6 0 192 KB
PEKERJAAN BESI ALUMANIUM 1.
1 Kg pasang rangka atap baja
a.
Bahan
-
Besi Profil WF Meni Besi
b.
Tenaga
-
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
1.100 0.080
Kg Kg
x x JUMLAH
Rp. Rp.
33,500.00 21,400.00
= = =
Rp. Rp. Rp.
36,850.00 1,712.00 38,562.00
0.006 0.060 0.006 0.000
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
45,000.00 35,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
270.00 2,100.00 285.00 14.70 2,669.70
=
Rp.
41,231.70
JUMLAH (a) + (b) 2
1 m2 pasang pintu besi baja
a.
Bahan
-
Pintu Besi Baja
b.
Tenaga
-
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
1.000
m2
x JUMLAH
Rp.
265,600.00
= =
Rp. Rp.
265,600.00 265,600.00
0.650 0.650 0.065 0.032
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
45,000.00 35,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
29,250.00 22,750.00 3,087.50 1,568.00 56,655.50
=
Rp.
322,255.50
JUMLAH (a) + (b) 3
1 m2 pasang jendela besi
a.
Bahan
-
jendela besi
b.
Tenaga
-
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
1.000
m2
x JUMLAH
Rp.
265,600.00
= =
Rp. Rp.
265,600.00 265,600.00
1.050 1.050 0.105 0.005
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
45,000.00 35,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
47,250.00 36,750.00 4,987.50 257.25 89,244.75
=
Rp.
354,844.75
JUMLAH (a) + (b)
4
1 m2 pasang rolling door
a.
Bahan
-
Rolling Door
b.
Tenaga
-
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
1.000
m2
x JUMLAH
Rp.
882,200.00
= =
Rp. Rp.
882,200.00 882,200.00
1.500 1.050 0.150 0.005
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
45,000.00 35,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
67,500.00 36,750.00 7,125.00 254.80 111,629.80
=
Rp.
993,829.80
JUMLAH (a) + (b) 5
1 m2 pasang pintu alluminium
a.
Bahan
-
pintu alluminium
b.
Tenaga
-
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
1.000
m2
x JUMLAH
Rp.
332,200.00
= =
Rp. Rp.
332,200.00 332,200.00
1.050 1.050 0.105 0.005
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
45,000.00 35,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
47,250.00 36,750.00 4,987.50 254.80 89,242.30
=
Rp.
421,442.30
JUMLAH (a) + (b) 6
1 m2 pasang terali besi
a.
Bahan
-
Besi Strip 2 x 3
b.
Tenaga
-
Tukang Las Pekerja Kepala Tukang Mandor
1.150
m2
x JUMLAH
Rp.
8,800.00
= =
Rp. Rp.
10,120.00 10,120.00
1.200 1.200 0.012 0.001
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
45,000.00 35,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
54,000.00 42,000.00 570.00 29.40 96,599.40
=
Rp.
106,719.40
JUMLAH (a) + (b)
7
1 m2 pasang jendela nako & dan tralis
a.
Bahan
-
jendela nako paku biasa 1/2" - 1" besi strip
b.
Tenaga
-
Pekerja Tukang Kayu Kepala Tukang Mandor
1.100 0.020 0.025
m2 Kg m3
x x x JUMLAH
Rp. Rp. Rp.
30,500.00 12,600.00 8,800.00
= = = =
Rp. Rp. Rp. Rp.
33,550.00 252.00 220.00 34,022.00
0.200 0.200 0.020 0.001
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
35,000.00 45,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
7,000.00 9,000.00 950.00 49.00 16,999.00
=
Rp.
51,021.00
JUMLAH (a) + (b) 8
1 m2 pasang talang datar, seng BJLS 2.8 mm
a.
Bahan
-
seng plat 3 x 6 bjls 28 paku biasa 1/2" - 1" kayu borneo, papan flincote / meni besi
b.
Tenaga
-
Pekerja Tukang Kayu Kepala Tukang Mandor
0.500 0.015 0.010 0.250
Lbr Kg m3 Kg
x x x x JUMLAH
Rp. Rp. Rp. Rp.
66,800.00 12,600.00 1,200,000.00 21,400.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
33,400.00 189.00 11,520.00 5,350.00 50,459.00
0.150 0.400 0.025 0.001
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
35,000.00 45,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
5,250.00 18,000.00 1,187.50 61.25 24,498.75
=
Rp.
74,957.75
JUMLAH (a) + (b) 9
1 m2 pasang talang miring, seng BJLS 2.8 mm
a.
Bahan
-
seng plat 3 x 6 bjls 28 paku biasa 1/2" - 1" kayu borneo, papan flincote / meni besi
b.
Tenaga
-
Pekerja Tukang Kayu Kepala Tukang Mandor
0.500 0.015 0.019 0.300
Lbr Kg m3 Kg
x x x x JUMLAH
Rp. Rp. Rp. Rp.
66,800.00 12,600.00 1,200,000.00 21,400.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
33,400.00 189.00 22,800.00 6,420.00 62,809.00
0.040 0.400 0.025 0.001
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
35,000.00 45,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
1,400.00 18,000.00 1,187.50 61.25 20,648.75
=
Rp.
83,457.75
JUMLAH (a) + (b)
10 1 m2 pasang talang 1/2 lingkaran D-10 cm, seng BJLS 2.8 mm a.
Bahan
-
seng plat 3 x 6 bjls 28 paku biasa 1/2" - 1" kayu borneo, papan flincote / meni besi
b.
Tenaga
-
Pekerja Tukang Kayu Kepala Tukang Mandor
0.300 0.100 0.019 0.500
Lbr Kg m3 Kg
x x x x JUMLAH
Rp. Rp. Rp. Rp.
66,800.00 12,600.00 1,200,000.00 21,400.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
20,040.00 1,260.00 22,800.00 10,700.00 54,800.00
0.150 0.250 0.025 0.001
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
35,000.00 45,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
5,250.00 11,250.00 1,187.50 61.25 17,748.75
=
Rp.
72,548.75
JUMLAH (a) + (b) 11 1 m2 pasang talang 1/2 lingkaran D-10 cm, seng BJLS 2.4 mm a.
Bahan
-
seng plat 3 x 6 bjls 24 paku biasa 1/2" - 1" kayu borneo, papan flincote / meni besi
b.
Tenaga
-
Pekerja Tukang Kayu Kepala Tukang Mandor
0.300 0.100 0.019 0.500
Lbr Kg m3 Kg
x x x x JUMLAH
Rp. Rp. Rp. Rp.
54,700.00 12,600.00 1,200,000.00 21,400.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
16,410.00 1,260.00 22,800.00 10,700.00 51,170.00
0.150 0.250 0.025 0.001
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
35,000.00 45,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
5,250.00 11,250.00 1,187.50 61.25 17,748.75
=
Rp.
68,918.75
JUMLAH (a) + (b) 5
1 bh pasang Ventilator
a.
Bahan
-
Ventilator 24"
b.
Tenaga
-
Tukang Besi Konstruksi Pekerja Kepala Tukang Mandor
1.000
bh
x JUMLAH
Rp.
3,082,200.00
= =
Rp. Rp.
3,082,200.00 3,082,200.00
1.050 1.050 0.105 0.005
Oh Oh Oh Oh
x x x x JUMLAH
Rp. Rp. Rp. Rp.
45,000.00 35,000.00 47,500.00 49,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
47,250.00 36,750.00 4,987.50 254.80 89,242.30
=
Rp.
