LOMBA KOMPETENSI SISWA ( LKS ) SEKOLAH MENENGAH KEJURUAN TINGKAT NASIONAL KE XXV TAHUN 2017
KISI – KISI BIDANG LOMBA
BRICKLAYING
KEMENTRIAN PENDIDIKAN DAN KEBUDAYAAN DIREKTORAT JENDERAL MANAJEMEN PENDIDIKAN DASAR DAN MENENGAH DIREKTORAT PEMBINAAN SEKOLAH MENENGAH KEJURUAN TAHUN 2017
0
A. Introduction The practical test is included 2 parts: part 1and part 2 -
Part 1 Bricklaying and finishing joint,no plastering : + Bricklaying : Bricklaying complex - structure with clay bricks of 60 x 100 x 215 mm, and concrete block no plastering. Time: 9 hours.
-
Part 2 are included 2 works: + Bricklaying : Bricklaying complex - structure with clay bricks of 60 x 100 x 215 mm, and concrete blocks 100 x 200 x 440 mm. Time: 6 hours. + Plastering: Plastering complex - structure Time: 1 hour.
Time allowed for 2 parts is 16 hours over the 3 days of competition.
B. Project information Projects have designed to incorporate the following technical skills: 1. Excution of drawings. 2.
Measurement and marking out.
3.
Leveling and plumbing.
4.
Cutting and shaping bricks using traditional hand tool and masonry saws.
5.
Building walls in accordance to plans including all decorative work.
6.
Joints finishing.
7.
Work cleanliness.
8.
Bricklaying of part 1 commences on day one and second day.
9.
Part 2 commences on the second day and third day.
10. Plastering of part 2 commences on the third day. 11. Marking for bricklaying of the part 1 will commence on the first evening or the second morning and evening. 12. Marking for bricklaying of the part 2 will commence on the third afternoon and evening. 13. The plastering of the part 2 will be marked on the third afternoon or morning. 14. Final marks may not be known until the end of the competition. 15. Final marking will be at the end of day 3 and be completed the day following the competition.
1
C. Specification 1. All brickwork to be set out and constructed to dimensions, bonds and angles as specified on the drawings. 2.
All decorative and practical details to be constructed to projections, angles, radii and overhangs as shown on drawings.
3.
All cut bricks to be produced accurately to shape required whilst maintaining 10 mm perpend joints.
4.
All bricks to be laid showing best face and arises.
5.
All brickwork to be taken up maintaining plumb level in alignment and to the correct angles.
6.
Brickwork to be taken up to a vertical gauge.
7.
Cut faces where possible to be concealed in wall, not shown on back.
8.
All details to be built as per instructions available on the drawings.
9.
Bricklaying mortar : Cement - sand mortar (1 PC : 3 Sand) or Drymix (MU or SIKA Plastermix Produk)
10. Plastering Mortar : Cement - sand mortar (1 PC : 2,5 Sand) or Drymix (MU or SIKA Plastermix Produk).
D. Instruction to competitors 1. Time allowed is 16 hours finishing 2 parts. 2. Requirement for competitors
It is 10 minutes prior to the commencement of competition, competitors will be provided materials, and know the position as they drow lots.
Competitors are not allowed to ask about the drawing and method of construction during the competition.
Competitors are not allowed to mark any symbols on their products .If they do so, their products will not be marked.
When the time is over, competitors must announce to the expert about their products.
Materials are available at site and competitors will be helped to do cleaning.
Competitors to check the measuring tools.
Competitors to wear safety clothes suitable with their work.
If there’s any problem, competitors to speak to the expert for help.
Competitors are not allowed to leave the competition without permission.
