof Pagar bawah sloof Atas sloof bawah sloof Atas sloof
= = = = = = = =
Panjang 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m
= = = = =
Panjang 3.85 2.50 3.40 4.10 0.65
= = = = bawah sloof Atas sloof bawah sloof Atas sloof bawah sloof Atas sloof bawah sloof Atas sloof
ø 10 ø 10 ø8
Pek Kolom K1 a Pek. Pembesian
Pek Kolom K2 a Pek. Pembesian Kantor Pagar
Kantor Pagar
4
ø 12
ø 12 ø 12 ø 12 ø 12 ø8
ø 12 ø 12 ø 12 ø 12 ø8
Pek. Bekisting Kolom
Cor Beton Mutu K.200
Pek Kolom K3 a Pek. Pembesian Pagar
b
Pek. Bekisting Kolom
c
Cor Beton Mutu K.200
=
m
Cor Beton Mutu K.200
c
Panjang 0.6 Panjang 0.60
d
b
=
x
Lebar 0.20
Hanggar TPS3R WC Pagar
3
m
m
x
Pek. Bekisting Pondasi
Cor Beton Mutu K.200
=
Panjang 0.60
m
c
c
=
Berat jenis Jumlah Besi 0.892 kg/m x 10.00 bh
m
Pek. Lantai Kerja Beton K.100 t=5 cm
Pek. Bekisting Kolom
ø 12
Panjang 1.29
Pagar
bawah sloof Atas sloof bawah sloof Atas sloof
SATUAN
4
x
b
b
3
Lebar 0.60
Pondasi Footplat P3 (120 cm x 80 cm x 20 cm) a Pek. Pembesian
JUMLAH
PERHITUNGAN VOLUME
5
Jumlah Pondasi x 19
=
218.55 Kg 218.55 Kg
=
0.34 m3 0.34 m3
=
1.52 m2 1.52 m2
x
Tebal 0.05
m
Jumlah Pondasi x 19
m
x
Jumlah 2.00
Bh
x
Jumlah Pondasi 19 x
m
x
Tebal 0.20
m
x
Jumlah Pondasi 19
=
1.37 m3 1.37 m3
Berat jenis Jumlah Besi 16.00 bh 0.892 kg/m x
x
Jumlah Pondasi 1
=
39.95 Kg 39.95 Kg
m
x
Jumlah Pondasi 1
=
0.05 m3 0.05 m3
Jumlah 2.00
Bh
x
Jumlah Pondasi 1
=
1.92 m2 1.92 m2
x
Tebal 0.20
m
x
Jumlah Pondasi 1
=
0.19 m3 0.19 m3
kg/m kg/m kg/m kg/m kg/m
x x x x x
Jumlah Besi 4.00 4.00 4.00 4.00 529.00
bh bh bh bh bh
x x x x
Jumlah Kolom 18 4 1 1
Lebar 0.20 0.20 0.20 0.20
m m m m
x x x x
Jumlah 4.00 4.00 4.00 4.00
Bh Bh Bh Bh
x x x x
Jumlah Kolom 18 x 4 1 1
x x x x x x x x
Lebar 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m
x x x x x x x x
Tinggi 0.80 3.80 0.80 3.05 0.80 2.60 0.80 3.30
m m m m m m m m
x x x x x x x x
Jumlah Kolom 18 18 4 4 1 1 1 1
m m m m m
x x x x x
Berat jenis 0.892 0.892 0.892 0.892 0.395
kg/m kg/m kg/m kg/m kg/m
x x x x x
Jumlah Besi 4.00 4.00 4.00 4.00 196.00
bh bh bh bh bh
x x x x
Jumlah Kolom 3 8 1 1
Panjang 3.85 2.50 3.40 4.10
m m m m
x x x x
Lebar 0.15 0.15 0.15 0.15
m m m m
x x x x
Jumlah 4.00 4.00 4.00 4.00
Bh Bh Bh Bh
x x x x
Jumlah Kolom 3 8 x 1 1
= = = = = = = =
Panjang 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
m m m m m m m m
x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m
x x x x x x x x
Tinggi 0.80 3.05 0.80 1.70 0.80 2.60 0.80 3.30
m m m m m m m m
x x x x x x x x
Jumlah Kolom 3 3 8 8 1 1 1 1
= = =
Panjang 3.40 4.10 0.41
m m m
x x x
Berat jenis Jumlah Besi 0.617 kg/m x 8.00 bh kg/m x 8.00 bh 0.617 0.395 kg/m x 58.00 bh
x x
Jumlah Kolom 1 2
= =
Panjang 3.40 4.10
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 4.00 4.00
Bh Bh
x x
Jumlah Kolom 1 2
= =
6.96 m2 2.04 m2 4.92 m2
= = = =
Panjang 0.15 0.15 0.15 0.15
m m m m
x x x x
Lebar 0.15 0.15 0.15 0.15
m m m m
x x x x
Tinggi 0.80 2.60 0.80 3.30
m m m m
x x x x
Jumlah Kolom 1 1 2 2
= = = =
0.26 0.02 0.06 0.04 0.15
1/3
1/3
1/3
= = = = =
485.65 295.32 54.93 12.13 14.62 108.66
Kg Kg Kg Kg Kg Kg
= = = =
40.40 22.08 12.32 2.72 3.28
m2 m2 m2 m2 m2
= = = = = = = =
4.23 0.58 2.74 0.13 0.49 0.03 0.10 0.03 0.13
m3 m3 m3 m3 m3 m3 m3 m3 m3
= = = = =
148.41 41.20 71.33 12.13 14.62 50.32
Kg Kg Kg Kg Kg Kg
= = = =
15.43 6.93 4.00 2.04 2.46
m2 m2 m2 m2 m2
= = = = = = = =
1.76 0.11 0.41 0.29 0.61 0.04 0.12 0.04 0.15
m3 m3 m3 m3 m3 m3 m3 m3 m3
= = =
66.62 16.77 40.45 9.39
Kg Kg Kg Kg
m3 m3 m3 m3 m3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1 3
2
3
Pekerjaan Sloof 20x30 a Pek. Pembesian Hanggar TPS3R
7
b
Pek. Bekisting Sloof
c
Cor Beton Mutu K.200
Pekerjaan Sloof 15x20 a Pek. Pembesian Hanggar TPS3R Kantor WC Pagar
b
c
Kiri Kanan Belakang Depan
Pek. Bekisting Sloof
Cor Beton Mutu K.200
Hanggar TPS3R Kantor WC Pagar
JUMLAH
= = =
Panjang 17.00 12.00 0.73
m m m
x x x
= =
Panjang 17 12
m m
x x
Lebar 0.20 0.20
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi 2 x 2 x
= =
Panjang 17.00 12.00
m m
x x
Lebar 0.20 0.20
m m
x x
Tinggi 0.30 0.30
m m
x x
Jumlah sisi 2 2
= = = = = = = = = =
Panjang 12.00 3.50 3.00 2.45 1.75 2.57 20.00 2.83 11.20 0.47
m m m m m m m m m m
x x x x x x x x x x
Berat jenis 0.892 0.892 0.892 0.892 0.892 0.892 0.892 0.892 0.892 0.395
kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m
x x x x x x x x x x
Jumlah Besi 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 338
bh bh bh bh bh bh bh bh bh bh
x x x x x x x x x
Jumlah sisi 1 2 2 1 2 1 1 1 1
= = = = = = = = =
Panjang 12.00 3.50 3.00 2.45 1.75 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m m
x x x x x x x x x
Jumlah 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh
x x x x x x x x x
Jumlah sisi 1 2 x 2 x 1 2 x 1 1 1 1
= = = = = Kiri = Kanan = Belakang = Depan =
Panjang 12.00 3.50 3.00 2.45 1.75 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
Tinggi 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
m m m m m m m m m
x x x x x x x x x
Jumlah sisi 1 2 2 1 2 1 1 1 1
ø 12 ø 12 ø8
ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø 12 ø8
SATUAN
4
Berat jenis Jumlah Besi 0.892 kg/m x 6.00 bh 6.00 bh 0.892 kg/m x bh 0.395 kg/m x 290.00
Jumlah sisi x 2 x 2
= = =
1/2 1/2
1/2 1/2 1/2
5
393.92 181.90 128.40 83.62
Kg Kg Kg Kg
= =
11.60 m2 6.80 m2 4.80 m2
= =
3.48 m3 2.04 m3 1.44 m3
= = = = = = = = = =
303.68 42.80 24.97 21.40 8.74 12.48 9.17 71.33 10.09 39.95 62.75
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
= = = = = = = = =
23.72 4.80 1.40 1.20 0.98 0.70 1.03 8.00 1.13 4.48
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = = = = = = =
2.03 0.36 0.21 0.18 0.07 0.11 0.08 0.60 0.08 0.34
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
NO 1 10
URAIAN PEKERJAAN 2 Pekerjaan Ring Balok 20x20 a Pek. Pembesian
3
Hanggar TPS3R TPS
11
b
Pek. Bekisting Ring Balok
c
Cor Beton Mutu K.200
Pekerjaan Balok 15x20 a Pek. Pembesian
b
Pek. Bekisting Ring Balok
c
Cor Beton Mutu K.200
Pekerjaan Ring Balok 15/15 a Pek. Pembesian Hanggar TPS3R WC Kantor Pagar
b
c
Kiri Kanan Belakang Depan
Hanggar TPS3R WC Kantor Pagar
13
Pekerjaan lantai beton bertulang a Pek. Pembesian Hanggar TPS3R Halaman
b
14
m m m
x x x
= =
Panjang 17 12
m m
x x
Lebar 0.20 0.20
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi 2 x 2 x
= =
Panjang 17.00 12.00
m m
x x
Lebar 0.20 0.20
m m
x x
Tinggi 0.20 0.20
m m
x x
Jumlah sisi 2 2
= = = =
Panjang 2.45 3.00 1.75 0.73
m m m m
x x x x
Berat jenis 0.617 0.617 0.617 0.395
kg/m kg/m kg/m kg/m
x x x x
Jumlah Besi 6.00 6.00 6.00 40.00
bh bh bh bh
x x x
Jumlah sisi 1 1 2
= =
Panjang 2.45 1.75
m m
x x
Lebar 0.20 0.20
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi 2 2
= =
3.36 m2 1.96 m2 1.40 m2
= =
Panjang 2.45 1.75
m m
x x
Lebar 0.15 0.15
m m
x x
Tinggi 0.20 0.20
m m
x x
Jumlah sisi 2 2
= =
0.25 m3 0.15 m3 0.11 m3
= = = = = = = = = =
Panjang 12.00 2.45 1.75 3.50 3.00 2.57 20.00 2.83 11.20 0.41
m m m m m m m m m m
x x x x x x x x x x
Berat jenis 0.617 0.617 0.617 0.617 0.617 0.892 0.892 0.892 0.892 0.395
kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m
x x x x x x x x x x
Jumlah Besi 4.00 6.00 6.00 6.00 6.00 4.00 4.00 4.00 4.00 335.00
bh bh bh bh bh bh bh bh bh bh
x x x x x x x x x
Jumlah sisi 1 2 2 2 1 1 1 1 1
= = = = = = = = =
Panjang 12.00 2.45 1.75 3.50 3.00 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
Jumlah 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Bh Bh Bh Bh Bh Bh Bh Bh Bh
x x x x x x x x x
Jumlah sisi 1 2 x 2 x 2 x 1 1 1 1 1
= = = = = Kiri = Kanan = Belakang = Depan =
Panjang 12.00 2.45 1.75 3.50 3.00 2.57 20.00 2.83 11.20
m m m m m m m m m
x x x x x x x x x
Lebar 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
Tinggi 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
m m m m m m m m m
x x x x x x x x x
= = = = = = = = = =
Panjang 13.4 11.8 13.8 7.3 1.5 0.35 1.75 0.77 19.35 0.6
m m m m m m m m m m
x x x x x x x x x x
Berat jenis 0.395 0.395 0.617 0.617 0.617 0.617 0.617 0.617 0.617 0.617
kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m kg/m
x x x x x x x x x x
Jumlah Besi 59.00 67.00 25.00 46.00 2.00 5.00 3.00 6.00 2.00 65.00
bh bh bh bh bh bh bh bh bh bh
= = = = = Area Ram =
Panjang 13.4 13.8 1.5 1.75 19.35 8.5
m m m m m m
x x x x x x
Lebar 11.8 7.3 0.35 0.77 0.6 2
m m m m m m
x x x x x x
Tebal 0.20 0.15 0.15 0.15 0.15 0.20
m m m m m m
= =
Panjang 2.45 1.75
m m
x x
=
Panjang 2.45
m
x
Lebar 1.75
m
=
Panjang 2.45
m
x
Lebar 1.75
m
ø 10 ø 10 ø 10 ø 10 ø 10 ø 12 ø 12 ø 12 ø 12 ø8
Cor Beton Mutu K.175
Hanggar TPS3R Halaman
Pek. Plat /Dak Beton a Pembesian WC
b
Pek. Bekisting
c
Cor Beton Mutu K.200
ø 8-20 ø 8-20 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30 ø 10-30
ø 10-15 ø 10-15
Berat jenis Jumlah Besi 0.617 kg/m x 6.00 bh 6.00 bh 0.617 kg/m x bh 0.395 kg/m x 290.00
Berat jenis Jumlah Besi bh 0.617 kg/m x 12.00 0.617 kg/m x 17.00 bh
Jumlah sisi x 2 x 2
5
= = =
ø 10 ø 10 ø8
Pek. Bekisting Ring Balok
Cor Beton Mutu K.200
SATUAN
4
Panjang 17.00 12.00 0.53
ø 10 ø 10 ø 10 ø8
WC
12
JUMLAH
PERHITUNGAN VOLUME
x
= = =
1/2 1/2
275.43 125.87 88.85 60.71
Kg Kg Kg Kg
= =
11.60 m2 6.80 m2 4.80 m2
= =
2.32 m3 1.36 m3 0.96 m3
= = = =
44.67 9.07 11.11 12.96 11.53
Kg Kg Kg Kg Kg
= = = = = = = = = =
282.53 29.62 18.14 12.96 25.91 11.11 9.17 71.33 10.09 39.95 54.25
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
= = = = = = = = =
17.79 3.60 0.74 0.53 1.05 0.90 0.77 6.00 0.85 3.36
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
Jumlah sisi 1 2 2 2 1 1 1 1 1
= = = = = = = = =
0.62 0.27 0.11 0.08 0.16 0.07 0.06 0.45 0.06 0.25
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
(halaman samping) (halaman samping)
= = = = = = = = = =
1,053.65 312.29 312.29 212.87 207.19 1.85 1.08 3.24 2.85
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
(halaman samping) 1/2
= = = = = =
1/2 1/2 1/2
= =
48.72 31.62 15.11 0.08 0.20
m3 m3 m3 m3 m3 m3 1.70 m3
36.50 m3 18.14 m3 18.36 m3 4.29 m2 4.29 m2
x
Tebal 0.15
m
=
0.64 m3 0.64 m3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
IV 1
PEKERJAAN DINDING, LANTAI DAN PLESTERAN Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R Samping Kanan = Depan = Area Dalam = Samping Kiri = Bawah Sloof Kiri = Kanan = Belakang = Depan =
b
Kantor
Depan Samping Kiri Samping Kanan Belakang Bawah Sloof
2
c
WC
d
Pagar
Pek. Plesteran Dinding a Bangunan Hanggar TPS3R
b
3
Kantor
Depan Samping Kanan Belakang Bawah Sloof
= = = = = = Kiri = = Kanan = = Belakang = Depan =
= = = Kanan = Belakang = Depan =
Depan
= Box tanaman = = = Samping Kiri = = Samping Kanan = Belakang = Bawah Sloof Kiri = = Kanan = Belakang = Depan = = = Samping Kanan Samping Kiri Depan Area Dalam
= = = =
Depan Samping Kiri Samping Kanan Belakang
= = = =
c
WC
Depan Samping Kanan Belakang
= = =
d
Pagar
Depan Samping Kiri Samping Kanan Belakang
= = = =
Cor Beton Lantai Beton Mutu K.200 Hanggar TPS3R Gudang = Area Penyimpanan = Tempat Barang Lapak = KM/WC = Kantor =
Panjang 3.8 3.8 3.8 2.8 2.8 2.8 2.8 2.8
Lebar 3.35 2.28 0.37 2.85 1.35 3.35 2.28 0.37 2.85 1.35 3.35 3.35
m m m m m m m m
m m m m m m m m m m m m
x x x x x x x x
x x x x x x x x x x x x
Lebar 2.8 3.2 2.8 2.0 0.8 0.8 0.8 0.8
Tinggi 3.05 3.05 3.05 3.05 3.05 4.2 0.8 0.8 0.8 0.8 0.8 0.8
m m m m m m m m
x x x x x x x x
JUMLAH
Jumlah sisi 4 1 4 4 4 4 5 5
-
-
3.47
-
1.11
Luas pintu/ Jendela/ kerawang/ Glasblok
1.87 1.69 13.48
40.32
Luas pintu/ Jendela/ kerawang/G lasblok m m m m m m m m m m m m
SATUAN
4
sisi
5
= = = = = = = =
142.96 40.69 10.48 29.08 22.40 8.96 8.96 11.20 11.20
m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = = = = = = = = = =
60.60 13.69 6.95 1.13 8.69 4.12 15.18 1.82 0.30 2.28 1.08 2.68 2.68
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = = = =
23.50 7.21 7.02 4.88 1.84 1.28 1.28
m2 m2 m2 m2 m2 m2 m2
= = = = = = = = = = = = = = =
73.61 4.05 2.85 1.23 0.88 27.14 3.05 3.93 3.38 13.16 1.48 1.90 1.64 2.40 4.56 1.96
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
= = = =
205.28 81.37 44.80 20.95 58.16
m2 m2 m2 m2 m2
= = = =
89.03 27.38 13.91 17.39 30.36
m2 m2 m2 m2 m2
Luas pintu/ Jendela/ kerawang/G lasblok
Lebar 1.60 2.30 1.60 2.30 1.60 1.60
m m m m m m
x x x x x x
Tinggi 3.05 3.05 3.05 0.8 0.8 0.8
m m m m m m
-
2.33
Panjang 3 2.85 2.45 0.5 2.35 1.85 2.38 2.05 2.35 1.85 2.38 2.05 3 2.85 2.45
m m m m m m m m m m m m m m m
x x x x x x x x x x x x x x x
Lebar 1.35 0.5 0.5 0.35 1.65 1.65 1.65 1.65 0.8 0.8 0.8 0.8 0.8 0.8 0.8
m m m m m m m m m m m m m m m
x x x x x x x x x x x x x x x
Jumlah sisi 1 2 1 5 7 1 1 1 7 1 1 1 1 2 1
Luas bidang 40.69 22.40 10.48 29.08
m2 m2 m2 m2
x x x x
Sisi 2 2 2 2
Bh Bh Bh Bh
luar-dalam
m2 m2 m2 m2
x x x x
2 2 2 2
Bh Bh Bh Bh
luar-dalam
7.21 m2 7.02 m2 4.88 m2
x x x
2 2 2
Bh Bh Bh
= = =
38.21 14.42 14.03 9.76
m2 m2 m2 m2
m2 m2 m2 m2
x x x x
2 2 2 2
Bh Bh Bh Bh
= = = =
93.01 18.00 60.39 7.85 6.77
m2 m2 m2 m2 m2
m m m m m
x x x x x
Lebar 3.23 3.23 3.23 1.60 2.85
m m m m m
= = = = =
5.04 1.88 0.92 0.92 0.37 0.95
m3 m3 m3 m3 m3 m3
13.69 6.95 8.69 15.18
9.00 30.20 3.93 3.38
Panjang 5.83 2.85 2.85 2.30 3.33
luar-dalam luar-dalam luar-dalam
luar-dalam luar-dalam luar-dalam
x x x x x
Tebal 0.10 0.10 0.10 0.10 0.10
m m m m m
NO
URAIAN PEKERJAAN
1 4
2 Pek Keramik lantai Uk.40x40
5
Pek Keramik lantai WC Uk.20x20
6
Pek Keramik dinding WC Uk.10x20
7
Pek. Dinding Tawing layar
V 1
c 2
3
3
4 46.21 9.41 18.56 9.12 9.12
SATUAN 5
Kantor = Gudang = Area Penyimpanan = Tempat Barang Lapak =
Panjang 3.3 5.8 2.85 2.85
m m m m
x x x x
Lebar 2.85 3.2 3.2 3.2
m m m m
= = = =
=
Panjang 2.30
m
x
