PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET No I 1
Uraian
Panjang
Lebar
Tinggi
Luas
Volume
PEKERJAAN PONDASI Galian Pondasi Utama =((10.5*2)+(9*2)+(2.75+3)) 44.75
1.00
0.50
1.00
22.38
22.38 m3
0.50
0.70
6.75
4.73 m3
0,50
2
Galian Pondasi Teras
=((1.5*2)+5.5)) 13.50 0,70
0,50
3
Timbunan Kembali Bekas Galian
4
Urugan Pasir Bawah Pondasi
5
Urugan Pasir Bawah Lantai
5
Pasangan Batu Kali ( 1 : 4 ) m3
-
-
-
6.78 m3
58.25
0.50
0.10
29.13
2.91 m3
8.00
6.00
0.10
48.00
4.80 m3
44.75
0.38
1.50
16.78
25.17 m3
13.50
0.38
1.50
5.06
7.59 m3
44.75
0.15
0.20
6.71
1.34 m3
0,25
0,25
1,00
1,50 0,50
0,50
II 1
-
PEKERJAAN BETON BERTULANG ( 1 : 2 : 3 ) M 3 Cor Sloof 20/30 0,15
0,20
2
Pembesian Begel Ø 6 mm jarak 20 cm 0,15
=((29.75/0.2) + 1 ) * 0.8 119.80
119.80 m'
0,20
3
Tulangan Pokok 4 Ø 10 mm
=4 * 29.75 179.00
4
Begesting
179.00 m'
=29.75*2 sisi 0,15
89.50
0.20
-
17.90
17.90 m2
85.50
0.15
0.30
12.83
3.85 m3
0,20
5
Cor Ring Balk 15/20
= ((9*3)+(6.5*3)+(5.5*1)) 0,15
0,30
Take Off Sheet hal 1 dari 26 hal
No 6
Uraian Pembesian Begel Ø 6 mm jarak 20 cm
Panjang
Tinggi
Luas
Volume
=((52/0,15) + 1 ) * 1
Ø6
0,15
Lebar
Ø 12
571.00
571.00 m'
342.00
342.00 m'
342.00
342.00 m'
Ø 10
0,30 Ø 12
7
8
9
=(4 * 52)
Tulangan Pokok 4 Ø 12 mm
Tulangan Tengah 2 Ø 10 mm
=(2 * 52)
Begesting
=52*2 sisi 0,15
171.00
0.30
-
51.30
51.30 m2
64.00
0.20
0.20
12.80
2.56 m3
0,30 0,20
10 Cor Kolom 20 / 20
=16 * 4 0,20
11 Pembesian Begel Ø 6 mm jarak 15 cm
= ((( 11 * 4 )/0,15)+1) * 0,9 384.90
0,20
384.90 m'
0,20
12 Tulangan Pokok 4 Ø 12 mm
= 4 * 4 * 11
13 Tulangan Tengah 4 Ø 10 mm
256.00
256.00 m'
256.00
256.00 m'
= 4 * 4 * 11
14 Begesting
=4 * 11 * 4 sisi 0,20
256.00
0.20
9.00
6.50
39.00
0.50
51.20
51.20 m2
0.12
58.50
7.02 m3
0.10
19.50
1.95 m3
0,20
15 Cor Atap Beton 9 x 6.5 m' Tebal 12 cm' Lisplank
Balok
6.50
Atap Beton
Lisplank keliling = (9 + 6.5 ) * 2
9.00
Plat Atap
Take Off Sheet hal 2 dari 26 hal
No
Uraian 16 Penulangan Atap Beton Ø 8
Panjang
Tinggi
Luas
=(( 9 / 0.1) + 1 ) * 6.5 * 2 1,183.00
Ø 8 - 10
Ø 8 - 12.5
Lebar
Volume 1,183.00 m'
0.12
=(( 6.5 / 0.1) + 1 ) *9 * 2 1,908.00
0.50
0.10
0.35
Ø 8 - 10
Lisplank
Plat Atap
17 Penulaangan List Plank Beton Ø 8
= ((((6.5 + 9 ) * 2)/0.125 ) + 1) * 0.6 187.80
187.80 m'
= (((0.5/0.125 ) + 1) * ((6.5+9)*2)) 195.00
195.00 m'
18 Begesting Atap Beton
19 Begesting Lis Plank Beton
1,908.00 m'
9.00
6.50
58.50
58.50 m2
39.00
1.00
39.00
39.00 m2
= ((6.5 + 9 ) * 2)
