PROYEK PEMBANGUNAN MUSHOLLA JLN. KOTA LEUTIK CAMPERENIK, CIANJUR
NO
1 2 3 4
JENIS PEKERJAAN
PEKERJAAN PEKERJAAN PEKERJAAN PEKERJAAN
Sub Total
STRUKTUR ARSITEKTUR SARANA LUAR MEKANIKAL
SPESIFIKASI
UNIT s Ls Ls Ls
VOL
1.00 1.00 1.00 1.00
UNIT PRICE (RP) 167,007,085.00 283,028,000.00 2,280,600.00 28,850,100.00
TOTAL PRICE (RP) 167,007,085.00 283,028,000.00 2,280,600.00 28,850,100.00 481,165,785.00
PROYEK PEMBANGUNAN MUSHOLLA JLN. KOTA LEUTIK CAMPERENIK, CIANJUR
NO
JENIS PEKERJAAN
1. I 1 2 3 4 5 6 7
PEKERJAAN STRUKTUR PEKERJAAN TANAH Galian tanah pondasi & tie beam Urugan tanah kembali bekas galian Pemadatan tanah Urugan Basecourse bawah lantai t = 10 cm Lantai kerja bawah pondasi dan Tie Beam t = 5 cm Urugan Pasir bawah pondasi dan Tie Beam t = 10 cm Plastic cor bawah lantai
1 2 3 4 5 6 7 8 9 10
PEKERJAAN STRUKTUR BETON Pondasi tapak P1 Pondasi menerus P2 Kolom K1 (400x400) cm Tie Beam TB1 20x35 Tie Beam TB2 15x25 Plat Atap t : 12 cm Wiremesh M8 Dobel Kubah Masjid Ring balok praktis 15x20 cm Kolom Praktis 15x15 cm Cor Slab TOC ± 0,00 t = 8 cm (wiremesh M-6 single)
II
2. I
TOTAL PRICE (RP)
Ready Mix K250 Pasangan Batu Kali Ready Mix K250 Ready Mix K250 Ready Mix K250 Ready Mix K250 Ready Mix K250 Ready Mix K250 Site mix K175 Ready mix K-175
m3 m3 m2 m3 m2 m2 m2
75.44 25.15 12.44 6.40 3.11 6.22 64.00
125,000.00 270,000.00 125,000.00 350,000.00 1,100,000.00 360,000.00 6,000.00
9,429,750.00 6,789,420.00 1,554,750.00 2,240,000.00 3,420,450.00 2,238,840.00 384,000.00
m3 m3 m3 m3 m3 m3 ls m' m' m3
0.59 23.58 3.04 2.24 1.26 12.00 1.00 65.50 64.00 5.12
5,000,000.00 550,000.00 5,300,000.00 5,100,000.00 5,100,000.00 3,200,000.00 7,000,000.00 300,000.00 175,000.00 2,900,000.00
2,940,000.00 12,969,000.00 16,112,000.00 11,424,000.00 6,406,875.00 38,400,000.00 7,000,000.00 19,650,000.00 11,200,000.00 14,848,000.00 283,028,000
250,000.00 75,000.00
65,500,000.00 39,300,000.00
Asia Tile / Mulia Asia Tile / Mulia Asia Tile / Mulia ex. Sika
m2 m1 m1 m2
64.00 24.00 65.50 100.00
215,000.00 95,000.00 95,000.00 75,000.00
13,760,000.00 2,280,000.00 6,222,500.00 7,500,000.00
PEKERJAAN PLAFOND 1 Plafond Gypsum 9 mm 2 List plafond Gypsum 10x10 fin. Cat
Jaya Board Kornis Gypsum
m2 m1
100.00 65.50
170,000.00 45,000.00
17,000,000.00 2,947,500.00
PEKERJAAN PENGECATAN 1 Cat Dinding Interior Emulsion 2 Cat Dinding Exterior Weather Coat 3 Cat plafond ex. Cendana
Vinilex Mowilex Vinilex
m2 m2 m2
262.00 262.00 100.00
42,000.00 62,000.00 42,000.00
11,004,000.00 16,244,000.00 4,200,000.00
buah buah buah buah buah buah
3.00 3.00 2.00 4.00 6.00 10.00
6,200,000.00 5,500,000.00 4,500,000.00 1,500,000.00 4,600,000.00 1,600,000.00
18,600,000.00 16,500,000.00 9,000,000.00 6,000,000.00 27,600,000.00 16,000,000.00
PEKERJAAN SANITAIR 1 Kran air 2 Floor drain 4 Closet Jongkok
bh bh bh
10.00 4.00 2.00
175,000.00 180,000.00 450,000.00
1,750,000.00 720,000.00 900,000.00
PEKERJAAN SARANA LUAR 1 Rabat beton keliling, tanpa tulangan 2 Grill (stainless steel) area tempat wudhu
m2 m'
1.68 4.50
420,000.00 350,000.00
2,280,600 705,600.00 1,575,000.00
1 2 3 4 5 7
3.
