4 0 106 KB
RENCANA ANGGARAN BIAYA PABRIK INFUSE PT. SATORIA ANEKA INDUSTRI - PURWOSARI - JAWA TIMUR I. JEMBATAN TIMBANG NO A
URAIAN PEKERJAAN
UNIT
VOL.
HARGA SAT
TOTAL
PEKERJAAN PERSIAPAN I
B 1.1
1.2 1 2
3
4
5
6
PEKERJAAN PERSIAPAN Pengukuran Pembuatan Bouwplank
m2 m'
174.00 Rp 70.00 Rp
TOTAL PEKERJAAN PERSIAPAN (A) PEKERJAAN STRUKTUR PEKERJAAN TANAH Urug sirtu Galian tanah pondasi Urug kembali dengan tanah sirtu galian Buang tanah bekas galian Urug pasir - Pile cap - Sloof - Plat - Ramp Perataan dan pemadatan - Plat - Ramp SUB TOTAL PEKERJAAN TANAH PEKERJAAN PONDASI & STRUKTUR BETON BAWAH Pemotongan kepala tiang pancang Pondasi Batu Kali - Pasangan batu kali - Aanstamping - Plester dan Acian Lantai kerja beton site mix 1Pc : 3Ps : 5Kr tebal 5 cm - Pile cap - Sloof - Plat - Ramp Plat Ramp - Beton K-300 - Bekesting tepi - Besi Beton Balok/Poer Pot B-B - Beton K-300 - Bekesting - Besi Beton - Plat - Siku 70 Balok/Poer Pot C-C - Beton K-300 - Bekesting - Besi Beton
1,000 Rp 15,000 Rp Rp
174,000.00 1,050,000.00 1,224,000
m3 m3 m3 m3
46.40 12.38 5.23 7.16
Rp Rp Rp Rp
138,298 42,920 14,307 47,689
Rp Rp Rp Rp
6,417,043.40 531,351.80 74,766.95 341,215.41
m3 m3 m3 m3
4.28 2.96 10.08 4.80
Rp Rp Rp Rp
181,219 181,219 181,219 181,219
Rp Rp Rp Rp
776,340.17 536,406.84 1,826,682.75 869,848.93
m2 m2
41.76 40.00
Rp Rp
10,000 Rp 10,000 Rp Rp
417,600.00 400,000.00 12,191,256
Ttk
30.00 Rp
33,382 Rp
1,001,460.00
m3 m3
5.39 Rp 4.08 Rp
550,000 Rp 225,000 Rp
2,964,500.00 918,000.00
m2
22.44 Rp
45,305 Rp
1,016,635.93
m3 m3 m3 m3
1.07 0.72 2.09 2.04
m3 m2 kg m3 m2 kg kg kg m3 m2 kg
Rp Rp Rp Rp
Rp Rp Rp Rp
817,200.18 549,378.27 1,594,723.03 1,556,571.76
12.24 Rp 6.12 Rp 1957.00 Rp
900,000 Rp 88,225 Rp 9,729 Rp
11,016,000.00 539,935.83 19,038,818.39
11.14 34.85 1121.00 276.14 66.45
900,000 88,225 9,729 11,636 11,445
Rp Rp Rp Rp Rp
10,022,400.00 3,074,458.14 10,905,730.92 3,213,202.86 760,520.25
900,000 Rp 88,225 Rp 9,729 Rp
4,320,000.00 1,552,756.64 3,974,122.29
Rp Rp Rp Rp Rp
4.80 Rp 17.60 Rp 408.50 Rp
763,025 763,025 763,025 763,025
7
8
9 10
Sloof - Beton K-300 - Bekesting - Besi Beton Plat Beton - Beton K-300 - Bekesting - Wiremesh M6 double acian 1Pc : 3Ps Benangan
m3 m2 kg m3 m2 m2 m2 m
5.18 Rp 25.92 Rp 1284.25 Rp 6.30 2.16 100.80 5.30 60.20
Rp Rp Rp Rp Rp
900,000 Rp 88,225 Rp 9,729 Rp 900,000 88,225 69,626 45,305 16,691
SUB TOTAL PEKERJAAN PONDASI & STRUKTUR BETON BAWAH
4,665,600.00 2,286,787.05 12,493,920.55
Rp Rp Rp Rp Rp Rp
5,670,000.00 190,565.59 7,018,307.40 240,114.55 1,004,809.04 112,406,519
Rp Rp Rp
1,224,000.00 124,597,774.91 125,821,774.91
REKAPITULASI A
PEKERJAAN PERSIAPAN
B
PEKERJAAN STRUKTUR
M2 M2
GRAND TOTAL (SEBELUM PPN 10%)
DIBULATKAN: TERBILANG : # SERATUS TIGA PULUH SATU JUTA SERATUS LIMA PULUH RIBU RUPIAH #
BILL OF QUANTITY PEKERJAAN PEMBANGUNAN RUANG GENSET PERGUDANGAN-SAYUNG SEMARANG
NO
URAIAN PEKERJAAN
Volume SAT
HARGA SAT
TOTAL
RUANG GENSET 1 - 8 X 16 M A PEKERJAAN PERSIAPAN I PEKERJAAN PERSIAPAN Pengukuran Pembuatan Bouwplank Biaya kebersihan dll.