III PASANGAN BATU BATA 1/2 BATU ( 1 : 4 ) M 2 1 =(3,2 * 5.5) * 2
2
35.20
35.20 m2
67.20
67.20 m2
7.70
7.70 m2
8.40
8.40 m2
2.80
5.500
2
= ( 6.5 * 2.8 * 2 ) 2
2.80
6.5
=( 6.75 * 2.8 ) 3 2.80
2.75
4
5
6
7
=( 3 * 2.8 )
3.00
Plesteran dan acian tebal 1,5 cm
Skonengan sudut Kolom beton & Balok
Plesteran dan acian Atap Beton tebal 1,5 cm
Plesteran Waterproof batacote 3 lapis
=2 * ( 30.8 + 36.40 + 7.7 + 8.4 ) 237.00
237.00 m2
= (11 * 2.8 * 4 ) + (2 * 52 ) 227.20
227.20 m'
=( 9 * 6.5 ) 58.50
58.50 m2
58.50
58.50 m2
=( 9 * 6.5 )
Take Off Sheet hal 3 dari 26 hal
No
Uraian
Panjang
Lebar
Tinggi
Luas
Volume
IV PEKERJAAN LANTAI 1
Pemasangan Kramik lantai 30/30 ( 1 : 4 ) m2
8.00
6.00
48.00
48.00 m2
= 3 * (( 2 * 2,3 )+( 0,9 * 2 )) 19.20
0.06
0.12
0.01
0.14 m3
= 7 * (( 2 * 3 ) + ( 3 * 1,4 )) 71.40
0.06
0.12
0.01
0.51 m3
2** Pintu Panil
=3 bh x 0.9 m'
2.70
2.00
5.40
5.40 m2
3** Membuat/memasang jendela kaca
=0.9*9
8.1
1.00
8.10
8.10 m2
8 6.5
55
6
V
PEKERJAAN KOSEN PINTU DAN JENDELA
1
Membuat/memasang kosen pintu/jendela 0,90 0,40
1,90
1,00
1,00 0,40 1,00
VI PEKERJAAN PENGECATAN 1 Pengecatan dan plemur tembok
= ( 30.8 + 36.40 + 7.70 + 8.40 ) 118.50
Pengecatan Lis Plank Beton
= (9 + 6.5 ) * 2 * 1
Pengecatan Atap Beton
2
118.50 m2
31.00
31.00 m2
58.50
58.50 m2
= (9 * 6.5 )
Mendempul, memplamur, mengecat kusen dan daun pintu dan cendela = 3 * (( 2 * 2,3 )+( 0,9 * 2 )) 0,90 19.20 0,40
0.24
4.61
4.61 m2
0.24
17.14
17.14 m2
2.00
10.80
10.80 m2
1,90
1,00
1,00 0,40 1,00
= 7 * (( 2 * 3 ) + ( 3 * 1,4 )) 71.40 =3*0.9 * 2 sisi
Pintu Panil
5.40
Take Off Sheet hal 4 dari 26 hal
B
275
Jenis Prasarana
275 A
A
Lokasi 600 Judul Gambar 275 Dibuat Oleh :
400
50 Diperiksa Oleh :
350 B 800
300 400
150 400 Diketahui Oleh :
DENAH
Lembar 02 Dari 12 Lembar
0.50
2.50
Jenis Prasarana 0.30 275
50
Lokasi
275
Judul Gambar
TAMPAK DEPAN
TAMPAK BANGUNAN Dibuat Oleh : 0.50
2.50
0.30 350
300 400
Diperiksa Oleh :
Diketahui Oleh :
150 400
TAMPAK SAMPING Lembar 03 Dari 12 Lembar
+ 600
Jenis Prasarana
+ 400
Lokasi
Judul Gambar
Lantai Sloof 15/15
Pasir Urug
Dibuat Oleh :
+/- 0,00 - 70 - 130 - 140
c c v v
c c v v 350
c c v v
c c v v 300
150
Diperiksa Oleh :
POTONGAN A - A
Diketahui Oleh :
Lembar 04 Dari 12 Lembar
+ 600 8/12
8/12 4/6 Genteng
Jenis Prasarana
8/12 + 400 8/12
Lokasi
Plafon Ring Balk 15/15
Judul Gambar
Dibuat Oleh :
+/- 0,00 - 70 - 130 - 140
c cv v
600
c cv v
cc vv 150
Diperiksa Oleh :
POTONGAN B - B
Diketahui Oleh :
Lembar 5 Dari 12 Lembar
Jenis Prasarana