Lebar 1.60
m
=
3.68 m2 3.68 m2
= = =
Panjang 2.3 1.6 0.6
m m m
x x x
Lebar 1.2 1.2 1.2
m m m
x x x
sisi 2 1 1
= = =
8.16 5.52 1.92 0.72
m2 m2 m2 m2
Hanggar TPS3R T.Layar kanan = T. Layar kiri = T. Layar Blkg = Kantor T. Layar kiri = T. Layar kanan = WC T. Layar kiri = T. Layar kanan =
Panjang 12.2 12.2 17.2 2.7 2.7 2.7 2.7
m m m m m m m
x x x x x x x
Lebar 2 2 2 1 1 1 1
m m m m m m m
x x
1/2 1/2
x x x x
1/2 1/2 1/2 1/2
= = = = = = =
64.20 12.20 12.20 34.40 1.35 1.35 1.35 1.35
m2 m2 m2 m2 m2 m2 m2 m2
x
Lebar + overstek 13
/
Derajat Kemiringan (Cos15) 0.966
=
242.24 m2 242.24 m2
x
Lebar + overstek 4
/
Derajat Kemiringan (Cos15) 0.966
=
18.63 m2 18.63 m2
x
Lebar + overstek 3.5
/
Derajat Kemiringan (Cos15) 0.966
=
9.96 m2 9.96 m2
= Volume Rangka Atap = 242.24
= =
242.24 m2 242.24 m2
PEKERJAAN ATAP, PLAFOND, LISPLANK Rangka Atap Baja Ringan a Hanggar TPS3R
b
JUMLAH
PERHITUNGAN VOLUME
Kantor
WC
Pek Atap Genteng Metal Zincalume a Hanggar TPS3R
=
Panjang+ overstek 18
=
Panjang+ overstek 4.5
=
Panjang+ overstek 2.75
m
m
m
m
m
m
m2 m2 m2 m2 m2
b
Kantor
= Volume Rangka Atap = 18.63
= =
18.63 m2 18.63 m2
d
WC
= Volume Rangka Atap = 9.96
= =
9.96 m2 9.96 m2
Pek. Lisplank Superplank Eksterior Hanggar TPS3R Kantor WC
= = =
Panjang/ cos15 13.46 4.14 3.62
m m m
+ + +
Panjang 18 4.5 2.75
m m
=
Panjang 3.35
m
x
Lebar 2.85
m
=
9.55 m2 9.55 m2
=
9.55 m2 9.55 m2
sisi x x
= = = =
2 2
57.34 31.46 13.14 12.75
m m m m
4
Rangka Hollow Plafond Kantor
5
Pek. Pas. Plafond Kalsiboard
=
Panjang 3.35
m
x
Lebar 2.85
m
V 1
PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R P1 = = J1 = =
Panjang 0.1 0.1 0.1 0.1
m m m m
x x x x
Lebar 0.05 0.05 0.05 0.05
m m m m
x x x x
Panjang Kusen 2.1 1.02 1.45 1
m m m m
x x x x
Jumlah Kusen 2 1 3 2
x x x x
Jumlah P/J 2 2 2 2
= = = =
0.12 0.04 0.01 0.04 0.02
m3 m3 m3 m3 m3
= = = =
Panjang 0.1 0.1 0.1 0.1
m m m m
x x x x
Lebar 0.05 0.05 0.05 0.05
m m m m
x x x x
Panjang Kusen 2.1 1.05 1.45 1
m m m m
x x x x
Jumlah Kusen 2 1 3 2
x x x x
Jumlah P/J 1 1 1 1
= = = =
0.06 0.02 0.01 0.02 0.01
m3 m3 m3 m3 m3
P1
=
Panjang 0.1
m
x
Lebar 0.05
m
x
Panjang Kusen 2.1 m
x
Jumlah Kusen Jumlah P/J 2 x 1
=
0.02 m3 0.02 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 2
=
3.60 m3 3.60 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 1
=
1.80 m3 1.80 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 1
=
1.80 m3 1.80 m3
J1
= =
Lebar 0.1 0.1
m m
x x
Panjang 1.45 0.43
m m
x x
= =
2.26 m2 1.74 m2 0.52 m2
b
Kantor
P1 J1
c 2
3
WC
Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R
b
Kantor
c
WC
Pek. Rangka Jendela Kaca Kayu Klas II
Jumlah Rangka 4 Bh 4 Bh
x x
Jumlah Jendela 3 3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
4
Pek.Pemasangan Kaca Tebal 5 mm
5
Pek. Engsel Pintu
6
Pek. Engsel Jendela
7
Kunci Tanam
=
8
Hak angin Jendela
=
J1
=
Panjang 1.45
=
SATUAN
4
=
=
12.00 Bh 12.00
=
12.00 Bh 12.00
4.00
=
4.00 Bh
6.00
=
6.00 Bh
m
Jumlah engsel 4 bh
x
m
Jumlah Kaca x 4 Bh
Jumlah Jendela x 3
5 7.48 m3 7.48 m3
Jumlah engsel = 3 bh
Lebar 0.43
JUMLAH
banyak pintu 4 x
x
banyak jendela 3
9
Gerendel Jendela
=
6.00
=
6.00 Bh
10
Handel Jendela
=
6.00
=
6.00 Bh
11
Pekerjaan Ventilasi Kerawang
V3
=
Panjang 2.7
m
x
Lebar 1.5
m
x
Jumlah 4
=
16.20 m2 16.20 m2
12
Pekerjaan Pas. Glasblock
Hanggar 1 Hanggar 2 Kantor
= = =
Panjang 2.8 3.2 1.4
m m m
x x x
Lebar 0.6 0.6 0.2
m m m
x x x
Jumlah 4 1 1
= = =
8.92 6.72 1.92 0.28
VI 1
PEKERJAAN PENGECATAN Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar
= = = = =
= = = =
205.28 89.03 38.21 93.01
m2 m2 m2 m2
2
Pengecatan Plafond Kantor
=
=
9.55
m2
3
Pengecatan Kusen Pintu dan Jendela
m2 m2 m2 m2 m2
P1 J1
4
5
Pengecatan Pintu Panel a Hanggar TPS3R
b
Kantor
c
WC
Pengecatan Rangka Jendela Kaca
Pek. Urugan Pasir t=5 cm
c
Pek Cor Beton K.175 tebal 10 cm
d
Pek. Sloof 15/15 - Pek. Pembesian
- Pek. bekisting
- Pek cor beton K.175
x x x x
Lebar 0.2 0.2 0.2 0.2
m m m m
x x x x
Jumlah Kusen Bh 2 Bh 1 Bh 3 Bh 2
x x x x
Jumlah P/J 5 5 4 4
= = = =
10.08 4.10 0.90 3.48 1.60
Jumlah sisi 2 Bh
x
Jumlah Pintu 3
=
10.80 m3 10.80 m3
Panjang 2
m
x
Lebar 0.9
m
x
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 2
Bh
x
Jumlah Pintu 1
=
3.60 m3 3.60 m3
P1
=
Panjang 2
m
x
Lebar 0.9
m
x
Jumlah 2
Bh
x
Jumlah Pintu 1
=
3.60 m3 3.60 m3
J1
= =
Panjang 0.1 0.1
m m
x x
Lebar 1.55 0.45
m m
x x
Jumlah Rangka 4 Bh 4 Bh
x x
= =
3.20 m2 2.48 m2 0.72 m2
=
Panjang 2.50
m
x
Lebar 1.5
m
x
Tinggi 1.85
x
=
Panjang 2.50
m
x
Lebar 1.5
m
x
Tinggi 0.05
Panjang 2.20
m
x
Lebar 1.2
m
x
Tinggi 0.1
= = =
Panjang 2.5 1.5 0.40
m m m
x x x
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 2.00 2.00
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Tinggi 0.15 0.15
= =
Panjang 1.70 0.41
m m
x x
=
Panjang 1.70
m
x
Lebar 0.15
m
x
Jumlah 4.00
Bh
=
Panjang 1.70
m
x
Lebar 0.15
m
x
Tinggi 0.15
m
ø 10 ø 10 ø8
- Pek cor beton K.175
Pek. Kolom 15/15 - Pek. Pembesian
Panjang Kusen 2.05 m 0.9 m 1.45 m 1 m
=
- Pek. bekisting
e
9.55
P1
VII PEKERJAAN SANITASI 1 Pekerjaan Septictank 1 unit a. Galian Septictank b
= = = =
volume pekerjaan plesteran 205.28 89.03 38.21 93.01
m2 m2 m2 m2
ø 10 ø8
Jumlah Jendela 4 4
Jumlah 1
unit
=
6.94 m3 6.94 m3
x
Jumlah 1
unit
=
0.19 m3 0.19 m3
x
Jumlah 1
unit
=
0.26 m3 0.26 m3
Berat jenis Jumlah Besi bh 0.617 kg/m x 4.00 0.617 kg/m x 4.00 bh bh 0.395 kg/m x 40.00
m
x x
Sisi 2 2
x x x
Jumlah unit 1 1 1
= = =
Bh Bh
x x
Jumlah sisi 2 2
m m
x x
Berat jenis Jumlah Besi 4.00 bh 0.617 kg/m x 0.395 kg/m x 46.00 bh
x
26.06 12.34 7.40 6.32
Kg Kg Kg Kg
x x
Jumlah unit 1 1
= =
2.40 m2 1.50 m2 0.90 m2
Jumlah sisi Jumlah unit 2 x 1 2 x 1
= =
0.18 m3 0.11 m3 0.07 m3
Jumlah Kolom Jumlah unit 4 x 1 x 1
= =
24.23 Kg 16.78 Kg 7.45 Kg
x
Jumlah sisi Jumlah unit 4 x 1
=
4.08 m2 4.08 m2
x
Jumlah sisi Jumlah unit 4 x 1
=
0.15 m3 0.15 m3
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
f
Pek. Pas. Batako
9
Pek. Plesteran
h
Pek. Ring Balk 15/15 - Pek. Pembesian
ø 10 ø 10 ø8
- Pek. bekisting
- Pek cor beton K.175
i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian
ø 8-15 ø 8-15 ø 8-15
- Pek. bekisting
- Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian
ø 8-15 ø 8-15 ø 8-15
- Pek. bekisting
- Pek cor beton K.175 k. Bioseptictank BF-08
l
Urugan Pasir dalam septictank
JUMLAH
SATUAN
4 5 11.56 m2 7.48 m2 4.08 m2
= =
Panjang 2.2 1.2
m m
x x
Lebar 1.7 1.7
m m
x x
Jumlah sisi 2 2
x x
Jumlah unit 1 1
= =
= =
Panjang 2.2 1.2
m m
x x
Lebar 1.7 1.7
m m
x x
Jumlah sisi 2 2
x x
Jumlah unit 1 1
= =
11.56 m2 7.48 m2 4.08 m2
= = =
Panjang 2.5 1.5 0.40
m m m
x x x
Jumlah unit 1 1 1
= = =
28.28 12.34 7.40 8.53
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah sisi Jumlah unit 2 x 1 2 x 1
= =
2.40 m2 1.50 m2 0.90 m2
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
m m
x x
Tinggi 0.15 0.15
m m
x x
Jumlah sisi Jumlah unit 2 x 1 2 x 1
= =
0.18 m3 0.11 m3 0.07 m3
= = =
Panjang 2.2 0.3 0.15
m m m
x x x
Berat jenis Jumlah Besi 0.395 kg/m x 4.00 bh bh 0.395 kg/m x 8.00 0.395 kg/m x 4.00 bh
x x x
Jumlah unit 1 1 1
= = =
4.66 3.48 0.95 0.24
= =
Panjang 2.5 1.5
m m
x x
Lebar 0.15 0.15
x x
Jumlah unit 1 1
= =
1.20 m2 0.75 m2 0.45 m2
=
Panjang 2.5
m
x
Lebar 1.50
m
-
Volume tutup mainhole 0.098
=
0.17 m3 0.28 m3
= = =
Panjang 0.7 0.7 0.15
m m m
x x x
Berat jenis Jumlah Besi 0.395 kg/m x 5.00 bh kg/m x bh 0.395 5.00 bh 0.395 kg/m x 4.00
x x x
Jumlah unit 1 1 1
= = =
3.00 1.38 1.38 0.24
= =
Panjang 0.7 0.7
m m
x x
Lebar 0.15 0.15
m m
x x
Jumlah 2.00 2.00
Bh Bh
x x
Jumlah unit 1 1
= =
0.42 m2 0.21 m2 0.21 m2
=
Panjang 0.7
m
x
Lebar 0.70
m
x
Tinggi 0.10
m
x
Jumlah unit 1
=
0.05 m3 0.05 m3
=
1
=
1.00 Bh
=
Panjang 2.2
m
x
Lebar 1.2
= =
0.34 Bh 0.34 m3
=
Panjang 1.7
m
+
Pipa Air Lindi 1.8
=
3.50 m
=
Panjang 0.5
m
+
0.78
m
+
0.65
=
1.93 m
m
+
13.42
m
+
4.84
=
36.66 m
Berat jenis Jumlah Besi 0.617 kg/m x 4.00 bh bh 0.617 kg/m x 4.00 0.395 kg/m x 54.00 bh
m m
m
m
x x
Jumlah 2.00 2.00
x
Tinggi 0.10
x
Tinggi 1.2
Bh Bh
m
Sisi x x
-
2 2
x x x
Volume Biofil 3
x
x
Jumlah unit 1
Jumlah unit 2
Kg Kg Kg Kg
m3 Kg Kg Kg
m3 Kg Kg Kg
2
Pekerjaan Pipa 4"
3
Pekerjaan Pipa 2"
4
Pekerjaan Pipa 3/4" (Air Bersih)
=
Panjang 4.1
5
Pek. Sumur Bor+pompa
=
1.00
=
1.00 Bh
6
Pekerjaan kran air
=
2.00
=
2.00 Bh
7
Pekerjaan stop kran
=
1.00
=
1.00 Bh
8
Profil tank 1200 L
=
1.00
=
1.00 Bh
9
Pek. Closed Duduk
=
1.00
=
1.00 Bh
10
Pek. Wastafel+cermin
=
1.00
11
Pek. Grill besi penutup saluran
= (
12.00
m
+
6.6
+
7.7
= +
13.5
+
12
x x x
Tinggi 2.3 2.3 0.7
=
37.50
1.00 Bh 37.50 M
VIII PEKERJAAN JEMBATAN
1
Pekerjaan Pondasi Batu Belah
2
Pekerjaan Sloof 20/30 a Pek. Pembesian
b
Pekerjaan Bekisting Sloof
c
Cor Beton K.200
m m m
x x x
(Lebar atas+lebar bawah)/2 0.7 0.7 0.75
x
m
2
Berat jenis Jumlah Besi 6.00 bh 0.617 kg/m x 6.00 bh 0.617 kg/m x bh 0.395 kg/m x 122.00
x x
Jumlah sisi 2 2
A B
= = =
Panjang 5.70 5.30 1.40
ø 10 ø 10 ø8
= = =
Panjang 5.30 3.80 0.73
m m m
x x x
= = =
Panjang 5.30 3.80 3.80
m m m
x x x
Lebar 0.3 0.3 0.2
m m m
x x x
Jumlah 4 4 2
Bh Bh Bh
= =
Panjang 5.30 3.80
m m
x x
Lebar 0.3 0.3
m m
x x
Tebal 0.2 0.2
m m
m m m
x x
Jumlah sisi 2 2
= = =
19.18 9.18 8.53 1.47
m3 m3 m3 m3
= = =
102.56 39.24 28.14 35.18
Kg Kg Kg Kg
= = =
12.44 6.36 4.56 1.52
m2 m2 m2 m2
= =
1.09 m2 0.64 m2 0.46 m2
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1
2
3
3
4
5
Pekerjaan Balok 20/30 a Pek. Pembesian
b
Pekerjaan Bekisting Balok
c
Cor Beton K.200
Pekerjaan Plat beton a Pek. Pembersian
b
Pekerjaan Bekisting Plat
c
Cor Beton K200 tebal 20 cm
Pekerjaan Reling jembatan a Pembesian Kolom 15/15
b
Pek. Bekisting Kolom
c
Cor Beton K.200
d
Pek. Pas Batako
e
Pek. Plesteran
X 1 2 3 4 5 6 7 8
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
XI 1
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC
2
Pekerjaan Pintu Pagar Besi
3
Pekerjaan Handrailing Pintu Masuk
4
Pekerjaan Rolling door
5
Pek. Handrail WC
6
Pekerjaan ukiran kayu
7
Pek. Plesteran letter timbul
X 1 2
PERALATAN TPS3R Mesin Pencacah Plastik Mesin Pencacah Kompos
ø 10 ø 10 ø8
ø 10 ø 10
ø 12 ø8
JUMLAH
= = =
Panjang 5.30 3.80 0.73
m m m
x x x
= = = =
Panjang 5.30 5.30 3.80 3.80
m m m m
x x x x
Lebar 0.3 0.2 0.3 0.2
m m m m
x x x x
Jumlah 2 1 2 1
Bh Bh Bh Bh
= =
Panjang 5.30 3.80
m m
x x
Lebar 0.3 0.3
m m
x x
Tebal 0.2 0.2
m m
x x
= =
Panjang 5.3 3.8
m m
x x
Berat jenis Jumlah Besi bh 0.617 kg/m x 2.00 bh 0.617 kg/m x 2.00
x x
= = =
Panjang 5.30 5.30 3.80
m m m
x x x
Lebar 3.8 0.2 0.2
m m m
x x x
Jumlah 1 2 2
m m m
=
Panjang 5.30
m
x
Lebar 3.8
m
x
Tebal 0.2
m
= =
Panjang 1.00 0.36
m m
x x
=
Panjang 1.00
m
x
Lebar 0.15
m
x
=
Panjang 1.00
m
x
Lebar 0.15
m
x
Tebal 0.15
m
=
Panjang 3.10
m
x
Lebar 0.5
m
x
Jumlah 2
Bh
= =
Panjang 3.10 0.20
m m
x x
Lebar 0.5 0.5
m m
x x
= = = = = = = =
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
= =
Tinggi 2.00 2.00
m m
x x
Panjang 2.85 2.45
=
Panjang 5.00
m
x
Lebar 1.89
m
x x x x
2 3 2 1
x x x x
Jumlah 2 2 2 2
= = = =
Hanggar TPS3R =
Panjang 1.96 0.72 0.25 0.19
Berat jenis Jumlah Besi 6.00 bh 0.617 kg/m x 6.00 bh 0.617 kg/m x bh 0.395 kg/m x 61.00
Berat jenis Jumlah Besi 0.617 kg/m x 4.00 bh bh 0.395 kg/m x 20.00 Jumlah Papan 4 m
Jumlah Sisi 2 Bh 2 Bh
Jumlah x x
x x x
1 1
Jumlah
1 1
Banyak Besi bh 19.00 bh 27.00
50% 50% 50%
x
Jumlah Kolom 8
x
Jumlah Kolom 8x
x
Jumlah Kolom 8
x x
Jumlah 2 2
= = =
51.28 19.62 14.07 17.59
Kg Kg Kg Kg
= = = =
7.28 3.18 1.06 2.28 0.76
m2 m2 m2 m2 m2
= =
0.55 m2 0.32 m2 0.23 m2
= =
250.87 Kg 124.26 Kg 126.61 Kg
= = =
50%
5
11.89 10.07 1.06 0.76
x x
Jumlah 2 1
m2 m2 m2 m2
=
4.03 m2 4.03 m2
= =
22.59 Kg 19.74 Kg 2.84 Kg
=
2.40 m2 2.40 m2
=
0.18 m2 0.18 m2
=
3.10 m2 3.10 m2
= =
6.60 m2 6.20 m2 0.40 m2
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
m m
SATUAN
4
Unit Titik Bh Bh Bh Bh Titik Bh
.= .=
16.30 m2 11.40 m2 4.90 m2
.=
9.45 m2 9.45 m2
7.84 4.32 1.00 0.38
Jumlah .=
13.54 M'
Kantor =
0.95 0.72 0.25 0.19
m m m m
x x x x
2 3 2 1
x x x x
1 1 1 1
= = = =
1.90 2.16 0.50 0.19
.=
4.75 M
WC =
0.72 0.25 0.19
m m m
x x x
5 2 1
x x x
1 1 1
= = =
3.60 0.50 0.19
.=
4.29 M
pengelasan (100% fisik) =
13.54
=
Panjang 2.85
=
1.20
Depan = Samping Kiri =
+
m
Luas ukiran m2 2.64 m2 2.16
=
1.00
= =
1.00 1.00
x
x x
4.75
Lebar 2.55
+
4.29
22.58 M
.=
7.27 m2 7.27 m2
=
1.20 M
jumlah 4 4
19.20 m2 10.56 m2 8.64 m2 =
1.00 Paket
1.00 1.00
Unit Unit
NO
URAIAN PEKERJAAN
PERHITUNGAN VOLUME
1 3
2
3
Mesin Pengayak
=
1.00
XI A 1 2 3 4 5 6 7 8 B 1 2 3 4 5 6 7
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA 4.00 = Sosialisasi K3 dan Prokes (Spanduk) 21.00 = Helm Keselamatan 21.00 = Rompi Kerja 21.00 = Sarung Tangan (Safety Glove) 21.00 = Sepatu Keselamatan (Rubber Shoes) 3.00 Tali Pengaman = 2.00 Kotak P3K = 1.00 Asuransi Tenaga Kerja = KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 2.00 Alat ukur suhu badan nir-sentuh (Thermoscan) = 25.00 Vitamin C (1 Box isi 100 tablet) = 2.00 Tempat Cuci Tangan = 4.00 Sabun Cuci Tangan (Cair) 200ml/btl = 25.00 Masker kain = 2.00 Alat penyemprot desinfektan = 3.00 Cairan Desinfektan 5L =
XII 1 2 3 4 5
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Papan Nama Kegiatan
= = = = =
1.00 1.00 1.00 9.00 1.00
JUMLAH 4
SATUAN 5
1.00
Unit
4.00 21.00 21.00 21.00 21.00 3.00 2.00 1.00
Bh Bh Bh Bh Bh Bh Bh Paket
2.00 25.00 2.00 4.00 25.00 2.00 3.00
Bh Bh Bh Bh Bh Bh Bh
1.00 1.00 1.00 9.00 1.00
Ls Ls Ls Bh Paket
Form - RAB1
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
HASIL KESEPAKATAN HARGA SATUAN UPAH/BAHAN/ALAT
Provinsi Kota
No.
I.
Uraian Tenaga Kerja
TENAGA KERJA 1 Mandor 2 Kepala Tukang 3 Tukang Batu 4 Tukang Kayu 5 Tukang Besi 6 Tukang Cat 7 Pekerja
No.
II.