50.27 49.00 0.70
m2 m' ls
954 14,307 2,000,000
TOTAL PEKERJAAN PERSIAPAN (A) B PEKERJAAN STRUKTUR 1.1 PEKERJAAN TANAH Urug sirtu tebal 40 cm + pemadatan di bawah lantai Galian tanah pondasi Urug kembali dengan tanah sirtu galian Buang tanah bekas galian Urug pasir padat tebal 20 cm bawah pondasi dan Sloof - Pile Cap - Sloof
47,961 701,043 1,400,000 2,149,004
35.84 29.90 11.26 24.58 0.00 2.93 6.16
m3 m3 m3 m3
138,298 42,920 14,307 47,689
4,956,613 1,283,485 161,037 1,172,388
m3 m3
181,219 181,219
531,768 1,116,306
SUB TOTAL PEKERJAAN TANAH
9,221,597
1.2 PEKERJAAN PONDASI & STRUKTUR BETON BAWAH 1 Tiang pancang 20x20 cm 84 m' 84 m' 6 titik
- Supply Tiang Pancang - Pemancangan - Bobok tiang pancang
2
3
4
5
- Pemotongan kepala tiang pancang Lantai kerja beton site mix 1Pc : 3Ps : 5Kr tebal 5 cm - Pile cap - Sloof Pile cap P1 - Beton K-225 2.4 - Bekesting - Besi Beton Pondasi genset - Beton K-225 - Bekesting - Wiremesh M6 double - Plastic sheet Sloof S1 30x60 cm - Beton K-225 - Bekesting - Besi Beton
50,000
8,820,000 2,940,000 300,000
105,000 35,000
6
nos
33,382
210,309
0.73 1.54
m3 m3
763,025 763,025
559,755 1,175,059
2.52 10.08 363.13
m3 m2 kg
875,000
2,205,000 252,000 4,085,156
1.40 2.10 5.60 5.60
m3 m2 m2 m2
7.06 47.04 806.96
m3 m2 kg
25,000 11,250 875,000
25,000 11,250
3,000 875,000
25,000 11,250
1,225,000 52,500 63,000 16,800 6,174,000 1,176,000 9,078,300
6
7
8
9
10
11
12
Sloof S2 20x40 cm - Beton K-225 - Bekesting - Besi Beton Balok B1 20x50 cm - Beton K-225 - Bekesting - Besi Beton Balok B2 20x30 cm - Beton K-225 - Bekesting - Besi Beton Balok Listplank 10x80 cm - Beton K-225 - Bekesting - Besi Beton Kolom K1 25x25 cm - Beton K-225 - Bekesting - Besi Beton Kolom K2 15x20 cm - Beton K-225 - Bekesting - Besi Beton Kabel Pit + Tutup - Beton K-225 t: 10 mm - Bekesting - Wiremesh M6 single - Siku 40 - Plat bordes (t: 4.5mm) ikuti lapangan
2.24 22.40 392.95
m3 m2 kg
4.20 39.20 ###
m3 m2 kg
2.52 24.36 401.73
m3 m2 kg
3.14 66.64 398.86
m3 m2 kg
1.70 27.22 357.63
m3 m2 kg
0.68 14.52 220.29
m3 m2 kg
3.82 43.23 38.15 91.35 693.00
m3 m2 m2 kg kg
875,000
88,225 11,250 875,000
25,000 11,250 875,000
25,000 11,250 875,000
25,000 11,250 875,000
25,000 11,250 875,000