3. Materials Clay Brick (Batu bata pres) 60 x 100 x 215 mm. Light Brick (Bata ringan) 100 x 200 x 440 mm. Drymix/SIKA/MU (adukan kering siap pakai). 2
4. Tools and means of production a. The competitor must bring the remaining tools in a toolbox
(Peralatan yang
harus dibawa peserta) :
Brick trowel (cetok pasang bata)
Plastering trowel (cetok plesteran)
Pointing trowel (cetok lidah/lancip)
Wooden float (roskam kayu)
Measuring (meteran)
Hammer (palu)
Leveling (Waterpass 50 cm)
Leveling (waterpass) 100 or 120 mm
Square (siku baja)
Line bobbins (penahan benang)
Plumb line (unting-unting)
Jointer (pembentuk nat)
Hand saw (gergaji tangan)
Helmed (helm)
Safety footwear (sepatu kerja)
Safety clothes (pakaian kerja)
Eye protection (kacamata pengaman)
Masker (penutup debu)
b.
The committee must be prepare the remaining tools for competitors (peralatan yang disediakan panitia) :
Folding rule (Jidar aluminium 200 cm)
Hoe (cangkul)
Mortar box (kotak adukan)
Pail (ember)
Tub stock water (bak tandon air)
Electric cutting brick machine (mesin pemotong bata)
Water hose (selang air)
Wood (papan kayu 10 x 100 x 1000 mm)
3
E. Test Project marking The experts will decide together on the marking criteria and the dimensional tolerances. 1.
Marking Criteria Building the part 1 and 2 :
Basic dimension
Structure
Joint thickness
Vertically
Flatness
Perpendicular
Leveling
Solid of joint
Cutting
Working productivity
2.
Marking Criteria Plastering :
Vertically
Flatness
Smoothness
Productivity
The experts with every competitors the best during the competition. “Good luck”
4
LEMBAR INFORMASI LKS TINGKAT NASIONAL KE XXV TAHUN 2017 BIDANG LOMBA BRICKLAYING 1. PEBIMBING :
Mengikuti Teknikel Meeting sebelum pelaksanaan lomba dengan waktu dan tempat ditentukan kemudian.
Diperkenankan membantu kompetitor dalam penyiapan peralatan sebelum pelaksanaan perlombaan.
Diperkenankan membantu kompetitor dalam pembersihan lokasi dan perapihan bahan serta peralatan setelah selesai lomba.
Dilarang membantu dalam bentuk apapun kepada kompetitor ketika lomba berlangsung, kecuali seijin Juri.
Diperkenankan melihat prosesi penilaian dengan tidak mengganggu atau intervensi terhadap keputusan Juri.
Membantu menciptakan suasana meriah dan kekeluargaan diantara sesama Pebimbing, Kompetitor, Juri dan semua yang terlibat dalam pelaksanaan lomba dengan tidak mengganggu kompetitor.
2. KOMPETITOR :
Mengikuti Teknikel Meeting sebelum pelaksanaan lomba dengan waktu dan tempat ditentukan kemudian.
Datang 15 menit sebelum lomba dimulai.
Mempersiapkan peralatan dan bahan dengan atau tanpa bantuan Pebimbing.
Mengikuti lomba dengan tertib dan tidak mengganggu sesama kompetitor pada waktu berjalannya lomba.
Menggunakan alat pelindung diri (APD) : kacamata, masker, dan penutup telinga pada waktu memotong batu bata/bata ringan.
Jika menemui masalah harus melapor kepada Juri.
Tidak diperkenankan berbicara dengan Juri kecuali pada waktu istirahat dan Ishoma.
Wajib membersihkan lokasi lomba, menata bahan dan peralatan setiap lomba telah selesai.
Mengikuti pengarahan akhir dari Juri sebelum meninggalkan lokasi lomba. Tidak diperkenankan menggunakan bahan kimia untuk pembersihan pasangan.