BULAN :
: Kalimantan Tengah : Palangka Raya
Uraian Tenaga Kerja
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 25 26 27
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62
BAHAN/MATERIAL : Cat Menie Kayu Platone Cat dasar kayu platone Cat penutup kayu platone Cat tembok Kwas 4" Paku 5 - 12 cm Pasir beton Pasir Pasang Semen Portland Semen Portland Gresik Minyak Cat/Thinner Cemerlang Ampelas Kayu Flexigo Kran air stainless Duffi Seal Tape Onda Papan Informasi Kegiatan Kunci Tanam Engsel Pintu Lem Kayu Bata Merah Pipa PVC 4" AW Pipa PVC 3/4" AW Pipa PVC 2" AW Elboh/Knee Stop Kran 3/4 TanahUrug Besi Beton Polos Besi beton polos dia. 8 Besi beton polos dia. 10 Besi beton polos dia. 12 Kawat Beton/Bendrat Plywood 9 mm Batako Keramik lantai uk.40x40 Semen Warna Keramik lantai uk.20x20 Keramik dinding uk.10x20 Baja ringan 75x35x0,75 MM Hollow 30x30x0,3 MM Paku Skrup Atap Metal Zincalume Spandek (106x600) Paku Anti Karat Papan Plank Kalsiboard tbl.8 mm (30x240mm) Besi Hollow Plafond 1,3x 3,3 mm Kalsiboard tebal 6 mm Paku Kalsiboard Kaca Bening 5 mm Sealant Kaca Engsel Pintu 4" Engsel Jendela Kunci pintu tanam lengkap Hak/Kait Angin Gerendel/Kunci slot Handel Jendela Bioseptictank BF-08 Profil tank 1200 L Closed duduk Batu Belah (Tangkiling-Dalam Kota) Roster/Kerawang uk. 30cmx30cm Glasblock uk. 20x20 KalsiBoard tebal 8 mm (120x240) Wastafel lengkap+cermin putih Box panel 20x80x60 Penyambungan Daya Baru PLN Instalasi Titik Lampu
Satuan
HOK HOK HOK HOK HOK HOK HOK
Satuan
Kg Kg Kg Kg Bh Kg m3 m3 Kg 40 Kg/zak Kg Lbr Bh Kg Lbr Bh Bh Kg Bh Btg Btg Btg Bh Bh m3 Kg Batang Batang Batang Kg Lbr Bh Doz Kg Doz Doz Batang Batang Bh Lbr Kg Lbr Batang Lbr Kg m2 Kg Bh Bh Bh Bh Bh Bh Bh Bh Unit m3 Bh Bh Bh Unit Bh Unit Titik
Kecamatan Kelurahan
: Sebangau : Kereng Bangkirai
HARGA SATUAN SESUAI STANDAR KOTA/KABUPAT EN 225,000 170,000 155,000 150,000 150,000 150,000 140,000
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN SESUAI Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3 STANDAR Nama: Nama: KABUPATEN/KO Nama: TA Almt : Almt : Almt : Telp : Telp : Telp :
62,400 62,400 62,400 120,000 45,000 22,000 200,000 190,000 1,325 53,000 28,100 10,000 65,000 12,000 200,000 195,000 26,000 33,000 800 295,000 42,000 127,500 25,000 65,000 100,000 12,000 47,000 70,500 101,500 25,000 130,000 3,000 75,000 5,000 65,000 65,400 82,000 50,000 3,500 255,000 35,000 155,000 15,000 110,000 25,000 135,000 47,500 35,000 41,000 95,000 20,800 35,000 8,000 10,643,500 1,600,000 1,828,300 400,000 25,000 27,000 190,000 940,000 760,000 4,500,000 325,000
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
60,000 60,000 60,000 110,000 45,000 22,000 180,000 150,000 1,275 51,000 28,100 10,000 65,000 12,000 200,000 195,000 26,000 33,000 800 295,000 42,000 127,500 25,000 65,000 100,000 12,000 45,000 70,000 101,000 25,000 130,000 2,800 75,000 5,000 65,000 65,400 125,000 50,000 3,500 250,000 35,000 155,000 15,000 110,000 25,000 135,000 47,500 35,000 41,000 95,000 20,800 35,000 8,000 10,643,500 1,600,000 1,800,000 400,000 25,000 26,000 190,000 940,000 760,000 4,500,000 325,000
Nama Toko/Pemasok
No.
Uraian Tenaga Kerja
63 64 65 66 67 68 69 70 71
Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak Pipa Besi Galvanis tbl 1,2 mm P=6 m Rolling door manual Pagar BRC Hot Deep Galvanized T.90-P.240 Pagar BRC Hot Deep Galvanized 73 Pipa Stainless Steel 2" Pipa Stainless Steel 2" 74 Glassblock 75 Sumur Bor+Pompa
No.
Uraian Tenaga Kerja
1 2 3 4 5 6 7 8
No.
III.
Uraian Tenaga Kerja
Bh Bh Bh Bh Titik Bh Batang m2 Lembar M2 btg/6m m Bh Unit
Satuan
m3 m3 m3 m3 m3 m3 Batang Batang
Satuan
206,000
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN Toko/Pemasok -1 Toko/Pemasok - 2 Toko/Pemasok - 3 SESUAI STANDAR Nama: Nama: KABUPATEN/KO Nama: TA Almt : Almt : Almt : Telp : Telp : Telp : 4,000,000.00 4,000,000.00 5,000,000.00 5,000,000.00 6,500,000.00 6,000,000.00 2,250,000.00 2,200,000.00 2,500,000.00 2,450,000.00 475,000.00 450,000.00 35,000.00 35,000.00 30,000.00 30,000.00
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 SESUAI STANDAR Nama: Nama: Nama: KABUPATEN/KO Almt : Almt : Almt : TA Telp : Telp : Telp :
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 1 Sosialisasi K3 dan Prokes (Spanduk) 2 Helm Keselamatan 3 Rompi Kerja 4 Sarung Tangan (Safety Glove) 5 Sepatu Keselamatan (Rubber Shoes) 6 Tali Pengaman 7 Kotak P3K 8 Asuransi Tenaga Kerja 9 Alat ukur suhu badan nir-sentuh (Thermoscan) 10 Vitamin C (1 Box isi 100 tablet) 11 Tempat Cuci Tangan 12 Sabun Cuci Tangan (Cair) 200ml/btl 13 Masker kain 14 Alat penyemprot desinfektan 15 Cairan Desinfektan 5L
No.
XIX
Balok Kayu Klas II (Lanan) Papan Kayu Klas II (Lanan) Papan Kayu Klas II (Benuas) Balok Kayu Klas III Papan Kayu Klas III Kerikil (Maks 30mm) Kayu Galam diameter 10-12 cm P=4 m Kayu Galam diameter 6-10 cm P=4 m
Satuan
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN SESUAI Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 STANDAR Nama: Nama: KABUPATEN/KO Nama: TA Almt : Almt : Almt : Telp : Telp : Telp : 35,000 20,000 20,000 760,000 325,000 20,000 179,500 500,000 577,500
Uraian Tenaga Kerja
1 2 3 4 5 6
Satuan
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
35,000 20,000 20,000 760,000 325,000 20,000 179,500 500,000 577,500 320,000 308,700 52,000 26,000 2,500,000 REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
4,000,000.00 5,000,000.00 6,000,000.00 2,200,000.00 2,450,000.00 450,000.00 35,000.00 30,000.00 REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
75,000 100,000 60,000 5,000 100,000 231,500 40,000 912,000 350,000 25,000 250,000 25,000 5,000 65,000 75,000
HARGA SATUAN HASIL SURVEY*) HARGA SATUAN Toko/Pemasok - 1 Toko/Pemasok - 2 Toko/Pemasok - 3 SESUAI STANDAR Nama: Nama: Nama: KABUPATEN/KO Almt : Almt : Almt : TA Telp : Telp : Telp :
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
REKOMENDASI HARGA TERENDAH YANG DIPILIH UNTUK BULAN INI HARGA SATUAN*)
Nama Toko/Pemasok
270,000.00 250,000.00 150,000.00 10,000.00 500,000.00 250,000.00
*) Harga Satuan sampai dilokasi Kegiatan (sudah termasuk biaya Transport)
…………., Tgl. …………….20…..
Diverifikasi Oleh : Askot Infrastruktur,
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
Dibuat Oleh :
UPL
RAB-2
BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU)
DAFTAR KUANTITAS PEKERJAAN PAKET : PEMBANGUNAN TPS3R
Kab./Kota Kecamatan NO.
: Palangka Raya : Sebangau
Kelurahan BKM URAIAN PEKERJAAN
: Kereng Bangkirai : Kereng Membangun SATUAN
VOLUME
I 1 2
PEKERJAAN PERSIAPAN Pembersihan Awal Pengukuran dan Pemasangan Bowplank
m2 m
200.00 66.00
II 1 2 3 4 5
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam (p. 2m)
m3 m3 m3 m3 Btg
218.55 11.68 2.92 45.49 372.00
III 1
PEKERJAAN BETON BERTULANG Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pek Kolom K3 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200
Kg m3 m2 m3
318.33 0.67 2.24 2.69
Kg m3 m2 m3
218.55 0.34 1.52 1.37
Kg m3 m2 m3
39.95 0.05 1.92 0.19
Kg m2 m3
485.65 40.40 4.23
Kg m2 m3
148.41 15.43 1.76
Kg m2 m3
66.62 6.96 0.26
Kg m2 m3
393.92 11.60 3.48
2
3
4
5
6
7
NO. 8
9
10
11
12
13
IV 1
2
3 4 5 6 7 V 1
2
3 4 5
URAIAN PEKERJAAN
SATUAN
VOLUME
Kg m2 m3
303.68 23.72 2.03
Kg m2 m3
275.43 11.60 2.32
Kg m2 m3
44.67 3.36 0.25
Kg m2 m3 0.00 Kg m3
282.53 17.79 0.62 0.00 1053.65 48.72
Kg m2 m3
36.50 4.29 0.64
PEKERJAAN DINDING, PLESTERAN DAN KERAMIK Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R b Kantor c WC d Pagar Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar Cor Beton Lantai Beton Mutu K.200 Pek Keramik lantai Uk.40x40 Pek Keramik lantai WC Uk.20x20 Pek Keramik dinding WC Uk.10x20 Pek. Dinding Tawing layar
m2 m2 m2 m2 0.00 m2 m2 m2 m2 m3 m2 m2 m2 m2
142.96 60.60 23.50 73.61 0.00 205.28 89.03 38.21 93.01 5.04 46.21 3.68 8.16 64.20
PEKERJAAN ATAP, PLAFOND, LISPLANK Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC Pek. Lisplank Superplank Eksterior Rangka Hollow Plafond Kantor Pek. Pas. Plafond Kalsiboard
m2 m2 m2 0.00 m2 m2 m2 m m2 m2
242.24 18.63 9.96 0.00 242.24 18.63 9.96 57.34 9.55 9.55
Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu K.175 Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu K.200
NO. VI 1
2
3 4 5 6 7 8 9 10 11 12 VII 1
2 3 4
5
URAIAN PEKERJAAN PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R b Kantor c WC Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R b Kantor c WC Pek. Rangka Jendela Kaca Kayu Klas II Pek.Pemasangan Kaca Tebal 5 mm Pek. Engsel Pintu Pek. Engsel Jendela Kunci Tanam Hak angin Jendela Gerendel Jendela Handel Jendela Pekerjaan Ventilasi Kerawang Pekerjaan glasblock PEKERJAAN PENGECATAN Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar Pengecatan Plafond Kantor Pengecatan Kusen Pintu dan Jendela Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC Pengecatan Rangka Jendela Kaca
VIII PEKERJAAN SANITASI 1 Pekerjaan Septictank 1 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175
SATUAN
VOLUME
0.00 m3 m3 m3
0.00 0.12 0.06 0.02
m2 m2 m2 m2 m2 bh bh bh bh bh bh m2 m2
3.60 1.80 1.80 2.26 7.48 12.00 12.00 4.00 6.00 6.00 6.00 16.20 8.92
m2 m2 m2 m2 m2 m2
205.28 89.03 38.21 93.01 9.55 10.08
m2 m2 m2 m2
10.80 3.60 3.60 3.20
m3 m2 m3
6.94 0.19 0.26
Kg m2 m3
26.06 2.40 0.18
Kg m2 m3 m2 m2
24.23 4.08 0.15 11.56 11.56
Kg m2 m3
28.28 2.40 0.18
NO.
URAIAN PEKERJAAN i
2 3 4 5 6 7 8 9 10 IX 1 2
3
4
5
X 1 2 3 4 5 6 7 8
Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank Pekerjaan Pipa 4" Pekerjaan Pipa 2" Pekerjaan Pipa 3/4" (Air Bersih) Pek. Sumur Bor+pompa Pekerjaan kran air Pekerjaan stop kran Profil tank 1200 L Pek. Closed Duduk Pek. Wastafel+cermin PEKERJAAN JEMBATAN Pekerjaan Pondasi Batu Belah Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof c Cor Beton K.200 Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton K.200 Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton K.200 d Pek. Pas Batako e Pek. Plesteran ### ### PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
SATUAN
VOLUME
Kg m2 m3
4.66 1.20 0.17
Kg m2 m3 Bh m3 m m m Bh Bh Bh Bh Bh Unit
3.00 0.42 0.05 1.00 0.34 3.50 1.93 36.66 1.00 2.00 1.00 1.00 1.00 1.00
m3
19.18
kg m2 m3
102.56 12.44 1.09
kg m2 m3
51.28 7.28 0.55
kg m2 m3
250.87 11.89 4.03
Kg m2 m3 m2 m2 Err:509
22.59 2.40 0.18 3.10 6.60 Err:509
Unit Titik Bh Bh Bh Bh Titik Bh
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
NO.
URAIAN PEKERJAAN
SATUAN
VOLUME
XI 1 3 4 5 6
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Handrail difabel stainless Pekerjaan Rolling door Pek. Handrail closet Pekerjaan ukiran kayu
m2 0.00 m2 m m2
16.30 0.00 7.27 1.20 19.20
XII 1 2 3
PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Mesin Pengayak Kapasitas 500 Kg/Jam
Unit Unit Unit
1.00 1.00 1.00
XIII A 1 2 3 4 5 6 7 8 B 1 2 3 4 5 6 7
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA Sosialisasi K3 dan Prokes (Spanduk) Helm Keselamatan Rompi Kerja Sarung Tangan (Safety Glove) Sepatu Keselamatan (Rubber Shoes) Tali Pengaman Kotak P3K Asuransi Tenaga Kerja KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 Alat ukur suhu badan nir-sentuh (Thermoscan) Vitamin C (1 Box isi 100 tablet) Tempat Cuci Tangan Sabun Cuci Tangan (Cair) 200ml/btl Masker kain Alat penyemprot desinfektan Cairan Desinfektan 5L
Bh Bh Bh Bh Bh Bh Bh Paket
4.00 21.00 21.00 21.00 21.00 3.00 2.00 1.00
Bh Bh Bh Bh Bh Bh Bh
2.00 25.00 2.00 4.00 25.00 2.00 3.00
XIV 1 2 3 4 5
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Pengujian Lab Papan Nama Kegiatan
Ls Ls Ls Bh Paket
1.00 1.00 1.00 1.00 1.00
Diverifikasi Oleh : Askot Infrastruktur
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
Dibuat Oleh :
UPL
Form - RAB 3
BANTUAN PiMiRINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU)
FORMAT PiRiKAMAN ANALISA HARGA SATUAN Pikirjaan Satuan Pimbayaran No. A.
: (K3) Pimbirsihan 1 m2 lapangan dan pirataan : M2 Uraian
Tinaga Kirja Pikirja Mandor
B.
Bahan
C.
Peralatan
Kodi
Satuan
L.01 L.04
OH OH
Koifisiin
Kodi Analisa A.2.2.1.9 Harga Satuan (Rp.)
0.1000 0.0500
140,000.00 Jumlah Tinaga
Jumlah Harga (Rp) 14,000.00 14,000.00
Jumlah Bahan
D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
C.
: (Pengukuran dan pemasangan 1 m’ Bouwplank : M2 Uraian
Tenaga Kerja Pekerja Tukang Kayu Kepala tukang Mandor
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Bahan Kayu balok 5/7 Klas III Paku 5-10 cm Kayu papan 2/20 Klas III
m3 Kg m3
Koefisien 0.1000 0.1000 0.0100 0.0050
0.012 0.02 0.0070
Peralatan
D.
No.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00
Tenaga Kerja Pekerja Mandor
B.
Bahan
C.
Peralatan
Kode
Satuan
L.01 L.04
OH OH
Koefisien 0.7500 0.0250
Jumlah Harga (Rp)
Jumlah Tenaga
14,000.00 15,000.00 1,700.00 30,700.00
2,200,000.00 22,000.00 2,450,000.00 Jumlah Bahan
26,400.00 440.00 17,150.00 43,990.00
Jumlah Peralatan
74,690.00
: Penggalian 1 m3 tanah biasa sedalam 1 m : M3 Uraian
14,000.00 Kode Analisa A. 2.2.1.4.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
A.
Jumlah Peralatan
Kode Analisa A. 2.3.1.1 Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga
Jumlah Harga (Rp) 105,000.00 105,000.00
Jumlah Bahan
D.
Jumlah Peralatan Harga Satuan Pekerjaan (A+B+C)
105,000.00
Pekerjaan Satuan Pembayaran No. A.
: Pengurugan kembali 1 m3 galian tanah : M3 Uraian
Tenaga Kerja Pekerja Mandor
B.
Bahan
C.
Peralatan
No.
C.
Uraian Tenaga Kerja Pekerja Mandor
0.5000 0.0500
Kode
Satuan
L.01 L.04
OH OH
0.3000 0.0100
m3
1.2000
Bahan Tanah urug
Koefisien
Peralatan
140,000.00 Jumlah Tenaga -
No.
Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga 100,000 Jumlah Bahan Jumlah Peralatan
: Pengurugan 1 m3 dengan Pasir : M3 Uraian
Tenaga Kerja Pekerja Mandor
B.
Bahan Pasir Urug
C.
Peralatan
Kode
Satuan
L.01 L.04
OH OH
m3
D.
No.
Koefisien 0.3000 0.0100
1.2000
Harga Satuan (Rp.) 140,000.00 Jumlah Tenaga 150,000.00 Jumlah Bahan Jumlah Peralatan
: 1 Btg Pancang Cerucuk Kayu atau Dolken dia. 8 - 10 Cm (panjang :M Uraian
A.
Tenaga Kerja Pekerja Tukang Kayu
B.
Bahan Dolken Kayu Galam ø 10-12 m Alat Bantu
C.
Peralatan
70,000.00 70,000.00
70,000.00
Jumlah Harga (Rp) 42,000.00 42,000.00 120,000.00 120,000.00 162,000.00 Kode Analisa A.2.3.1.11.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
Jumlah Harga (Rp)
Kode Analisa A.2.3.1.11.a
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
D.
OH OH
Harga Satuan (Rp.)
: Pengurugan 1 m3 dengan tanah urug : M3
D.
A.
L.01.01 L.04.01
Koefisien
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
B.
Satuan
Jumlah Bahan Jumlah Peralatan
D.
A.
Kode
Kode Analisa A.2.3.1.9.
Koefisien
42,000.00 42,000.00 180,000.00 180,000.00 222,000.00 Kode Analisa P.07.a
Kode
Satuan
L.01 L.02
OH OH
0.045 0.012
140,000 150,000 Jumlah Tenaga
6,300.00 1,800.00 8,100.00
Btg
1.000 0.200
35,000 35,000 Jumlah Bahan
35,000.00 7,000.00 42,000.00 50,100.00
Harga Satuan Pekerjaan (A+B+C)
Harga Satuan (Rp.)
Jumlah Harga (Rp)
Jumlah Peralatan
Jumlah Harga (Rp)
Pekerjaan Satuan Pembayaran No. A.
B.
C.
: Pembesian 10 kg dengan besi polos atau besi ulir : Kg Uraian
Tenaga Kerja Pekerja Tukang Besi Kepala Tukang Mandor
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Bahan Besi beton Kawat Beton
Kg Kg
Koefisien
Kode Analisa A.4.1.1.17
Harga Satuan (Rp.)
0.0700 0.0700 0.0070 0.0040
140,000.00 150,000.00 170,000.00 -
Jumlah Harga (Rp)
Jumlah Tenaga
9,800.00 10,500.00 1,190.00 21,490.00
12,000.00 25,000.00 Jumlah Bahan
126,000.00 3,750.00 129,750.00
10.5000 0.1500
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
151,240.00 Pembesian 1 Kg Besi
Pekerjaan Satuan Pembayaran No. A.
B.
: Membuat 1 m3 beton mutu f’c = 7,4 Mpa (K.100) : M3 Uraian
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Semen Portland Pasir beton Split Air
Satuan
Koefisien
Kode Analisa A.4.1.1.1
Harga Satuan (Rp.)
Jumlah Harga (Rp)
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
231,000.00 42,625.00 4,760.00 278,385.00
kg kg kg Liter
247.0000 869.0000 999.0000 215.0000
1,275.00 128.57 250.00
314,925.00 111,728.57 249,750.00 676,403.57
Jumlah Bahan C.
15,124.00
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
954,788.57
: Membuat 1 m3 beton mutu f’c = 14,5 Mpa (K.175) : M3 Uraian
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor Bahan Semen Portland Pasir beton Split Air
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.4.1.1.5.
Harga Satuan (Rp.)
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
231,000.00 42,625.00 4,760.00 278,385.00
kg kg kg Liter
326.0000 760.0000 1,029.0000 215.0000
1,275.00 128.57 250.00
415,650.00 97,714.29 257,250.00 770,614.29
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
1,048,999.29
Pekerjaan Satuan Pembayaran No. A.