3,171,442.30
JUMLAH (a) + (b)
REKAPITULASI BIAYA PEKERJAAN
: PEMBANGUNAN PABRIK ES KAP. 15 TON/HARI
LOKASI TAHUN
: KEL. BERAS BASAH KEC. PANGKALAN SUSU - LANGKAT : 2015
NO
JENIS PEKERJAAN
JUMLAH HARGA (Rp)
A
PEKERJAAN PERSIAPAN DAN ADMINISTRASI
16,432,387.50
B
PEKERJAAN TANAH
29,402,631.53
C
PEKERJAAN PONDASI
48,557,340.39
D
PEKERJAAN BETON
E
PEKERJAAN DINDING
48,765,593.63
F
PEKERJAAN LISTRIK
3,147,375.00
G
PEKERJAAN PLESTERAN
H
PEKERJAAN KAYU
I
PEKERJAAN PENGECATAN
29,669,982.09
J
PEKERJAAN KUNCI KACA
1,281,184.49
K
PEKERJAAN ATAP
48,756,430.00
L
PEKERJAAN LANTAI
10,321,792.81
M
PEKERJAAN BRAIN TANK DAN ICE SCAN SET
739,100,000.00
N
PEKERJAAN CONDENSING UNIT
876,500,000.00
O
PEKERJAAN LAIN LAIN
JUMLAH PPN 10 % JUMLAH TERMASUK PPN 10 % DIBULATKAN
215,178,725.33
59,783,778.60 103,598,712.64
38,664,000.00
2,269,159,934.00 226,915,993.40 2,496,075,927.40 2,496,075,000.00
TERBILANG : SATU MILYAR DELAPAN RATUS ENAM PULUH JUTA RUPIAH
An. Kepala Dinas Perikanan dan Kelautan Kabuaten Langkat Kabid Kelautan dan Perikanan Tangkap
Jantje R. Turangan Nip. 19610617 198303 1 005
DAFTAR KUANTITAS DAN HARGA PEKERJAAN : LOKASI : TAHUN :
PEMB. PABRIK ES BALOK KAPASITAS 15 TON Pangkalan Susu - Kab. Langkat 2015
NO
URAIAN PEKERJAAN
SATUAN
HARGA SATUAN (Rp)
VOLUME
JUMLAH HARGA (Rp)
A 1 2 3 4 5 6
PEKERJAAN PERSIAPAN DAN ADMINISTRASI Pembuatan Papan Nama Kegiatan 1 m2 Membersihkan Lapangan dan Perataan 1 m' Pengukuran dan Pemasangan Bouwplank Asbuilt Drawing Penyediaan Air kerja Mobilisasi dan Demobilisasi
Ls M2 M1 Ls Ls Ls
500,000.00 15,968.75 71,896.88 1,500,000.00 2,500,000.00 5,000,000.00
1.00 200.00 52.00 1.00 1.00 1.00 JUMLAH (A)
500,000.00 3,193,750.00 3,738,637.50 1,500,000.00 2,500,000.00 5,000,000.00 16,432,387.50
B 1 2 3 4 5
PEKERJAAN TANAH 1 m3 Galian Tanah Biasa Sedalam 1 Meter 1 m3 Urugan Kembali 1 m3 Pemadatan Tanah 1 m3 Urugan Tanah Biasa 1 m3 Urugan Pasir
M3 M3 M3 M3 M3
42,695.00 20,467.13 53,368.75 184,484.38 449,373.75
79.80 26.60 90.00 90.00 9.00 JUMLAH (B)
3,407,061.00 544,425.53 4,803,187.50 16,603,593.75 4,044,363.75 29,402,631.53
C 1 2 3
PEKERJAAN PONDASI 1 m1 Pemancangan Bambu/Cerucuk 1 m3 Pasang Pondasi Batu Kosong 1 m3 Pasang Pondasi Batu Kali 1 Pc : 4 Ps
M1 M3 M3
30,268.75 431,219.63 814,840.13
140.00 16.80 45.50 JUMLAH (C)
4,237,625.00 7,244,489.70 37,075,225.69 48,557,340.39
D 1 2 3 4 5 6
PEKERJAAN BETON 1 m3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr 1 m3 membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr 1 Kg Pembesian dengan besi polos atau besi ulir 1 m2 pasang bekisting untuk Sloof 1 m2 pasang bekisting untuk Kolom 1 m2 pasang bekisting untuk Balok
M3 M3 M3 KG M2 M2
1,112,957.00 1,348,544.00 14,479.31 188,454.88 423,263.25 309,673.25
15.25 30.33 6,065.60 42.00 84.00 84.00 JUMLAH (D)
16,972,594.25 40,898,642.43 87,825,717.90 7,915,104.75 35,554,113.00 26,012,553.00 215,178,725.33
E 1 2
PEKERJAAN DINDING 1 m2 pasang dinding bata tebal 1/2 bata, 1 Pc : 2 Ps 1 m2 pasang dinding bata tebal 1/2 bata, 1 Pc : 4 Ps
M2 M2
152,010.30 137,921.38
35.00 315.00 JUMLAH (E)
5,320,360.50 43,445,233.13 48,765,593.63
F 1 2 3 4 5 6 7
PEKERJAAN LISTRIK Box MCB 16 Ampere Instalasi Listrik Stop Kontak Saklar Tunggal Saklar Ganda Lampu Jari Jari 14 Watt Pasar arde
Bh M1 Bh Bh Bh Bh Unit
50,000.00 45,000.00 34,375.00 34,375.00 34,375.00 45,000.00 350,000.00
4.00 40.90 2.00 1.00 2.00 13.00 1.00 JUMLAH (F)
200,000.00 1,840,500.00 68,750.00 34,375.00 68,750.00 585,000.00 350,000.00 3,147,375.00
G 1 2 3
PEKERJAAN PLESTERAN 1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm. 1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm. 1 m2 Acian Semen, tebal 5 mm.
M2 M2 M2
59,928.93 54,050.55 30,767.01
70.00 630.00 700.00 JUMLAH (G)
4,195,025.10 34,051,846.50 21,536,907.00 59,783,778.60
H 1 2 3 4 5 6
PEKERJAAN KAYU 1 m3 pasang kusen pintu dan jendela kayu 1 m2 pasang pintu panel kayu 1 m2 pasang daun jendela kaca kayu 1 m2 pasang plafon triplek 3 mm + rangka kayu klas II 1 m1 pasang list plafon kayu profil 1 m2 pasang rangka baja ringan Uk ( 100 x 34 ) mm tebal 0.6
M3 M2 M2 M2 M1 M2
6,483,732.50 553,236.75 453,267.00 179,099.13 23,696.88 325,000.00
0.75 3.36 4.60 59.05 14.00 258.11 JUMLAH (H)
4,862,799.38 1,858,875.48 2,085,028.20 10,575,803.33 331,756.25 83,884,450.00 103,598,712.64
I 1
PEKERJAAN PENGECATAN 1 m2 Pengecatan Kayu Baru ( 1 lapis plamir ), 1 lapis cat dasar, dan 2 lapis cat penutup 1 m2 Pengecatan Tembok Baru ( 1 lapis plamir ), 1 lapis cat dasar, dan 2 lapis cat penutup. 1 m2 Pengecatan permukaan baja / Seng dengan meni besi 1 m2 Pengecatan Plafond, 1 lapis cat dasar, 2 lapis cat penutup
M2
60,690.94
35.00
2,124,182.81
M2
25,358.84
700.00
17,751,186.25
M2 M2
31,740.75 27,131.84
258.11 59.05 JUMLAH (I)
8,192,478.02 1,602,135.00 29,669,982.09
2 3 4
J 1 2 3 4 5 6
PEKERJAAN KUNCI KACA 1 buah pasang kunci tanam antik 1 buah pasang kunci tanam kamar mandi 1 buah pasang engsel pintu 1 buah pasang engsel jendela 1 buah pasang kait angin 1 m2 pasang kaca, tebal 5 mm
Bh Bh Bh Bh Bh M2
208,687.13 125,213.44 52,046.78 32,131.19 32,246.78 262,146.78
1.00 1.00 6.00 4.00 4.00 1.44 JUMLAH (K)
208,687.13 125,213.44 312,280.69 128,524.75 128,987.13 377,491.37 1,281,184.49
K 1 2
PEKERJAAN ATAP 1 m2 Pekerjaan atap Singcalum 1 M1 Pasang bubungan
M2 M1