25,000 11,250 875,000
25,000 11,250
16,250 16,250
SUB TOTAL PEKERJAAN PONDASI & STRUKTUR BETON BAWAH 1.5 PEKERJAAN LANTAI BETON 1 Cor lantai ruang genset - Cor lantai warehouse beton K-225 t : 15cm - Tulangan Wire Mesh plat lantai M6-150 (1 layer) - Alas Plastik - Floorhardener Ex Fosroc atau yang setara, 5kg/m2 hijau 2 Cor dack atap ruang genset - Cor lantai warehouse beton K-225 t : 15cm - Tulangan Wire Mesh plat lantai M6-150 (1 layer) - Bekesting rangka kayu 6/12 & multiplek 12 mm - Perancah
1,960,000 1,976,236 4,420,631 3,675,000 980,000 11,300,231 2,205,000 609,000 4,519,463 2,744,000 1,666,000 4,487,175 1,488,375 680,400 4,023,338 595,350 362,880 2,478,263 3,338,125 1,080,625 429,188 1,484,438 11,261,250 106,097,845
13.44 89.60 89.60 89.60
m3 m2 m2 m2
975,000 37,500 3,000 125,000
18,720,000 4,800,000 384,000 16,000,000
18.90 189.00 126.00 126.00
m3 m2 m2 m2
975,000 37,500 240,000 40,000
26,325,000 10,125,000 43,200,000 7,200,000
SUB TOTAL PEKERJAAN LANTAI BETON
126,754,000
TOTAL PEKERJAAN STRUKTUR (B)
242,073,442
C PEKERJAAN ARSITEKTUR 1.1 PEKERJAAN PASANGAN Pasangan 1 bata 1Pc : 5Ps di bawah Ring Nol
13.72
m2
192,000
3,763,200
Pasangan 1/2 bata 1Pc : 5Ps di atas Ring Nol Plesteran + acian 1Pc : 3Ps Benangan sudut Kolom praktis Balok praktis
140.42 346.43 343.14 37.73 37.80
m2 m2 m1 m1 m1
96,000 39,000 9,500 95,000 95,000
SUB TOTAL PEKERJAAN PASANGAN 2 PEKERJAAN PINTU 1 Pintu Baja
19,257,600 19,301,100 4,656,900 5,120,500 5,130,000 57,229,300
10.50
m2
700,000
SUB TOTAL PEKERJAAN PINTU
10,500,000 10,500,000
3 PEKERJAAN CAT - Exterior Ex Catylac, Plamir Semen Putih - Interior ex Catylac, Plamir - Acian beton ekspos - Waterproofing Type Coating Area Dack - Screeding Area Dack
145.60 318.22 156.24 126.00 126.00
m2 m2 m2 m2 m2
38,500 38,500 9,500 93,232 35,000
SUB TOTAL PEKERJAAN CAT 4 PEKERJAAN SALURAN 1 Pipa PVC 3" 2 Roof Drain
8,008,000 17,502,100 2,120,400 16,781,789 6,300,000 50,712,289
21.00 4.20
m Un
SUB TOTAL SALURAN
37,500 185,000
1,125,000 1,110,000 2,235,000
TOTAL PEKERJAAN ARSITEKTUR ( C )
120,676,589
REKAPITULASI A PEKERJAAN PERSIAPAN B PEKERJAAN STRUKTUR C PEKERJAAN ARSITEKTUR GRAND TOTAL RUANG GENSET
M2 M2 M2
2,149,004 242,073,442 120,676,589 364,899,036