B.
: Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 200) : M3 Uraian
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Semen Portland Pasir beton Split Air
Satuan
Koefisien
Kode Analisa A.4.1.1.6.
Harga Satuan (Rp.)
OH OH OH OH
1.6500 0.2750 0.0280 0.0830
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
231,000.00 42,625.00 4,760.00 278,385.00
kg kg kg Liter
352.0000 731.0000 1,031.0000 215.0000
1,275.00 128.57 250.00
448,800.00 93,985.71 257,750.00 800,535.71
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
1,078,920.71
: (K3) Pemasangan 1 m2 bekisting untuk pondasi : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting
Satuan
Koefisien
Kode Analisa A.4.1.1.20
Harga Satuan (Rp.)
OH OH OH OH
0.5200 0.2600 0.0260 0.0260
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
72,800.00 39,000.00 4,420.00 116,220.00
m3 kg kg
0.0400 0.3000 0.1000
2,450,000.00 22,000.00 -
98,000.00 6,600.00 104,600.00
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
220,820.00
: (K3) Pemasangan 1 m2 bekisting untuk sloof : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.4.1.1.21 Harga Satuan (Rp.)
OH OH OH OH
0.5200 0.2600 0.0260 0.0260
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
72,800.00 39,000.00 4,420.00 116,220.00
m3 kg kg
0.0400 0.4000 0.2000
2,450,000.00 22,000.00
98,000.00 8,800.00 106,800.00
Jumlah Bahan C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
223,020.00
Pekerjaan Satuan Pembayaran No. A.
B.
: (K3) Pemasangan 1 m2 bekisting untuk kolom : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting Balok kayu kelas II uk.5/7 Plywood tebal 9 mm Dolken kayu φ 8-10cm
Satuan
Koefisien
Kode Analisa A.4.1.1.22 Harga Satuan (Rp.)
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
92,400.00 49,500.00 5,610.00 147,510.00
m3 kg kg m3 Lbr Batang
0.0400 0.4000 0.2000 0.0150 0.3500 2.0000
2,450,000.00 22,000.00
98,000.00 8,800.00 60,000.00 60,000.00 226,800.00
4,000,000.00 30,000.00 Jumlah Bahan
C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
374,310.00
: (K3) Pemasangan 1 m2 bekisting untuk balok : M3 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10cm
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.4.1.1.23 Harga Satuan (Rp.)
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
92,400.00 49,500.00 5,610.00 147,510.00
m3 kg kg m3 Lbr Batang
0.0400 0.4000 0.2000 0.0180 0.3500 2.0000
2,450,000.00 22,000.00
98,000.00 8,800.00 72,000.00 60,000.00 238,800.00
4,000,000.00 30,000.00 Jumlah Bahan
C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
386,310.00
Pekerjaan Satuan Pembayaran No. A.
B.
: (K3) Pemasangan 1 m2 bekisting untuk plat : M2 Uraian
Tenaga Kerja Pekerja Tukang kayu Kepala tukang Mandor
Kode
L.01 L.02 L.03 L.04
Bahan Papan Kayu Klas III Paku 5-10 cm Minyak Bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu φ 8-10cm
Satuan
Koefisien
Kode Analisa A.4.1.1.24 Harga Satuan (Rp.)
OH OH OH OH
0.6600 0.3300 0.0330 0.0330
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
92,400.00 49,500.00 5,610.00 147,510.00
m3 kg kg m3 Lbr Batang
0.0400 0.4000 0.2000 0.0150 0.3500 6.0000
2,450,000.00 22,000.00
98,000.00 8,800.00 60,000.00 45,500.00 180,000.00 392,300.00
4,000,000.00 130,000.00 30,000.00 Jumlah Bahan
C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
: 1 m2 Pengecatan bidang kayu baru : M2
No.
Uraian
A.
Tenaga Kerja Pekerja Tukang cat Kepala tukang Mandor
B.
539,810.00
Kode L.01 L.02 L.03 L.04
Bahan Cat menie Kayu Plamuur Cat dasar Kayu Cat penutup Kayu Kuas Pengencer Ampelas
Satuan
Koefisien
Kode Analisa A.4.7.1.4. Harga Satuan (Rp.)
OH OH OH OH
0.0700 0.0090 0.0060 0.0030
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
9,800.00 1,350.00 1,020.00 12,170.00
Kg Kg Kg Kg Bh Kg Lbr
0.2000 0.1500 0.1700 0.2600 0.0100 0.0300 0.2000
60,000.00 60,000.00 60,000.00 45,000.00 28,100.00 10,000.00
12,000.00 10,200.00 15,600.00 450.00 843.00 2,000.00 41,093.00
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
53,263.00
: Pengecatan 1 m2 tembok baru : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang cat Kepala tukang Mandor
B.
Bahan Plamuur Cat dasar Tembok Cat Penutup Tembok
C.
Peralatan
Kode L.01 L.02 L.03 L.04
Satuan
Kode Analisa A.4.7.1.10.
Koefisien
OH OH OH OH
0.0200 0.0630 0.0063 0.0030
Kg Kg Kg
0.1000 0.1200 0.1800
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 110,000.00 110,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 2,800.00 9,450.00 1,071.00 13,321.00 13,200.00 19,800.00 33,000.00 -
D.
Harga Satuan Pekerjaan (A+B+C)
46,321.00
Pekerjaan Satuan Pembayaran No. A.
B.
: (K3) Pemasangan 1 buah closet duduk/monoblock : Bh Uraian
Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.5.1.1.1.
Harga Satuan (Rp.)
OH OH OH OH
3.300 1.100 0.010 0.160
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
462,000.00 170,500.00 1,700.00 634,200.00
Unit %
1.000 6.000
1,800,000.00 1,800,000.00
1,800,000.00 108,000.00 1,908,000.00
Bahan Closed duduk Perlengkapan
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
2,542,200.00
: Pemasangan 1 buah kran diameter ½” atau ¾ ” : Bh Uraian
Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.5.1.1 19.
Harga Satuan (Rp.)
OH OH OH OH
0.010 0.400 0.040 0.005
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
1,400.00 62,000.00 6,800.00 70,200.00
Bh Bh
1.000 0.025
65,000.00 12,000.00
65,000.00 300.00 65,300.00
Bahan Kran Air Seal Tape
Jumlah Bahan C.
Jumlah Harga (Rp)
Peralatan -
Jumlah Peralatan D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No. A.
B.
135,500.00
: Pemasangan 1 buah Stop Kran 3/4 : Bh Uraian
Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
Kode Analisa A.5.1.1 19.a Harga Satuan (Rp.)
OH OH OH OH
0.010 0.400 0.040 0.005
140,000.00 155,000.00 170,000.00 Jumlah Tenaga
1,400.00 62,000.00 6,800.00 70,200.00
Bh Bh
1.000 0.025
65,000.00 12,000.00
65,000.00 300.00 65,300.00
Bahan Stop Kran 3/4 Seal Tape
Jumlah Bahan C.
Peralatan Jumlah Peralatan
D.
Jumlah Harga (Rp)
Harga Satuan Pekerjaan (A+B+C)
135,500.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m’ pipa PVC tipe AW diameter 4” :M Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Pipa PVC 4” Perlengkapan
C.
Peralatan
D.
L.01 L.02 L.03 L.04
Satuan
Koefisien
OH OH OH OH
0.0810 0.1350 0.0135 0.0040
M %
1.200 35.000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Uraian Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Pipa PVC 3/4” Perlengkapan
C.
Peralatan
D.
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
OH OH OH OH
0.0360 0.0600 0.0060 0.0020
M %
1.200 35.000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 73,750 73,750 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” :M
A.
Uraian Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Pipa PVC 2” Perlengkapan
C.
Peralatan
Kode
L.01 L.02 L.03 L.04
Satuan
Koefisien
OH OH OH OH
0.0540 0.0900 0.0090 0.0030
M %
1.200 35.000
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 11,340.00 20,925.00 2,295.00 34,560.00 88,500.00 25,812.50 114,312.50 148,872.50 Kode Analisa A.5.1.1 26.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 10,500 10,500 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m’ pipa PVC tipe AW diameter 2” :M
A.
D.
Kode
Kode Analisa A.5.1.1 32.
Jumlah Harga (Rp) 5,040.00 9,300.00 1,020.00 15,360.00 12,600.00 3,675.00 16,275.00 31,635.00 Kode Analisa A.5.1.1 29.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 31,875 31,875 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 7,560.00 13,950.00 1,530.00 23,040.00 38,250.00 11,156.25 49,406.25 72,446.25
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 cm2 dinding conblock HB10/Batako 1SP : 4PP : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Bh
Batako
Semen Portland
Kg
Pasir pasang C.
m3
No.
0.388
Uraian Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan Semen Portland
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
Kg
Pasir pasang
m3
Koefisien
0.3000 0.1500 0.0150 0.0150
6.240
0.024
Peralatan
D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 2,800 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm : M2
A.
Uraian Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
Ubin keramik 40x40 Semen Portland
Pasir pasang Semen warna
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
0.700 0.350 0.035 0.035
Doz Kg
10.000
M3 Kg
Koefisien
1.050 0.045 0.500
Peralatan Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 42,000.00 15,500.00 1,700.00 59,200.00 35,000.00 15,465.75 58,200.00 108,665.75 167,865.75 Kode Analisa A.4.4.2.4.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1m2 lantai keramik ukuran 40 cm x 40 cm : M2
A.
D.
12.500
12.130
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
C.
0.3000 0.1000 0.0100 0.0150
Peralatan
D.
C.
Koefisien
Kode Analisa A.4.4.1.21a.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 75,000.00 1,275.00 150,000.00 5,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 42,000.00 23,250.00 2,550.00 67,800.00 7,956.00 3,600.00 11,556.00 79,356.00 Kode Analisa A.4.4.3.35.a Jumlah Harga (Rp) 98,000.00 54,250.00 5,950.00 158,200.00 78,750.00 12,750.00 6,750.00 2,500.00 100,750.00 258,950.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
0.700 0.350 0.035 0.035
Doz Kg
10.400
Ubin keramik 20x20 Semen Portland
Pasir pasang Semen warna C.
M3 Kg
0.045 0.500
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Uraian Tenaga Kerja Pekerja Tukang batu Kepala tukang Mandor
B.
Bahan
Kode
Satuan
L.01 L.02 L.03 L.04
OH OH OH OH
0.900 0.450 0.045 0.045
Doz Kg
1.050
Ubin keramik 10x20 Semen Portland
Pasir pasang Semen warna
M3 Kg
Koefisien
9.300
0.180 2.750
Peralatan
D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 65,000.00 1,275.00 150,000.00 5,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 dinding keramik 10 cm x 20 cm : M2
A.
Uraian Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan baja ringan 75x35x0,75 MM baja ringan 30x30x0,3 MM Paku Skrup
C.
Peralatan
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.060 0.060 0.006 0.003
M M Bh
2.000 1.500 19.000
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 98,000.00 54,250.00 5,950.00 158,200.00 68,250.00 13,260.00 6,750.00 2,500.00 90,760.00 248,960.00 Kode Analisa A.4.4.3.53.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 65,400.00 1,275.00 150,000.00 5,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 Rangka Kuda-kuda Baja Ringan : M2
A.
D.
1.050
Peralatan
D.
C.
Koefisien
Kode Analisa A.4.4.3.36.
Jumlah Harga (Rp) 126,000.00 69,750.00 7,650.00 203,400.00 68,670.00 11,857.50 27,000.00 13,750.00 121,277.50 324,677.50 Kode Analisa A.4.2.1.2 d
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00
Jumlah Harga (Rp)
Jumlah Tenaga
8,400.00 9,000.00 1,020.00 18,420.00
20,833.33 8,333.33 3,500.00 Jumlah Bahan
41,666.67 12,500.00 66,500.00 120,666.67
Jumlah Peralatan
139,086.67
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Genteng Metal Paku Genteng Metal
C.
Peralatan
D.
No.
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.200 0.100 0.010 0.001
M2 Kg
1.020 0.200
Uraian Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Nok Genteng Metal Paku Genteng Metal
140,000.00 150,000.00 170,000.00 Jumlah Tenaga
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.250 0.150 0.015 0.013
M2 Kg
1.100 0.200
Peralatan
D.
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.)
39,308.18 35,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m’ nok genteng metal :M
A.
Uraian Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Papan Plank Kalsiboard Paku 5-10 cm
C.
Peralatan
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.100 0.200 0.020 0.005
M' Kg
1.10000 0.100
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 28,000.00 15,000.00 1,700.00 44,700.00 40,094.34 7,000.00 47,094.34 91,794.34 Kode Analisa A.4.5.2.37
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga
35,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m’ Listplank Kalsiboard Exterior :M
A.
D.
Satuan
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
C.
Kode
Kode Analisa A.4.5.2.32.
Jumlah Harga (Rp) 35,000.00 22,500.00 2,550.00 60,050.00 7,000.00 7,000.00 67,050.00 Kode Analisa A.4.6.1.21.a
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 64,583.33 22,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 14,000.00 30,000.00 3,400.00 47,400.00 71,041.67 2,200.00 73,241.67 120,641.67
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m2 Rangka Besi Hollow Modul 60x60 cm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Besi Hollow Plafond 1,3x 3,3 mm Assesoris (Perkuatan, Las dll)
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.350 0.350 0.035 0.018
M' Ls
4.000 (100%xRangka)
No.
140,000.00 150,000.00 170,000.00
2,500.00 2,500.00 Rp Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 Langit2 Kalsiboard uk 1,2x2,4 m tebal 9mm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala tukang Mandor
B.
Bahan Kalsiboard 6 mm Paku Kalsiboard
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.100 0.100 0.010 0.005
Lbr Kg
0.375 0.030
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.)
Jumlah Tenaga
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 110,000.00 25,000.00 Jumlah Bahan Jumlah Peralatan
: Pembuatan dan pas 1 m3 kusen pintu dan kusen jendela Kayu Klas : M3 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala Tukang Mandor
B.
Bahan Balok kayu kelas II Paku Skrup Lem Kayu
C.
Peralatan
D.
Kode
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
6.000 18.000 1.800 0.300
M3 Kg Kg
1.200 1.250 1.000
Harga Satuan Pekerjaan (A+B+C)
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 4,000,000.00 22,000.00 33,000.00 Jumlah Bahan Jumlah Peralatan
Kode Analisa A.4.2.1.21. Jumlah Harga (Rp) 49,000.00 52,500.00 5,950.00 107,450.00 10,000.00 10,000.00 20,000.00 127,450.00 Kode Analisa A.4.5.1.1a Jumlah Harga (Rp) 14,000.00 15,000.00 1,700.00 30,700.00 41,250.00 750.00 42,000.00 72,700.00 Kode Analisa A.4.6.1.2. Jumlah Harga (Rp) 840,000.00 2,700,000.00 306,000.00 3,846,000.00 4,800,000.00 27,500.00 33,000.00 4,860,500.00 8,706,500.00
Pekerjaan Satuan Pembayaran No.
: Pembuatan dan pemasangan 1 m2 daun pintu panel, Kayu Klas II : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Papan Kayu Klas II Lem Kayu
C.
Peralatan
D.
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.000 3.000 0.300 0.050
M3 Kg
0.040 0.500
No.
140,000.00 150,000.00 170,000.00
5,000,000.00 33,000.00 Jumlah Bahan Jumlah Peralatan
: Pembuatan dan pemasangan 1 m2 pintu jendela kaca, Kayu Klas I : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Papan Kayu Klas II Lem Kayu
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.800 2.400 0.240 0.040
M3 Kg
0.024 0.300
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.)
Jumlah Tenaga
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 5,000,000.00 33,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 kaca tebal 5 mm : M2 Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Kaca Tebal 5 mm Sealant
C.
Peralatan
D.
Kode
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.001
M2 Kg
1.100 0.050
Harga Satuan Pekerjaan (A+B+C)
Kode Analisa A.4.6.1.5. Jumlah Harga (Rp) 140,000.00 450,000.00 51,000.00 641,000.00 200,000.00 16,500.00 200,000.00 841,000.00 Kode Analisa A.4.6.1.6. Jumlah Harga (Rp) 112,000.00 360,000.00 40,800.00 512,800.00 120,000.00 9,900.00 120,000.00 632,800.00 Kode Analisa A.4.6.2.17
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 135,000.00 47,500.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 148,500.00 2,375.00 148,500.00 175,650.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 buah engsel pintu : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Engsel pintu
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02b L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0008
Bh
1.000
No.
140,000.00 150,000.00 170,000.00
35,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 buah engsel jendela kupu-kupu : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Engsel jendela
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02b L.03 L.04
OH OH OH OH
0.010 0.100 0.010 0.0005
Bh
1.000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Harga Satuan (Rp.)
Jumlah Tenaga
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
Uraian Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Kunci tanam biasa
C.
Peralatan
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.010 0.500 0.050 0.0050
Bh
1.000
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 35,000.00 35,000.00 62,150.00 Kode Analisa A.4.6.2.6.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 41,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 buah kunci tanam biasa : Bh
A.
D.
Kode Analisa A.4.6.2.5
Jumlah Harga (Rp) 1,400.00 15,000.00 1,700.00 18,100.00 41,000.00 41,000.00 59,100.00 Kode Analisa A.4.6.2.2.
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 95,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 1,400.00 75,000.00 8,500.00 84,900.00 95,000.00 95,000.00 179,900.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 buah kait angin : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Kait angin
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0080
Bh
1.000
No.
140,000.00 150,000.00 170,000.00
20,800.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 buah kunci slot : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Grendel/Kunci Slot
C.
Peralatan
D. Pekerjaan Satuan Pembayaran
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0080
Bh
1.000
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 35,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 buah Handel Jendela : Bh Uraian
A.
Tenaga Kerja Pekerja Tukang kayu Kepala Tukang Mandor
B.
Bahan Handel Jendela
C.
Peralatan
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 20,800.00 20,800.00 47,950.00 Kode Analisa A.4.6.2.11.
Harga Satuan Pekerjaan (A+B+C)
No.
Harga Satuan (Rp.)
Jumlah Tenaga
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
D.
Kode Analisa A.4.6.2.9.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.015 0.150 0.015 0.0080
Bh
1.000
Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 35,000.00 35,000.00 62,150.00 Kode Analisa A.4.6.2.8.a
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 8,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 2,100.00 22,500.00 2,550.00 27,150.00 8,000.00 8,000.00 35,150.00
Pekerjaan Satuan Pembayaran No.
: Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP : m3 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala Tukang Mandor
B.
Bahan Batu belah Semen Portland Pasir pasang
C.
Peralatan
D.
No.
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.500 0.750 0.075 0.0750
m3 Kg m3
1.200 163.000 0.520
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 400,000.00 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 dinding terawang (rooster) : m2 Uraian
A.
Tenaga Kerja Pekerja Tukang batu Kepala Tukang Mandor
B.
Bahan Roster/Kerawang Semen Portland Pasir pasang
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.300 0.100 0.010 0.0150
Bh Kg m3
12.000 11.000 0.035
No.
Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 25,000.00 1,275.00 150,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 dinding pemisah GRC Board : m3 Uraian
A.
Tenaga Kerja Pekerja Tukang Kayu Kepala Tukang Mandor
B.
Bahan Balok Kayu Klas II Paku Kalsiboard GRC Board tebal 8 m Lem Kayu
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
0.2000 0.6000 0.0600 0.0100
m3 Kg Lbr Kg
0.0280 0.1500 0.4300 0.5600
Peralatan Harga Satuan Pekerjaan (A+B+C)
Jumlah Harga (Rp) 210,000.00 116,250.00 12,750.00 339,000.00 480,000.00 207,825.00 78,000.00 765,825.00 1,104,825.00 Kode Analisa A. 4.4.1.23
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
D.
Satuan
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran
C.
Kode
Kode Analisa A.3.2.1.2.
Jumlah Harga (Rp) 42,000.00 15,500.00 1,700.00 59,200.00 300,000.00 14,025.00 5,250.00 319,275.00 378,475.00 Kode Analisa A.4.6.1.25.a
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00
Jumlah Harga (Rp)
Jumlah Tenaga
28,000.00 90,000.00 10,200.00 128,200.00
25,000.00 190,000.00
3,750.00 81,700.00
Jumlah Bahan Jumlah Peralatan
85,450.00 213,650.00
Pekerjaan Satuan Pembayaran No.
: (K3) Pemasangan 1 buah wastafel : m3 Uraian
A.
Tenaga Kerja Pekerja Tukang Batu Kepala Tukang Mandor
B.
Bahan Wastafel+cermin Semen Portland Pasir pasang Perlengkapan
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.2000 1.4500 0.1500 0.0600
Unit Kg M3 %
1.2000 6.0000 0.0100 12.0000
Harga Satuan Pekerjaan (A+B+C)
Pekerjaan Satuan Pembayaran No.
Kode Analisa A.5.1.1 5. Harga Satuan (Rp.) 140,000.00 155,000.00 170,000.00 Jumlah Tenaga 940,000.00 1,275.00 150,000.00 940,000.00 Jumlah Bahan Jumlah Peralatan
: Pemasangan 1 m2 rolling door alluminium : m3 Uraian
A.
Tenaga Kerja Pekerja Tukang besi Kepala Tukang Mandor
B.
Bahan Rolling Door
C.
Peralatan
D.