155,000.00 250,000.00
258.11 35.00 JUMLAH (L)
40,006,430.00 8,750,000.00 48,756,430.00
L 1 2 3
PEKERJAAN LANTAI 1 m2 pasang lantai keramik ukuran 30x30 cm Cor beton tebal 10 cm ( lantai dan dinding baraintank ) Cor beton tebal 3 cm dasar lantai baraintank
M2 M3 M3
163,679.25 1,112,957.00 1,348,544.00
8.75 6.77 1.01 JUMLAH (M)
1,432,193.40 7,530,267.06 1,359,332.35 10,321,792.81
M PEKERJAAN BRAIN TANK DAN ICE SCAN SET 1 Insulation for Brine Tank (Polyiurethane Foam) 2 Plate for Brine Tank 6 mm 3 Papan Penutup Brine Tank 4 Chaimt Hoist Electric Kapasitas 1 Ton 5 Filling Water Tank 6 Ice Can Dumper 7 Ice Can Frame 8 Ice Can HOTDIP, Kapasitas @ 50 Kg (Tebal : 1.8mm) 9 Agitator + Dynamo 380V, 3 Phase / 50 Hz 4HP 10 WF ( Rangka Baja ) untuk Chamhoist dan Dudukan Filling Tank 11 Thowing Tank / Bak Celup 12 Biaya Pemasangan
Ls Ls Ls Set Set Set Set Pcs Unit Set Paket Paket
80,000,000.00 95,000,000.00 19,500,000.00 35,000,000.00 25,000,000.00 5,950,000.00 2,500,000.00 950,000.00 27,600,000.00 45,000,000.00 5,950,000.00 25,000,000.00
1.00 1.00 1.00 1.00 1.00 1.00 25.00 300.00 2.00 1.00 1.00 1.00 JUMLAH (N)
80,000,000.00 95,000,000.00 19,500,000.00 35,000,000.00 25,000,000.00 5,950,000.00 62,500,000.00 285,000,000.00 55,200,000.00 45,000,000.00 5,950,000.00 25,000,000.00 739,100,000.00
N 1 2 3 4 5 6
Unit Unit Unit Unit Unit Ls
125,000,000.00 35,000,000.00 65,000,000.00 95,000,000.00 29,500,000.00 45,000,000.00
2.00 2.00 2.00 2.00 2.00 2.00
250,000,000.00 70,000,000.00 130,000,000.00 190,000,000.00 59,000,000.00 90,000,000.00
Ton Ls mtr Ls Paket
3,000,000.00 14,500,000.00 400,000.00 10,000,000.00 25,000,000.00
10.00 1.00 20.00 1.00 1.00 JUMLAH (O)
30,000,000.00 14,500,000.00 8,000,000.00 10,000,000.00 25,000,000.00 876,500,000.00
M2 Ls
1,200,000.00 18,264,000.00
17.00 1.00 JUMLAH (P)
20,400,000.00 18,264,000.00 38,664,000.00
PEKERJAAN CONDENSING UNIT Compressor Bitzer 6F, Open Type, 50 Hz,380 Volt Bitzer by Germany Electrict Motor, Teco 30 Kw/40HP, 50 Hz, 380 Volt Condensor Air Cooler MERK Eden atau yang setara Evaporator, Vendamper System Spiral Electric Control / Panel Listrik Accessories Compressor : reciver, acumulator, HP/LP, Freon, Thermometer, Sigh Glass, Oil Separator 7 Nacl 8 Panel Distribusi 9 Kabel Power NYY 4 x 35mm 10 Biaya Running test 11 Biaya Pemasangan O 1 2
PEKERJAAN LAIN LAIN Pintu besi akses masuk dan keluar pabrik dg palat 0.3 mm Kabel dan aksesoris termasuk Pemasangan
PEKERJAAN PERSIAPAN
1 b
1 m2 Membersihkan Lapangan dan Perataan Tenaga
-
Pekerja Mandor
2 a. -
1 m' Pengukuran dan Pemasangan Bouwplank Bahan Kayu 5/7 0.012 Btg Paku Biasa 2" - 5" 0.020 Kg Kayu Papan 3/20 0.007 Kg
b. -
Tenaga Tukang Kayu Pekerja Kepala Tukang Mandor
0.100 0.050
0.100 0.100 0.010 0.005
Oh Oh
Oh Oh Oh Oh
x Rp. x Rp. JUMLAH JUMLAH (a)
93,500.00 132,375.00
= = = =
Rp. Rp. Rp. Rp.
9,350.00 6,618.75 15,968.75 15,968.75
2,580,000.00 21,750.00 2,580,000.00
= = = =
Rp. Rp. Rp. Rp.
30,960.00 435.00 18,060.00 49,455.00
x Rp. 110,000.00 x Rp. 93,500.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
11,000.00 9,350.00 1,430.00 661.88 22,441.88 71,896.88
= = = = = = = =
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
59,500.00 541,800.00 6,525.00 20,963.25 7,500.00 22,550.00 149,737.50 808,575.75
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
220,000.00 93,500.00 28,600.00 6,618.75 348,718.75 1,157,294.50
= = = =
Rp. Rp. Rp. Rp.
112,612.50 13,530.00 17,500.00 143,642.50
= = = =
Rp. Rp. Rp. Rp.
93,500.00 13,237.50 106,737.50 250,380.00
x Rp. x Rp. x Rp. JUMLAH
3 a. -
1 m2 Pembuatan Barak Sementara, Gudang Semen dan Alat - alat Bahan Dolken Kayu Ø 8-10/400 1.700 Btg x Rp. 35,000.00 3 Kayu 0.210 M x Rp. 2,580,000.00 Paku Biasa 0.300 Kg x Rp. 21,750.00 Semen Portland 10.500 Kg x Rp. 1,996.50 Pasir beton 0.030 M3 x Rp. 250,000.00 Koral Beton 0.050 M3 x Rp. 451,000.00 Seng Gelombang BLJS 30 1.500 Lbr x Rp. 99,825.00 JUMLAH b. Tenaga - Tukang Kayu 2.000 Oh x Rp. 110,000.00 - Pekerja 1.000 Oh x Rp. 93,500.00 - Kepala Tukang 0.200 Oh x Rp. 143,000.00 - Mandor 0.050 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b) 4 a. -
1 m2 Pembuatan Jalan Masuk Menuju Lokasi, Tebal 25 cm Bahan Batu Belah 0.275 M3 x Rp. 409,500.00 Kerikil 0.030 M3 x Rp. 451,000.00 Pasir 0.050 M3 x Rp. 350,000.00 JUMLAH b. Tenaga - Pekerja 1.000 Oh x Rp. 93,500.00 - Mandor 0.100 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
PEKERJAAN TANAH 1. b. -
1 m3 Galian Tanah Biasa Sedalam 1 Meter Tenaga Pekerja 0.400 Oh Mandor 0.040 Oh
x Rp. x Rp. JUMLAH
93,500.00 132,375.00
= = =
Rp. Rp. Rp.
37,400.00 5,295.00 42,695.00
2 1 m3 Urugan Kembali b. Tenaga Pekerja Mandor
0.192 0.019
Oh Oh
x Rp. x Rp. JUMLAH
93,500.00 132,375.00
= = =
Rp. Rp. Rp.
17,952.00 2,515.13 20,467.13
3 1 m3 Pemadatan Tanah b. Tenaga Pekerja Mandor
0.500 0.050
Oh Oh
x Rp. x Rp. JUMLAH
93,500.00 132,375.00
= = =
Rp. Rp. Rp.
46,750.00 6,618.75 53,368.75
4 1 m3 Urugan Pasir a. Bahan Pasir Urug
1.200
M3
x Rp. JUMLAH
350,000.00
= =
Rp. Rp.
420,000.00 420,000.00
b. Tenaga Pekerja Mandor
0.300 0.010
Oh Oh
x Rp. 93,500.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = =
Rp. Rp. Rp. Rp.
28,050.00 1,323.75 29,373.75 449,373.75
5 1 m3 Urugan Tanah Biasa a. Bahan Tanah Urug / Timbunan
1.200
M3
x Rp. JUMLAH
131,500.00
= =
Rp. Rp.