UNIT PRICE (RP)
262.00 524.00
V
VI
VOL
m2 m2
1 2 3 4
IV
UNIT
167,007,085
PEKERJAAN ARSITEKTUR PEKERJAAN DINDING 1 Pasangan dinding bata tebal 1/2 bata,campuran spesi 1 PC : 2 PP Plesteran dinding 1 PC : 2 PP, T = 15 mm dan acian 2
II
III
SPESIFIKASI
4. A a
1 2 3 4 5
b
1 2 3 4 5
PEKERJAAN LANTAI Keramik lantai 40x40 Keramik 10 x 40 cm Batas Shoff Plint lantai 10 x 40 cm Waterprofing dak atap, Membrane termasuk screed pelindung
PEKERJAAN PINTU DAN JENDELA Pintu kaca Swing Double P1 Pintu kaca Swing Double P2 Pintu P3 Pintu P4 PVC Jendela J1 Jendela BV
Aluminium, Ascesorries Deckson Aluminium, Ascesorries Deckson Kayu, Ascesorries Deckson Silky Aluminium, Ascesorries Deckson Aluminium, Ascesorries Deckson
PEKERJAAN MEKANIKAL INSTALASI PLUMBING Instalasi Pipa Air Bersih lengkap dengan Fitting Pipa air bersih dari pipa PVC Class AW lengkap dengan sambungan, gantungan / penyangga, material bantu, sesuai dengan gambar dan spesifikasi teknik Wavin AW Pipa Ø 32 mm Wavin AW Pipa Ø 20 mm Kitz Ball valve dia 32 mm Rucika Fitting Pompa transfer kap 30 ltr/m ex Sanyo Sanyo Instalasi Pompa Transfer Instalasi PVC aw Wavin Gate valve Ø 32 Matrial Bantu Instalasi Pipa Air Kotor, Air Bekas, Dan Pipa Venting Lengkap Dengan Fitting Pipa air kotor, bekas dan venting dari pipa PVC Class AW lengkap dengan sambungan, gantungan / penyangga, material bantu, sesuai dengan gambar dan spesifikasi teknik Air kotor, Air Bekas dan Venting Wavin AW Pipa Ø 100 mm Wavin AW Pipa Ø 65 mm Wavin AW Floor Clean Out Ø 100 mm Vent Cap Ø 100 mm American Standart Fitting Rucika TOTAL
28,850,100
m m buah ls unit
24.00 118.00 1.00 1.00 1.00
16,500.00 8,500.00 409,200.00 2,000,000.00 9,500,000.00
396,000.00 1,003,000.00 409,200.00 2,000,000.00 9,500,000.00
ls buah ls
1.00 1.00 1.00
2,000,000.00 602,400.00 1,500,000.00
2,000,000.00 602,400.00 1,500,000.00
m m buah buah ls
30.00 45.00 3.00 21.00 1.00
90,700.00 38,500.00 360,000.00 186,000.00 2,000,000.00
2,721,000.00 1,732,500.00 1,080,000.00 3,906,000.00 2,000,000.00 481,165,785.00