18 0 207 KB
HARGA PERKIRAAN SENDIRI (HPS) PENGADAAN JASA KONSULTASI PEKERJAAN KEGIATAN LOKASI TAHUN ANGGARAN
: : : :
BELANJA JASA KONSULTANSI PENYUSUNAN DED PEMBANGUNAN GEDUNG INSTALASI PENGUJIAN KEMETROLOGIAN PENYUSUNAN DED PEMBANGUNAN GEDUNG INSTALASI PENGUJIAN KEMETROLOGIAN KABUPATEN BADUNG APBD PERUBAHAN KABUPATEN BADUNG TAHUN ANGGARAN 2019
No
I I.1
1
I.2
1 2
Uraian
Unit/ satuan
Kuantitas/ volume
Harga Satuan (Rp)
Jumlah (Rp)
Biaya Langsung Personil Biaya Tenaga Ahli Team Leader/Ahli (Arsitek S1, 4 th) Jumlah Biaya Ass. Tenaga Ahli/ Sub profesional Surveyor (Sipil D3, 1 th) Cad operator (Sipil D3, 1 th)
1 org
60 /
30 =
2.00 bln
11,954,000.00
23,908,000.00 23,908,000.00
2 org 1 org
7 / 45 /
30 = 30 =
0.23 bln 1.50 bln
4,737,000.00 4,737,000.00
2,210,600.00 7,105,500.00
Jumlah I.3
1
Biaya Tenaga Pendukung Tenaga administrasi (SMA, 4 th) Jumlah
II Biaya Langsung Non Personil II.1 Biaya Operasional Kantor 1 Biaya ATK + Bahan Habis Pakai Jumlah
9,316,100.00
1 org
30 /
30 =
1.00 bln
3,275,000.00
3,275,000.00 3,275,000.00
1 ls
435,000.00
435,000.00 435,000.00
II.2 Biaya Pelaporan
1 2 3
I II
Laporan Pendahuluan Laporan Akhir (Final Report) Soft Copy Dokumen DalamBentuk Flashdisk Jumlah
3 eks 4 eks 1 bh
22,500.00 230,000.00 80,000.00
67,500.00 920,000.00 80,000.00 1,067,500.00
JUMLAH BIAYA LANGSUNG PERSONIL
36,499,100.00
JUMLAH BIAYA LANGSUNG NON PERSONIL Jumlah I + II : : PPn 10% Jumlah Biaya : : Dibulatkan : Empat Puluh Satu Juta Delapan Ratus Satu Ribu Rupiah Terbilang
1,502,500.00 38,001,600.00 3,800,160.00 41,801,760.00 41,801,000.00
Mangupura , 1 April 2019 Pejabat Pembuat Komitmen/PPK
I Gusti Ayu Kadek Yudiani, S.Sos NIP. 19660625 198603 2 006
BACK UP LAPORAN AKHIR NO KETERANGAN 1 Laporan pendahuluan Biaya jilid
HARGA SATUAN (Rp.) 250.00 10,000.00
VOLUME 50 Hal 1 Jilid
HARGA (Rp.) 12,500.00 10,000.00 22,500.00
Jumlah Total :
22,500.00
Mangupura 2017 Pejabat Pembuat Komitmen/PPK Kepala Bidang Cipta Karya Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Badung
I G A Ngr. Arinda Trisnawati, ST NIP. 196905241998032 005
BACK UP LAPORAN AKHIR NO KETERANGAN 1 Gambar A3 Biaya jilid
HARGA SATUAN (Rp.) 700.00 20,000.00
VOLUME 75 Hal 1 Jilid
HARGA (Rp.) 52,500.00 20,000.00 72,500.00
2
Spesifikasi teknis Biaya jilid
250.00 10,000.00
150 Hal 1 Jilid
37,500.00 10,000.00 47,500.00
3
Rencana anggaran biaya (RAB) Biaya jilid
250.00 10,000.00
300 Hal 1 Jilid
75,000.00 10,000.00 85,000.00
4
Laporan akhir Biaya jilid
250.00 10,000.00
60 Hal 1 Jilid
15,000.00 10,000.00 25,000.00
Jumlah Total :
230,000.00
Mangupura 2017 Pejabat Pembuat Komitmen/PPK Kepala Bidang Cipta Karya Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Badung
I G A Ngr. Arinda Trisnawati, ST NIP. 196905241998032 005
Lampiran 3 DAFTAR BIAYA LANGSUNG PERSONIL DAN BIAYA TIDAK LANGSUNG PERSONIL DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KAB. BADUNG TAHUN ANGGARAN 2019 BIAYA LANGSUNG PERSONIL NO
BIDANG AKADEMIK/KEAHLIAN
1
2
A.