157,800.00 157,800.00
0.250 0.025
Oh Oh
x Rp. 93,500.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = =
Rp. Rp. Rp. Rp.
23,375.00 3,309.38 26,684.38 184,484.38
166,375.00 451,000.00 350,000.00
= = = =
Rp. Rp. Rp. Rp.
45,753.13 13,530.00 17,500.00 76,783.13
93,500.00 132,375.00
= = =
Rp. Rp. Rp.
93,500.00 13,237.50 106,737.50
=
Rp.
183,520.63
b. Tenaga Pekerja Mandor
6 1 m2 Pembuatan Jalan Sementara, Tebal 25 cm a. Bahan Batu Belah 0.275 M3 x Rp. Kerikil 0.030 M3 x Rp. Pasir 0.050 M3 x Rp. JUMLAH b. Tenaga Pekerja 1.000 Oh x Rp. Mandor 0.100 Oh x Rp. JUMLAH
JUMLAH (a) + (b)
PEKERJAAN PONDASI 1 a. -
1 m1 Pemancangan Bambu/Cerucuk Bahan Bambu Diameter 10 Cm 1.100
M1
x Rp. JUMLAH
8,750.00
= =
Rp. Rp.
9,625.00 9,625.00
0.150 0.050
Oh Oh
x Rp. 93,500.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = =
Rp. Rp. Rp. Rp.
14,025.00 6,618.75 20,643.75 30,268.75
-
1 m3 Pasang Pondasi Batu Kosong Bahan Pasir Urug Batu Belah 15 / 20 cm 1.200 Pasir Urug 0.300
M3 M3
x Rp. x Rp. JUMLAH
166,375.00 350,000.00
= = =
Rp. Rp. Rp.
199,650.00 105,000.00 304,650.00
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
72,930.00 42,900.00 5,577.00 5,162.63 126,569.63 431,219.63
3 a. -
1 m3 Pasang Pondasi Batu Kali 1 Pc : 4 Ps Bahan Batu Belah 15 / 20 cm 1.100 M3 Semen Portland 163.000 Kg Pasir pasang 0.520 M3
x Rp. x Rp. x Rp. JUMLAH
166,375.00 1,996.50 157,000.00
= = = =
Rp. Rp. Rp. Rp.
183,012.50 325,429.50 81,640.00 590,082.00
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
140,250.00 66,000.00 8,580.00 9,928.13 224,758.13 814,840.13
b. Tenaga - Pekerja - Mandor
2 a.
0.780 0.390 0.039 0.039
1.500 0.600 0.060 0.075
Oh Oh Oh Oh
PEKERJAAN DINDING 1 a. -
1 m2 pasang dinding bata tebal 1/2 bata, 1 Pc : 2 Ps Bahan Batu Bata 35.000 Bh x Rp. Semen Portland 18.950 Kg x Rp. 3 Pasir pasang 0.038 M x Rp. JUMLAH b. Tenaga - Pekerja 0.320 Oh x Rp. - Tukang Batu 0.100 Oh x Rp. - Kepala Tukang 0.010 Oh x Rp. - Mandor 0.015 Oh x Rp. JUMLAH
1,825.00 1,996.50 157,000.00
= = = =
Rp. Rp. Rp. Rp.
63,875.00 37,833.68 5,966.00 107,674.68
93,500.00 110,000.00 143,000.00 132,375.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
29,920.00 11,000.00 1,430.00 1,985.63 44,335.63
=
Rp.
152,010.30
= = = =
Rp. Rp. Rp. Rp.
63,875.00 22,959.75 6,751.00 93,585.75
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
29,920.00 11,000.00 1,430.00 1,985.63 44,335.63 137,921.38
JUMLAH (a) + (b) 2 a. -
1 m2 pasang dinding bata tebal 1/2 bata, 1 Pc : 4 Ps Bahan Batu Bata 35.000 Bh x Rp. 1,825.00 Semen Portland 11.500 Kg x Rp. 1,996.50 Pasir pasang 0.043 M3 x Rp. 157,000.00 JUMLAH b. Tenaga - Pekerja 0.320 Oh x Rp. 93,500.00 - Tukang Batu 0.100 Oh x Rp. 110,000.00 - Kepala Tukang 0.010 Oh x Rp. 143,000.00 - Mandor 0.015 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
PEKERJAAN LISTRIK
1. a -
1 Bh Pemasangan titik Lampu Tenaga Pekerja Kepala Tukang Mandor
1.200 0.650 0.120
Oh Oh Oh
x Rp. x Rp. x Rp. JUMLAH
93,500.00 143,000.00 132,375.00
= = = =
Rp. Rp. Rp. Rp.
112,200.00 92,950.00 15,885.00 221,035.00
PEKERJAAN PLESTERAN 1 a. -
1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm. Bahan Semen Portland 8.520 Kg Pasir plesteran 0.017 M3
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
2 a. -
1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm. Bahan Semen Portland 5.200 Bh Pasir plesteran 0.020 Kg
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
0.200 0.150 0.015 0.010
1 a. -
1 m2 Acian Semen, tebal 5 mm. Bahan Semen Portland
b. -
Tenaga Pekerja Kepala Tukang Mandor
x Rp. x Rp. JUMLAH
1,996.50 250,000.00
= = =
Rp. Rp. Rp.
17,010.18 4,250.00 21,260.18
x Rp. x Rp. x Rp. x Rp. JUMLAH JUMLAH (a) + (b)
93,500.00 110,000.00 143,000.00 132,375.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
18,700.00 16,500.00 2,145.00 1,323.75 38,668.75 59,928.93
x Rp. x Rp. JUMLAH
1,996.50 250,000.00
= = =
Rp. Rp. Rp.
10,381.80 5,000.00 15,381.80
Oh Oh Oh Oh
x Rp. x Rp. x Rp. x Rp. JUMLAH JUMLAH (a) + (b)
93,500.00 110,000.00 143,000.00 132,375.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
18,700.00 16,500.00 2,145.00 1,323.75 38,668.75 54,050.55
4.307
Kg
x Rp. JUMLAH
1,996.50
= =
Rp. Rp.
8,598.26 8,598.26
0.200 0.015 0.010
Oh Oh Oh
x Rp. x Rp. x Rp. JUMLAH JUMLAH (a) + (b)
93,500.00 143,000.00 132,375.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
18,700.00 2,145.00 1,323.75 22,168.75 30,767.01
0.200 0.150 0.015 0.010
Oh Oh Oh Oh
PEKERJAAN KAYU 1 1 m3 pasang kusen pintu dan jendela kayu a. Bahan - kayu klas I, balok
1.100
m3
x Rp. JUMLAH
3,919,200.00
= =
Rp. Rp.
4,311,120.00 4,311,120.00
6.000 20.000 2.000 0.300
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,870,000.00 220,000.00 42,900.00 39,712.50 2,172,612.50 6,483,732.50
a. Bahan - kayu klas I, papan
0.040
m3
x Rp. JUMLAH
3,559,200.00
= =
Rp. Rp.
142,368.00 142,368.00
b. -
1.000 2.500 0.250 0.050
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
93,500.00 275,000.00 35,750.00 6,618.75 410,868.75 553,236.75
b. -
Tenaga Pekerja Tukang kayu Kepala Tukang Mandor
2 1 m2 pasang pintu panel kayu
Tenaga Pekerja Tukang kayu Kepala Tukang Mandor
3 1 m2 pasang daun jendela kaca kayu a. Bahan - kayu klas I, papan
0.035
m3
x Rp. JUMLAH
3,559,200.00
= =
Rp. Rp.
124,572.00 124,572.00
b. -
0.800 2.000 0.200 0.040
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
74,800.00 220,000.00 28,600.00 5,295.00 328,695.00 453,267.00
Tenaga Pekerja Tukang kayu Kepala Tukang Mandor
6 1 m2 pasang lisplang ukuran (3 x 20) cm, kayu klas II a. Bahan - kayu klas II, papan - paku biasa 2" - 5"
0.032 0.050
m3 kg
x Rp. x Rp. JUMLAH
2,580,000.00 21,750.00
= = =
Rp. Rp. Rp.