Kode
Satuan
Koefisien
L.01 L.02 L.03 L.04
OH OH OH OH
1.0000 1.0000 0.1200 0.0060
Unit
1.0000
Harga Satuan Pekerjaan (A+B+C)
Dibuat oleh : Ketua KSM
Jumlah Harga (Rp) 168,000.00 224,750.00 25,500.00 418,250.00 1,128,000.00 7,650.00 1,500.00 112,800.00 1,249,950.00 1,668,200.00 Kode Analisa A.4.2.1.10
Harga Satuan (Rp.) 140,000.00 150,000.00 170,000.00 Jumlah Tenaga 500,000.00 Jumlah Bahan Jumlah Peralatan
Jumlah Harga (Rp) 140,000.00 150,000.00 20,400.00 310,400.00 500,000.00 500,000.00 810,400.00
Tim Verifikasi, Tim Faskel
Tim Korkot
RAB-4
PROGRAM KOTA TANPA KUMUH (KOTAKU) DAFTAR HARGA SATUAN JADI PEKERJAAN Kab./Kota Kecamatan Kelurahan BKM
NO.
: : : :
Palangka Raya Sebangau Kereng Bangkirai Kereng Membangun
JENIS PEKERJAAN
Nama Paket Pekerjaan : Pembangunan TPS3R
SATUAN
HARGA (Rp.)
I 1. 2.
PEKERJAAN PERSIAPAN Pembersihan Awal Pengukuran dan Pemasangan Bowplank
m2 m
Rp Rp
14,000.00 74,690.00
II 1. 2. 3. 4. 5.
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam (p. 2m)
m3 m3 m3 m3 Btg
Rp Rp Rp Rp Rp
162,000.00 105,000.00 70,000.00 222,000.00 50,100.00
Kg m3 m2 m3
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Kg m3 m2 m3
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Kg m3 m2 m3
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 374,310.00 1,078,920.71
III PEKERJAAN BETON BERTULANG 1. Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 2. Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 3. Pondasi Footplat P3 (120 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 4. Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200
NO. 5.
6.
7.
8.
9.
10.
11.
12.
13.
JENIS PEKERJAAN Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pek Kolom K3 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu K.175 Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu K.200
IV PEKERJAAN DINDING, PLESTERAN DAN KERAMIK 1. Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R b Kantor c WC d Pagar
SATUAN
HARGA (Rp.)
Kg m2 m3
Rp Rp Rp
15,124.00 374,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 374,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
Kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
Kg m3
Rp Rp
15,124.00 1,048,999.29
Kg m2 m3
Rp Rp Rp
15,124.00 539,810.00 1,078,920.71
m2 m2 m2 m2
Rp Rp Rp Rp
167,865.75 167,865.75 167,865.75 167,865.75
NO. 2.
3. 4. 5. 6. 7. V 1.
2.
3. 4. 5.
JENIS PEKERJAAN Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar Cor Beton Lantai Beton Mutu K.200 Pek Keramik lantai Uk.40x40 Pek Keramik lantai WC Uk.20x20 Pek Keramik dinding WC Uk.10x20 Pek. Dinding Tawing layar PEKERJAAN ATAP, PLAFOND, LISPLANK Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC Pek. Lisplank Superplank Eksterior Rangka Hollow Plafond Kantor Pek. Pas. Plafond Kalsiboard
VI PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG 1. Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3m3 b Kantor m3 c WC m3 2. Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R b Kantor c WC 3. Pek. Rangka Jendela Kaca Kayu Klas II 4. Pek.Pemasangan Kaca Tebal 5 mm 5. Pek. Engsel Pintu 6. Pek. Engsel Jendela 7. Kunci Tanam 8. Hak angin Jendela 9. Gerendel Jendela 10. Handel Jendela 11. Pekerjaan Ventilasi Kerawang 12. Pekerjaan glasblock
SATUAN
HARGA (Rp.)
m2 m2 m2 m2 m3 m2 m2 m2 m2
Rp Rp Rp Rp Rp Rp Rp Rp Rp
79,356.00 79,356.00 79,356.00 79,356.00 1,078,920.71 258,950.00 248,960.00 324,677.50 213,650.00
m2 m2 m2
Rp Rp Rp
139,086.67 139,086.67 139,086.67
m2 m2 m2 m m2 m2
Rp Rp Rp Rp Rp Rp
91,794.34 91,794.34 91,794.34 120,641.67 127,450.00 72,700.00
m3 m3 m3
Rp Rp Rp
8,706,500.00 8,706,500.00 8,706,500.00
m2 m2 m2 m2 m2 bh bh bh bh bh bh m2 m2
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
841,000.00 841,000.00 841,000.00 632,800.00 175,650.00 62,150.00 59,100.00 179,900.00 47,950.00 62,150.00 35,150.00 378,475.00 650,000.00
NO.
JENIS PEKERJAAN
VII PEKERJAAN PENGECATAN 1. Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar 2. Pengecatan Plafond Kantor 3. Pengecatan Kusen Pintu dan Jendela 4. Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC 5. Pengecatan Rangka Jendela Kaca VIII PEKERJAAN SANITASI 1. Pekerjaan Septictank 1 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15### - Pek. PembesiKg - Pek. bekistin m2 - Pek cor beto m3 f Pek. Pas. Bata m2 g Pek. Plesteran m2 h Pek. Ring Balk### - Pek. PembesiKg - Pek. bekistin m2 - Pek cor beto m3 i Pek. Plat penu ### - Pek. PembesiKg - Pek. bekistin m2 - Pek cor beto m3 j Pek. Tutup ma### - Pek. PembesiKg - Pek. bekistin m2 - Pek cor beto m3 k Bioseptictank Bh l Urugan Pasir dm3
SATUAN
HARGA (Rp.)
m2 m2 m2 m2 m2 m2
Rp Rp Rp Rp Rp Rp
46,321.00 46,321.00 46,321.00 46,321.00 46,321.00 53,263.00
m2 m2 m2 m2
Rp Rp Rp Rp
53,263.00 53,263.00 53,263.00 53,263.00
m3 m2 m3
Rp Rp Rp
105,000.00 222,000.00 1,048,999.29
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,048,999.29
Kg m2 m3 m2 m2
Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,048,999.29 167,865.75 79,356.00
Kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,048,999.29
Kg m2 m3
Rp Rp Rp
15,124.00 539,810.00 1,048,999.29
Kg m2 m3 Bh m3
Rp Rp Rp Rp Rp
15,124.00 539,810.00 1,048,999.29 12,287,000.00 222,000.00
NO. 2. 3. 4. 5. 6. 7. 8. 9. 10.
JENIS PEKERJAAN Pekerjaan Pipa 4" Pekerjaan Pipa 2" Pekerjaan Pipa 3/4" (Air Bersih) Pek. Sumur Bor+pompa Pekerjaan kran air Pekerjaan stop kran Profil tank 1200 L Pek. Closed Duduk Pek. Wastafel+cermin
IX PEKERJAAN JEMBATAN 1. Pekerjaan Pondasi Batu Belah 2. Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof c Cor Beton K.200 3. Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton K.200 4. Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm 5. Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton K.200 d Pek. Pas Batako e Pek. Plesteran ### Err:509 X 1. 2. 3. 4. 5. 6. 7. 8.
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
SATUAN
HARGA (Rp.)
m m m Bh Bh Bh Bh Bh Unit
Rp Rp Rp Rp Rp Rp Rp Rp Rp
148,872.50 72,446.25 31,635.00 2,500,000.00 135,500.00 135,500.00 1,600,000.00 2,542,200.00 1,668,200.00
m3
Rp
1,104,825.00
kg m2 m3
Rp Rp Rp
15,124.00 223,020.00 1,078,920.71
kg m2 m3
Rp Rp Rp
15,124.00 386,310.00 1,078,920.71
kg m2 m3
Rp Rp Rp
15,124.00 539,810.00 1,078,920.71
Kg m2 m3 m2 m2 Err:509
Rp Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,078,920.71 167,865.75 79,356.00 Err:509
Unit Titik Bh Bh Bh Bh Titik Bh
Rp Rp Rp Rp Rp Rp Rp Rp
4,500,000.00 325,000.00 35,000.00 20,000.00 20,000.00 760,000.00 325,000.00 20,000.00
NO.
JENIS PEKERJAAN
SATUAN
HARGA (Rp.)
XI 1. 3. 4. 5. 6.
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Handrail difabel stainless Pekerjaan Rolling door Pek. Handrail closet Pekerjaan ukiran kayu
m2 0.00 m2 m m2
Rp Rp Rp Rp Rp
320,000.00 810,400.00 52,000.00 625,000.00
XII 1. 2. 3.
PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Mesin Pengayak Kapasitas 500 Kg/Jam
Unit Unit Unit
Rp Rp Rp
36,130,000.00 22,650,000.00 18,150,000.00
XIII A 1. 2. 3. 4. 5. 6. 7. 8. B 1. 2. 3. 4. 5. 6. 7.
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA Bh Sosialisasi K3 dan Prokes (Spanduk) Helm Keselamatan Bh Rompi Kerja Bh Bh Sarung Tangan (Safety Glove) Bh Sepatu Keselamatan (Rubber Shoes) Bh Tali Pengaman Kotak P3K Bh Asuransi Tenaga Kerja Paket KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 Bh Alat ukur suhu badan nir-sentuh (Thermoscan) Vitamin C (1 Box isi 100 tablet) Bh Tempat Cuci Tangan Bh Sabun Cuci Tangan (Cair) 200ml/btl Bh Bh Masker kain Bh Alat penyemprot desinfektan Cairan Desinfektan 5L Bh
Rp Rp Rp Rp Rp Rp Rp Rp
75,000.00 100,000.00 60,000.00 5,000.00 100,000.00 231,500.00 40,000.00 912,000.00
Rp Rp Rp Rp Rp Rp Rp
350,000.00 25,000.00 250,000.00 25,000.00 5,000.00 65,000.00 75,000.00
XIV 1. 2. 3. 4. 5.
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Pengujian Lab Papan Nama Kegiatan
Rp Rp Rp Rp Rp
270,000.00 250,000.00 150,000.00 10,000.00 500,000.00
Ls Ls Ls Bh Paket
Diverifikasi Oleh : Askot Infrastruktur,
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
Dibuat Oleh :
UPL
RAB-5 BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT PROGRAM KOTA TANPA KUMUH (KOTAKU) RENCANA ANGARAN BIAYA Kab./Kota Kecamatan Kelurahan BKM NO
: : : :
Nama Paket Pekerjaan
Palangka Raya Sebangau Kereng Bangkirai Kereng Membangun JENIS PEKERJAAN
SATUANVOLUME ANALISA
: Pembangunan TPS3R
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
I 1 2
PEKERJAAN PERSIAPAN Pembersihan Awal Pengukuran dan Pemasangan Bowplank
m2 m
200.00 66.00
A.2.2.1.9 A. 2.2.1.4.
Rp Rp
II 1 2 3 4 5
PEKERJAAN TANAH Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam (p. 2m)
14,000.00 Rp 74,690.00 Rp Jumlah I Rp
m3 m3 m3 m3 Btg
218.55 11.68 2.92 45.49 372.00
A.2.3.1.11.a A. 2.3.1.1 A.2.3.1.9. A.2.3.1.11. P.07.a
Rp Rp Rp Rp Rp
III 1
PEKERJAAN BETON BERTULANG Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pek Kolom K3 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu K.175
162,000.00 105,000.00 70,000.00 222,000.00 50,100.00 Jumlah II
Rp Rp Rp Rp Rp Rp
35,405,100.00 1,226,610.00 204,435.00 10,099,672.44 18,637,200.00 65,573,017.44
Kg m3 m2 m3
318.33 0.67 2.24 2.69
A.4.1.1.17 A.4.1.1.1 A.4.1.1.20 A.4.1.1.6.
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Rp Rp Rp Rp
4,814,347.30 641,617.92 494,636.80 2,900,138.88
Kg m3 m2 m3
218.55 0.34 1.52 1.37
A.4.1.1.17 A.4.1.1.1 A.4.1.1.20 A.4.1.1.6.
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Rp Rp Rp Rp
3,305,312.39 326,537.69 335,646.40 1,475,963.54
Kg m3 m2 m3
39.95 0.05 1.92 0.19
A.4.1.1.17 A.4.1.1.1 A.4.1.1.20 A.4.1.1.6.
Rp Rp Rp Rp
15,124.00 954,788.57 220,820.00 1,078,920.71
Rp Rp Rp Rp
604,153.39 45,829.85 423,974.40 207,152.78
Kg m2 m3
485.65 40.40 4.23
A.4.1.1.17 A.4.1.1.22 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 374,310.00 Rp 1,078,920.71 Rp
7,345,020.01 15,122,124.00 4,561,676.78
Kg m2 m3
148.41 15.43 1.76
A.4.1.1.17 A.4.1.1.22 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 374,310.00 Rp 1,078,920.71 Rp
2,244,497.39 5,775,603.30 1,895,933.43
Kg m2 m3
66.62 6.96 0.26
A.4.1.1.17 A.4.1.1.22 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 374,310.00 Rp 1,078,920.71 Rp
1,007,557.35 2,605,197.60 281,598.31
Kg m2 m3
393.92 11.60 3.48
A.4.1.1.17 A.4.1.1.21 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,078,920.71 Rp
5,957,668.77 2,587,032.00 3,754,644.09
Kg m2 m3
303.68 23.72 2.03
A.4.1.1.17 A.4.1.1.21 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,078,920.71 Rp
4,592,826.58 5,290,034.40 2,186,432.83
Kg m2 m3
275.43 11.60 2.32
A.4.1.1.17 A.4.1.1.23 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
4,165,565.51 4,481,196.00 2,503,096.06
Kg m2 m3
44.67 3.36 0.25
A.4.1.1.17 A.4.1.1.23 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
675,542.20 1,298,001.60 271,888.02
Kg m2 m3
282.53 17.79 0.62
A.4.1.1.17 A.4.1.1.23 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
4,272,923.98 6,872,454.90 665,154.62
Kg m3
1053.65 48.72
A.4.1.1.17 A.4.1.1.6.
Rp Rp
15,124.00 Rp 1,048,999.29 Rp
15,935,374.47 51,102,918.08
2
3
4
5
6
7
8
9
10
11
12
2,800,000.00 4,929,540.00 7,729,540.00
NO
JENIS PEKERJAAN
SATUANVOLUME ANALISA
13
Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu K.200
IV 1
PEKERJAAN DINDING, PLESTERAN DAN KERAMIK Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R m2 b Kantor m2 c WC m2 d Pagar m2 Pek. Plesteran Dinding a Bangunan Hanggar TPS3R m2 b Kantor m2 c WC m2 d Pagar m2 Cor Beton Lantai Beton Mutu K.200 m3 Pek Keramik lantai Uk.40x40 m2 Pek Keramik lantai WC Uk.20x20 m2 Pek Keramik dinding WC Uk.10x20 m2 m2 Pek. Dinding Tawing layar
2
3 4 5 6 7 V 1
2
3 4 5 VI 1
2
3 4 5 6 7 8 9 10 11 12 VII 1
2 3 4
5
PEKERJAAN ATAP, PLAFOND, LISPLANK Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC Pek. Lisplank Superplank Eksterior Rangka Hollow Plafond Kantor Pek. Pas. Plafond Kalsiboard
Kg m2 m3
JUMLAH HARGA (Rp)
36.50 4.29 0.64
A.4.1.1.17 A.4.1.1.24 A.4.1.1.6.
Rp Rp Rp
15,124.00 539,810.00 1,078,920.71 Jumlah III
Rp Rp Rp Rp
551,958.70 2,314,435.38 693,880.88 176,587,548.53
142.96 60.60 23.50 73.61
A.4.4.1.21a. A.4.4.1.21a. A.4.4.1.21a. A.4.4.1.21a.
Rp Rp Rp Rp
167,865.75 167,865.75 167,865.75 167,865.75
Rp Rp Rp Rp
23,998,020.47 10,173,168.05 3,945,348.72 12,356,346.06
205.28 89.03 38.21 93.01 5.04 46.21 3.68 8.16 64.20
A.4.4.2.4. A.4.4.2.4. A.4.4.2.4. A.4.4.2.4. A.4.1.1.6. A.4.4.3.35.a A.4.4.3.36. A.4.4.3.53. A.4.6.1.25.a
Rp Rp Rp Rp Rp Rp Rp Rp Rp
79,356.00 79,356.00 79,356.00 79,356.00 1,078,920.71 258,950.00 248,960.00 324,677.50 213,650.00 Jumlah III
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,290,136.20 7,065,382.10 3,031,875.34 7,380,822.20 5,439,098.26 11,964,784.75 916,172.80 2,649,368.40 13,716,330.00 118,926,853.35
m2 m2 m2
242.24 18.63 9.96
A.4.2.1.2 d A.4.2.1.2 d A.4.2.1.2 d
Rp Rp Rp
139,086.67 Rp 139,086.67 Rp 139,086.67 Rp
33,691,801.24 2,591,677.02 1,385,827.29
m2 m2 m2 m m2 m2
242.24 18.63 9.96 57.34 9.55 9.55
A.4.5.2.32. A.4.5.2.32. A.4.5.2.32. A.4.6.1.21.a A.4.2.1.21. A.4.5.1.1a
Rp Rp Rp Rp Rp Rp
A.4.6.1.2. A.4.6.1.2. A.4.6.1.2.
Rp Rp Rp
A.4.6.1.5. A.4.6.1.5. A.4.6.1.5. A.4.6.1.6. A.4.6.2.17 A.4.6.2.5 A.4.6.2.6. A.4.6.2.2. A.4.6.2.9. A.4.6.2.11. A.4.6.2.8.a A. 4.4.1.23 Ls
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
841,000.00 841,000.00 841,000.00 632,800.00 175,650.00 62,150.00 59,100.00 179,900.00 47,950.00 62,150.00 35,150.00 378,475.00 650,000.00 Jumlah V
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,027,600.00 1,513,800.00 1,513,800.00 1,427,596.80 1,314,213.30 745,800.00 709,200.00 719,600.00 287,700.00 372,900.00 210,900.00 6,131,295.00 5,798,000.00 25,467,560.65
PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R m3 0.12 b Kantor m3 0.06 c WC m3 0.02 Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R m2 3.60 b Kantor m2 1.80 c WC m2 1.80 Pek. Rangka Jendela Kaca Kayu Klas II m2 2.26 Pek.Pemasangan Kaca Tebal 5 mm m2 7.48 Pek. Engsel Pintu bh 12.00 Pek. Engsel Jendela bh 12.00 Kunci Tanam bh 4.00 Hak angin Jendela bh 6.00 Gerendel Jendela bh 6.00 Handel Jendela bh 6.00 Pekerjaan Ventilasi Kerawang m2 16.20 Pekerjaan glasblock m2 8.92 PEKERJAAN PENGECATAN Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar Pengecatan Plafond Kantor Pengecatan Kusen Pintu dan Jendela Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC Pengecatan Rangka Jendela Kaca
HARGA SATUAN (Rp)
91,794.34 91,794.34 91,794.34 120,641.67 127,450.00 72,700.00 Jumlah IV
Rp Rp Rp Rp Rp Rp Rp
22,235,895.93 1,710,453.53 914,617.51 6,918,162.66 1,216,828.88 694,103.25 71,359,367.32
8,706,500.00 Rp 8,706,500.00 Rp 8,706,500.00 Rp
1,007,342.05 504,977.00 182,836.50
m2 m2 m2 m2 m2 m2
205.28 89.03 38.21 93.01 9.55 10.08
A.4.7.1.10. A.4.7.1.10. A.4.7.1.10. A.4.7.1.10. A.4.7.1.10. A.4.7.1.4.
Rp Rp Rp Rp Rp Rp
46,321.00 46,321.00 46,321.00 46,321.00 46,321.00 53,263.00
Rp Rp Rp Rp Rp Rp
9,508,737.82 4,124,143.91 1,769,740.13 4,308,269.89 442,249.75 536,891.04
m2 m2 m2 m2
10.80 3.60 3.60 3.20
A.4.7.1.4. A.4.7.1.4. A.4.7.1.4. A.4.7.1.4.
Rp Rp Rp Rp
53,263.00 53,263.00 53,263.00 53,263.00 Jumlah VI
Rp Rp Rp Rp Rp
575,240.40 191,746.80 191,746.80 170,441.60 21,819,208.14
NO VIII 1
2 3 4 5 6 7 8 9 10 11 12 IX 1 2
3
4
5
JENIS PEKERJAAN PEKERJAAN SANITASI Pekerjaan Septictank 1 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank Pekerjaan Pipa 4" Pekerjaan Pipa 2" Pekerjaan Pipa 3/4" (Air Bersih) Pek. Sumur Bor+pompa Pekerjaan kran air Pekerjaan stop kran Profil tank 1200 L Pek. Closed Duduk Pek. Wastafel+cermin Pek. Grill besi penutup saluran Pek. Bak air lindi & resapan PEKERJAAN JEMBATAN Pekerjaan Pondasi Batu Belah Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof c Cor Beton K.200 Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton K.200 Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton K.200 d Pek. Pas Batako e Pek. Plesteran
SATUANVOLUME ANALISA
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
m3 m2 m3
6.94 0.19 0.26
A. 2.3.1.1 A.2.3.1.11. A.4.1.1.5.
Rp Rp Rp
105,000.00 Rp 222,000.00 Rp 1,048,999.29 Rp
728,437.50 41,625.00 276,935.81
Kg m2 m3
26.06 2.40 0.18
A.4.1.1.17 A.4.1.1.21 A.4.1.1.5.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,048,999.29 Rp
394,191.94 535,248.00 188,819.87
Kg m2 m3 m2 m2
24.23 4.08 0.15 11.56 11.56
A.4.1.1.17 A.4.1.1.22 A.4.1.1.5. A.4.4.1.21a. A.4.4.2.4.
Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,048,999.29 167,865.75 79,356.00
Rp Rp Rp Rp Rp
366,486.28 1,527,184.80 160,496.89 1,940,528.07 917,355.36
Kg m2 m3
28.28 2.40 0.18
A.4.1.1.17 A.4.1.1.21 A.4.1.1.5.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,048,999.29 Rp
427,646.22 535,248.00 188,819.87
Kg m2 m3
4.66 1.20 0.17
A.4.1.1.17 A.4.1.1.24 A.4.1.1.5.
Rp Rp Rp
15,124.00 Rp 539,810.00 Rp 1,048,999.29 Rp
70,492.96 647,772.00 176,231.88
Kg m2 m3 Bh m3 m m m Bh Bh Bh Bh Bh Unit m unit
3.00 0.42 0.05 1.00 0.34 3.50 1.93 36.66 1.00 2.00 1.00 1.00 1.00 1.00 37.50 1.00
A.4.1.1.17 A.4.1.1.24 A.4.1.1.5. Ls A.2.3.1.11. A.5.1.1 32. A.5.1.1 29. A.5.1.1 26. Ls A.5.1.1 19. A.5.1.1 19.a Ls A.5.1.1.1. A.5.1.1 5. Ls Ls
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
m3
19.18
A.3.2.1.2.
kg m2 m3
102.56 12.44 1.09
kg m2 m3
15,124.00 539,810.00 1,048,999.29 12,287,000.00 222,000.00 148,872.50 72,446.25 31,635.00 2,500,000.00 135,500.00 135,500.00 1,600,000.00 2,542,200.00 1,668,200.00 89,400.00 1,360,000.00 Jumlah VII
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
45,402.25 226,720.20 51,400.97 12,287,000.00 74,592.00 521,053.75 139,821.26 1,159,739.10 2,500,000.00 271,000.00 135,500.00 1,600,000.00 2,542,200.00 1,668,200.00 3,352,500.00 1,360,000.00 37,058,649.98
Rp
1,104,825.00 Rp
21,190,543.50
A.4.1.1.17 A.4.1.1.21 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 223,020.00 Rp 1,078,920.71 Rp
1,551,043.33 2,774,368.80 1,178,181.42
51.28 7.28 0.55
A.4.1.1.17 A.4.1.1.23 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 386,310.00 Rp 1,078,920.71 Rp
775,521.67 2,812,336.80 589,090.71
kg m2 m3
250.87 11.89 4.03
A.4.1.1.17 A.4.1.1.24 A.4.1.1.6.
Rp Rp Rp
15,124.00 Rp 539,810.00 Rp 1,078,920.71 Rp
3,794,191.15 6,418,340.90 4,345,892.64
Kg m2 m3 m2 m2
22.59 2.40 0.18 3.10 6.60
A.4.1.1.17 A.4.1.1.22 A.4.1.1.6. A.4.4.1.21a. A.4.4.2.4.
Rp Rp Rp Rp Rp
15,124.00 374,310.00 1,078,920.71 167,865.75 79,356.00 Jumlah VIII
Rp Rp Rp Rp Rp
341,620.91 898,344.00 194,205.73 520,383.83 523,749.60
Rp
47,907,814.98
NO
JENIS PEKERJAAN
X 1 2 3 4 5 6 7 8
PEKERJAAN LISTRIK Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
XI 1 2 3
PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Pintu Pagar Besi Pekerjaan Handrail difabel stainless a Hanggar TPS3R panjang 2 m b Kantor panjang 0,95 m c WC Panjang 0,75 d Biaya pengelasan & pemasangan (100% fisik) Pekerjaan Rolling door Pek. Handrail closet Pekerjaan ukiran kayu Pek. Plesteran letter timbul
SATUANVOLUME ANALISA
HARGA SATUAN (Rp)
Unit Titik Bh Bh Bh Bh Titik Bh
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
Ls Ls Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp Rp
m2 m2
16.30 9.45
Ls Ls
Rp Rp
m m m m m2 m m2 Paket
13.54 4.75 4.29 22.58 7.27 1.20 19.20 1.00
Ls Ls Ls Ls A.4.2.1.10 Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp Rp
XII 1 2 3
PERALATAN TPS3R Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Unit Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8H Unit Mesin Pengayak Kapasitas 500 Kg/Jam Unit
52,000.00 52,000.00 52,000.00 52,000.00 810,400.00 52,000.00 625,000.00 830,000.00 Jumlah IX
Rp Rp Rp Rp Rp Rp Rp Rp Rp
704,080.00 247,000.00 223,080.00 1,174,160.00 5,889,582.00 62,400.00 12,000,000.00 830,000.00 32,016,302.00
1.00 1.00 1.00
Ls Ls Ls
Rp Rp Rp
XIII A 1 2 3 4 5 6 7 8 B 1 2 3 4 5 6 7
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA Sosialisasi K3 dan Prokes (Spanduk) Bh 4.00 Helm Keselamatan Bh 21.00 Rompi Kerja Bh 21.00 Sarung Tangan (Safety Glove) Bh 21.00 Sepatu Keselamatan (Rubber Shoes) Bh 21.00 Tali Pengaman Bh 3.00 Kotak P3K Bh 2.00 Asuransi Tenaga Kerja Paket 1.00 KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 Alat ukur suhu badan nir-sentuh (Thermoscan) Bh 2.00 Vitamin C (1 Box isi 100 tablet) Bh 25.00 Tempat Cuci Tangan Bh 2.00 Sabun Cuci Tangan (Cair) 200ml/btl Bh 4.00 Masker kain Bh 25.00 Alat penyemprot desinfektan Bh 2.00 Cairan Desinfektan 5L Bh 3.00
36,130,000.00 Rp 22,650,000.00 Rp 18,150,000.00 Rp Jumlah IX Rp
36,130,000.00 22,650,000.00 18,150,000.00 76,930,000.00
Ls Ls Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp Rp
75,000.00 100,000.00 60,000.00 5,000.00 100,000.00 231,500.00 40,000.00 912,000.00
Rp Rp Rp Rp Rp Rp Rp Rp
300,000.00 2,100,000.00 1,260,000.00 105,000.00 2,100,000.00 694,500.00 80,000.00 912,000.00
Ls Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp Rp
XIV 1 2 3 4 5 6
ADMINISTRASI KEGIATAN Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
350,000.00 25,000.00 250,000.00 25,000.00 5,000.00 65,000.00 75,000.00 Jumlah X
Rp Rp Rp Rp Rp Rp Rp Rp
700,000.00 625,000.00 500,000.00 100,000.00 125,000.00 130,000.00 225,000.00 9,956,500.00
Ls Ls Ls Ls Ls Ls
Rp Rp Rp Rp Rp Rp
270,000.00 250,000.00 150,000.00 10,000.00 500,000.00 250,000.00 Jumlah IX
Rp Rp Rp Rp Rp Rp Rp
270,000.00 250,000.00 150,000.00 80,000.00 500,000.00 250,000.00 1,500,000.00
TOTAL Rp DIBULATKAN Rp
705,002,362 705,000,000
4 5 6 7
Ls Ls Ls Ls Bh Paket
1.00 1.00 1.00 8.00 1.00 1.00
4,500,000.00 325,000.00 35,000.00 20,000.00 20,000.00 760,000.00 325,000.00 20,000.00 Jumlah IX
JUMLAH HARGA (Rp) Rp Rp Rp Rp Rp Rp Rp Rp Rp
4,500,000.00 4,225,000.00 455,000.00 80,000.00 80,000.00 760,000.00 1,950,000.00 120,000.00 12,170,000.00
320,000.00 Rp 600,000.00 Rp
5,216,000.00 5,670,000.00
JADWAL PELAKSANAAN PEKERJAAN PAKET : PEMBANGUNAN TPS3R KAB/KOTA KECAMATAN No. I
II
III
: PALANGKA RAYA : SABANGAU URAIAN PEKERJAAN
KELURAHAN BKM SATUAN
VOLUME
JML.BIAYA (Rp.)
BOBOT DURASI (%) (Minggu)
1
PEKERJAAN PERSIAPAN 1 Pembersihan Awal 2 Pengukuran dan Pemasangan Bowplank
m2 m
200.00 66.00
2,800,000.00 4,929,540.00
0.40 0.70
2 1
PEKERJAAN TANAH 1 Pek urugan tanah lokasi kegiatan 2 Pek. Galian Tanah Pondasi 3 Pek. Urugan Bekas Galian 4 Pek. Urugan Pasir bawah lantai 5 Pek. Pemancangan Cerucuk Kayu Galam (p. 2m)
m3 m3 m3 m3 Btg
218.55 11.68 2.92 45.49 372.00
35,405,100.00 1,226,610.00 204,435.00 10,099,672.44 18,637,200.00
5.02 0.17 0.03 1.43 2.64
2 0 0 0 0
Kg m3 m2 m3
318.33 0.67 2.24 2.69
4,814,347.30 641,617.92 494,636.80 2,900,138.88
0.68 0.09 0.07 0.41
0 0 0 0
Kg m3 m2 m3
218.55 0.34 1.52 1.37
3,305,312.39 326,537.69 335,646.40 1,475,963.54
0.47 0.05 0.05 0.21
0 0 0 0
Kg m3 m2 m3
39.95 0.05 1.92 0.19
604,153.39 45,829.85 423,974.40 207,152.78
0.09 0.01 0.06 0.03
0 0 0 0
Kg m2 m3
485.65 40.40 4.23
7,345,020.01 15,122,124.00 4,561,676.78
1.04 2.14 0.65
0 0 0
Kg m2 m3
148.41 15.43 1.76
2,244,497.39 5,775,603.30 1,895,933.43
0.32 0.82 0.27
0 0 0
Kg m2 m3
66.62 6.96 0.26
1,007,557.35 2,605,197.60 281,598.31
0.14 0.37 0.04
0 0 0
Kg m2 m3
393.92 11.60 3.48
5,957,668.77 2,587,032.00 3,754,644.09
0.85 0.37 0.53
0 0 0
Kg m2 m3
303.68 23.72 2.03
4,592,826.58 5,290,034.40 2,186,432.83
0.65 0.75 0.31
0 0 0
Kg m2 m3
275.43 11.60 2.32
4,165,565.51 4,481,196.00 2,503,096.06
0.59 0.64 0.36
0 0 0
PEKERJAAN BETON BERTULANG 1 Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 2 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 3 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 4 Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 5 Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 6 Pek Kolom K3 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 7 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 8 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 9 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200
2
: KERENG BANGKIRAI : KERENG MEMBANGUN
3
4
5
6
7
8
JADWAL PELAKSANAAN (Minggu Ke) 9 10 11 12 13 14
15
16
17
18
19
20
21
KETERANGAN
No.
URAIAN PEKERJAAN 10 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 11 Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 12 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu K.175 13 Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu K.200
IV
V
VI
PEKERJAAN DINDING, PLESTERAN DAN KERAMIK 1 Pek. Pasangan dinding Bataco a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 2 Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar 3 Cor Beton Lantai Beton Mutu K.200 4 Pek Keramik lantai Uk.40x40 5 Pek Keramik lantai WC Uk.20x20 6 Pek Keramik dinding WC Uk.10x20 7 Pek. Dinding Tawing layar PEKERJAAN ATAP, PLAFOND, LISPLANK 1 Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC 2 Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC 3 Pek. Lisplank Superplank Eksterior 4 Rangka Hollow Plafond Kantor 5 Pek. Pas. Plafond Kalsiboard PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG 1 Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R b Kantor c WC 2 Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R b Kantor c WC 3 Pek. Rangka Jendela Kaca Kayu Klas II 4 Pek.Pemasangan Kaca Tebal 5 mm 5 Pek. Engsel Pintu
SATUAN
VOLUME
JML.BIAYA (Rp.)
BOBOT DURASI (%) (Minggu)
1
Kg m2 m3
44.67 3.36 0.25
675,542.20 1,298,001.60 271,888.02
0.10 0.18 0.04
0 0 0
Kg m2 m3
282.53 17.79 0.62
4,272,923.98 6,872,454.90 665,154.62
0.61 0.97 0.09
0 0 0
Kg m3
1,053.65 48.72
15,935,374.47 51,102,918.08
2.26 7.25
0 0
Kg m2 m3
36.50 4.29 0.64
551,958.70 2,314,435.38 693,880.88
0.08 0.33 0.10
0 0 0
m2 m2 m2 m2
142.96 60.60 23.50 73.61
23,998,020.47 10,173,168.05 3,945,348.72 12,356,346.06
3.40 1.44 0.56 1.75
0 0 0 0
m2 m2 m2 m2 m3 m2 m2 m2 m2
205.28 89.03 38.21 93.01 5.04 46.21 3.68 8.16 64.20
16,290,136.20 7,065,382.10 3,031,875.34 7,380,822.20 5,439,098.26 11,964,784.75 916,172.80 2,649,368.40 13,716,330.00
2.31 1.00 0.43 1.05 0.77 1.70 0.13 0.38 1.95
0 0 0 0 0 0 0 0 0
m2 m2 m2
242.24 18.63 9.96
33,691,801.24 2,591,677.02 1,385,827.29
4.78 0.37 0.20
0 0 0
m2 m2 m2 m m2 m2
242.24 18.63 9.96 57.34 9.55 9.55
22,235,895.93 1,710,453.53 914,617.51 6,918,162.66 1,216,828.88 694,103.25
3.15 0.24 0.13 0.98 0.17 0.10
0 0 0 0 0 0
m3 m3 m3
0.12 0.06 0.02
1,007,342.05 504,977.00 182,836.50
0.14 0.07 0.03
0 0 0
m2 m2 m2 m2 m2 bh
3.60 1.80 1.80 2.26 7.48 12.00
3,027,600.00 1,513,800.00 1,513,800.00 1,427,596.80 1,314,213.30 745,800.00
0.43 0.21 0.21 0.20 0.19 0.11
0 0 0 0 0 0
2
3
4
5
6
7
8
JADWAL PELAKSANAAN (Minggu Ke) 9 10 11 12 13 14
15
16
17
18
19
20
21
KETERANGAN
No.
URAIAN PEKERJAAN 6 Pek. Engsel Jendela 7 Kunci Tanam 8 Hak angin Jendela 9 Gerendel Jendela 10 Handel Jendela 11 Pekerjaan Ventilasi Kerawang 12 Pekerjaan glasblock
VII
VIII
PEKERJAAN PENGECATAN 1 Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar 2 Pengecatan Plafond Kantor 3 Pengecatan Kusen Pintu dan Jendela 4 Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC 5 Pengecatan Rangka Jendela Kaca PEKERJAAN SANITASI 1 Pekerjaan Septictank 1 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank 2 Pekerjaan Pipa 4" 3 Pekerjaan Pipa 2" 4 Pekerjaan Pipa 3/4" (Air Bersih) 5 Pek. Sumur Bor+pompa 6 Pekerjaan kran air 7 Pekerjaan stop kran 8 Profil tank 1200 L
SATUAN
VOLUME
JML.BIAYA (Rp.)
BOBOT DURASI (%) (Minggu) 0.10 0 0.10 0 0.04 0 0.05 0 0.03 0 0.87 0 0.82 0
bh bh bh bh bh m2 m2
12.00 4.00 6.00 6.00 6.00 16.20 8.92
709,200.00 719,600.00 287,700.00 372,900.00 210,900.00 6,131,295.00 5,798,000.00
m2 m2 m2 m2 m2 m2
205.28 89.03 38.21 93.01 9.55 10.08
9,508,737.82 4,124,143.91 1,769,740.13 4,308,269.89 442,249.75 536,891.04
1.35 0.58 0.25 0.61 0.06 0.08
0 0 0 0 0 0
m2 m2 m2 m2
10.80 3.60 3.60 3.20
575,240.40 191,746.80 191,746.80 170,441.60
0.08 0.03 0.03 0.02
0 0 0 0
m3 m2 m3
6.94 0.19 0.26
728,437.50 41,625.00 276,935.81
0.10 0.01 0.04
0 0 0
Kg m2 m3
26.06 2.40 0.18
394,191.94 535,248.00 188,819.87
0.06 0.08 0.03
0 0 0
Kg m2 m3 m2 m2
24.23 4.08 0.15 11.56 11.56
366,486.28 1,527,184.80 160,496.89 1,940,528.07 917,355.36
0.05 0.22 0.02 0.28 0.13
0 0 0 0 0
Kg m2 m3
28.28 2.40 0.18
427,646.22 535,248.00 188,819.87
0.06 0.08 0.03
0 0 0
Kg m2 m3
4.66 1.20 0.17
70,492.96 647,772.00 176,231.88
0.01 0.09 0.02
0 0 0
Kg m2 m3 Bh m3 m m m Bh Bh Bh Bh
3.00 0.42 0.05 1.00 0.34 3.50 1.93 36.66 1.00 2.00 1.00 1.00
45,402.25 226,720.20 51,400.97 12,287,000.00 74,592.00 521,053.75 139,821.26 1,159,739.10 2,500,000.00 271,000.00 135,500.00 1,600,000.00
0.01 0.03 0.01 1.74 0.01 0.07 0.02 0.16 0.35 0.04 0.02 0.23
0 0 0 0 0 0 0 0 0 0 0 0
1
2
3
4
5
6
7
8
JADWAL PELAKSANAAN (Minggu Ke) 9 10 11 12 13 14
15
16
17
18
19
20
21
KETERANGAN
No.
URAIAN PEKERJAAN
SATUAN
9 Pek. Closed Duduk 10 Pek. Wastafel+cermin 11 Pek. Grill besi penutup saluran IX
X
XI
XII
XIII A
PEKERJAAN JEMBATAN 1 Pekerjaan Pondasi Batu Belah 2 Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof c Cor Beton K.200 3 Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton K.200 4 Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm 5 Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton K.200 d Pek. Pas Batako e Pek. Plesteran ### PEKERJAAN LISTRIK 1 Penyambungan Daya Baru PLN 2 Instalasi Titik Lampu 3 Lampu SL 18 Watt 4 Saklar Tunggal 5 Saklar Ganda 6 Pek. Pas. Panel Listrik 7 Pek. Instalasi stop kontak 8 Stop Kontak
Err:509
VOLUME
BOBOT DURASI (%) (Minggu) 2,542,200.00 0.36 0 1,668,200.00 0.24 0 3,352,500.00 0.48 0
JML.BIAYA (Rp.)
Bh Unit m
1.00 1.00 37.50
m3
19.18
21,190,543.50
3.01
0
kg m2 m3
102.56 12.44 1.09
1,551,043.33 2,774,368.80 1,178,181.42
0.22 0.39 0.17
0 0 0
kg m2 m3
51.28 7.28 0.55
775,521.67 2,812,336.80 589,090.71
0.11 0.40 0.08
0 0 0
kg m2 m3
250.87 11.89 4.03
3,794,191.15 6,418,340.90 4,345,892.64
0.54 0.91 0.62
0 0 0
Kg m2 m3 m2 m2 Err:509
22.59 2.40 0.18 3.10 6.60 Err:509
Unit Titik Bh Bh Bh Bh Titik Bh
1.00 13.00 13.00 4.00 4.00 1.00 6.00 6.00
4,500,000.00 4,225,000.00 455,000.00 80,000.00 80,000.00 760,000.00 1,950,000.00 120,000.00
0.64 0.60 0.06 0.01 0.01 0.11 0.28 0.02
0 0 0 0 0 0 0 0
341,620.91 0.05 898,344.00 0.13 194,205.73 0.03 520,383.83 0.07 523,749.60 0.07 Err:509 Err:509
0 0 0 0 0 0
PEKERJAAN LAIN-LAIN 1 Pekerjaan Pagar Besi BRC 2 Pekerjaan Pintu Pagar Besi 3 Pekerjaan Handrail difabel stainless a Hanggar TPS3R panjang 2 m b Kantor panjang 0,95 m c WC Panjang 0,75 d Biaya pengelasan & pemasangan (100% fisik) 4 Pekerjaan Rolling door 5 Pek. Handrail closet 6 Pekerjaan ukiran kayu 7 Pek. Plesteran letter timbul
m2 m2
16.30 9.45
5,216,000.00 5,670,000.00
0.74 0.80
0 0
m m m m m2 m m2 Paket
13.54 4.75 4.29 22.58 7.27 1.20 19.20 1.00
704,080.00 247,000.00 223,080.00 1,174,160.00 5,889,582.00 62,400.00 12,000,000.00 830,000.00
0.10 0.04 0.03 0.17 0.84 0.01 1.70 0.12
0 0 0 0 0 0 0 0
PERALATAN TPS3R 1 Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP 2 Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP 3 Mesin Pengayak Kapasitas 500 Kg/Jam
Unit Unit Unit
1.00 1.00 1.00
36,130,000.00 22,650,000.00 18,150,000.00
5.12 3.21 2.57
0 0 0
KEBUTUHAN K3 DAN PROKES PENCEGAHAN COVID - 19 KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA 1 Sosialisasi K3 dan Prokes (Spanduk) 2 Helm Keselamatan
Bh Bh
4.00 21.00
300,000.00 2,100,000.00
0.04 0.30
1
2
3
4
5
6
7
8
JADWAL PELAKSANAAN (Minggu Ke) 9 10 11 12 13 14
15
16
17
18
19
20
21
KETERANGAN
No.
B
XIV
URAIAN PEKERJAAN 3 Rompi Kerja 4 Sarung Tangan (Safety Glove) 5 Sepatu Keselamatan (Rubber Shoes) 6 Tali Pengaman 7 Kotak P3K 8 Asuransi Tenaga Kerja KEBUTUHAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19 1 Alat ukur suhu badan nir-sentuh (Thermoscan) 2 Vitamin C (1 Box isi 100 tablet) 3 Tempat Cuci Tangan 4 Sabun Cuci Tangan (Cair) 200ml/btl 5 Masker kain 6 Alat penyemprot desinfektan 7 Cairan Desinfektan 5L ADMINISTRASI KEGIATAN 1 Pelaporan KSM 2 Photo Copy / Penggandaan 3 Biaya Alat Tulis Kantor (ATK) 4 Materai 5 Pengujian Lab 6 Papan Nama Kegiatan JUMLAH
SATUAN
VOLUME
JML.BIAYA (Rp.)