PAPAN BUBUNGAN
Lokasi
BALOK BUBUNGAN 8/12 USUK 4/6
Judul Gambar
GORDING 6/10
DETAIL KUDA-KUDA Dibuat Oleh : KAKI KUDA-KUDA 8/12 TIANG 8/12
SEKUR 8/12
Diperiksa Oleh :
Diketahui Oleh : BEGEL 8x50 mm DINDING
BALOK KUDA-KUDA 8/12
Lembar 6 Dari 12 Lembar
KUDA-KUDA
Jenis Prasarana TEMBOK
Lokasi USUK 4/6
GENTENG
Judul Gambar DETAIL ATAP GENTING RENG 2/3
Dibuat Oleh :
GORDING 6/10
Diperiksa Oleh :
Diketahui Oleh :
Lembar 7 Dari 12.Lembar
3.00 1 5 2 5
7.5 m
Jenis Prasarana
6.0 Lokasi
50
3.00 Judul Gambar 50
25
DENAH PONDASI
15
Dibuat Oleh :
1.50 Diperiksa Oleh :
4.00
4.00
4.00 Diketahui Oleh :
12 m
Lembar 8 Dari 12.Lembar
Ring Balk 15/20
400
Jenis Prasarana
Lokasi
Sloof 15/20
Lantai
Judul Gambar DETAIL PONDASI
Pasir Urug
Pasir Urug
Dibuat Oleh :
Rolag
10
70
TANAH URUG
130
Diperiksa Oleh : 60 60 70
1.50
10
50
Diketahui Oleh :
50
DETAIL PONDASI Lembar 9 Dari 12.Lembar
0,90
0,90
0,90
0,40
Jenis Prasarana 1,40
Lokasi
Judul Gambar
1,90
KUSEN KANTOR TK Dibuat Oleh :
Diperiksa Oleh : 6/12
Diketahui Oleh :
Lembar 10 Dari 12 Lembar
40
40
Jenis Prasarana 100
Lokasi
Judul Gambar 190
PINTU & JENDELA 100
100
Dibuat Oleh :
Diperiksa Oleh :
90
Diketahui Oleh :
Lembar 11 Dari 12 Lembar
4 - Ø 10 Ø 6 - 20
15
Ø 6 - 20
20
Jenis Prasarana 4 - Ø 10 Ø 6 - 15
DETAIL SLOOF
Lokasi
Judul Gambar 4 - Ø 12
PENULANGAN BETON Dibuat Oleh :
15
4 - Ø 10 Ø 6 - 20
15
Ø 6 - 15 Ø 6 - 20
Diperiksa Oleh : 15
20
4 - Ø 10
Diketahui Oleh : 4 - Ø 12
DETAIL RING BALK
DETAIL KOLOM
Lembar 12 Dari 12 Lembar
U
7.5 m
Jenis Prasarana
Lokasi
RENC. GEDUNGT K
12 m
Judul Gambar DENAH Dibuat Oleh :
TOKO KUD
Diperiksa Oleh :
RESAPAN
KANTOR DESA
SEPTIK TANK
Diketahui Oleh :
Lembar 01 Dari 12 embar
Jenis Prasarana
Lokasi
Judul Gambar GAMBAR SANITASI Dibuat Oleh :
Diperiksa Oleh :
Diketahui Oleh :
Lembar 13 Dari 12 embar
Jenis Prasarana
Lokasi
Judul Gambar DENAH Dibuat Oleh :
Diperiksa Oleh :
Diketahui Oleh :
Lembar 14 Dari 12 embar
ANALISA PERHITUNGAN GEDUNG ANALISA BANGUNAN SNI 2008 & BOW No A.1
A.1
A . 12
G.I/4
Uraian
Analisa
Volume
Kebutuhan
Galian Tanah pondasi untuk tiap m 3 Pekerja 1.0000 27.10 m3 Timbunan Kembali untuk tiap m 3 Pekerja 0.2500
6.78 m3
Urugan pasir bawah temasuk penyiramannya ( m 3 ) Pasir Urug 1.2000 7.71 m3 Pekerja 0.4000 7.71 m3 Pas Batu Kali Pondasi 1 : 6 untuk tiap m 3 Batu 1.1000 32.77 Semen 2.3400 32.77 Pasir 0.5610 32.77 Tukang 0.6000 32.77 Kepala Tukang 0.7500 32.77 Pekerja 1.5000 32.77
Harga sat. Rp.
Bahan Rp
Upah Rp.
Total Rp.