82,560.00 1,087.50 83,647.50
b. -
0.100 0.200 0.020 0.005
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
9,350.00 22,000.00 2,860.00 661.88 34,871.88 118,519.38
1.05
Lbr
x Rp. JUMLAH
= =
Rp. Rp.
19,005.00 19,005.00
Tenaga pekerja Tukang kayu Kepala Tukang Mandor
7 1 m1 pasang list plafon kayu profil a. Bahan - kayu profil b. Tenaga
18,100.00
PEKERJAAN BETON 1. a. -
1 m3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr Bahan Semen Portland 218.000 Kg Pasir Beton 0.520 M3 Koral Beton 0.780 M3
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
2 a. -
1 m3 membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr Bahan Semen Portland 336.000 Kg Pasir Beton 0.520 M3 Koral Beton 0.780 M3
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
3 a. -
1 Kg Pembesian dengan besi polos atau besi ulir Bahan Besi Beton (Polos/Ulir) 1.050 Kg Kawat Beton 0.015 Kg
b. -
Tenaga Pekerja Tukang Besi Kepala Tukang Mandor
4 a. -
1 m2 pasang bekisting untuk Sloof Bahan Balok kayu klas II Paku biasa 2 - 5 " Minyak Bekisting
1.650 0.250 0.025 0.080
1.650 0.250 0.025 0.080
Oh Oh Oh Oh
Oh Oh Oh Oh
x Rp. x Rp. x Rp. JUMLAH
1,996.50 250,000.00 451,000.00
= = = =
Rp. Rp. Rp. Rp.
435,237.00 130,000.00 351,780.00 917,017.00
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
154,275.00 27,500.00 3,575.00 10,590.00 195,940.00 1,112,957.00
x Rp. x Rp. x Rp. JUMLAH
1,996.50 250,000.00 451,000.00
= = = =
Rp. Rp. Rp. Rp.
670,824.00 130,000.00 351,780.00 1,152,604.00
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
154,275.00 27,500.00 3,575.00 10,590.00 195,940.00 1,348,544.00
x Rp. x Rp. JUMLAH
12,000.00 21,000.00
= = =
Rp. Rp. Rp.
12,600.00 315.00 12,915.00
0.007 0.007 0.0007 0.0003
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
654.50 770.00 100.10 39.71 1,564.31 14,479.31
0.045 0.300 0.100
M3 Kg Ltr
x Rp. x Rp. x Rp. JUMLAH
= = = =
Rp. Rp. Rp. Rp.
116,100.00 6,525.00 4,800.00 127,425.00
2,580,000.00 21,750.00 48,000.00
b. Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
0.300 0.260 0.026 0.005
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
28,050.00 28,600.00 3,718.00 661.88 61,029.88 188,454.88
5 a. -
1 m2 pasang bekisting untuk Kolom Bahan Balok kayu klas II Paku biasa 2 - 5 " Minyak Bekisting Balok Kayu Plywood tebal 9 mm Dolken kayu galam Ø 8-10/4 m
0.040 0.400 0.200 0.015 0.350 2.000
M3 Kg Lt M3 Lbr Btg
x Rp. x Rp. x Rp. x Rp. x Rp. x Rp. JUMLAH
2,580,000.00 21,750.00 48,000.00 2,580,000.00 352,000.00 35,000.00
= = = = = = =
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
103,200.00 8,700.00 9,600.00 38,700.00 123,200.00 70,000.00 353,400.00
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
0.300 0.330 0.033 0.006
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
28,050.00 36,300.00 4,719.00 794.25 69,863.25 423,263.25
6 a. -
1 m2 pasang bekisting untuk Balok Bahan Balok kayu klas II Paku biasa 2 - 5 " Minyak Bekisting Balok Kayu Dolken kayu galam Ø 8-10/4 m
0.040 0.400 0.200 0.018 2.000
M3 Kg Lt M3 Btg
x Rp. x Rp. x Rp. x Rp. x Rp. JUMLAH
2,580,000.00 21,750.00 48,000.00 2,580,000.00 35,000.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
103,200.00 8,700.00 9,600.00 46,440.00 70,000.00 237,940.00
b. -
Tenaga Pekerja Tukang Batu Kepala Tukang Mandor
0.320 0.330 0.033 0.006
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
29,920.00 36,300.00 4,719.00 794.25 71,733.25 309,673.25
7 a.
1 m2 pasang bekisting untuk Plat Lantai Bahan M3 Kg Lt M3 Lbr Btg
x Rp. x Rp. x Rp. x Rp. x Rp. x Rp. JUMLAH
= = = = = = =
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
103,200.00 8,700.00 9,600.00 38,700.00 123,200.00 210,000.00 493,400.00
-
-
Balok Kayu Klas II Paku biasa 2 - 5 " Minyak Bekisting Balok Kayu Plywood tebal 9 mm Dolken kayu galam Ø 8-10/4 m
0.040 0.400 0.200 0.015 0.350 6.000
2,580,000.00 21,750.00 48,000.00 2,580,000.00 352,000.00 35,000.00
b. Tenaga -
Pekerja Tukang Batu Kepala Tukang Mandor
0.320 0.330 0.033 0.006
Oh Oh Oh Oh
x Rp. x Rp. x Rp. x Rp. JUMLAH
93,500.00 110,000.00 143,000.00 132,375.00
JUMLAH (a) + (b)
= = = = =
Rp. Rp. Rp. Rp. Rp.
29,920.00 36,300.00 4,719.00 794.25 71,733.25
=
Rp.
565,133.25
PEKERJAAN PENGECATAN
1
1 m2 Pengecatan Kayu Baru ( 1 lapis plamir ), 1 lapis cat dasar, dan 2 lapis cat penutup a. Bahan - Cat Meni 0.200 Kg x Rp. 35,000.00 - Plamir 0.150 Kg x Rp. 11,000.00 - Cat dasar 0.170 Kg x Rp. 35,000.00 - Cat penutup 2 kali 0.260 Kg x Rp. 143,000.00 - Kuas 0.010 Kg x Rp. 18,700.00 JUMLAH b. Tenaga - Pekerja 0.070 Oh x Rp. 93,500.00 - Tukang Cat 0.009 Oh x Rp. 110,000.00 - Kepala Tukang 0.006 Oh x Rp. 143,000.00 - Mandor 0.0025 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
7,000.00 1,650.00 5,950.00 37,180.00 187.00 51,967.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
6,545.00 990.00 858.00 330.94 8,723.94 60,690.94
= = = = =
Rp. Rp. Rp. Rp. Rp.
1,100.00 3,900.00 10,140.00 187.00 15,327.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,870.00 6,930.00 900.90 330.94 10,031.84 25,358.84
= = =
Rp. Rp. Rp.
3,500.00 187.00 3,687.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,870.00 22,000.00 2,860.00 1,323.75 28,053.75 31,740.75
2
1 m2 Pengecatan Tembok Baru ( 1 lapis plamir ), 1 lapis cat dasar, dan 2 lapis cat penutup. a. Bahan - Plamir 0.100 Kg x Rp. 11,000.00 - Cat dasar 0.100 Kg x Rp. 39,000.00 - Cat penutup 2 kali 0.260 Kg x Rp. 39,000.00 - Kuas 0.010 Kg x Rp. 18,700.00 JUMLAH b. Tenaga - Pekerja 0.020 Oh x Rp. 93,500.00 - Tukang Cat 0.063 Oh x Rp. 110,000.00 - Kepala Tukang 0.0063 Oh x Rp. 143,000.00 - Mandor 0.0025 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b) 3 a. -
1 m2 Pengecatan permukaan baja / Seng dengan meni besi Bahan Meni besi 0.100 Kg x Rp. 35,000.00 Kuas 0.010 Bh x Rp. 18,700.00 JUMLAH b. Tenaga - Pekerja 0.020 Oh x Rp. 93,500.00 - Tukang Cat 0.200 Oh x Rp. 110,000.00 - Kepala Tukang 0.0200 Oh x Rp. 143,000.00 - Mandor 0.0100 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
4. a. -
1 m2 Pengecatan Plafond, 1 lapis cat dasar, 2 lapis cat penutup Bahan Plamir 0.250 Kg x Rp. 11,000.00 Cat penutup 2 kali 0.320 Kg x Rp. 39,000.00 Kuas cat 0.100 Bh x Rp. 18,700.00 JUMLAH b. Tenaga - Pekerja 0.020 Oh x Rp. 93,500.00 - Tukang Cat 0.063 Oh x Rp. 110,000.00 - Kepala Tukang 0.0063 Oh x Rp. 143,000.00 - Mandor 0.0025 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = =
Rp. Rp. Rp. Rp.
