Sod Facing [PDF]

  • 0 0 0
  • Suka dengan makalah ini dan mengunduhnya? Anda bisa menerbitkan file PDF Anda sendiri secara online secara gratis dalam beberapa menit saja! Sign Up
File loading please wait...
Citation preview

FLOW CHART OF SOD FACING Start



Trimming/ Slope Excavation



1. Before execute sod facing work, Contractor shall be trimming location with 2:1, as shown on construction drawing which approved by Engineer.



Install Sod Facing



2. After Trimming have been executed, sod facing install with chess board method which size 20cm x 20cm per segment, this method will be shown on attached picture .



Water Spraying



Finish



3. After install sod facing, it will be maintenance by spraying water on location.



1. Trimming Location by Excavator



2. Install Sod Facing by Manually



3. Method of Sod Facing Area of Install sod facing



4. Water Spraying