27.100 HOK
100,000
2,710,000
2,710,000
1.693 HOK
100,000
169,300
169,300
9.255 m3 3.085 HOK
125,000 100,000
1,156,875 308,500
1,156,875 308,500
2,457,375 3,686,100 4,914,800
8,109,450 5,044,952 3,216,675 2,457,375 3,686,100 4,914,800
167,750 70,350 268,500
409,868 126,700 407,625 167,750 70,350 268,500
m3 m3 m3 m3 m3 m3
36.042 76.671 18.381 19.659 24.574 49.148
m3 zak m3 HOK HOK HOK
225,000 65,800 175,000 125,000 150,000 100,000
8,109,450 5,044,952 3,216,675
G.XIII/10 Pek Beton Bertulang 1:2:3 untuk tiap m 3 Cor Sloof Semen 4.6400 1.34 m3 Pasir 0.5400 1.34 m3 Kerikil 0.8100 1.34 m3 Tukang Batu 1.0000 1.34 m3 Kepala Tukang 0.3500 1.34 m3 Pekerja 2.0000 1.34 m3
6.229 0.724 1.087 1.342 0.469 2.685
zak m3 m3 HOK HOK HOK
65,800 175,000 375,000 125,000 150,000 100,000
409,868 126,700 407,625
Besi ø 10 Besi ø 6 Kawat Tukang Besi Kepala Tukang Pekerja Papan 2 /20 - 2 m' Kayu 4/6 - 4 m' Paku
1.0500 1.0500 2.6250 1.2250 0.5250 1.2250 2.5000 0.0900 0.0300
179.00 119.80 1.34 1.34 1.34 1.34 17.90 17.90 17.90
m' m' m3 m3 m3 m3 m2 m2 m2
15.56 10.41 3.524 1.644 0.704 1.644 44.750 1.611 0.537
bt bt kg HOK HOK HOK lbr btg kg
95,000 45,000 20,000 125,000 150,000 100,000 25,000 35,000 20,000
1,478,200 468,450 70,480
Kolom Semen Pasir Kerikil Tk Kayu Kepala Tukang Pekerja
4.6400 0.5400 0.8100 1.0000 0.3500 2.0000
2.56 2.56 2.56 2.56 2.56 2.56
m3 m3 m3 m3 m3 m3
11.878 1.382 2.073 2.560 0.896 5.120
zak m3 m3 HOK HOK HOK
65,800 175,000 375,000 125,000 125,000 100,000
781,572 241,850 777,375
Besi ø 10 Besi ø 6 Kawat Tukang Besi Kepala Tukang Pekerja Papan 2 /20 - 2 m' Kayu 4/6 - 4 m' Paku
1.0500 1.0500 2.6250 1.2250 0.5250 1.2250 2.5000 0.0900 0.0300
256.00 384.90 2.56 2.56 2.56 2.56 51.20 51.20 51.20
m' m' m3 m3 m3 m3 m2 m2 m2
22.26 33.46 6.720 3.136 1.344 3.136 128.000 4.608 1.536
bt bt kg HOK HOK HOK lbr btg kg
65,000 45,000 20,000 125,000 150,000 100,000 25,000 8,000 20,000
1,446,900 1,505,700 134,400
205,500 105,600 164,400 1,118,750 56,385 10,740
320,000 112,000 512,000
392,000 201,600 313,600 3,200,000 36,864 30,720
1,478,200 468,450 70,480 205,500 105,600 164,400 1,118,750 56,385 10,740
781,572 241,850 777,375 320,000 112,000 512,000 1,446,900 1,505,700 134,400 392,000 201,600 313,600 3,200,000 36,864 30,720
Analisa TK hal 19 dari 26 hal
No
G.II/4
Uraian
Analisa
Volume
Kebutuhan
Harga sat. Rp.
Bahan Rp
Ring Balk Semen Pasir Kerikil Tk Kayu Kepala Tukang Pekerja
4.6400 0.5400 0.8100 1.0000 0.3500 2.0000
3.85 3.85 3.85 3.85 3.85 3.85
m3 m3 m3 m3 m3 m3
17.852 2.077 3.116 3.847 1.346 7.695
zak m3 m3 HOK HOK HOK
65,800 175,000 375,000 125,000 125,000 100,000
1,174,662 363,475 1,168,500
Besi ø 10 Besi ø 6 Kawat Tukang Besi Kepala Tukang Pekerja Papan 2 /20 - 2 m' Kayu 4/6 - 4 m' Paku
1.0500 1.0500 2.6250 1.2250 0.5250 1.2250 2.5000 0.0900 0.0300
342.00 571.00 3.85 3.85 3.85 3.85 51.30 51.30 51.30
m' m' m3 m3 m3 m3 m2 m2 m2
29.73 49.65 10.099 4.713 2.019 4.713 128.250 4.617 1.539
bt bt kg HOK HOK HOK lbr btg kg
95,000 45,000 20,000 125,000 150,000 100,000 25,000 8,000 20,000
2,824,350 2,234,250 201,980
Atap Beton Semen Pasir Kerikil Tk Kayu Kepala Tukang Pekerja
4.6400 0.5400 0.8100 1.0000 0.3500 2.0000
7.02 7.02 7.02 7.02 7.02 7.02
m3 m3 m3 m3 m3 m3
32.572 3.790 5.686 7.020 2.457 14.040
zak m3 m3 HOK HOK HOK
65,800 175,000 375,000 125,000 125,000 100,000
2,143,238 663,250 2,132,250
Besi ø 8 Kawat Tukang Besi Kepala Tukang Pekerja Papan 2 /20 - 2 m' Kayu 4/6 - 4 m' Bambu Paku
1.0500 2.6250 1.2250 0.5250 1.2250 2.5000 0.5000 5.0000 0.0300
3,091.00 7.02 7.02 7.02 7.02 58.50 58.50 58.50 58.50
m' m3 m3 m3 m3 m2 m2 m2 m2
257.58 18.427 8.599 3.685 8.599 146.250 29.250 292.500 1.755