2,750.00 12,480.00 1,870.00 17,100.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,870.00 6,930.00 900.90 330.94 10,031.84 27,131.84
PEKERJAAN SANITASI 1 a. -
Memasang 1 buah kloset jongkok porselen Bahan Kloset Jongkok Porselen 1.000 Semen Portland 6.000 Pasir Pasang 0.010
Bh Kg Kg
x Rp. x Rp. x Rp. JUMLAH
253,000.00 1,996.50 157,000.00
= = = =
Rp. Rp. Rp. Rp.
253,000.00 11,979.00 1,570.00 266,549.00
b. -
Tenaga Pekerja Tukang batu Kepala Tukang Mandor
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
93,500.00 165,000.00 214,500.00 21,180.00 494,180.00 760,729.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
730.00 239,580.00 47,100.00 76,250.00 11,979.00 375,639.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
93,500.00 159,500.00 21,450.00 13,237.50 287,687.50 663,326.50
5,293.75 6,352.50
= = =
Rp. Rp. Rp.
6,352.50 2,223.38 8,575.88
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
3,366.00 6,600.00 858.00 238.28 11,062.28 19,638.15
x Rp. x Rp. JUMLAH
47,250.00 56,700.00
= = =
Rp. Rp. Rp.
56,700.00 19,845.00 76,545.00
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
7,573.50 14,850.00 1,930.50 542.74 24,896.74 101,441.74
1.000 1.500 1.500 0.160
2 a. -
Memasang 1 buah bak mandi batu bata volume 0.30 m3 Bahan Batu bata 0.400 m3 x Rp. 1,825.00 Semen Portland 120.000 kg x Rp. 1,996.50 Pasir Pasang 0.300 m3 x Rp. 157,000.00 Keramik 20 x 25 1.000 dos x Rp. 76,250.00 Semen nat 6.000 Kg x Rp. 1,996.50 JUMLAH b. Tenaga - Pekerja 1.000 Oh x Rp. 93,500.00 - Tukang batu 1.450 Oh x Rp. 110,000.00 - Kepala Tukang 0.150 Oh x Rp. 143,000.00 - Mandor 0.100 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
3 a. -
Memasang 1 m' pipa PVC tipe AW diameter 1/2 " Bahan Pipa PVC 1.200 m' Perlengkapan 0.350 -
b. -
Tenaga Pekerja Tukang pipa Kepala Tukang Mandor
4 a. -
Memasang 1 m' pipa PVC tipe AW diameter 3 " Bahan Pipa PVC 1.200 m' Perlengkapan 0.350 -
b. -
Tenaga Pekerja Tukang pipa Kepala Tukang Mandor
0.036 0.060 0.006 0.0018
0.081 0.135 0.0135 0.0041
Oh Oh Oh Oh
Oh Oh Oh Oh
x Rp. x Rp. JUMLAH
5 a. -
Memasang 1 buah kran diameter 3/4" atau 1/2" Bahan Kran air 1.000 Bh Seal tape 0.025 Bh
b. -
Tenaga Pekerja Tukang batu Kepala Tukang Mandor
6 a. b. -
Memasang 1 buah floor drain Bahan Floor drain Tenaga Pekerja Tukang batu Kepala Tukang Mandor
7 a. -
1 Unit Septitank Bahan Batu kali/Gunung Semen Portland Pasir Pasang Pekerjaan Beton Bertulang ( 100
b. -
Tenaga Pekerja Tukang batu Kepala Tukang Mandor
2 a. -
x Rp. x Rp. JUMLAH
30,000.00 3,500.00
= = =
Rp. Rp. Rp.
30,000.00 87.50 30,087.50
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
935.00 11,000.00 1,430.00 661.88 14,026.88 44,114.38
31,300.00
=
Rp.
31,300.00
0.010 0.100 0.010 0.005
Oh Oh Oh Oh
1.000
Bh
0.010 0.100 0.010 0.005
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
935.00 11,000.00 1,430.00 661.88 14,026.88 45,326.88
2.800 450.000 2.500 0.225
M3 Kg M3 M3
x Rp. x Rp. x Rp. x Rp. JUMLAH
166,375.00 1,996.50 157,000.00 3,064,140.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
465,850.00 898,425.00 392,500.00 689,431.50 2,446,206.50
12.000 8.000 6.000 3.000
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,122,000.00 880,000.00 858,000.00 397,125.00 3,257,125.00 5,703,331.50
= = = = = = =
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
1,925.00 438,900.00 20,410.00 9,020.00 31,200.00 900,000.00 1,401,455.00
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
132,770.00 162,030.00 6,721.00 9,398.63 310,919.63 1,712,374.63
x
Rp.
Memasang 1 buah bak kontrol pasangan batu bata ukuran 45x45 tinggi 50 cm Bahan Batu bata 0.250 m3 x Rp. 7,700.00 Semen Portland 77.000 kg x Rp. 5,700.00 Pasir Pasang 0.130 m3 x Rp. 157,000.00 Batu Kerikil 0.020 m3 x Rp. 451,000.00 Besi Beton 2.600 kg x Rp. 12,000.00 Pasir Beton 3.600 m2 x Rp. 250,000.00 JUMLAH b. Tenaga - Pekerja 1.420 Oh x Rp. 93,500.00 - Tukang batu 1.473 Oh x Rp. 110,000.00 - Kepala Tukang 0.047 Oh x Rp. 143,000.00 - Mandor 0.071 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
PEKERJAAN KUNCI DAN KACA
1. 1 buah pasang kunci tanam antik a. Bahan - kunci tanam antik
1.000
Bh
x Rp. JUMLAH
128,100.00
= =
Rp. Rp.
128,100.00 128,100.00
b. -
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
0.060 0.600 0.060 0.003
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
5,610.00 66,000.00 8,580.00 397.13 80,587.13 208,687.13
2 a. -
1 buah pasang kunci tanam kamar mandi Bahan kunci tanam kamar mandi 1.000
Bh
x Rp. JUMLAH
68,700.00
= =
Rp. Rp.
68,700.00 68,700.00
b. -
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
0.005 0.500 0.005 0.0025
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
467.50 55,000.00 715.00 330.94 56,513.44 125,213.44
3 a. -
1 buah pasang engsel pintu Bahan Engsel pintu
1.000
Bh
x Rp. JUMLAH
31,900.00
= =
Rp. Rp.
31,900.00 31,900.00
b. -
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
0.015 0.150 0.015 0.00075
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,402.50 16,500.00 2,145.00 99.28 20,146.78 52,046.78
4 a. -
1 buah pasang engsel jendela Bahan Engsel jendela
1.000
Bh
x Rp. JUMLAH
18,700.00
= =
Rp. Rp.
18,700.00 18,700.00
b. -
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
0.010 0.100 0.010 0.0005
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
935.00 11,000.00 1,430.00 66.19 13,431.19 32,131.19
5 a. -
1 buah pasang kait angin Bahan Kait angin
b. -
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
6 a. -
1 m2 pasang kaca, tebal 5 mm Bahan Kaca
b. -
Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor
1.000
Bh
x Rp. JUMLAH
12,100.00
= =
Rp. Rp.