BOBOT DURASI (%) (Minggu) 0.18 0.01 0.30 0.10 0.01 0.13
Bh Bh Bh Bh Bh Paket
21.00 21.00 21.00 3.00 2.00 1.00
1,260,000.00 105,000.00 2,100,000.00 694,500.00 80,000.00 912,000.00
Bh Bh Bh Bh Bh Bh Bh
2.00 25.00 2.00 4.00 25.00 2.00 3.00
700,000.00 625,000.00 500,000.00 100,000.00 125,000.00 130,000.00 225,000.00
0.10 0.09 0.07 0.01 0.02 0.02 0.03
Ls Ls Ls Ls Bh Paket
1.00 1.00 1.00 8.00 1.00 1.00
270,000.00 250,000.00 150,000.00 80,000.00 500,000.00 250,000.00
0.04 0.04 0.02 0.01 0.07 0.04
Err:509 Err:509
1
2
3
4
5
6
7
8
JADWAL PELAKSANAAN (Minggu Ke) 9 10 11 12 13 14
15
16
17
18
19
20
21
KETERANGAN
RAB-6 BANTUAN PEMERINTAH UNTUK MASYARAKAT ( BPM ) DFAT
PROGRAM KOTA TANPA KUMUH (KOTAKU) REKAPITULASI RENCANA ANGGARAN BIAYA Kab./Kota
: Palangka Raya
Kecamatan
: Sebangau
Kelurahan BKM
: Kereng Bangkirai : Kereng Membangun
NO.
NAMA PAKET
PEKERJAAN
01. PEKERJAAN PERSIAPANPembersihan Awal Pengukuran dan Pemasangan Bowplank 02. PEKERJAAN TANAH
Pek urugan tanah lokasi kegiatan Pek. Galian Tanah Pondasi Pek. Urugan Bekas Galian Pek. Urugan Pasir bawah lantai Pek. Pemancangan Cerucuk Kayu Galam (p. 2m)
03. PEKERJAAN BETON BERTULANG
Pondasi Footplat P1 (80 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pondasi Footplat P2 (60 cm x 60 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pondasi Footplat P3 (120 cm x 80 cm x 20 cm) a Pek. Pembesian b Pek. Lantai Kerja Beton K.100 t=5 cm c Pek. Bekisting Pondasi d Cor Beton Mutu K.200 Pek Kolom K1 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pek Kolom K2 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pek Kolom K3 a Pek. Pembesian b Pek. Bekisting Kolom c Cor Beton Mutu K.200 Pekerjaan Sloof 20x30 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Sloof 15x20 a Pek. Pembesian b Pek. Bekisting Sloof c Cor Beton Mutu K.200 Pekerjaan Ring Balok 20x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan Balok 15x20 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200
SATUAN VOLUME m2 m m3 m3 m3 m3 Btg
200.00 66.00 JUMLAH 218.55 11.68 2.92 45.49 372.00 JUMLAH
JUMLAH HARGA (Rp.) Rp Rp Rp Rp Rp Rp Rp
2,800,000.00 4,929,540.00 7,729,540.00 35,405,100.00 1,226,610.00 204,435.00 10,099,672.44 18,637,200.00 65,573,017.44
Kg m3 m2 m3
318.33 0.67 2.24 2.69
Rp Rp Rp Rp
4,814,347.30 641,617.92 494,636.80 2,900,138.88
Kg m3 m2 m3
218.55 0.34 1.52 1.37
Rp Rp Rp Rp
3,305,312.39 326,537.69 335,646.40 1,475,963.54
Kg m3 m2 m3
39.95 0.05 1.92 0.19
Rp Rp Rp Rp
604,153.39 45,829.85 423,974.40 207,152.78
Kg m2 m3
485.65 40.40 4.23
Rp Rp Rp
7,345,020.01 15,122,124.00 4,561,676.78
Kg m2 m3
148.41 15.43 1.76
Rp Rp Rp
2,244,497.39 5,775,603.30 1,895,933.43
Kg m2 m3
66.62 6.96 0.26
Rp Rp Rp
1,007,557.35 2,605,197.60 281,598.31
Kg m2 m3
393.92 11.60 3.48
Rp Rp Rp
5,957,668.77 2,587,032.00 3,754,644.09
Kg m2 m3
303.68 23.72 2.03
Rp Rp Rp
4,592,826.58 5,290,034.40 2,186,432.83
Kg m2 m3
275.43 11.60 2.32
Rp Rp Rp
4,165,565.51 4,481,196.00 2,503,096.06
Kg m2 m3
44.67 3.36 0.25
Rp Rp Rp
675,542.20 1,298,001.60 271,888.02
NO.
NAMA PAKET
PEKERJAAN Pekerjaan Ring Balok 15/15 a Pek. Pembesian b Pek. Bekisting Ring Balok c Cor Beton Mutu K.200 Pekerjaan lantai beton bertulang a Pek. Pembesian b Cor Beton Mutu K.175 Pek. Plat /Dak Beton a Pembesian b Pek. Bekisting c Cor Beton Mutu K.200
04. PEKERJAAN DINDING, Pek. Pasangan dinding Bataco PLESTERAN DAN a Bangunan Hanggar TPS3R KERAMIK b Kantor c WC d Pagar Pek. Plesteran Dinding a Bangunan Hanggar TPS3R b Kantor c WC d Pagar Cor Beton Lantai Beton Mutu K.200 Pek Keramik lantai Uk.40x40 Pek Keramik lantai WC Uk.20x20 Pek Keramik dinding WC Uk.10x20 Pek. Dinding Tawing layar 05. PEKERJAAN ATAP, PLAFOND, LISPLANK
06. PEKERJAAN PINTU, JENDELA, KUNCI & PENGGANTUNG
Rangka Atap Baja Ringan a Hanggar TPS3R b Kantor c WC Pek Atap Genteng Metal Zincalume a Hanggar TPS3R b Kantor c WC Pek. Lisplank Superplank Eksterior Rangka Hollow Plafond Kantor Pek. Pas. Plafond Kalsiboard Pek. Kusen Pintu dan Jendela Kayu Klas II a Hanggar TPS3R b Kantor c WC Pek. Daun Pintu Panel Kayu Klas II a Hanggar TPS3R b Kantor c WC Pek. Rangka Jendela Kaca Kayu Klas II Pek.Pemasangan Kaca Tebal 5 mm Pek. Engsel Pintu Pek. Engsel Jendela Kunci Tanam Hak angin Jendela Gerendel Jendela Handel Jendela Pekerjaan Ventilasi Kerawang Pekerjaan glasblock
SATUAN VOLUME
JUMLAH HARGA (Rp.)
Kg m2 m3
282.53 17.79 0.62
Rp Rp Rp
4,272,923.98 6,872,454.90 665,154.62
Kg m3
1053.65 48.72
Rp Rp
15,935,374.47 51,102,918.08
Kg m2 m3
36.50 Rp 4.29 Rp 0.64 Rp JUMLAH
551,958.70 2,314,435.38 693,880.88 176,587,548.53
m2 m2 m2 m2
142.96 60.60 23.50 73.61
Rp Rp Rp Rp
23,998,020 10,173,168 3,945,349 12,356,346
m2 m2 m2 m2 m3 m2 m2 m2 m2
205.28 89.03 38.21 93.01 5.04 46.21 3.68 8.16 64.20 JUMLAH
Rp Rp Rp Rp Rp Rp Rp Rp Rp
16,290,136 7,065,382 3,031,875 7,380,822 5,439,098 11,964,785 916,173 2,649,368 13,716,330 118,926,853.35
m2 m2 m2
242.24 18.63 9.96
Rp Rp Rp
33,691,801 2,591,677 1,385,827
m2 m2 m2 m m2 m2
242.24 18.63 9.96 57.34 9.55 9.55 JUMLAH
Rp Rp Rp Rp Rp Rp
22,235,896 1,710,454 914,618 6,918,163 1,216,829 694,103 71,359,367.32
Rp Rp Rp
1,007,342 504,977 182,837
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
3,027,600 1,513,800 1,513,800 1,427,597 1,314,213 745,800 709,200 719,600 287,700 372,900 210,900 6,131,295 5,798,000 25,467,560.65
m3 m3 m3 m2 m2 m2 m2 m2 bh bh bh bh bh bh m2 m2
0.12 0.06 0.02 3.60 1.80 1.80 2.26 7.48 12.00 12.00 4.00 6.00 6.00 6.00 16.20 8.92 JUMLAH
NO.
NAMA PAKET
07. PEKERJAAN PENGECATAN
PEKERJAAN Pengecatan dinding a Hanggar TPS3R b Kantor c WC d Pagar Pengecatan Plafond Kantor Pengecatan Kusen Pintu dan Jendela Pengecatan Pintu Panel a Hanggar TPS3R b Kantor c WC Pengecatan Rangka Jendela Kaca
08. PEKERJAAN SANITASI Pekerjaan Septictank 1 unit a Galian Septictank b Pek. Urugan Pasir t=5 cm c Pek Cor Beton K.175 tebal 10 cm d Pek. Sloof 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 e Pek. Kolom 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 f Pek. Pas. Batako g Pek. Plesteran h Pek. Ring Balk 15/15 - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 i Pek. Plat penutup septictank tebal 10 cm - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 j Pek. Tutup mainhole - Pek. Pembesian - Pek. bekisting - Pek cor beton K.175 k Bioseptictank Kapasitas 3000L l Urugan Pasir dalam septictank Pekerjaan Pipa 4" Pekerjaan Pipa 2" Pekerjaan Pipa 3/4" (Air Bersih) Pek. Sumur Bor+pompa Pekerjaan kran air Pekerjaan stop kran Profil tank 1200 L Pek. Closed Duduk Pek. Wastafel+cermin Pek. Grill besi penutup saluran Pek. Bak air lindi & resapan
SATUAN VOLUME
JUMLAH HARGA (Rp.)
m2 m2 m2 m2 m2 m2
205.28 89.03 38.21 93.01 9.55 10.08
Rp Rp Rp Rp Rp Rp
9,508,738 4,124,144 1,769,740 4,308,270 442,250 536,891
m2 m2 m2 m2
10.80 3.60 3.60 3.20 JUMLAH
Rp Rp Rp Rp
575,240 191,747 191,747 170,442 21,819,208.14
m3 m2 m3
6.94 0.19 0.26
Rp Rp Rp
728,438 41,625 276,936
Kg m2 m3
26.06 2.40 0.18
Rp Rp Rp
394,192 535,248 188,820
Kg m2 m3 m2 m2
24.23 4.08 0.15 11.56 11.56
Rp Rp Rp Rp Rp
366,486 1,527,185 160,497 1,940,528 917,355
Kg m2 m3
28.28 2.40 0.18
Rp Rp Rp
427,646 535,248 188,820
Kg m2 m3
4.66 1.20 0.17
Rp Rp Rp
70,493 647,772 176,232
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
45,402 226,720 51,401 12,287,000 74,592 521,054 139,821 1,159,739 2,500,000 271,000 135,500 1,600,000 2,542,200 1,668,200 3,352,500 1,360,000 37,058,649.98
Kg m2 m3 Bh m3 m m m Bh Bh Bh Bh Bh Unit m unit
3.00 0.42 0.05 1.00 0.34 3.50 1.93 36.66 1.00 2.00 1.00 1.00 1.00 1.00 37.50 1.00 JUMLAH
NO.
NAMA PAKET
PEKERJAAN
09. PEKERJAAN JEMBATAN Pekerjaan Pondasi Batu Belah Pekerjaan Sloof 20/30 a Pek. Pembesian b Pekerjaan Bekisting Sloof c Cor Beton K.200 Pekerjaan Balok 20/30 a Pek. Pembesian b Pekerjaan Bekisting Balok c Cor Beton K.200 Pekerjaan Plat beton a Pek. Pembersian b Pekerjaan Bekisting Plat c Cor Beton K200 tebal 20 cm Pekerjaan Reling jembatan a Pembesian Kolom 15/15 b Pek. Bekisting Kolom c Cor Beton K.200 d Pek. Pas Batako e Pek. Plesteran 10. PEKERJAAN LISTRIK
Penyambungan Daya Baru PLN Instalasi Titik Lampu Lampu SL 18 Watt Saklar Tunggal Saklar Ganda Pek. Pas. Panel Listrik Pek. Instalasi stop kontak Stop Kontak
11. PEKERJAAN LAIN-LAIN Pekerjaan Pagar Besi BRC Pekerjaan Pintu Pagar Besi Pekerjaan Handrail difabel stainless a Hanggar TPS3R panjang 2 m b Kantor panjang 0,95 m c WC Panjang 0,75 d Biaya pengelasan & pemasangan (100% fisik) Pekerjaan Rolling door Pek. Handrail closet Pekerjaan ukiran kayu Pek. Plesteran letter timbul 12. PERALATAN TPS3R
Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8HP Mesin Pengayak Kapasitas 500 Kg/Jam
13. KEBUTUHAN K3 DAN Sosialisasi K3 dan Prokes (Spanduk) PROKES PENCEGAHAN Helm Keselamatan COVID - 19 Rompi Kerja Sarung Tangan (Safety Glove) Sepatu Keselamatan (Rubber Shoes) Tali Pengaman Kotak P3K Asuransi Tenaga Kerja Alat ukur suhu badan nir-sentuh (Thermoscan) Vitamin C (1 Box isi 100 tablet) Tempat Cuci Tangan Sabun Cuci Tangan (Cair) 200ml/btl Masker kain Alat penyemprot desinfektan Cairan Desinfektan 5L
SATUAN VOLUME
JUMLAH HARGA (Rp.)
m3
19.18
Rp
21,190,544
kg m2 m3
102.5551 12.44 1.092
Rp Rp Rp
1,551,043 2,774,369 1,178,181
kg m2 m3
51.27755 7.28 0.546
Rp Rp Rp
775,522 2,812,337 589,091
kg m2 m3
250.8722 11.89 4.028
Rp Rp Rp
3,794,191 6,418,341 4,345,893
Kg m2 m3 m2 m2
22.588 2.4 0.18 3.1 6.6 JUMLAH 1 13 13 4 4 1 6 6 JUMLAH 16.30 9.45
Rp Rp Rp Rp Rp
341,621 898,344 194,206 520,384 523,750 47,907,814.98 4,500,000 4,225,000 455,000 80,000 80,000 760,000 1,950,000 120,000 12,170,000.00 5,216,000 5,670,000
13.54 4.75 4.29 22.58 7.27 1.20 19.20 1.00 JUMLAH 1.00 1.00 1.00 JUMLAH 4.00 21.00 21.00 21.00 21.00 3.00 2.00 1.00 2.00 25.00 2.00 4.00 25.00 2.00 3.00 JUMLAH
Rp Rp Rp Rp Rp Rp Rp Rp
Unit Titik Bh Bh Bh Bh Titik Bh m2 m2 m m m m m2 m m2 Paket Unit Unit Unit Bh Bh Bh Bh Bh Bh Bh Paket Bh Bh Bh Bh Bh Bh Bh
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp
704,080 247,000 223,080 1,174,160 5,889,582 62,400 12,000,000 830,000 32,016,302.00 36,130,000 22,650,000 18,150,000 76,930,000.00 300,000 2,100,000 1,260,000 105,000 2,100,000 694,500 80,000 912,000 700,000 625,000 500,000 100,000 125,000 130,000 225,000 9,956,500.00
NO.
NAMA PAKET
PEKERJAAN
SATUAN VOLUME Ls Ls Ls Ls Bh Paket
14. ADMINISTRASI KEGIAT Pelaporan KSM Photo Copy / Penggandaan Biaya Alat Tulis Kantor (ATK) Materai Pengujian Lab Papan Nama Kegiatan
Diverifikasi Oleh : Askot Infrastruktur,
Fasilitator Teknik,
Wiwit Whindari, ST.
Hengky Pradana, ST
Dibuat Oleh :
JUMLAH HARGA (Rp.)
1.00 1.00 1.00 8.00 1.00 1.00 JUMLAH
270,000 250,000 150,000 80,000 500,000 250,000 1,500,000.00
TOTAL
705,002,362.40
PEMBULATAN
705,000,000.00
UPL
FORM - RPD
RENCANA PENGGUNAAN DANA (RPD) KSM/PANITIA
Kab./Kota Kecamatan Kel/Desa KSM/Panit
: Palangka Raya : Sebangau : Kereng Bangkirai : Kereng Membangun 3
NO.
URAIAN
(1)
Nama Paket
:
TPS 3R
JUMLAH HARGA RPD TAHAP-I SESUAI SPPD-L (70%) (Rp.)
(2)
RPD TAHAP-II (30%) (5)
(4)
TENAGA KERJA 1. Kepala Tukang 1.
8,670,000
6,069,000
2,601,000
2. Tukang Batu
23,095,000
16,166,500
6,928,500
3. Tukang Kayu
19,800,000
13,860,000
5,940,000
4. Tukang Besi
20,250,000
14,175,000
6,075,000
5. Tukang Cat
3,750,000
2,625,000
1,125,000
126,000,000
88,200,000
37,800,000
201,565,000
141,095,500
60,469,500
1. Kayu balok 5/7 Klas III
1,781,250
1,246,875
534,375
2. Paku 5 -10 cm
1,672,000
1,170,400
501,600
3. Kayu papan 2/20 Klas III
27,273,900
19,091,730
8,182,170
4. Tanah Urug
28,100,000
19,670,000
8,430,000
5. Pasir Urug
7,950,000
5,565,000
2,385,000
6. Kayu Galam ø 10-12 m
6,825,000
4,777,500
2,047,500
6. Pekerja JUMLAH BAHAN
7. Besi Beton Besi beton polos dia. 8
20,025,000
-
-
14,017,500
6,007,500
Besi beton polos dia. 10
7,000,000
4,900,000
2,100,000
Besi beton polos dia. 12
20,806,000
14,564,200
6,241,800
8. Kawat Beton 9. Semen Portland 10. Pasir Beton
1,750,000
1,225,000
525,000
40,596,000
28,417,200
12,178,800
6,120,000
4,284,000
1,836,000
14,400,000
10,080,000
4,320,000
13. Balok Kayu Klas II uk.5/7
8,008,000
5,605,600
2,402,400
14. Dolken Kayu ø8-10
9,240,000
6,468,000
2,772,000
11. Split
15. Plywood 9 mm
1,040,000
728,000
312,000
16. Batako
11,480,000
8,036,000
3,444,000
17. Pasir Pasang
22,350,000
15,645,000
6,705,000
3,675,000
2,572,500
1,102,500
19. Semen Warna
240,000
168,000
72,000
20. Ubin Keramik 20x20
260,000
182,000
78,000
21. Ubin Keramik 10x20
588,600
412,020
176,580
22. Paku GRC
175,000
122,500
52,500
18. Ubin Keramik 40x40
23. Kalsiboard Tebal 9 mm
3,610,000
2,527,000
1,083,000
24. Baja Ringan 75x35x0,75 MM
24,125,000
16,887,500
7,237,500
25. Baja Ringan 30x30x0,3 MM
3,350,000
2,345,000
1,005,000
26. Paku Skrup
4,200,000
2,940,000
1,260,000
11,000,000
7,700,000
3,300,000
1,890,000
1,323,000
567,000
27. Genteng Metal 28. Paku Genteng Metal
NO.
URAIAN 29. Papan Plank Kalsiboard 30. Besi Hollow Plafond 1,3x3,3 32. Kalsiboard 6 mm 33. Paku Kalsiboard
4,185,000
2,929,500
RPD TAHAP-II (30%)
1,255,500
90,000
63,000
27,000
660,000
462,000
198,000
75,000
52,500
22,500
9,360,000
6,552,000
2,808,000
33,000
23,100
9,900
36. Papan Kayu Klas II Benuas
1,680,000
1,176,000
504,000
37. Kaca Tebal 5 mm
1,120,500
784,350
336,150
34. Balok kayu kelas II 5/10 untuk kusen 35. Lem Kayu
38. Sealant
2.
JUMLAH HARGA RPD TAHAP-I SESUAI SPPD-L (70%) (Rp.)