bt kg HOK HOK HOK lbr btg btg kg
65,000 20,000 125,000 150,000 100,000 25,000 8,000 8,000 20,000
16,742,700 368,540
Listplank Beton Semen Pasir Kerikil Tk Kayu Kepala Tukang Pekerja
4.6400 0.5400 0.8100 1.0000 0.3500 2.0000
1.95 1.95 1.95 1.95 1.95 1.95
m3 m3 m3 m3 m3 m3
9.048 1.053 1.579 1.950 0.682 3.900
zak m3 m3 HOK HOK HOK
65,800 175,000 375,000 125,000 125,000 100,000
595,358 184,275 592,125
Besi ø 8 Kawat Tukang Besi Kepala Tukang Pekerja Papan 2 /20 - 2 m' Kayu 4/6 - 4 m' Bambu Paku
1.0500 2.6250 1.2250 0.5250 1.2250 2.5000 2.0000 2.0000 0.0300
382.80 1.95 1.95 1.95 1.95 39.00 39.00 39.00 39.00
m' m3 m3 m3 m3 m2 m2 m2 m2
33.28 5.118 2.388 1.023 2.388 97.500 78.000 78.000 1.170
bt kg HOK HOK HOK lbr btg btg kg
75,000 20,000 125,000 150,000 100,000 25,000 15,000 8,000 20,000
2,496,000 102,360
Pasangan Batu Merah 1/2 batu ( m2 ) adukan 1 : 6 untuk tiap m 2 Batu Bata 70.0000 118.50 m2 8,295.00 biji Semen 0.1664 118.50 m2 19.718 zak Pasir 0.0490 118.50 m2 5.806 m3 Tukang Batu 0.1000 118.50 m2 11.850 HOK Kepala Tukang 0.0150 118.50 m2 1.777 HOK Pekerja 0.3200 118.50 m2 37.920 HOK
1,000 65,800 175,000 125,000 150,000 100,000
8,295,000 1,297,444 1,016,050
Upah Rp.
480,875 168,250 769,500
589,125 302,850 471,300 3,206,250 36,936 30,780
877,500 307,125 1,404,000
1,074,875 552,750 859,900 3,656,250 234,000 2,340,000 35,100
243,750 85,250 390,000
298,500 153,450 238,800 2,437,500 1,170,000 624,000 23,400
1,481,250 266,550 3,792,000
Total Rp. 1,174,662 363,475 1,168,500 480,875 168,250 769,500 2,824,350 2,234,250 201,980 589,125 302,850 471,300 3,206,250 36,936 30,780
2,143,238 663,250 2,132,250 877,500 307,125 1,404,000 16,742,700 368,540 1,074,875 552,750 859,900 3,656,250 234,000 2,340,000 35,100
595,358 184,275 592,125 243,750 85,250 390,000 2,496,000 102,360 298,500 153,450 238,800 2,437,500 1,170,000 624,000 23,400
8,295,000 1,297,444 1,016,050 1,481,250 266,550 3,792,000
Analisa TK hal 20 dari 26 hal
No G. X / 4
Uraian
Analisa
Plesteran dan Acian Dinding Luar Semen 0.0736 Pasir 0.0220 Tukang Batu 0.1500 Kepala Tukang 0.0100 Pekerja 0.2000
Volume
65,800 175,000 125,000 150,000 100,000
1,431,018 1,137,675
2.925 146.250 0.351 11.700 1.170 17.550
zak kg m3 HOK HOK HOK
65,800 20,000 175,000 125,000 150,000 100,000
192,465 2,925,000 61,425
m3 m3 m3 m3 m3 m3
209.280 24.960 41.760 1.200 3.840 79.200
zak m3 m3 HOK HOK HOK
65,800 175,000 375,000 125,000 150,000 100,000
13,770,624 4,368,000 15,660,000
Memasang lantai Keramik 30 / 30 ( 1 : 4 ) untuk tiap m 2 Keramik 1.0000 48.00 m2 48.000 Dos Semen 0.1860 48.00 m2 8.928 zak Semen Putih 0.0300 48.00 m2 1.440 zak Pasir 0.0180 48.00 m2 0.864 m3 Tukang Batu 0.4500 48.00 m2 21.600 HOK Kepala Tukang 0.0300 48.00 m2 1.440 HOK Pekerja 0.6000 48.00 m2 28.800 HOK
65,000 65,800 75,000 175,000 125,000 150,000 100,000
3,120,000 587,462 108,000 151,200
m2 kg m2 HOK HOK HOK
2,400,000 20,000 150,000 125,000 150,000 100,000
388,800 24,300 1,336,500
Meranti ( m 2 ) m2 0.216 m3 m2 13.500 HOK m2 1.350 HOK m2 5.400 HOK
2,400,000 125,000 150,000 100,000
48.00 48.00 48.00 48.00 48.00 48.00
F. IV / 36 Membuat / Memasang Jendela Kaca Kayu 3/10 0.0200 Paku 0.1500 Kaca 1.1000 Tukang 2.1500 Kepala Tukang 0.2150 Pekerja 0.5150
( m2 ) 8.10 8.10 8.10 8.10 8.10 8.10
F.IV / 23 Membuat dan Memasang Pintu Panil Kayu Meranti , Papan 0.0400 Tukang 2.5000 Kepala Tukang 0.2500 Pekerja 1.0000
Kayu 5.40 5.40 5.40 5.40
I. / 5
Bahan Rp
m2 m2 m2 m2 m2 m2
G.XIII / 18 Rabat Beton 1 : 3 : 5 untuk tiap m 3 Semen 4.3600 Pasir 0.5200 Krikil 0.8700 Tukang Batu 0.0250 Kepala Tukang 0.0800 Pekerja 1.6500
I. / 3
Harga sat. Rp.
