JOB SAFETY ANALYSIS INSTRUCTIONS ON NEXT PAGE



LOCATION:



REQUIRED AND / OR RECOMMENDED PPE:



SEQUENCE OF BASIC JOB STEPS 1. Step 1 Prepare paper work (PTW, Method Statement)



2. Step 2 Preparation



3.



4.



5.



Step 3 Equipment



Step 4 Working



Step 5 (finishing work) Housekeeping and clean work site.



DATE:



JOB DESCRIPTION:



AREA:



- Regular PPE: coverall, Safety shoe, hard hat, safety glass, ear protection.



POTENTIAL HAZARDS



MITIGATION REQUIRED -Obtain approved shop drawing -Obtain Work Permit -Obtain approved Method of Statement



- No Drawing - No Work Permit - No Method of Statement



- No safety shoes - No safety glass - No helmet - No gloves - No safety belt



- Wear safety shoes - Wear safety glass - Wear helmet - Wear gloves - Wear safety belt



- No inspected hand tools - No inspected drilling machine. - Slip/Trip hazards - No inspected scissor lift



- Inspected hand tools - Inspected drilling machine. - Checking hazards - Inspected scissor lift



-Scissor Lift could be collapsed - Ladder may be fall down -Material & equipment and worker could be dropped out of working platform of Lift - Caused fire by spark of hand machines. - Fall from high level - Electric shock. - falling object - pinch point ?



- Scissor Lift arranged as approved type. - Keep strongly ladder - Hand tools is contained in box. -To arrange Fire Extinguisher - Using safety harness - Checking equipment before using. - using tool box - Nothing stuck at roof area



- Work area is duty - Material is not tidy



- Clean work area - Material is tidy



Prepared by Supervisor/ Engineer Review by JOTUN Supervisor/Engineer Review by: JOTUN EHS Supervisor



JSA NO.: NEW: Yes / No REVISED: Yes / No



STATUS / REMARKS



Completed all preparation works before start the work.



To prepare PPE before start the work.



To check before start the work.



Training safety rules & regulation and knowledge of contruction method for worker prior working. Inspected and tagged by MW Group



Supervisor must be checked before leave working area



Reviewed by: CM/PM Sub-Contractor: Approved by: JOTUN (Construction Manager/ Project Manager) Approved by: JOTUN EHS Manager