47,500
33,250
14,250
39. Engsel pintu
420,000
294,000
126,000
40. Engsel jendela
492,000
344,400
147,600
41. Kunci tanam biasa
380,000
266,000
114,000
42. Kait angin
124,800
87,360
37,440
43. Grendel/Kunci Slot
210,000
147,000
63,000
44. Handel Jendela
48,000
33,600
14,400
4,875,000
3,412,500
1,462,500
46. Glassblock
5,798,000
4,058,600
1,739,400
47. Cat tembok
12,100,000
8,470,000
3,630,000
49. Cat Menie kayu
180,000
126,000
54,000
50. Cat dasar Kayu
300,000
210,000
90,000
51. Cat Penutup Kayu
45. Roster/Kerawang
480,000
336,000
144,000
52. Kuas
45,000
31,500
13,500
53. Pengencer
28,100
19,670
8,430
54. Ampelas
80,000
56,000
24,000
1,800,000
1,260,000
540,000
130,000
91,000
39,000
55. Closet Duduk 57. Kran air 59. Stop Kran 3/4
65,000
45,500
19,500
60. Pipa PVC 4”
295,000
206,500
88,500
62. Pipa PVC 3/4”
294,000
205,800
88,200
64. Pipa PVC 2”
127,500
89,250
38,250
66. Wastafel+cermin
940,000
658,000
282,000
21,287,000
14,900,900
6,386,100
69. Profil Tank 1200 L
1,600,000
1,120,000
480,000
70. Sumur bor+pompa
2,500,000
1,750,000
750,000
71. Grill besi penutup saluran
3,352,500
2,346,750
1,005,750
72. Batu belah
7,200,000
5,040,000
2,160,000
74. Penyambungan Daya Baru PLN
4,500,000
3,150,000
1,350,000
75. Instalasi Titik Lampu
4,225,000
2,957,500
1,267,500
455,000
318,500
136,500
80,000
56,000
24,000
68. Bioseptictank Kapasitas 3000L
76. Lampu SL 18 Watt 77. Saklar Tunggal 78. Saklar Ganda
80,000
56,000
24,000
760,000
532,000
228,000
1,950,000
1,365,000
585,000
120,000
84,000
36,000
82. Pagar Besi BRC
5,232,000
3,662,400
1,569,600
83. Pekerjaan Pintu Pagar Besi
4,725,000
3,307,500
1,417,500
84. Pekerjaan Handrailing difabel stainless
1,170,000
819,000
351,000
85. Biaya pengelasan
1,170,000
819,000
351,000
79. Pek. Pas Panel Listrik 80. Pek. Instalasi Stop Kontak 81. Stop Kontak
NO.
JUMLAH HARGA RPD TAHAP-I SESUAI SPPD-L (70%) (Rp.)
URAIAN 86. Pekerjaan Rolling door
5,889,582
87. Pek. Handrail WC
4,122,707
RPD TAHAP-II (30%)
1,766,875
62,000
43,400
18,600
12,000,000
8,400,000
3,600,000
800,000
560,000
240,000
415,152,232
290,606,562
124,545,670
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP
36,130,000
25,291,000
10,839,000
2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel
22,650,000
15,855,000
6,795,000
3. Mesin Pengayak Kapasitas 500 Kg/Jam
18,150,000
12,705,000
5,445,000
76,930,000
53,851,000
23,079,000
300,000
210,000
90,000
2. Helm Keselamatan
2,100,000
1,470,000
630,000
3. Rompi Kerja
1,260,000
882,000
378,000
88. Pekerjaan ukiran kayu 89. Pek. Plesteran letter timbul JUMLAH ALAT 3.
JUMLAH KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA 1. Sosialisasi K3 dan Prokes (Spanduk)
4. Sarung Tangan (Safety Glove)
105,000
73,500
31,500
2,100,000
1,470,000
630,000
694,500
486,150
208,350
80,000
56,000
24,000
8. Asuransi Tenaga Kerja
912,000
638,400
273,600
9. Alat ukur suhu badan nir-sentuh (Thermoscan)
700,000
490,000
210,000
10. Vitamin C (1 Box isi 100 tablet)
625,000
437,500
187,500
11. Tempat Cuci Tangan
500,000
350,000
150,000
12. Sabun Cuci Tangan (Cair) 200ml/btl
100,000
70,000
30,000
13. Masker kain
100,000
70,000
30,000
14. Alat penyemprot desinfektan
130,000
91,000
39,000
15. Cairan Desinfektan 5L
225,000
157,500
67,500
9,931,500
6,952,050
2,979,450
1. Pelaporan KSM
270,000
189,000
81,000
2. Photo Copy / Penggandaan
250,000
175,000
75,000
3. Biaya Alat Tulis Kantor (ATK)
150,000
105,000
45,000
80,000
56,000
24,000
5. Pengujian Lab
500,000
350,000
150,000
6. Papan Nama Kegiatan
250,000
175,000
75,000
1,500,000
1,050,000
450,000
TOTAL
705,078,732
493,555,112
211,523,620
Dibulatkan
705,000,000
493,500,000
211,500,000
5. Sepatu Keselamatan (Rubber Shoes) 6. Tali Pengaman 4.
7. Kotak P3K
JUMLAH ADMINISTRASI
4.
4. Materai
JUMLAH
Diverifikasi Oleh : Fasilitator Teknik,
Dibuat Oleh KSM Kereng Membangun 3
Hengky Pradana, ST
Aldius
FORM - RPD
RENCANA PENGGUNAAN DANA (RPD) KSM/PANITIA
Kab./Kota Kecamatan Kel/Desa KSM/Panit
: Palangka Raya : Sebangau : Kereng Bangkirai : Kereng Membangun 3
NO.
Nama Paket
JUMLAH HARGA SESUAI SPPD-L (Rp.)
URAIAN
(1)
(2)
:
TPS 3R
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.) (5)
(4)
TENAGA KERJA 1. Kepala Tukang 1.
8,670,000
4,420,000
4,250,000
2. Tukang Batu
23,095,000
13,640,000
9,455,000
3. Tukang Kayu
19,800,000
12,600,000
7,200,000
4. Tukang Besi
20,250,000
13,500,000
6,750,000
5. Tukang Cat
3,750,000
-
3,750,000
126,000,000
71,400,000
54,600,000
201,565,000
115,560,000
86,005,000
1. Kayu balok 5/7 Klas III
1,781,250
1,781,250
-
2. Paku 5 -10 cm
1,672,000
1,320,000
352,000
3. Kayu papan 2/20 Klas III
27,273,900
26,003,500
1,270,400
4. Tanah Urug
28,100,000
26,200,000
1,900,000
5. Pasir Urug
7,950,000
7,950,000
-
6. Kayu Galam ø 10-12 m
6,825,000
6,825,000
-
6. Pekerja JUMLAH BAHAN
7. Besi Beton Besi beton polos dia. 8
20,025,000
-
-
6,660,000
13,365,000 -
Besi beton polos dia. 10
7,000,000
7,000,000
Besi beton polos dia. 12
20,806,000
20,806,000
-
1,750,000
1,250,000
500,000
40,596,000
20,196,000
20,400,000
6,120,000
2,880,000
3,240,000
14,400,000
5,850,000
8,550,000
13. Balok Kayu Klas II uk.5/7
8,008,000
6,440,000
1,568,000
14. Dolken Kayu ø8-10
9,240,000
6,600,000
2,640,000 520,000
8. Kawat Beton 9. Semen Portland 10. Pasir Beton 11. Split
15. Plywood 9 mm
1,040,000
520,000
16. Batako
11,480,000
11,480,000
-
17. Pasir Pasang
22,350,000
19,200,000
3,150,000
18. Ubin Keramik 40x40
3,675,000
-
3,675,000
19. Semen Warna
240,000
-
240,000
20. Ubin Keramik 20x20
260,000
-
260,000
NO.
URAIAN
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.)
21. Ubin Keramik 10x20
588,600
-
588,600
22. Paku GRC
175,000
-
175,000
23. Kalsiboard Tebal 9 mm
3,610,000
3,610,000
24. Baja Ringan 75x35x0,75 MM
24,125,000
24,375,000 -
25. Baja Ringan 30x30x0,3 MM
3,350,000
3,350,000
-
26. Paku Skrup
250,000
4,200,000
1,750,000
2,450,000
11,000,000
11,000,000
-
28. Paku Genteng Metal
1,890,000
1,890,000
-
29. Papan Plank Kalsiboard
4,185,000
-
4,185,000
90,000
-
90,000
32. Kalsiboard 6 mm
660,000
-
660,000
33. Paku Kalsiboard
75,000
-
75,000
9,360,000
9,360,000
-
27. Genteng Metal
30. Besi Hollow Plafond 1,3x3,3
34. Balok kayu kelas II 5/10 untuk kusen 35. Lem Kayu
33,000
-
33,000
36. Papan Kayu Klas II Benuas
1,680,000
-
1,680,000
37. Kaca Tebal 5 mm
1,120,500
-
1,120,500
47,500
-
47,500
39. Engsel pintu
420,000
-
420,000
40. Engsel jendela
492,000
-
492,000
41. Kunci tanam biasa
380,000
-
380,000
42. Kait angin
124,800
-
124,800
43. Grendel/Kunci Slot
210,000
-
210,000
48,000
-
48,000
45. Roster/Kerawang
4,875,000
4,875,000
-
46. Glassblock
5,798,000
5,798,000
-
47. Cat tembok
12,100,000
-
12,100,000
49. Cat Menie kayu
180,000
-
180,000
50. Cat dasar Kayu
300,000
-
300,000
51. Cat Penutup Kayu
480,000
-
480,000
52. Kuas
45,000
-
45,000
53. Pengencer
28,100
-
28,100
38. Sealant
2.
JUMLAH HARGA SESUAI SPPD-L (Rp.)
44. Handel Jendela
54. Ampelas
80,000
-
80,000
1,800,000
-
1,800,000
130,000
-
130,000
59. Stop Kran 3/4
65,000
-
65,000
60. Pipa PVC 4”
295,000
-
295,000
62. Pipa PVC 3/4”
294,000
-
294,000
64. Pipa PVC 2”
127,500
-
127,500
66. Wastafel+cermin
940,000
-
940,000
55. Closet Duduk 57. Kran air
68. Bioseptictank Kapasitas 3000L
21,287,000
21,287,000
-
69. Profil Tank 1200 L
1,600,000
-
1,600,000
70. Sumur bor+pompa
2,500,000
2,500,000
-
71. Grill besi penutup saluran
3,352,500
72. Batu belah
7,200,000
74. Penyambungan Daya Baru PLN
4,500,000
9,200,000 -
3,352,500 2,000,000 4,500,000
NO.
JUMLAH HARGA SESUAI SPPD-L (Rp.)
URAIAN 75. Instalasi Titik Lampu
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.)
4,225,000
-
4,225,000
455,000
-
455,000
77. Saklar Tunggal
80,000
-
80,000
78. Saklar Ganda
80,000
-
80,000
760,000
-
760,000
1,950,000
-
1,950,000
120,000
-
120,000
82. Pagar Besi BRC
5,232,000
-
5,232,000
83. Pekerjaan Pintu Pagar Besi
4,725,000
-
4,725,000
84. Pekerjaan Handrailing difabel stainless
1,170,000
-
1,170,000
85. Biaya pengelasan
1,170,000
-
1,170,000
86. Pekerjaan Rolling door
5,889,582
-
5,889,582
62,000
-
62,000
12,000,000
12,000,000
-
800,000
-
800,000
JUMLAH
415,152,232
289,956,750
125,195,482
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP
36,130,000
36,130,000
-
2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8
22,650,000
22,650,000
-
3. Mesin Pengayak Kapasitas 500 Kg/Jam
18,150,000
18,150,000
-
76,930,000
76,930,000
300,000
300,000
-
2. Helm Keselamatan
2,100,000
2,100,000
-
3. Rompi Kerja
1,260,000
1,260,000
-
76. Lampu SL 18 Watt
79. Pek. Pas Panel Listrik 80. Pek. Instalasi Stop Kontak 81. Stop Kontak
87. Pek. Handrail WC 88. Pekerjaan ukiran kayu 89. Pek. Plesteran letter timbul
ALAT 3.
JUMLAH
-
KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA 1. Sosialisasi K3 dan Prokes (Spanduk)
4. Sarung Tangan (Safety Glove) 5. Sepatu Keselamatan (Rubber Shoes) 6. Tali Pengaman 4.
7. Kotak P3K
105,000
105,000
-
2,100,000
2,100,000
-
694,500
694,500
-
80,000
80,000
-
8. Asuransi Tenaga Kerja
912,000
912,000
-
9. Alat ukur suhu badan nir-sentuh (Thermoscan)
700,000
700,000
-
10. Vitamin C (1 Box isi 100 tablet)
625,000
500,000
125,000
11. Tempat Cuci Tangan
500,000
500,000
-
12. Sabun Cuci Tangan (Cair) 200ml/btl
100,000
100,000
-
13. Masker kain
100,000
100,000
-
14. Alat penyemprot desinfektan
130,000
130,000
-
15. Cairan Desinfektan 5L
225,000
225,000
-
16. Tisu
JUMLAH
9,931,500
72,000 9,878,500
125,000
NO.
JUMLAH HARGA SESUAI SPPD-L (Rp.)
URAIAN
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.)
ADMINISTRASI
4.
1. Pelaporan KSM
270,000
2. Photo Copy / Penggandaan 3. Biaya Alat Tulis Kantor (ATK) 4. Materai
-
270,000
250,000
-
250,000
150,000
150,000
-
80,000
80,000
-
5. Pengujian Lab
500,000
-
500,000
6. Papan Nama Kegiatan
250,000
250,000
-
43,500
-
7. Biaya transfer
JUMLAH
1,500,000
523,500
1,020,000
TOTAL
705,078,732
492,848,750
212,345,482
Diverifikasi Oleh : Fasilitator Teknik,
Dibuat Oleh KSM Kereng Membangun 3
Hengky Pradana, ST
Aldius
FORM - RPD
RENCANA PENGGUNAAN DANA (RPD) KSM/PANITIA
Kab./Kota Kecamatan Kel/Desa KSM/Panit
: Palangka Raya : Sebangau : Kereng Bangkirai : Kereng Membangun 3
NO.
Nama Paket
JUMLAH HARGA SESUAI SPPD-L (Rp.)
URAIAN
(1)
(2)
:
TPS 3R
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.) (5)
(4)
TENAGA KERJA 1. Kepala Tukang 1.
8,670,000
8,500,000
170,000
2. Tukang Batu
23,095,000
23,095,000
-
3. Tukang Kayu
19,800,000
19,800,000
-
4. Tukang Besi
20,250,000
21,750,000 -
5. Tukang Cat
3,750,000
3,750,000
6. Pekerja
1,500,000 -
126,000,000
128,100,000 -
201,565,000
204,995,000
(3,430,000)
1. Kayu balok 5/7 Klas III
1,781,250
1,781,250
-
2. Paku 5 -10 cm
1,672,000
1,672,000
-
3. Kayu papan 2/20 Klas III
27,273,900
27,273,900
-
4. Tanah Urug
28,100,000
28,200,000 -
5. Pasir Urug
7,950,000
7,950,000
-
6. Kayu Galam ø 10-12 m
6,825,000
6,825,000
-
JUMLAH
2,100,000
BAHAN
7. Besi Beton Besi beton polos dia. 8
20,025,000
100,000
-
-
20,025,000
-
Besi beton polos dia. 10
7,000,000
7,000,000
-
Besi beton polos dia. 12
20,806,000
20,806,000
-
1,750,000
1,750,000
-
40,596,000
40,596,000
-
6,120,000
6,120,000
14,400,000
14,850,000 -
13. Balok Kayu Klas II uk.5/7
8,008,000
8,008,000
-
14. Dolken Kayu ø8-10
9,240,000
9,240,000
-
8. Kawat Beton 9. Semen Portland 10. Pasir Beton 11. Split
15. Plywood 9 mm
450,000
1,040,000
1,040,000
-
16. Batako
11,480,000
11,480,000
-
17. Pasir Pasang
22,350,000
22,350,000
-
18. Ubin Keramik 40x40
3,675,000
3,675,000
-
19. Semen Warna
240,000
240,000
-
20. Ubin Keramik 20x20
260,000
260,000
-
NO.
URAIAN
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.)
21. Ubin Keramik 10x20
588,600
588,600
-
22. Paku GRC
175,000
175,000
-
23. Kalsiboard Tebal 9 mm
3,610,000
5,320,000 -
1,710,000
24. Baja Ringan 75x35x0,75 MM
24,125,000
24,375,000 -
250,000
25. Baja Ringan 30x30x0,3 MM
3,350,000
3,350,000
-
26. Paku Skrup
4,200,000
3,500,000
700,000
11,000,000
11,000,000
-
28. Paku Genteng Metal
1,890,000
1,890,000
-
29. Papan Plank Kalsiboard
4,185,000
4,185,000
-
90,000
90,000
-
32. Kalsiboard 6 mm
660,000
660,000
-
33. Paku Kalsiboard
75,000
75,000
-
9,360,000
9,360,000
-
27. Genteng Metal
30. Besi Hollow Plafond 1,3x3,3
34. Balok kayu kelas II 5/10 untuk kusen 35. Lem Kayu
33,000
33,000
-
36. Papan Kayu Klas II Benuas
1,680,000
1,680,000
-
37. Kaca Tebal 5 mm
1,120,500
1,120,500
-
47,500
47,500
-
39. Engsel pintu
420,000
420,000
-
40. Engsel jendela
492,000
492,000
-
41. Kunci tanam biasa
380,000
380,000
-
42. Kait angin
124,800
124,800
-
43. Grendel/Kunci Slot
210,000
210,000
-
48,000
48,000
-
45. Roster/Kerawang
4,875,000
4,875,000
-
46. Glassblock
5,798,000
5,798,000
47. Cat tembok
12,100,000
13,200,000 -
38. Sealant
2.
JUMLAH HARGA SESUAI SPPD-L (Rp.)
44. Handel Jendela
1,100,000
49. Cat Menie kayu
180,000
180,000
-
50. Cat dasar Kayu
300,000
300,000
-
51. Cat Penutup Kayu
480,000
480,000
-
52. Kuas
45,000
45,000
-
53. Pengencer
28,100
28,100
-
54. Ampelas 55. Closet Duduk 57. Kran air
80,000
80,000
-
1,800,000
1,800,000
-
130,000
130,000
-
59. Stop Kran 3/4
65,000
65,000
60. Pipa PVC 4”
295,000
590,000 -
62. Pipa PVC 3/4”
294,000
294,000
64. Pipa PVC 2”
127,500
255,000 -
127,500
66. Wastafel+cermin
940,000
1,668,200 -
728,200
68. Bioseptictank Kapasitas 3000L
295,000 -
21,287,000
12,287,000
9,000,000
69. Profil Tank 1200 L
1,600,000
1,600,000
-
70. Sumur bor+pompa
2,500,000
2,500,000
-
71. Grill besi penutup saluran
3,352,500
3,352,500
72. Batu belah
7,200,000
9,200,000 -
74. Penyambungan Daya Baru PLN
4,500,000
4,500,000
2,000,000 -
NO.
JUMLAH HARGA SESUAI SPPD-L (Rp.)
URAIAN 75. Instalasi Titik Lampu
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.)
4,225,000
4,225,000
-
455,000
455,000
-
77. Saklar Tunggal
80,000
80,000
-
78. Saklar Ganda
80,000
80,000
-
760,000
760,000
-
1,950,000
1,950,000
-
120,000
120,000
-
76. Lampu SL 18 Watt
79. Pek. Pas Panel Listrik 80. Pek. Instalasi Stop Kontak 81. Stop Kontak 82. Pagar Besi BRC
5,232,000
5,232,300 -
300
83. Pekerjaan Pintu Pagar Besi
4,725,000
6,032,500 -
1,307,500
84. Pekerjaan Handrailing difabel stainless
1,170,000
1,175,200 -
5,200
85. Biaya pengelasan
1,170,000
1,175,200 -
86. Pekerjaan Rolling door
5,889,582
3,632,500
2,257,082
62,000
-
62,000
12,000,000
12,000,000
-
800,000
700,000
100,000
JUMLAH
415,152,232
411,377,050
3,775,182
1. Mesin Pencacah Plastik kap 400 Kg/hari Diesel 16 HP
36,130,000
36,130,000
-
2. Mesin Pencacah Kompos kapasitas 500 kg/jam Diesel 8
22,650,000
22,650,000
-
3. Mesin Pengayak Kapasitas 500 Kg/Jam
18,150,000
18,150,000
-
76,930,000
76,930,000
300,000
300,000
-
2. Helm Keselamatan
2,100,000
2,100,000
-
3. Rompi Kerja
1,260,000
1,260,000
-
87. Pek. Handrail WC 88. Pekerjaan ukiran kayu 89. Pek. Plesteran letter timbul
5,200
ALAT 3.
JUMLAH
-
KEBUTUHAN KESEHATAN DAN KESELAMATAN KERJA 1. Sosialisasi K3 dan Prokes (Spanduk)
4. Sarung Tangan (Safety Glove) 5. Sepatu Keselamatan (Rubber Shoes) 6. Tali Pengaman 4.
7. Kotak P3K
105,000
105,000
-
2,100,000
2,100,000
-
694,500
694,500
-
80,000
80,000
-
8. Asuransi Tenaga Kerja
912,000
912,000
-
9. Alat ukur suhu badan nir-sentuh (Thermoscan)
700,000
700,000
-
4.
NO.
JUMLAH HARGA SESUAI SPPD-L (Rp.)
URAIAN
REALISASI s/d SAAT INI (Rp.)
SISA s/d SAAT INI (Rp.)
10. Vitamin C (1 Box isi 100 tablet)
625,000
625,000
-
11. Tempat Cuci Tangan
500,000
500,000
-
12. Sabun Cuci Tangan (Cair) 200ml/btl
100,000
100,000
13. Masker kain
100,000
125,000 -
14. Alat penyemprot desinfektan
130,000
130,000
15. Cairan Desinfektan 5L
225,000
225,000
16. Tisu
JUMLAH
72,000 -
25,000 72,000
9,931,500
10,028,500
(25,000)
1. Pelaporan KSM
270,000
270,000
-
2. Photo Copy / Penggandaan
250,000
250,000
-
3. Biaya Alat Tulis Kantor (ATK)
150,000
150,000
-
80,000
80,000
-
5. Pengujian Lab
500,000
500,000
-
6. Papan Nama Kegiatan
250,000
250,000
ADMINISTRASI
4.
4. Materai
7. Biaya transfer
-
58,000 -
58,000
JUMLAH
1,500,000
1,558,000
(58,000)
TOTAL
705,078,732
704,888,550
262,182
Diverifikasi Oleh : Fasilitator Teknik,
Dibuat Oleh KSM Kereng Membangun 3
Hengky Pradana, ST
Aldius