JADWAL KOMPETISI BIDANG LOMBA BRICKLAYING LKS TINGKAT NASIONAL KE XXV TAHUN 2017 TGL ........ NO
HARI/TGL
JAM
KEGIATAN
1
1
13.00-17.00
2
2
08.15-10.15 10.15-10.30 10.30-12.00 12.00-13.00 13.00-15.00 15.00-15.15 15.15-16.45
Technical meeting dilanjutkan pesiapan dan pemotongan bata Kompetisi istirahat Kompetisi Isoma Kompetisi istirahat Kompetisi
08.15-10.15 10.15-10.30 10.30-12.00 12.00-13.00 13.00-15.30 15.00-15.15 15.15-16.45
Kompetisi istirahat Kompetisi Isoma Kompetisi istirahat Kompetisi
08.15-10.15 11.00-17.00
Kompetisi Penilaian
3
4
3
4
KETERANGAN/ WAKTU
2 jam 1jam 30 menit 2 jam 1 jam 30 menit Jumlah 7 jam 2 jam 1jam 30 menit 2 jam 1 jam 30 menit Jumlah 7 jam 2 jam Juri Total 16 jam
DAFTAR KEBUTUHAN ALAT LKS NASIONAL KE XXV TAHUN 2017 (ESTIMASI PESERTA 24 ORANG)
BIDANG LOMBA: BRICKLAYING No. 1 2 3 4 5 6 7 8
Nama Bahan Cangkul Kotak adukan Ember Tandon air Selang air Jidar aluminium Mesin Pemotong bata Papan kayu
Spesifikasi
Jumlah
Satuan
Umum/biasa Kayu/plastik uk.40 x 60 cm Plastik/karet Kapasitas 250 liter Plastik 20 x 60 x 2000 mm Elektrik 20 x 100 x 1500 mm
24 24 30 1 20 24 12 48
buah buah buah buah meter buah buah buah
Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp
35.000,00 40.000,00 7.500,00 300.000,00 10.000,00 40.000,00 10.000.000,00 15.000,00
Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp
840.000,00 960.000,00 225.000,00 300.000,00 200.000,00 960.000,00 120.000.000,00 720.000,00
Jumlah Total : Rp
124.205.000,00
Bandung, 18 Oktober 2016
(……………………….)
Keterangan
DAFTAR KEBUTUHAN BAHAN LKS NASIONAL KE XXV TAHUN 2017 (ESTIMASI PESERTA 24 ORANG) BIDANG LOMBA: BRICKLAYING No.
Nama Bahan
Spesifikasi
1
Batu bata (Warna merah) Batu bata kuning dengan cat
2 3
Bata ringan (Hebel)
Bata pres 60 x100 x 215 mm Bata pres 60 x100 x 215 mm 100 x 200 x 600 mm
Drymix/SIKA/MU
Untuk pasangan bata dan plester
Jumlah
Satuan
5160 2100 12
290
buah buah m3 zak
Harga Satuan Rp Rp Rp Rp
6.500.00 7.000.00 800.000,00 65.000,00
Jumlah Harga Rp Rp Rp Rp
33.540.000,00 14.700.000,0 09.600.000,00 18.850.000,00
Jumlah Total : Rp
76.690.000,00
Bandung, 18 Oktober 2016
(……………………….)
Keterangan
LOMBA KOMPETENSI SISWA (LKS) SEKOLAH MENENGAH KEJURUAN TINGKAT NASIOANAL KE XXV TAHUN 2017 Penilaian obyektif : Nama/No: Piece Position 1
KETEPATAN
Marking Aspek
Trade : BRICKLAYING (Part 1)
Interval of Value @ deviasion deviasion (mm) 1s/d10 0,15
Score
Total deviasion
Calculation
3 4 5 6 7
Ukuran tinggi pasangan bata 140 cm Ukuran panjang keseluruhan 170 cm Ukuran tinggi 50 cm Ukuran panjang 60 cm Ukuran panjang 55 cm Kesikuan luar samping kanan Kesikuan dalam samping kanan
