7 0 445 KB
TIMES SCHEDULE PROYEK DOCKING REPAIR PT. DUTABAHARI MENARA LINE DOCKYARD Jl. Ir.H.P.M Noor, Kuin Cerucuk Banjarmasin 70129 Telp. +62 511 4413364 Fax. +62 511 4413365
NAMA PROYEK KODE PEKERJAAN
: BG. TAMA 2502
STATUS DOCKING
: DOCKING REPAIR
: R - 8.142 /DR
KLASIFIKASI
: BKI / IS
ESTIMASI WAKTU REPAIR DOCK
: 18 Hari
DIMENSI
: 76.20/75.15 x 21.94 x 4.87 Meter
NO. PENAWARAN
:
PEMILIK KAPAL
: PT. HABCO PRIMATAMA
1 NO
DESCRIPTION OF WORKS
Lama pekerjaan
Alat /Gun
Bobot Progress %
Progress %
Actual Progress %
5.00%
60.00%
3.00%
0.50%
0.50%
0.50%
0.50%
Hari
2.00%
2.00%
Hari
2.00%
Kapal datang & tambat
1
Hari
Pemasangan kupingan tarik
1
Hari
Proses Docking
1
Proses Undocking
1
20.00%
HULL CONSTRUCTION
Pelurusan Bulwark Ps Plate Plate Top bulwark Stanchion Top stanchion Ganti siku bulwark haluan Top bulwark Stanchion Top stanchion
SANDBLASTING DAN PAINTING
4
5
6
7
8
9
10
11
12
13
7
8
9
10
11
12
13
14
15
16
17
18
2.00%
93.10%
18.62%
7
Hari
7.88%
1.13%
1.13%
1.13%
1.13%
1.13%
1.13%
1.13%
7
Hari
2.39%
0.34%
0.34%
0.34%
0.34%
0.34%
0.34%
0.34%
7
Hari
2.83%
0.40%
0.40%
0.40%
0.40%
0.40%
0.40%
0.40%
7
Hari
2.01%
0.29%
0.29%
0.29%
0.29%
0.29%
0.29%
0.29%
7
Hari
0.50%
0.07%
0.07%
0.07%
0.07%
0.07%
0.07%
0.07%
4
Hari
2.89%
0.72%
0.72%
0.72%
0.72%
4
Hari
1.26%
0.31%
0.31%
0.31%
0.31%
4
Hari
0.25%
0.06%
0.06%
0.06%
0.06%
4
Hari
15.00% 6.75%
1.69%
1.69%
2
Hari
2.25%
1.13%
2
Hari
2.25%
1.13%
2
Hari
2.25%
1
Hari
1.50%
10
Hari
60.00%
OTHER
Bongkar dan Pasang Anti Karat Bongkar dan Semen Kembali Decksell Manhole Buka dan Tutup Kembali Decksell Manhole Cleaning Batu Bara Haluan Rewelding skeg Ps
3
SEPTEMBER 2018 6
Docking Preparation
2
Total
50.50%
7.58% 1.69%
1.69%
1.13% 1.13% 1.13%
1.13% 1.50%
69.11%
100.00%
41.47%
3.00%
3.94% 6.94%
6.00%
6.00%
6.00%
6.00%
6.00%
6.00%
6.00%
6.00%
6.00%
6.00%
11.04%
10.45%
11.02%
11.02%
9.33%
8.23%
8.23%
7.50%
6.00%
8.25%
17.98%
28.43%
39.45%
50.46%
59.79%
68.02%
76.25%
83.75%
89.75%
Demikian yang dapat kami sampaikan, atas perhatian dan kerjasamannya saya ucapkan terima kasih. Direncanakan oleh,
Diketahui
Disetujui =
Masudi Pimpro
Guszazif Titah P. Manager Produksi
Hadi Soetrisno General Manager
Keterangan : Estimasi
= Re schedule = Actual Huruf warna hijau pekerjaan tambahan = Tidak ada kerja = Selesai
98.00%
2.00% 100.00%