Dalam ( 1 : 6 ) m 2 295.50 m2 21.748 zak 295.50 m2 6.501 m3 295.50 m2 44.325 HOK 295.50 m2 2.955 HOK 295.50 m2 59.100 HOK
Plesteran Waterproof batacote 3 lapis Semen 0.0500 58.50 Batacote 2.5000 58.50 Pasir 0.0060 58.50 Tukang Batu 0.2000 58.50 Kepala Tukang 0.0200 58.50 Pekerja 0.3000 58.50
H/4
Kebutuhan
m2 m2 m2 m2 m2 m2
0.162 1.215 8.910 17.415 1.741 4.171
Mlamir dan Mengecat dengan cat Tembok dinding luar dalam dan langit Cat Tembok 0.3600 208.00 m2 74.880 kg Plamer 0.1000 208.00 m2 20.800 kg Kertas Amplas 0.0500 208.00 m2 10.400 lbr Tk Cat 0.0630 208.00 m2 13.104 HOK Kepala Tukang 0.0063 208.00 m2 1.310 HOK Pekerja 0.0200 208.00 m2 4.160 HOK
langit ( m 2 ) 55,000 4,118,400 25,000 520,000 6,000 62,400 125,000 150,000 100,000
Mendempul,melamer,mengecat,pitu/jendela,daun pintu, lisplank ( M 2) Cat Kayu 0.4300 32.54 m2 13.993 kg Tiner 0.0800 32.54 m2 2.603 ltr Plamer 0.1500 32.54 m2 4.881 kg Dempul Jadi 0.0750 32.54 m2 2.440 kg Kertas Amplas 0.1000 32.54 m2 3.254 ltr Tukang Cat 0.1050 32.54 m2 3.417 HOK Kepala Tukang 0.0400 32.54 m2 1.301 HOK Pekerja 0.0700 32.54 m2 2.278 HOK
65,000 25,000 25,000 35,000 6,000 125,000 150,000 100,000
Upah Rp.
Total Rp.
5,540,625 443,250 5,910,000
1,431,018 1,137,675 5,540,625 443,250 5,910,000
1,462,500 175,500 1,755,000
192,465 2,925,000 61,425 1,462,500 175,500 1,755,000
150,000 576,000 7,920,000
13,770,624 4,368,000 15,660,000 150,000 576,000 7,920,000
2,700,000 216,000 2,880,000
3,120,000 587,462 108,000 151,200 2,700,000 216,000 2,880,000
2,176,875 261,150 417,100
388,800 24,300 1,336,500 2,176,875 261,150 417,100
518,400 1,687,500 202,500 540,000
518,400 1,687,500 202,500 540,000
1,638,000 196,500 416,000
4,118,400 520,000 62,400 1,638,000 196,500 416,000
427,125 195,150 227,800
909,545 65,075 122,025 85,400 19,524 427,125 195,150 227,800
909,545 65,075 122,025 85,400 19,524
Analisa TK hal 21 dari 26 hal
RENCANA ANGGARAN BIAYA Propinsi Kabupaten Kecamatan Desa
: : : :
UraIan 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
2 BAHAN Batu Bata Batu Belah Besi Ǿ 10 Besi Ǿ 6 Besi Ǿ 8 Besi Ǿ 12 Cat Kayu Cat Tembok Dempul Kayu Engsel pintu Kaca 3 mm Kawat Bendrat Bambu Kayu Alba 4/6 Keramik 30/30 ( KW 1 ) Kerikil 2/3 Kertas Amplas Paku Papan begesting 2/20 Pasir pasang Plamer Selot Pintu Semen PC 50 kg Semen Putih Tiner Pasir Urug Lem Kayu Kayu 3/10
Total 3 8,295.00 36.05 68.00 94.00 290.86 23.54 13.00 74.00 3.00 12.00 8.00 20.00 11.00 29.25 48.00 48.02 13.00 4.00 302.00 60.70 26.00 5.00 373.00 2.00 2.00 9.25 0.21 0.38
VOLUME Dari Dari Swadaya Dana Desa 5 4
-
-
8,295.00 36.05 68.00 94.00 290.86 23.54 13.00 74.00 3.00 12.00 8.00 20.00 11.00 29.25 48.00 48.02 13.00 4.00 302.00 60.70 26.00 5.00 373.00 2.00 2.00 9.25 0.21 0.38
No. RAB : Pogram : Jenis Kegiatan : Ukuran/Dimensi : Kategori Biaya Satuan 6
7
biji m3 lonjor lonjor lonjor lonjor kg kg kg biji m2 kg btg m3 m2 m3 lembar kg lbr m3 kg biji zak zak liter m3 kg m3
I.a I.a I. b I. b I. b I. b I. b I. b I. b I. b I. b I. b I.a I. b I. b I.a I. b I. b I. b I.a I. b I. b I. b I. b I. b I.a I. b I. b