8 9 10 11
Kesikuan luar samping kiri Kesikuan dalam samping kiri Ketegakan samping kanan Ketegakan samping kanan depan
1s/d10 1s/d10 1s/d10 1s/d10
0,15 0,15 0,15 0,15
1,5 1,5 1,5 1,5
1,5 1,5 1,5 1,5
12
Ketegakan tengah depan kanan
1s/d10
0,15
1,5
1,5
13
Ketegakan tengah samping kanan depan ketegakan tengah samping kanan belakang Ketegakan samping kiri Ketegakan samping kiri depan Ketegakan tengah depan kiri Ketegakan tengah samping kiri depan Ketegakan tengah samping kiri belakang Kedataran puncak pasangan bata ringan Kedataran pasangan bata lapis 1 samping kanan Kedataran pasangan bata lapis 1 samping kiri Kerataan lapis 1 Kerataan diagonal 1 Kerataan diagonal 2 Kerataan diagonal 3 Kerataan diagonal 4 Kerataan rolag samping kanan Kerataan rolag samping kiri Kerataan bata ringan lapis 21 TOTAL SCORE
1s/d10
0,15
1,5
1,5
1s/d10
0,15
1,5
1,5
1s/d10 1s/d10 1s/d10 1s/d10
0,15 0,15 0,15 0,15
1,5 1,5 1,5 1,5
1,5 1,5 1,5 1,5
1s/d10
0,15
1,5
1,5
1s/d10 1s/d10
0,1 0,1
1 1
1 1
1s/d10
0,1
1
1
1s/d10 1s/d10 1s/d10 1s/d10 1s/d10 1s/d10 1s/d10 1s/d10
0,1 0,1 0,1 0,1 0,1 0,1 0,1 0,1
1 1 1 1 1 1 1 1 39,5
1 1 1 1 1 1 1 1 39,5
2
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1,5
1,5
1s/d10
0,15
1,5
1,5
1s/d10 1s/d10 1s/d10 1s/d10 1s/d10
0,15 0,15 0,15 0,15 0,15
1,5 1,5 1,5 1,5 1,5
1,5 1,5 1,5 1,5 1,5
LOMBA KOMPETENSI SISWA (LKS) SEKOLAH MENENGAH KEJURUAN TINGKAT NASIOANAL KE XXV TAHUN 2017
Peniaian subyektif : Nama /No:
PENDUKUNG VISUAL
Trade : BRICKLAYING (Part 1)
Interval of Value @ deviasion deviasion (mm)
Piece Position
Marking Aspek
1
Potongan bata miring samping kiri
1s/d10
0,15
1,5
1,5
2
Potongan bata miring samping kanan Potongan beton ringan puncak sesuai gambar Pasangan bata rolag miring Angka 1 sesuai gambar terpasang tegak dan menonjol 2 cm Angka 7 sesuai gambar terpasang tegak dan menonjol 2 cm Siar padat, tidak ada lubang termasuk pada bagian belakang
1s/d10
0,15
1,5
1,5
1s/d10
0,15
1,5
1,5
1s/d10 1s/d10
0,15 0,15
1,5 1,5
1,5 1,5
1s/d10
0,15
1,5
1,5
1s/d10
0,15
1,5
1,5
Semua ukuran nat sama Bentuk nat sesuai gambar Kebersihan pasangan TOTAL SCORE
1s/d10 1s/d10 1s/d10
0,15 0,15 0,15
1,5 1,5 1,5 15
1,5 1,5 1,5 15
3 4 5
6
7 8 9 10
Score
Total deviasion
Calculation
LOMBA KOMPETENSI SISWA (LKS) SEKOLAH MENENGAH KEJURUAN TINGKAT NASIOANAL KE XXV TAHUN 2017 Penilaian obyektif : Nama/No:
KETEPATAN
Piece Marking Aspek Position 1 Ukuran tinggi keseluruan pasangan 154 cm 2 Ukuran tinggi pasangan bata merah 70 cm kanan 3 Ukuran panjang keseluruhan 190 cm 4 Kesikuan 5 Ketegakan samping kanan 6 Ketegakan depan kanan 7 Ketegakan depan kiri 8 Ketegakan samping kiri depan 9 Ketegakan samping kiri belakang