GAJI DASAR TAHUN PENDIDI (GD) PENGAL KAN AMAN 3
4
5
BBS
BBU
TP
(0,3-0,4)XGD (0,5-1,3)XGD (0,1-0,3)XGD
6
7
Jasa / Keuntungan
Total
0,10x(GD+BBS+BBU)
(Rupiah)
DIBULATKAN / DASAR PENYUSUNAN HPS (Rupiah)
9
10
11
8
TENAGA AHLI DENGAN PENDIDIKAN S2
1
AHLI UTAMA
2
S2
11,238,000.00 4,495,200.00 7,866,600.00
1,123,800.00
2,359,980.00
27,083,580.00
27,084,000.00
11
S2
10,711,000.00 4,284,400.00 7,497,700.00
1,071,100.00
2,249,310.00
25,813,510.00
25,814,000.00
10
S2
10,234,000.00 4,093,600.00 7,163,800.00
1,023,400.00
2,149,140.00
24,663,940.00
24,664,000.00
9
S2
9,734,000.00 3,893,600.00 6,813,800.00
973,400.00
2,044,140.00
23,458,940.00
23,459,000.00
8
S2
9,207,000.00 3,682,800.00 6,444,900.00
920,700.00
1,933,470.00
22,188,870.00
22,189,000.00
7
S2
8,731,000.00 3,492,400.00 6,111,700.00
873,100.00
1,833,510.00
21,041,710.00
21,042,000.00
6
S2
8,178,000.00 3,271,200.00 5,724,600.00
817,800.00
1,717,380.00
19,708,980.00
19,709,000.00
5
S2
7,703,000.00 3,081,200.00 5,392,100.00
770,300.00
1,617,630.00
18,564,230.00
18,565,000.00
4
S2
7,203,000.00 2,881,200.00 5,042,100.00
720,300.00
1,512,630.00
17,359,230.00
17,360,000.00
3
S2
6,701,000.00 2,680,400.00 4,690,700.00
670,100.00
1,407,210.00
16,149,410.00
16,150,000.00
2
S2
6,199,000.00 2,479,600.00 4,339,300.00
619,900.00
1,301,790.00
14,939,590.00
14,940,000.00
1
S2
5,672,000.00 2,268,800.00 3,970,400.00
567,200.00
1,191,120.00
13,669,520.00
13,670,000.00
16
S1
10,393,000.00 4,157,200.00 7,275,100.00
1,039,300.00
2,182,530.00
25,047,130.00
25,048,000.00
15
S1
9,919,000.00 3,967,600.00 6,943,300.00
991,900.00
2,082,990.00
23,904,790.00
23,905,000.00
14
S1
9,497,000.00 3,798,800.00 6,647,900.00
949,700.00
1,994,370.00
22,887,770.00
22,888,000.00
13
S1
9,074,000.00 3,629,600.00 6,351,800.00
907,400.00
1,905,540.00
21,868,340.00
21,869,000.00
12
S1
8,600,000.00 3,440,000.00 6,020,000.00
860,000.00
1,806,000.00
20,726,000.00
20,726,000.00
11
S1
8,125,000.00 3,250,000.00 5,687,500.00
812,500.00
1,706,250.00
19,581,250.00
19,582,000.00
10
S1
7,650,000.00 3,060,000.00 5,355,000.00
765,000.00
1,606,500.00
18,436,500.00
18,437,000.00
9
S1
7,123,000.00 2,849,200.00 4,986,100.00
712,300.00
1,495,830.00
17,166,430.00
17,167,000.00
8
S1
6,753,000.00 2,701,200.00 4,727,100.00
675,300.00
1,418,130.00
16,274,730.00
16,275,000.00
7
S1
6,332,000.00 2,532,800.00 4,432,400.00
633,200.00
1,329,720.00
15,260,120.00
15,261,000.00
6
S1