01 DANA DESA Gedung PAUD 7,5 X 12 M HARGA SATUAN RP 8
1,000 225,000 95,000 45,000 75,000 112,500 65,000 55,000 35,000 45,000 150,000 20,000 35,000 2,500,000 65,000 375,000 6,000 20,000 25,000 175,000 25,000 35,000 65,800 75,000 25,000 125,000 35,000 2,500,000 SUB TOTAL I
BIAYA Total 9=3 x 8
Dari Swadaya 9=4*8
Dari Dana Desa 10=5*8
8,295,000 8,111,250 6,460,000 4,230,000 21,814,500 2,648,250 845,000 4,070,000 105,000 540,000 1,200,000 400,000 385,000 73,125,000 3,120,000 18,007,500 78,000 80,000 7,550,000 10,622,500 650,000 175,000 24,543,400 150,000 50,000 1,156,250 7,350 945,000
-
8,295,000 8,111,250 6,460,000 4,230,000 21,814,500 2,648,250 845,000 4,070,000 105,000 540,000 1,200,000 400,000 385,000 73,125,000 3,120,000 18,007,500 78,000 80,000 7,550,000 10,622,500 650,000 175,000 24,543,400 150,000 50,000 1,156,250 7,350 945,000
199,364,000
-
199,364,000
UraIan 1
2
1 2 3 4 5 6 7 8 9 10 11 12 13
ALAT Air Kerja Bambu Benang Cangkul Ember cor Kawat ayakan Sewa Kereta dorong Kuas Meteran 5 m' Papan Nama Prasasti Skop Slang Waterpass
UPAH 1 Pekerja 2 Tukang 3 Kep Kelompok
VOLUME Dari Dari Swadaya Dana Desa 5 4
Total 3 1.00 30.00 5.00 5.00 20.00 3.00 1.00 5.00 1.00 1.00 1.00 5.00 17.00
247 162 43
1.00 30.00 5.00 5.00 20.00 3.00 1.00 5.00 1.00 1.00 1.00 5.00 17.00
-
247 162 43
Kategori Biaya Satuan
HARGA SATUAN RP 8
6
7
ls Bh roll Bh Bh m' Bh Bh Bh Bh Bh Bh m'
II.a II.a II.a II.a II.a II.a II.a II.a II.a II c II c II.a II.a
750,000 15,000 5,000 65,000 12,000 35,000 575,000 15,000 15,000 200,000 350,000 65,000 3,000 SUB TOTAL II
HOK HOK HOK
III.a III.a III.a
100,000 125,000 150,000 SUB TOTAL III Jumlah Total : DANA DESA
Sumber Dana
CATATAN : - Sumbangan dalam bentuk bahan, upah dan alat, tulis dalam kolom Volume dari Swadaya - Nilai RAB didapat dari kolom Volume Dari Dana dikalikan dengan kolom Harga Satuan yang dikalikan dengan kolom Harga Satuan yang kemudian ditotalkan. - Sumbangan dalam bentuk uang dimasukkan pada baris terbawah (Sumber Dana dari Swadaya) - Swadaya dalam bentuk lahan ditulis dalam format lain. Katagori Biaya I.a. Pembelian bahan hasil tenaga manusia I.b. Pembelian bahan hasil industri I.c. Pembelian bahan administrasi II.a. Pembelian alat tangan II.b. Pembelian / penyewaan alat mesin II.c. Pembelian alat administrasi III.a. Pembayaran tenaga kerja konstruksi III.b. Pembayaran tenaga untuk pengumpulan bahan III.c. Pembayaran honorarium Tim Pelaksana Diperiksa Oleh :
Buku,
BIAYA Total 9=3 x 8
Dari Dana Desa 10=5*8
750,000 450,000 25,000 325,000 240,000 105,000 575,000 75,000 15,000 200,000 350,000 325,000 51,000
-
750,000 450,000 25,000 325,000 240,000 105,000 575,000 75,000 15,000 200,000 350,000 325,000 51,000
3,486,000
-
3,486,000
24,700,000 20,250,000 6,450,000
-
24,700,000 20,250,000 6,450,000
51,400,000 254,250,000 254,250,000
-
51,400,000 254,250,000
713,889 185,321,700
3,138,889
2017
Dibuat Oleh : Ketua TPK
Dari Swadaya 9=4*8
Kader Teknis
RENCANA ANGGARAN BIAYA Propinsi Kabupaten Kecamatan Desa
: : : :
UraIan
1 2 3 4 5 6 6 7 8 9 ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