12,100.00 12,100.00
0.015 0.150 0.015 0.00075
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,402.50 16,500.00 2,145.00 99.28 20,146.78 32,246.78
1.100
m2
x Rp. JUMLAH
220,000.00
= =
Rp. Rp.
242,000.00 242,000.00
0.015 0.150 0.015 0.00075
Oh Oh Oh Oh
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
1,402.50 16,500.00 2,145.00 99.28 20,146.78 262,146.78
PEKERJAAN LANTAI 1 a. -
1 m2 pasang lantai keramik ukuran 30x30 cm Bahan Keramik warna 30x30 cm 11.8700 bh Semen Portland 8.3600 Kg Pasir Pasang 0.0230 m3 Semen Warna 0.9000 Kg
b. Tenaga - Pekerja - Tukang kayu - Kepala Tukang - Mandor
2 a. -
b. -
Oh Oh Oh Oh
1 m2 pasang lantai keramik ukuran 20x20 cm Bahan Keramik 20x20 cm 26.5000 bh Semen Portland 8.7600 Kg Pasir Pasang 0.0230 m3 Semen Warna 0.9000 Kg
b. Tenaga - Pekerja - Tukang kayu - Kepala Tukang - Mandor
3 a.
0.2500 0.1200 0.0120 0.0125
0.2700 0.1300 0.0130 0.0135
Oh Oh Oh Oh
x Rp. x Rp. x Rp. x Rp. JUMLAH
6,818.18 1,996.50 157,000.00 25,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
80,931.82 16,690.74 3,611.00 22,500.00 123,733.56
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
23,375.00 13,200.00 1,716.00 1,654.69 39,945.69 163,679.25
x Rp. x Rp. x Rp. x Rp. JUMLAH
2,566.00 1,996.50 157,000.00 25,000.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
67,999.00 17,489.34 3,611.00 22,500.00 111,599.34
x Rp. 93,500.00 x Rp. 110,000.00 x Rp. 143,000.00 x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
25,245.00 14,300.00 1,859.00 1,787.06 43,191.06 154,790.40
= = = = =
Rp. Rp. Rp. Rp. Rp.
64,150.00 18,567.45 2,826.00 37,500.00 123,043.45
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
56,100.00 49,500.00 6,435.00 3,971.25 116,006.25 239,049.70
1 m2 pasang dinding keramik ukuran 20x25 cm Bahan Keramik 20x25 cm 20.0000 bh x Rp. 3,207.50 Semen Portland 9.3000 Kg x Rp. 1,996.50 Pasir Pasang 0.0180 m3 x Rp. 157,000.00 Semen Warna 1.5000 Kg x Rp. 25,000.00 JUMLAH Tenaga Pekerja 0.6000 Oh x Rp. 93,500.00 Tukang kayu 0.4500 Oh x Rp. 110,000.00 Kepala Tukang 0.0450 Oh x Rp. 143,000.00 Mandor 0.0300 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
4 a. -
1 m2 pasang lantai keramik ukuran 40x40 cm Bahan Keramik warna 40x40 cm 6.250 bh Semen Portland 11.38 Kg Pasir Pasang 0.042 m3 Semen Portland Isian 1.5 Kg
b. Tenaga - Pekerja - Tukang kayu - Kepala Tukang - Mandor
0.250 0.120 0.012 0.0125
Oh Oh Oh Oh
x Rp. x Rp. x Rp. x Rp. JUMLAH
12,858.33 1,996.50 157,000.00 1,996.50
= = = = =
Rp. Rp. Rp. Rp. Rp.
80,364.58 22,720.17 6,594.00 2,994.75 112,673.50
x Rp. x Rp. x Rp. x Rp. JUMLAH
93,500.00 110,000.00 143,000.00 132,375.00
= = = = =
Rp. Rp. Rp. Rp. Rp.
23,375.00 13,200.00 1,716.00 1,654.69 39,945.69
=
Rp.
152,619.19
JUMLAH (a) + (b)
PEKERJAAN ATAP
1 a. b. -
2 a. b. -
1 m2 Pemasangan Atap Seng Gelombang BJLS 0.30 mm Bahan Seng Gelombang 0.7 Lbr x Rp. 99,825.00 Paku Seng 0.02 Kg x Rp. 28,000.00 JUMLAH Tenaga Pekerja 0.120 Oh x Rp. 93,500.00 Tukang kayu 0.060 Oh x Rp. 110,000.00 Kepala Tukang 0.006 Oh x Rp. 143,000.00 Mandor 0.006 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b) 1 m1 Pemasangan Bubungan Seng Plat BJLS 0.25 mm Bahan Seng Plat 0.30 Lbr x Rp. 83,175.00 Paku Seng 0.04 Kg x Rp. 28,000.00 JUMLAH Tenaga Pekerja 0.150 Oh x Rp. 93,500.00 Tukang kayu 0.070 Oh x Rp. 110,000.00 Kepala Tukang 0.008 Oh x Rp. 143,000.00 Mandor 0.006 Oh x Rp. 132,375.00 JUMLAH JUMLAH (a) + (b)
= = =
Rp. Rp. Rp.
69,877.50 560.00 70,437.50
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
11,220.00 6,600.00 858.00 794.25 19,472.25 89,909.75
= = =
Rp. Rp. Rp.
24,952.50 1,120.00 26,072.50
= = = = = =
Rp. Rp. Rp. Rp. Rp. Rp.
14,025.00 7,700.00 1,144.00 794.25 23,663.25 49,735.75
BAHAN MATERIAL ALAMI LOKASI : TAHUN : 2013 NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
JENIS BAHAN
SATUAN
Batu Kali / Batu Gunung Batu Belah 15 - 20 cm Batu Belah 10 - 15 cm Batu Belah 3 - 5 cm Batu Belah 2 - 3 cm Batu Belah 1 - 2 cm Kerikil / Koral Sirtu Timbunan Pilihan / Pasir Urug Timbunan Biasa / Tanah Urug Pasir Kasar / Pasir Beton Pasir Halus / Pasir Pasangan Pasir Plesteran
M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3
Balok Kayu Klas I Balok kayu Klas II Papan Klas I Papan Klas II Dolken Kayu Galam Ø 8-10 / 4 meter
M3 M3 M3 M3 Btg
HARGA (Rp) 166,375.00 166,375.00 409,500.00 441,650.00 451,000.00 451,900.00 451,000.00 320,700.00 350,000.00 131,500.00 250,000.00 157,000.00 250,000.00 3,919,200.00 2,580,000.00 3,559,200.00 2,580,000.00 35,000.00
KETERANGAN
BAHAN FABRIKASI LOKASI : TAHUN : 2013 NO
JENIS BAHAN
SPESIFIKASI
SATUAN
HARGA (Rp)
Zak
50 kg Kg Kg
99,825.00 1,996.50 25,000.00
Kg Kg Kg Kg Kg Kg
21,000.00 21,775.00 21,750.00 28,000.00 28,000.00 30,000.00
Uk. 122 x 244 cm Uk. 122 x 244 cm Uk. 122 x 244 cm Uk. 122 x 244 cm Uk. 122 x 244 cm
Lbr Lbr Lbr Lbr Lbr
158,850.00 129,775.00 151,250.00 219,625.00 352,000.00
1
Semen (PC)
2
Semen warna
3 6 7 8 9 10
Kawat Beton Besi Beton Paku Campuran Paku Tripleks Paku Seng Paku Beton
11 12 13 14 15
Teakwood 3 mm Tripleks 3 mm Tripleks 6 mm Tripleks 9 mm Tripleks 20 mm
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Pipa Galvanis Medium B Pipa Galvanis Medium B Pipa Galvanis Medium B Pipa Galvanis Medium B Pipa Galvanis Medium B Pipa Galvanis Medium B Pipa Galvanis Medium B Pipa Galvanis Medium B Pipa GIP Medium A Pipa GIP Medium A Pipa GIP Medium A Pipa GIP Medium A Pipa GIP Medium A Pipa GIP Medium A Pipa GIP Medium A Pipa GIP Medium A Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC Pipa PVC