5,884,000.00 2,353,600.00 4,118,800.00
588,400.00
1,235,640.00
14,180,440.00
14,181,000.00
5
S1
5,408,000.00 2,163,200.00 3,785,600.00
540,800.00
1,135,680.00
13,033,280.00
13,034,000.00
4
S1
4,960,000.00 1,984,000.00 3,472,000.00
496,000.00
1,041,600.00
11,953,600.00
11,954,000.00
3
S1
4,512,000.00 1,804,800.00 3,158,400.00
451,200.00
947,520.00
10,873,920.00
10,874,000.00
2
S1
3,244,000.00 1,297,600.00 1,622,000.00
324,400.00
616,360.00
7,104,360.00
7,105,000.00
1
S1
2,798,000.00 1,119,200.00 1,399,000.00
279,800.00
531,620.00
6,127,620.00
6,128,000.00
1
D3
2,163,000.00
865,200.00 1,081,500.00
216,300.00
410,970.00
4,736,970.00
4,737,000.00
2
STM
1,782,000.00
712,800.00
891,000.00
178,200.00
338,580.00
3,902,580.00
3,903,000.00
2
S1
1,654,000.00
661,600.00
827,000.00
165,400.00
314,260.00
3,622,260.00
3,623,000.00
1
S1
1,591,000.00
636,400.00
795,500.00
159,100.00
302,290.00
3,484,290.00
3,485,000.00
2
D3
1,527,000.00
610,800.00
763,500.00
152,700.00
290,130.00
3,344,130.00
3,345,000.00
4
SMA/SMK
1,495,000.00
598,000.00
747,500.00
149,500.00
284,050.00
3,274,050.00
3,275,000.00
2
S1
1,463,000.00
585,200.00
731,500.00
146,300.00
277,970.00
3,203,970.00
3,204,000.00
1
S1
1,399,000.00
559,600.00
699,500.00
139,900.00
265,810.00
3,063,810.00
3,064,000.00
2
D3
1,311,000.00
524,400.00
655,500.00
131,100.00
249,090.00
2,871,090.00
2,872,000.00
4
SMA/SMK
1,311,000.00
524,400.00
655,500.00
131,100.00
249,090.00
2,871,090.00
2,872,000.00
AHLI MADYA
AHLI MUDA
5
KOTA DPS 2019
12
B TENAGA AHLI DENGAN PENDIDIKAN S1 1
AHLI UTAMA
2
AHLI MADYA
3
AHLI MUDA
4
AHLI PRATAMA SUB PR0FESIONAL STAF (Surveyor, Inspector, Lab Technition, Cad Operator)
5
C TENAGA PENDUKUNG Sekretaris, Tenaga Administrasi / 1 operator komputer
2 Sopir, Pekerja, Office Boy
KETERANGAN : AHLI
SUB PROFESIONAL STAF DAN PENDUKUNG
- Gaji Dasar (GD)
- Gaji Dasar (GD)
- Beban Biaya Sosial (BBS) =
0.40
x GD
- Beban Biaya Sosial (BBS) =
0.30
x GD
- Beban Biaya Umum (BBU) =
0.70
x GD
- Beban Biaya Umum (BBU) =
0.50
x GD
- Tunjangan Penugasan (TP)=
0.10
x GD
- Tunjangan Penugasan (TP)=
0.10
x GD
- Jasa / Keuntungan
0.10 x (GD + BBS + BBU)
- Jasa / Keuntungan
0.10 x (GD + BBS + BBU)
=
=
BIAYA TIDAK LANGSUNG PERSONIL SEWA 1 2 3 4 5 6 7
SEWA MOBIL SEWA MOTOR SEWA KOMPUTER DAN PRINTER SEWA KANTOR (DILUAR SARBAGITA) SEWA ALAT UKUR DAN GPS, BB, SONDIR SEWA ALAT BORING (MEKANIS) SEWA ALAT SPT
BIAYA LAPORAN Rp. Rp. Rp. Rp. Rp. Rp. Rp.