BAHAN Batu Bata Batu Besi Ǿ 10 Besi Ǿ 6 Besi Ǿ 8 Besi Ǿ 12 Cat Kayu Cat Tembok Dempul Kayu Engsel pintu Kaca 3 mm Kawat Bendrat Bambu Kayu Balau 4/6 Keramik 30/30 ( KW 1 ) Kerikil 2/3 Kertas Amplas Paku Papan begesting 2/20 Pasir pasang Plamer Selot Pintu Semen PC 50 kg Semen Putih Tiner Pasir Urug Lem Kayu Kayu 3/10
1 2 3 4 5 7 9 ### ### ### ### ### ###
ALAT Air Kerja Bambu Benang Cangkul Ember cor Kawat ayakan Kereta dorong Kuas Meteran 5 m' Papan Nama Prasasti Skop Slang Timbang
UPAH 1 Pekerja
Total
VOLUME Dari Dari Swadaya DANA DESA
8,295.00 36.04 67.55 93.52 290.86 23.55 13.99 74.88 2.44 12.00 8.91 20.34 10.84 29.25 48.00 48.04 13.65 3.61 301.00 60.70 25.68 5.00 372.30 1.44 2.60 9.26 0.22 0.38
8,295.00 36.04 67.55 93.52 290.86 23.55 13.99 74.88 2.44 12.00 8.91 20.34 10.84 29.25 48.00 48.04 13.65 3.61 301.00 60.70 25.68 5.00 372.30 1.44 2.60 9.26 0.22 0.38
1.00 30.00 5.00 5.00 15.00 3.00 1.00 5.00 1.00 1.00 1.00 5.00 20.00
248
1.00 30.00 5.00 5.00 15.00 3.00 1.00 5.00 1.00 1.00 1.00 5.00 20.00
-
248
No. RAB : Pogram : Jenis Kegiatan : Ukuran/Dimensi : HARGA SATUAN Satuan RP biji m3 lonjor lonjor lonjor lonjor kg kg kg biji m2 kg btg m3 m2 m3 lembar kg lbr m3 kg biji zak zak liter m3 kg m3
ls Bh roll Bh Bh m' Bh Bh Bh Bh Bh Bh m'
01 DANA DESA Gedung PAUD 9 X 10,5 M Jumlah Total ( Rp. )
1,000 225,000 95,000 45,000 75,000 112,500 65,000 55,000 35,000 45,000 150,000 20,000 35,000 2,500,000 65,000 375,000 6,000 20,000 25,000 175,000 25,000 35,000 65,800 75,000 25,000 125,000 35,000 2,500,000
8,295,000 8,109,450 6,417,250 4,208,400 21,814,500 2,648,813 909,545 4,118,400 85,400 540,000 1,336,500 406,860 379,260 73,125,000 3,120,000 18,013,500 81,924 72,240 7,525,000 10,621,625 642,025 175,000 24,497,603 108,000 65,075 1,156,875 7,560 945,000
SUB TOTAL I
199,425,805
750,000 15,000 5,000 65,000 12,000 35,000 575,000 15,000 15,000 200,000 350,000 65,000 3,000
750,000 450,000 25,000 325,000 180,000 105,000 575,000 75,000 15,000 150,000 350,000 325,000 60,000
SUB TOTAL II
3,385,000
100,000
24,784,800 RAB hal 24
UraIan 2 Tukang 3 Kep Kelompok
Catatan :
VOLUME Dari Dari Total Swadaya DANA DESA 162 162 43 43
Sumber Dana
Satuan
HARGA SATUAN RP 125,000 150,000
Jumlah Total ( Rp. ) 20,264,000 6,483,900
SUB TOTAL III
51,532,700
TOTAL BIAYA Dari Dana Desa: Dari Swadaya :
254,343,505 254,343,505 -
RAB hal 25
REKAPITULASI RENCANA ANGGARAN BIAYA Propinsi : Kabupaten :
No
Kecamatan Desa Kegiatan Ukuran Jumlah No. RAB
Uraian
: :
:
Gedung PAUD : 9 X 10,5 M Bobot : 1 UNIT % : 01
DANA DESA SWADAYA I
BAHAN
II
PERALATAN
III
UPAH Jumlah
IV
Kegiatan Ukuran Jumlah No. RAB
: : : :
DANA DESA
Bobot %
SWADAYA
Kegiatan Ukuran Jumlah No. RAB
: : : :
DANA DESA
Bobot %
SWADAYA
DANA DESA
Jumlah Biaya Upah Jumlah HOK Konstruksi
SWADAYA
199,364,000
-
78.4
199,364,000
-
76.8
3,486,000
-
1.4
3,486,000
-
1.3
51,400,000
-
20.2
51,400,000
-
19.8
254,250,000
-
100
254,250,000
-
98
Operasional TPK 2 % Jumlah Total
Bobot %
JUMLAH TOTAL
5,352,600
2.1
254,250,000
-
100
259,602,600
-
100
51,400,000
-
20.2
51,400,000
-
19.8
452
-
452
-
HOK
HOK
HUKUM TUA
HOK
Ketua TPK
HOK