Uk. 1/2 " Uk. 3/4 " Uk. 1 " Uk. 11/4 " Uk. 11/2 " Uk. 2 " Uk. 2,5 " Uk. 3 " Uk. 1/2 " Uk. 3/4 " Uk. 1 " Uk. 11/4 " Uk. 11/2 " Uk. 2 " Uk. 2,5 " Uk. 3 " Uk. 1/2 " Uk. 3/4 " Uk. 1 " Uk. 11/4 " Uk. 11/2 " Uk. 2 " Uk. 2,5 " Uk. 3 " Uk. 4 "
Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf Staf
181,500.00 257,125.00 358,450.00 429,550.00 573,550.00 1,038,175.00 1,187,000.00 1,680,700.00 414,862.50 542,568.00 829,652.85 1,088,094.15 1,235,424.45 1,728,353.25 2,219,766.90 2,855,480.55 21,175.00 14,550.00 18,750.00 56,000.00 68,000.00 113,450.00 121,000.00 189,000.00 302,500.00
42
Knee PVC
Uk. 1/2 "
Bh
3,000.00
KETERANGAN
NO
JENIS BAHAN
43 44 45 46 47 48 49
Knee PVC Knee PVC Knee PVC Knee PVC Knee PVC Knee PVC Knee PVC
50 51
Batu Bata Paving Stone
52 53 54
Besi Siku Besi Siku Besi Siku
55 56 57 58 59 60 61 62 63
Seng Gelombang Seng Gelombang Seng Gelombang Seng Pelat Bubungan Tegel Keramik Tegel Keramik Tegel Keramik Tegel Keramik Tegel Keramik
64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
Cat Kayu / Besi Cat Kayu / Besi Cat Tembok Cat Tembok Cat Meni Kayu Cat Meni Besi Minyak Cat Minyak Cat Pelumas / Olie Dempul Kayu Plamir Tembok Plamir Tembok Kuas Cat Lem Kayu Vernis Batu Apung Kertas Ampelas
SPESIFIKASI
SATUAN
Uk. 3/4 " Uk. 1 " Uk. 11/4 " Uk. 11/2 " Uk. 2 " Uk. 3 " Uk. 4 "
Bh Bh Bh Bh Bh Bh Bh
4,000.00 5,000.00 6,000.00 7,000.00 10,000.00 15,000.00 20,000.00
Bh Bh
1,825.00 2,000.00
Uk. 30.30.3 Uk. 40.40.4 Uk. 50.50.5
M' M' M'
51,400.00 74,300.00 121,800.00
BJLS 0.20 mm BJLS 0.25 mm BJLS 0.30 mm BJLS 0.30 mm 10 x 20 cm 20 x 20 cm 20 x 25 cm 30 x 30 cm 40 x 40 cm
Lbr Lbr Lbr Lbr M2 M2 M2 M2 M2
71,400.00 89,850.00 99,825.00 83,175.00 64,150.00 64,150.00 76,250.00 75,000.00 77,150.00
Glotex Platone Matex Matex Altex Altex Thinner Afduner
Kg Kg 1 Kg 5 Kg 1 Kg 1 Kg Liter Liter Liter Kg Kaleng Kaleng Bh Ltr Ltr Kg Lbr
143,000.00 143,000.00 39,000.00 195,000.00 35,000.00 35,000.00 25,500.00 24,000.00 48,000.00 29,000.00 42,000.00 11,000.00 18,700.00 19,800.00 24,200.00 8,800.00 5,700.00
Altex 5 Kg 1 Kg 1 1 1
HARGA (Rp)
KETERANGAN
NO
JENIS BAHAN
81 82 83 84
Kaca Rayban Kaca Rayban Kaca Bening Kaca Bening
85 86 87 88 89 90 91
Kran (Kualitas Baik) Avour / Saringan Air Kotor Floor Drain Kloset Jongkok Kloset Duduk / Lengkap Wastafel IJUK
92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121
Kunci Pintu 1 Slaag Kunci Pintu 2 Slaag Grendel Jendela Kait Angin Engsel Jendela Kuningan Engsel Pintu Kuningan Lis Profil 5 cm Oxigen Box Sekring Box Sekring MCB MCB MCB MCB Saklar Tunggal Tanam Saklar Ganda Tanam Saklar Tunggal Timbul Saklar Ganda Timbul Stop Kontak Tanam Stop Kontak Timbul Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Jari-jari Lampu Jari-jari
122 123
Alat Bantu Alat Bantu khusus
SPESIFIKASI
SATUAN
3 mm 5 mm 3 mm 5 mm
M2 M2 M2 M2
180,000.00 251,000.00 145,000.00 220,000.00
Bh Bh Bh Bh Bh Bh Kg
30,000.00 36,000.00 31,300.00 253,000.00 2,002,000.00 671,000.00 14,800.00
5 Watt 10 Watt 15 Watt 25 Watt 40 Watt 60 Watt 75 Watt 100 Watt 18 Watt Philips 25 Watt Philips
Bh Bh Bh Bh Bh Bh M' Btl Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
68,700.00 128,100.00 17,600.00 12,100.00 18,700.00 31,900.00 18,100.00 297,000.00 36,300.00 61,600.00 28,600.00 34,100.00 36,300.00 45,100.00 20,900.00 27,500.00 17,600.00 20,900.00 27,500.00 12,100.00 6,600.00 7,700.00 9,300.00 12,100.00 17,600.00 23,100.00 25,300.00 28,600.00 41,800.00 48,400.00
1 1
Set Set
25,000.00 50,000.00
INA TOTO INA / TOTO
Cap Kuda Terbang Cap SES
1 1 Group 2 Group 2 Ampere 4 Ampere 6 Ampere 10 Ampere
HARGA (Rp)
KETERANGAN
UPAH KERJA LOKASI : TAHUN : 2013 NO 1 4 5 6 8 9 10 11 12 13 14
TENAGA KERJA Mandor Lapangan Kepala Tukang Tukang Operator Terlatih Pembantu Operator Buruh Lapangan Terlatih Buruh Lapangan Agak Terlatih Buruh Lapangan Tidak Terlatih Supir Truck (Material) Supir Personil Pembantu Supir (Kernet)
UPAH (Rp./Hari) 132,375 143,000 110,000 165,000 88,000 93,500 82,500 71,500 132,275 112,750 88,550
KODE MAN KTUK TUK
IDEM
KETERANGAN
Mandor Tukang Kayu, Batu dan Besi
PKR
Pekerja Terlatih
PKR2 SUP SUP2 PSUP
Pekerja Tidak Terlatih
86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121
Kunci Pintu Tanam Biasa Kunci Pintu Tanam Antik Grendel Jendela Kait Angin Engsel Jendela Kuningan Engsel Pintu Kuningan Lis Profil 5 cm Profil Baja ( Pabrikan ) Plat Eiser Besi Strip Pintu Rooling Door Pintu Alumanium Geotekstil Oxigen Box Sekring Box Sekring MCB MCB MCB MCB Saklar Tunggal Tanam Saklar Ganda Tanam Saklar Tunggal Timbul Saklar Ganda Timbul Stop Kontak Tanam Stop Kontak Timbul Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Pijar Lampu Jari-jari Lampu Jari-jari
1 1 1 1 1 Group 2 Group 2 Ampere 4 Ampere 6 Ampere 10 Ampere
5 Watt 10 Watt 15 Watt 25 Watt 40 Watt 60 Watt 75 Watt 100 Watt 14 Watt Philips 25 Watt Philips
Bh Bh Bh Bh Bh Bh M' Kg M2 Kg M2 M2 M2 Btl
61,000 115,000 15,000 10,000 16,000 28,000 15,000 30,000 240,000 12,000 900,000 400,000 37,500 260,000
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
32,000 55,000 25,000 30,000 32,000 40,000 18,000 24,000 15,000 18,000 24,000 10,000 5,000 6,000 7,500 10,000 15,000 20,000 22,000 25,000 36,000 42,000