5,500,000.00 550,000.00 950,000.00 3,000,000.00 550,000.00 1,250,000.00 400,000.00
/ BULAN / BULAN / BULAN / BULAN / HARI / HARI / HARI
LAPORAN PENDAHULUAN LAPORAN BULANAN LAPORAN TRIWULAN LAPORAN AKHIR LAINNYA
Rp. Rp. Rp. Rp.
100,000.00 / BUKU 100,000.00 Menyesuaikan 100,000.00 / BUKU 150,000.00 / BUKU
8 SEWA ALAT DCP 9 SEWA TRUK + BEBAN
-
-
Catatan : Biaya Personil berdasarkan Pengalaman Kerja dimaksud : dihitung dari Tahun mulai bekerjanya/ Hasil Karya yang telah dihasilkan Biaya Non Personil mengacu kepada Survey Pasar Tenaga Pendukung menyesuaikan dengan Upah Minimum Kabupaten (UMK) Kabupaten Badung Tahun 2017 sebesar: Rp. 2.299.311,-
Rp. Rp.
350,000.00 / HARI 2,000,000.00 / HARI
ATK Maksimum KOMUNIKASI KANTOR
Rp. Rp.
2,500,000.00 Menyesuaikan 700,000.00 / BULAN
Mangupura, Januari 2019 Kepala Dinas Pekerjaan Umum dan Penataan Ruang Kabupaten Badung
Ida Bagus Surya Suamba, ST.MT Pembina Utama Muda NIP. 19720916 199703.1.004
ANALISA BIAYA NON PERSONIL NO
URAIAN
A I
C
Jasa Tenaga Ahli (Pengolahan data)
1 titik 1 titik
500,000.00 250,000.00
500,000.00 250,000.00
JUMLAH
750,000.00
1 ttk 2 sample
700,000.00 75,000.00
700,000.00 150,000.00 850,000.00
Tes Kadar Air Tes Berat Jenis Tes Berat Volume Tes Kuat Tekan
2 sample 2 sample 2 sample 2 sample
50,000.00 50,000.00 50,000.00 150,000.00
100,000.00 100,000.00 100,000.00 300,000.00
JUMLAH
600,000.00
3,000,000.00 JUMLAH
3,000,000.00 3,000,000.00
30 bh 30 bh
30,000.00 12,000.00
900,000.00 360,000.00
300 lbr 300 lbr
215.00 600.00
64,500.00 180,000.00
JUMLAH
1,504,500.00
1,500.00 50,000.00
90,000.00 50,000.00
JUMLAH
140,000.00
20,000.00 40,000.00
360,000.00 40,000.00 400,000.00
PENGUKURAN TOPOGRAFI SITE
1
Pengukuran Site
BIAYA KONSULTASI/PRESENTASI Biaya Konsumsi 1 Nasi Kotak 2 Snack
II
1 Ha
Biaya Penggandaan Materi
1 2
F
JUMLAH HARGA
Tes Laboratorium
1 2 3 4
E
Tes Sondir
TES BORING (Mesin) Tes Lapangan 1 Tes Boring 2 Pengambilan Sampel
II
D I
HARGA SATUAN
TES SONDIR Tes Lapangan
1 2
B I
SATUAN
Foto Copy A4 Foto Copy A3
BIAYA DOKUMENTASI 1 Cetak Foto Digital 2 Album Foto
60 lbr 1 lbr
BIAYA GAMBAR 3 DIMENSI
1 Biaya Cetak Gambar 3 D 2 Jilid
18 lbr 1 bh