Trade : BRICKLAYING (Part 2)
Interval of Value @ deviasion deviasion 1s/d10 0,15
Score
Total deviasion
Calculation
1,5
1,5
1s/d10
0,15
1,5
1,5
1s/d10
0,15
1,5
1,5
1s/d10 1s/d10 1s/d10 1s/d10 1s/d10 1s/d10
0,15 0,15 0,15 0,15 0,15 0,15
1,5 1,5 1,5 1,5 1,5 1,5
1,5 1,5 1,5 1,5 1,5 1,5
10
Kedataran bata menonjol lapis 5
1s/d10
0,1
1
1
11 12 13
1s/d10 1s/d10 1s/d10
0,1 0,1 0,1
1 1 1
1 1 1
14
Kedataran atas huruf LKS Kedataran puncak lapis 14 Kedataran puncak bata ringan samping kanan Kerataan bata menonjol lapis 5
1s/d10
0,1
1
1
15 16 17 18
Kerataan bawah depan huruf LKS Kerataan diagonal 1 huruf LKS Kerataan diagonal 2 huruf LKS Kerataan depan puncak lapis 14
1s/d10 1s/d10 1s/d10 1s/d10
0,1 0,1 0,1 0,1
1 1 1 1
1 1 1 1
19
Kerataan diagonal 1 bata ringan samping kanan dari bawah belakang keatas depan Kerataan diagonal 2 bata ringan samping kanan dari bawah depan keatas belakang
1s/d10
0,1
1
1
1s/d10
0,1
1
1
24,5
24,5
20
TOTAL SCORE
LOMBA KOMPETENSI SISWA (LKS) SEKOLAH MENENGAH KEJURUAN TINGKAT NASIOANAL KE XXV TAHUN 2017
Peniaian subyektif : Nama /No:
PENDUKUNG VISUAL
Piece Marking Aspek Position 1 Huruf L sesuai gambar terpasang tegak dan menonjol 2 cm
Trade : BRICKLAYING (Part 2)
Interval of Value @ deviasion deviasion 1s/d10 0,15
Score
Total deviasion
Calculation
1,5
1,5
2
Huruf K sesuai gambar terpasang tegak dan menonjol 2 cm
1s/d10
0,15
1,5
1,5
3
Huruf S sesuai gambar terpasang tegak dan menonjol 2 cm
1s/d10
0,15
1,5
1,5
4
Siar padat, tidak ada lubang termasuk pada bagian belakang
1s/d10
0,15
1,5
1,5
5 6 7
Semua ukuran nat sama Bentuk nat sesuai gambar Kebersihan pasangan TOTAL SCORE
1s/d10 1s/d10 1s/d10
0,15 0,15 0,15
1,5 1,5 1,5 10,5
1,5 1,5 1,5 10,5
LOMBA KOMPETENSI SISWA (LKS) SEKOLAH MENENGAH KEJURUAN TINGKAT NASIOANAL KE XXV TAHUN 2017 Penilaian obyektif : Nama/No:
KETEPATAN
Piece Marking Aspek Position 1 Ketegakan samping kanan 2 Ketegakan samping kiri 3 Kerataaan diagonal 1 dari bawah kiri ke kanan atas 4 Kerataan diagonal 2 dari kanan bawah ke kiri atas 5 Kerataan bawah 6 Kesan plesteran TOTAL SCORE
Trade : PLASTERING
Interval of Value @ deviasion deviasion 1s/d10 0,2 1s/d10 0,2 1s/d10 0,15
Score
Total deviasion
Calculation
2 2 1,5
2 2 1,5
1s/d10
0,15
1,5
1,5
1s/d10 1s/d10
0,15 0,2
1,5 2 10,5
1,5 2 10,5
,..,
,.., f
1
18
2
14
8
11
4
•
•
7
•
I
10
'IEMPAT
lBFAT
MATERIAL
MA'IERIAL
11
17
11
11
20
21
22
,,
12
'IEMPAT JIR
28
24
LAY OUT COMPETITION PLACE
· -·Xl V
BRICKLAYINC3 llWlllLOI•• LOI•'-'ICICll
18-20 0KTOBER 2018
LCIK
f
M iii
i
'90INT TYPE :
B A•Rw B
--'r
r;
iii CONCREIE BLOCICll llZEl..
{I L
I
I tmm
l ,. •llli.I,
I .. L
-
'